ITB 22-060 Morgan Falls Connector Phase 2A
This Invitation to Bid is issued by the City of Sandy Springs, Georgia for the construction of the Morgan Falls Connector Phase 2A trail project. The project encompasses the construction of an 8'-12' wide multi-use concrete trail spanning 9,914 linear feet (1.88 miles) across two separate drawing sets, incorporating 5-inch concrete and 6-inch pervious concrete surfaces, retaining walls, drainage structures, pedestrian bridges, top-down boardwalk with concrete decking, roadway realignments, landscaping, trail signage, and amenities. The trail begins at Morgan Falls Overlook Park, follows Georgia Power Road to the river onto Fulton County and Edgewater property, and ends at the intersection of Cimarron Parkway at Roswell Road. A non-mandatory pre-bid conference is scheduled for July 19, 2022 at 2:00 PM EST via Zoom. Questions must be submitted by July 25, 2022 (or August 2, 2022 per the related contract opportunity posting) at 5:00 PM through the Bonfire portal. Bids are due August 5, 2022 at 2:00 PM EST (or August 19, 2022 per the related posting) via Zoom, with bid opening occurring simultaneously. All bids must be submitted exclusively through the Bonfire Portal at https://sandysprings.bonfirehub.com/projects/70774/details, with no alternative submission formats accepted.
Bidders must meet minimum qualifications including demonstrated experience with at least three concrete trail projects of 100 feet or more, installation of 100+ feet of top-down boardwalk, and setting a 50-foot or larger pre-engineered bridge. The successful bidder must self-perform a minimum of 51% of the work using company-owned equipment and provide proof of equipment ownership and a list of completed trail projects. Performance and payment bonds are required. The project will be managed by PATH Foundation serving as Construction Manager, with contractor utilization of Procore Software for project management at no cost. Minimum equipment requirements include one 18,000 LB excavator and one 18,000 LB skid loader. All work must comply with applicable Federal and State of Georgia laws, City ordinances, and GDOT specifications. The City reserves the right to reject all bids, cancel the solicitation, and make award determinations in its sole discretion.
Text of this file
INVITATION TO BID
22-060 Morgan Falls Connector Phase 2A
BID DUE DATE & OPENING August 5, 2022, 2:00 PM EST
VIA ZOOM
https://zoom.us/j/8146434147?pwd=enE0QWhqUVJQYlJvdlVRZjdtQmorQT09 Meeting ID: 814 643 4147
Passcode: K6qKVp +13017158592 US (Washington DC)
+13126266799 US (Chicago)
+16465588656 US (New York) Passcode: 495973
NON MANDATORY PRE-BID CONFERENCE July 19, 2022, 2:00 PM EST
VIA ZOOM
https://zoom.us/j/8146434147?pwd=enE0QWhqUVJQYlJvdlVRZjdtQmorQT09 Meeting ID: 814 643 4147
Passcode: K6qKVp +13017158592 US (Washington DC)
+13126266799 US (Chicago)
+16465588656 US (New York) Passcode: 495973
QUESTIONS DUE
July 25, 2022 5:00 P.M.
Bids shall only be accepted online through the Bonfire Portal at:
https://sandysprings.bonfirehub.com/projects/70774/details
Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
GENERAL INFORMATION:
1. All communications regarding this solicitation must be with the assigned Procurement
Agent, Edward S McAdoo III, purchasing@sandyspringsga.gov.
2. All questions or requests for clarification must be sent via Bonfire under Message - Opportunity
Q&A: https://sandysprings.bonfirehub.com/projects/70774/details.
Questions are due no later than July 25, 2022, 5:00 p.m. Questions received after this date and time may not be answered.
3. Questions and clarifications will be answered in the form of an addendum. Any addenda, schedule changes and other important information regarding the solicitation related to this solicitation will be posted on Bonfire website at https://sandysprings.bonfirehub.com/projects/70774/details. It is the Offeror’s https://zoom.us/j/8146434147?pwd=enE0QWhqUVJQYlJvdlVRZjdtQmorQT09 https://zoom.us/j/8146434147?pwd=enE0QWhqUVJQYlJvdlVRZjdtQmorQT09 mailto:purchasing@sandyspringsga.gov responsibility to check the Bonfire portal for any addendum or other communications related to this solicitation.
4. The form of contract (“Model Contract”) the City intends to execute with the successful Offeror is included in this ITB. Offerors are urged to read this Model Contract, including exhibits carefully prior to submitting a bid. In general, the City is unable to negotiate or revise contract provisions.
If an Offeror believes certain contract provisions are out of date, not applicable or place an undue burden or cost on the Offeror or the City, the Offeror must address these concerns in writing during the question and answer period. The Procurement Manager will review and determine the appropriate response. If the City determines a change is warranted, an addendum will be posted to this ITB. If a firm is unwilling to execute the Model Contract, whether modified by addendum or not, a bid should not be submitted.
5. The City of Sandy Springs reserves the right to reject all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Sandy Springs.
6. The City of Sandy Springs is not responsible for any technical difficulties. It is highly recommended that all potential contractors submit their quotes prior to the due date of this solicitation.
TERMS & CONDITIONS
1. All applicable Federal and State of Georgia laws and City of Sandy Springs ordinances, licenses and regulations of all agencies having jurisdiction shall apply to Offerors throughout and are incorporated herein.
2. Professionals requiring special licenses shall be licensed in the State of Georgia, and shall be responsible for those portions of the work as may be required by law.
3. No bid shall be accepted from, and no contract will be awarded to, any person, firm, or corporation that (i) is in arrears to the City with respect to any debt, (ii) is in default with respect to any obligation to the City, or (iii) is deemed irresponsible or unreliable by the City.
4. The City shall be able to request of an Offeror satisfactory evidence that it has the necessary financial resources to accomplish the requirements of the contract.
5. From the date this ITB is issued until a firm is selected, Offerors are not allowed to communicate with any staff or elected officials of the City regarding this solicitation, except at the direction of
Edward S McAdoo III, Procurement Agent in charge of this solicitation. Any unauthorized contact may disqualify the Offeror from further consideration. Contact information for the single point of contact is as follows:
Edward McAdoo III, Procurement Agent
City of Sandy Springs
1 Galambos Way
Sandy Springs, Georgia 30328
Email: purchasing@sandyspringsga.gov
6. While the City has every intention to make an award as a result of this solicitation, issuance of the
ITB in no way constitutes a commitment by the City to award and execute a contract. Upon a determination such actions would be in its best interest, the City, in its sole discretion, reserves the right to:
mailto:purchasing@sandyspringsga.gov
a. Cancel or terminate this ITB at any time. A notice of cancellation will be issued. If the
RFP is cancelled, the City will not reimburse any Offeror for preparation of its
Proposal. Proposals may be returned upon request if unopened;
b. Reject any or all Proposals received, make a contract award based directly on the
Proposals received in the best interest of the City, in its sole discretion, or enter into further discussions with one (1) or more Offerors;
c. Waive and/or amend any undesirable, inconsequential, or inconsistent provisions/specifications of this RFP which would not have significant impact on any
Proposal;
d. Make partial award or no award if it is in the best interest of the City to do so; and
e. Terminate any contract if the City determines adequate funds are not available.
DEFINITIONS
SSPWD: Sandy Springs Public Works Department
GDOT: Georgia Department of Transportation
ADA: Americans with Disabilities Act. The federal act that gives civil rights protections to the disabled similar to those provided to individuals based on race, color, sex, national origin, age and religion. It guarantees equal opportunity for individuals with disabilities in public accommodations, employment, transportation, state and local government services and telecommunications.
CONTRACT DOCUMENTS: Contract Agreement. General Conditions, Appendices, Special Provisions, Technical Specifications, Drawings and Plans, Bidding Documents, Exhibits
EA: Each
GAL: Gallon
LF: Lineal Feet
LS: Lump Sum
SY: Square Yard
TN: Ton
OWNER: City of Sandy Springs
Contractor: The Prime Contractor for the Construction
Project. DOL: U.S. Department of Labor
EXHIBIT A
TO CONTRACT AGREEMENT
PROJECT DESCRIPTION/SCOPE OF WORK
Morgan Falls Connector Phase 2A- Georgia Power
Morgan Fall Connector Phase 2A- Edgewater Apts
This trail project is being built on private properties where the City of Sandy Springs has acquired easements. The project begins at Morgan Falls Overlook Park and follows the
Georgia Power Road to the river onto Fulton County property, Edgewater property and ends at the intersection of Cimarron Parkway at Roswell Road. The project is 2 sets of drawings for a total distance of 9914 linear feet or 1.88 miles.
The projects consist of the construction of a 8’-12’ wide multi-use, 5 inch concrete & 6 inch pervious concrete trail, retaining walls, drainage structures, pedestrian bridges, top-down boardwalk with concrete decking, roadway realignments, landscaping, trail signage, and amenities for the City of Sandy Springs, Sandy Springs, Georgia.
MINIMUM QUALIFICATIONS
Each bidder shall have the minimum experience set forth in this ITB. We are looking for well-qualified contractors who have built a minimum of three (3) concrete trail projects, 100 feet or more top-down boardwalk and set a 50 foot or more pre-engineered bridge. The successful Bidder shall self-perform a minimum of 51% of the work in this contract with equipment owned by the organization. Successful Bidder must provide proof of company owned equipment and a list trail projects. The Bidder shall not subcontract, transfer, assign, or otherwise dispose of the contract or any portion thereof, without the written consent of the City.
PROJECT TECHNICAL SPECIFICATIONS FOLLOW GDOT SPECIFICATIONS
(The written descriptions of each section can be downloaded from this link) http://www.dot.ga.gov/PS/Business/Source
SPECIAL PROVISIONS
PERVIOUS CONCRETE
GDOT Section 439
CROSSWALK STRIPING MMA
GDOT Section 652
PEDESTRIAN BRIDGE
GDOT Section 534
CITY TRAIL SIGNAGE - 636
GDOT Sections:107,500,636,855,870,910,912,914,916
CITY BOLLARDS - 900
GDOT Sections: 500, 515, 603, 900
CITY TRAIL SIGN POST
GDOT Sections: 500, 502, 636, 860, 861, 862, 863, 911 http://www.dot.ga.gov/PS/Business/Source
CONSTRUCTION MANAGEMENT
The PATH Foundation will represent the City for all Construction Management Services.
The contractor will be required to manage the project using Procore Software. PATH
Foundation will host the software at No cost to the contractor. A City engineering inspector
(CEI) may periodically monitor construction activities.
1. There is no City furnished equipment to be installed by the contractor.
2. Bonds will be required for this project
COMPANY OWNED EQUIPMENT FORM
REGISTRATION NUMBER DESCRIPTION (Do not include work trucks)
MINIMUM EQUIPMENT REQUIRED FOR THIS PROJECT:
1. 18000 LB EXCAVATOR – 1
2. 18000 LB SKID LOADER – 1
'Tony Mado re' <tony @kai zenc ollab orativ e.co m>;
'Alliso n
Clark e'
<allis on.cl arke
@kai zenc ollab orativ e.co m>;
greta @pat hfoun datio n.org;
Ciacc io, Steve <SCi accio @Sa ndyS pring sga.g ov>;
Miss el, Kerry <KMi ssel
@Sa ndyS pring sga.g ov>;:
'Tony Mado re' <tony @kai zenc ollab orativ e.co m>;
'Alliso n
Clark e'
<allis on.cl
BIDDING INSTRUCTIONS
Failure to submit the following bid documents may result in the bid being deemed non-responsive and the bid shall be rejected:
City Bid Form City Qualification Signature and Certification Form
Bid Schedule Bid Price Certification
E-verify Affidavit under O.C.G.A. 13-10-91(b)(1) Addenda Acknowledgment
Subcontractor List Bid Bond
Upon award of contract the following items shall also be submitted:
Certification of Sponsor Drug Free Workplace Georgia Security Immigration Compliance Act Affidavit Certificate of Insurance Notice to Contractors Compliance with Electrical Safety Provisions Affidavit verifying Status for City Public Benefit Application Corporate Certificate
Payment Bond Performance Bond
BID FORM
(Bidder to sign and return)
TO: PURCHASING MANAGER
CITY OF SANDY SPRINGS
SANDY SPRINGS, GEORGIA 30350
Ladies and Gentlemen:
In compliance with your Invitation To Bid, the undersigned, hereinafter termed the Bidder, proposes to enter into a Contract with the City of Sandy Springs, Georgia, to provide the necessary machinery, tools, apparatus, other means of construction, and all materials and labor specified in the Contract Documents or as necessary to complete the Work in the manner therein specified within the time specified, as therein set forth, for:
ITB 22-060 Morgan Falls Connector Phase 2A
The Bidder has carefully examined and fully understands the Contract, Specifications, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, has satisfied himself as to the actual conditions and requirements of the Work, and hereby proposes and agrees that if his bid is accepted, he will contract with the City of Sandy Springs in full conformance with the Contract Documents.
Unless otherwise directed, all work performed shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition). All materials used in the process of completion of the work included in the Contract will be furnished from Georgia Department of Transportation certified suppliers only.
It is the intent of this Bid to include all items of construction and all Work called for in the Specifications, or otherwise a part of the Contract Documents.
In accordance with the foregoing, the undersigned proposes to furnish and construct the items listed in the attached Bid schedule for the unit prices stated.
The Bidder agrees that the cost of any work performed, materials furnished, services provided or expenses incurred, which are not specifically delineated in the Contract Documents but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled.
The Bidder further proposes and agrees hereby to promptly commence the Work with adequate forces and equipment within ten (10) calendar days from receipt of Notice to Proceed and to complete all Work within three hundred and sixty-five (365) calendar days from the initial Notice to Proceed.
The Bidder shall be responsible for installing and maintaining the “Best Management Practices” (BMP’s) throughout the term of the project.
If this bid shall be accepted by the City of Sandy Springs and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Contract, and give satisfactory Performance and Payment Bonds, or furnish satisfactory proof of carriage of the insurance required within ten days from the date of Notice of Award of the Contract, then the City of Sandy Springs may, at its option, determine that the undersigned abandoned the Contract and there upon this bid shall be null and void, and the sum stipulated in the attached Bid Bond or certified check shall be forfeited to the City of Sandy Springs as liquidated damages.
Bidder acknowledges receipt of the following addenda:
Addendum No. Date Received
Bidder further declares that the full name and resident address of Bidder’s Principal is as follows:
Signed, sealed, and dated this day of
Bidder:
Company Name
Seal
Bidder Mailing Address:
By:
Title: _
By:
Title:
QUALIFICATIONS SIGNATURE AND CERTIFICATION
(Bidder to sign and return)
I certify that this offer is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the proposal and certify that I am authorized to sign this proposal for the proposer. I further certify that the provisions of the Official Code of Georgia Annotated, Sections 45-10-20 et. seq., have not been violated and will not be violated in any respect.
Authorized Signature Date_
Print/Type Name_______________________________________________________
Email Address
Print/Type Company Name Here_
REQUESTTFOR REFERENCES
INVITATION TO BID #22-060
MORGAN FALLS CONNECTOR PHASE 2A
All references must be from customers for whom your company has provided projects completed in the last five years of similar scope and services as the specifications of Invitation to Bid #22-060 MORGAN FALLS
CONNECTOR PHASE 2A
References for: _______________________________________
(Company Name)
1. Company __________________________________________________________________________________________
Street Address ________________________________________________________________________________________
City, State & Zip _______________________________________________________________________________________
Contact Person Name_______________________________ Phone______________________________________________
Email address_________________________________________________________________________________________
Describe specific job performed and date: _________________________________________________________________
2. Company__________________________________________________________________________________________
Street Address ________________________________________________________________________________________
City, State & Zip _______________________________________________________________________________________
Contact Person Name________________________________ Phone_____________________________________________
Email address_________________________________________________________________________________________
Describe specific job performed and date: __________________________________________________________________
3. Company __________________________________________________________________________________________
Street Address ________________________________________________________________________________________
City, State & Zip _______________________________________________________________________________________
Contact Person Name ______________________________ Phone ______________________________________________
Email address_________________________________________________________________________________________
Describe specific job performed and date: __________________________________________________________________
BID SCHEDULE
Sandy Springs - Morgan Falls Connector Georgia Power- Quantities for Bid
DATE 6/20/2022
SECTION A: TRAIL AND ROADWAY
Item Number
Quantity Units Item Description Unit Price
Cost
150-1000 1 LS TRAFFIC CONTROL
210-0100 1 LS GRADING COMPLETE (INCLUDING DEMOLITION & TREE REMOVALS)
310-5080 1220 SY GR AGGR SUBBASE CRS,8 IN, INCL MATL, (HEAVY DUTY TYP)
441-0105 1245 SY CONCRETE TRAIL, 5IN, 3000 PSI, MED BROOM FINISH, INCL ADA RAMPS
AND PADS (YELLOW)
441-0106 1220 SY CONCRETE, 6IN, 3000 PSI, MED BROOM FINISH, (HEAVY DUTY TYP)
444-1000 2000 LF SAWED JOINTS IN NEW TRAIL&SIDEWALK PAVEMENTS @ 10' O.C.
457-1005 350 SY GEO GRID BIAXAL (TENSAR BX1 100)- WET AREAS AS DIRECTED ONLY
222-1002 275 SY #57 STONE (CLEAN), 6 IN, (ROOT BRIDGING AREAS)
603-7000 275 SY PLASTIC FILTER FABRIC (ROOT BRIDGING AREAS)
643-8200 510 LF BARRIER TREE FENCE (ORANGE), 4 FT
310-5080 1430 SY GR AGGR SUBBASE CRS,8 IN, INCL MATL (INCL DRIVEWAYS AND OTHER
AREAS)
402-4012 140 TN 4 IN RECYCLED ASPH CONC 19 MM SUPERPAVE, TYPE II, GP 2 ONLY, INCL
BITUM MATL & H LIME
402-4506 70 TN 2 IN RECYCLED ASPH CONC 9.5 MM SUPERPAVE, TYPE II, GP 2 ONLY,
INCL BITUM MATL & H LIME
413-1000 66 GL BITUM TACK
432-0208 620 SY FULL DEPTH MILL ASPH CONC PVMT
441-0018 305 SY DRIVEWAY CONCRETE,8IN
441-5002 950 LF CONCRETE HEADER CURB, 6 IN, TP 2
441-5012 55 LF CONCRETE HEADER CURB, 12 IN MAX, TP 2
441-6718 890 LF CONC CURB & GUTTER, 6 IN X 24 IN, TP ROLL
441-9000 5 EA CONCRETE WHEEL (10FT)
515-1000 8 EA METAL SIGN POST SQ, 8FT, PER TRAIL SIGN DETAIL
636-1033 13 SF MUTCD HIGHWAY SIGNS
636-1041 75 SF TRAIL SIGNAGE, DIRECT PRINT PER SPECIFICATIONS
636-3010 42 LF MUTCD HIGHWAY SQ. POST. 14 FT, BREAKAWAY
652-6501 1945 LF MMA SKIP TRAF STRIPE, 4 IN, YELLOW (TRAIL CL)
Section A Subtotal
SECTION B: STRUCTURAL ITEMS
Item Number
Quantity Units Item Description Unit Price
Cost
500-3800 110 CY RETAINING WALL ASHLAR FINISH (STA 8+75 - 10+05)
Section B Subtotal
SECTION C: EROSION CONTROL/STORM DRAINAGE
Number
Quantity Units Item Description Unit Price
Cost
163-0300 2 EA CONSTRUCTION EXIT
163-0301 12 MO EROSION CONTROL INSPECTIONS, WEEKLY AND MONTHLY
163-0402 1 LS TEMPORARY CONC. WASHDOWN
163-0542 2 LS CONSTRUCT AND REMOVE STONE FILTER RING
163-0529 3373 LF CONSTRUCT AND REMOVE TEMPORARY SEDIMENT BARRIER, TYPE S
163-0550 1 EA CONSTRUCT AND REMOVE INLET SEDIMENT TRAP, TYPE F
163-0550 2 EA CONSTRUCT AND REMOVE INLET SEDIMENT TRAP, TYPE P
165-0030 3373 LF MAINTENANCE OF SILT FENCE
165-0101 2 EA MAINTENANCE OF CONSTRUCTION EXIT
165-0105 3 LS MAINTENANCE OF INLET SEDIMENT TRAP
167-1000 12 MO WATER QUALITY MONITORING AND SAMPLING
700-6910 1.2 AC PERMANENT GRASSING
700-8000 1.2 AC FERTILIZER MIX GRADE
716-2000 220 SY EROSION CONTROL MATS, SLOPES
203-2000 10 LF CORE DRILL EXISTING 36IN PIPE
550-1180 22 LF STORM DRAIN PIPE, 18 IN, RCP, H 1-10
550-1240 58 LF STORM DRAIN PIPE, 24 IN, RCP, H 1-10
550-1300 294 LF STORM DRAIN PIPE, 30 IN, RCP, H 1-10
550-1360 242 LF STORM DRAIN PIPE,36 IN, RCP, H 1-10
550-4224 3 EA FES, 24IN HDPE
668-5000 4 EA JUNCTION BOX (1011A)
668-1100 2 EA SINGLE WING CATCH BASIN (1033 G)
668-2000 3 EA PEDESTAL TOP (48IN)
668-2100 1 EA GRATE INLET (1019B)
603-1300 18 SY TYPE 3 RIP RAP 6"-8"
603-2997 18 SY FILTER BLANKET
Section C Subtotal
SECTION D: LANDSCAPE & REVEGETATION
Number
Quantity Units Item Description Unit Price
Cost
643-0000 1 LS ELECTRIC CANTILEVER GATE CHAINLINK VEHICULAR AND TRAIL GATE
SYSTEM 36FT,(STA. 8+75), INCL MATL
643-8400 4 EA 6' CHAIN LINK GATE , BLACK VINYL COATED, 9 GA, 8FT GATE (16 FT
OPENING)
643-8400 2 EA 6' CHAIN LINK GATE , BLACK VINYL COATED, 9 GA, 10FT GATE (20 FT
OPENING)
643-8400 952 LF 6' CHAIN LINK FENCE , BLACK VINYL COATED, 9 GA
700-9300 1,800 SY SOD
700-9401 3 EA SCARLET OAK, 4" CAL.
700-9402 8 EA SERVICEBERRY, 3" CAL
700-9403 8 EA EASTERN REDBUD 'MERLOT', 3" CAL
700-9404 3 EA APPALACHIAN SPRING DOGWOOD, 3" CAL
700-9405 5 EA SWEETSPIRE, 5 GAL
700-9406 12 EA DWARF WALTERS VIBURNUM, 5 GAL
700-9407 10 EA AMERICAN BEAUTYBERRY, 3 GAL
700-9408 75 EA INDIANGRASS, 5 GAL
700-9409 15000 SF STREAMSIDE NATIVE GRASS & WILD FLOWERS MIXED SEED & PLUGS
(PER PLAN)
700-9410 96 EA ELIJAH BLUE FESCUE, 1 GAL
900-0526 4 EA FIXED STEEL BOLLARDS , INCL FOOTER
900-0527 7 EA REMOVABLE STEEL BOLLARDS, INCL ALL ATTACHMENTS
900-0528 1 EA BENCH
900-0529 1 EA TRASH RECEPTACLE
900-0530 1 EA BIKE RACK
900-0540 1 EA JAZZY DELUXE PULL DOG STATION
Section D Subtotal
SECTION A: ROADWAY AND TRAIL
SECTION D: LANDSCAPE
TOTAL:
Sandy Springs - Morgan Falls Connector 2A - Edgewater Apts- Quantities for Bid
DATE 6/20/2022
SECTION A: TRAIL AND ROADWAY
Item Number
Quantity Units Item Description Unit Price
Cost
150-1000 1 LS MOBILIZATION
150-1000 1 LS TRAFFIC CONTROL
210-0100 1 LS GRADING COMPLETE (INCLUDING DEMOLITION & TREE REMOVALS)
222-1002 1,640 SY #57 STONE 3 IN, (PERVIOUS CONCRETE)
310-5080 2000 SY GR AGGR SUBBASE CRS,8 IN, INCL MATL (HEAVY DUTY TRAIL)
439-0300 14436 SF PERVIOUS CONCRETE TRAIL, 6IN, 3000 PSI, ADA PADS (YELLOW)
441-0106 2000 SY CONCRETE TRAIL, 6IN, 3000 PSI, MED BROOM FINISH, ADA PADS,
(HEAVY DUTY TYP)
441-0105 1340 SY CONCRETE TRAIL, 5IN, 3000 PSI, MED BROOM FINISH, ADA PADS
(YELLOW) -1470
444-1000 7971 LF SAWED JOINTS IN CONCRETE TRAIL&SIDEWALK PAVEMENTS @ 10'-12'
O.C.
457-1005 1604 SY GEO GRID BIAXAL (TENSAR BX1 100)- PERVIOUS CONCRETE
222-1002 216 SY #57 STONE (CLEAN), 6 IN, (ROOT BRIDGING AREAS)
603-7000 216 SY PLASTIC FILTER FABRIC (ROOT BRIDGING AREAS)
643-8200 2300 LF BARRIER TREE FENCE (ORANGE), 4 FT
400-0000 1 LS RECONSTRUCT ASPH SPEED HUMP, PER PLANS
441-6718 1505 LF CONC CURB & GUTTER, 6 IN X 24 IN, TP ROLL TO MATCH EXIST.
441-5001 340 LF CONCRETE HEADER CURB, 6 IN, TP 2
441-5002 23 LF CONCRETE HEADER CURB, 9-12 IN, TP 2 (CHEEK WALL)
611-8120 6 EA ADJUST EXISTING UTILITY VAULT, METER, BOX , OR VALVE TO FINAL
GRADE (COM, IR, WATER, ETC.)
611-8050 3 EA ADJUST EXISTING MANHOLE TO GRADE
682-9950 180 LF DIRECTIONAL BORE CONDUIT NM TP2, 2IN, 18IN DEPTH- 2 LINES
668-6222 9966 LF CONDUIT NM TP2, 2IN, 18IN DEPTH, INCL WIRE TRACE (LIGHTS BY
GEORGIA POWER)
668-6222 5976 LF CONDUIT NM TP2, 2IN, INCL WIRE TRACE (UNDER BOARDWALK INCL
ELBOWS) 2-LINES
682-9022 52 EA UTILITY BOXES ON BOARDWALK AND TRAIL LIGHTS
515-1000 23 EA ALUMINUM SIGN POST SQ, 8FT, PER TRAIL SIGN DETAIL
515-1000 3 EA CUSTOM METAL SIGN POST ATTACHEMENT ON BOARDWALK, PER
DETAIL
636-1033 53 SF HIGHWAY SIGNS TP9 MAT
636-1041 208 SF TRAIL SIGNAGE, DIRECT PRINT PER SPECIFICATIONS
636-3010 70 LF HIGHWAY SIGNS POST SQUARE STEEL TUBE W/ BREAKAWAY SLEVE
652-0105 12 EA MMA PAVEMENT MARKING, BIKE SHARED LANE SYMBOL, INCL ARROWS
(SHARROW)
652-6501 3985 LF MMA SKIP TRAF STRIPE, 4 IN, YELLOW (TRAIL CL)
653-2804 10 SY MMA CROSSWALK TRAF STRIPING, WHITE,
653-2804 40 SY MMA CROSSWALK TRAF STRIPING, GREEN,
653-1704 25 LF THERMOPLASTIC SOLID TRAF STRIPE, 24 IN WHITE (STOP BARS)
652-9001 30 SY THERMOPLASTIC TRAF STRIPING, HATCH, WHITE
Section A Subtotal $0.00
Item Number
Quantity Units Item Description Unit Price
Cost
500-1005 3984 SY CONCRETE DECK COMPLETE, CLASS A, 5IN, INCL PAN, POUR STOP, MED
BROOM FINISH,
500-3800 10 CY CONC ABUTMENT WALLS (STA 40+12)
502-1200 2988 LF TOP-DOWN BOARDWALK WOOD STRUCTURE, INCL OVERLOOKS (STA
10+84 - 42+12)
515-1000 6026 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT: "CORTEN" COLOR)
607-3000 62 SF GRANITE VENEER (ABUTMENT WALLS)
500-3800 25 CY CONC ABUTMENT WALLS (STA 43+57, 44+32)
515-1000 630 LF HELICAL PIERS
534-1000 1 LS PRE-ENGINEERED TRAILBLAZER BRIDGE, 75 LF("CORTEN") STA 43+57 -
STA 44+32
500-3800 4 CY SPILLWAY BRIDGE APPROACH/ABUTMENT WALLS (STA 10+50)
607-3000 36 SF GRANITE VENEER (ABUTMENT WALLS)
515-1000 92 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT: "CORTEN" COLOR)
534-1000 27 LF SPILLWAY BRIDGE - (BUILT IN PLACE OR PRE-ENGINEERED, STA 10+55 -
STA 10+80)
500-3107 7 CY RETAINING WALL (STA 7+08 -8+15)
516-0001 89 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT: "CORTEN" COLOR)
607-3000 752 SF GRANITE VENEER (ON WALL)
500-3107 111 CY RETAINING WALL (STA 7+80 - 9+45)
516-0001 185 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT: "CORTEN" COLOR)
607-3000 752 SF GRANITE VENEER (ON WALL)
500-3107 211 CY RETAINING WALL STA 100+65 - 103+95 (SPUR TRAIL)
516-0001 330 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT: "CORTEN" COLOR)
607-3000 1400 SF GRANITE VENEER (ON WALL -330 LF)
500-3107 91 CY TURNDOWN WALL (STA 42+62 - 43+57) W/ GRANITE VENEER, (101 LF)
516-0001 141 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT: "CORTEN" COLOR)
607-3000 845 SF GRANITE VENEER
500-3107 20 CY STA 49+60 -51+15 GRAVITY WALL FOOTING, PER DETAIL, 155 FT
607-1000 73 CY STA 49+60 -51+15 GRAVITY WALL, MORTOR RUBBLE STONE, PER
DETAIL, 155 FT
500-3800 43 CY STA 53+15 - 53+46 CUSTOM STRUCTURAL SPAN/CANTILEVER SLAB, 31
FT
500-3107 19 CY STA 58+25 - 58+63, TURNDOWN WALL W/ ASHLAR FINISH, 38 FT
Section B Subtotal $0.00
Number
Quantity Units Item Description Unit Price
Cost
163-0300 6 EA CONSTRUCTION EXIT
163-0301 12 MO EROSION CONTROL INSPECTIONS, WEEKLY AND MONTHLY
163-0402 1 LS TEMPORARY CONC. WASHDOWN
163-0528 3384 LF CONSTRUCT AND REMOVE TEMPORARY SEDIMENT BARRIER, TYPE C
163-0529 5550 LF CONSTRUCT AND REMOVE TEMPORARY SEDIMENT BARRIER, TYPE S
163-0550 2 EA CONSTRUCT AND REMOVE INLET SEDIMENT TRAP, TYPE P
165-0030 1000 LF MAINTENANCE OF EROSION CONTROL FENCE
165-0101 6 EA MAINTENANCE OF CONSTRUCTION EXIT
165-0105 2 EA MAINTENANCE OF INLET SEDIMENT TRAP
167-1000 12 MO WATER QUALITY MONITORING AND SAMPLING
700-6910 3 AC PERMANENT GRASSING
700-8000 3 AC FERTILIZER MIX GRADE
716-2000 490 SY EROSION CONTROL MATS, SLOPES
611-3000 2 EA RECONSTRUCT CB TOP INCL CONCRETE FLUME
550-1180 60 LF STORM DRAIN PIPE, 18 IN, HDPE, H 1-10
550-4218 4 EA FES, 18IN HDPE
603-1300 18 SY TYPE 3 RIP RAP 6"-8"
603-2997 18 SY FILTER BLANKET
Section C Subtotal
SECTION D: LANDSCAPE & REVEGETATION
Number
Quantity Units Item Description Unit Price
Cost
900-0526 8 EA FIXED STEEL BOLLARD
900-0527 6 EA REMOVABLE STEEL BOLLARDS, INCL ALL ATTACHMENTS
900-0528 7 EA FLEXIBLE BOLLARD DELINEATOR
900-0528 8 EA BENCH
900-0529 4 EA TRASH RECEPTACLE
754-4100 2 EA JAZZY DELUXE PULL DOG STATION
700-9400 4 EA GINKO BILOBA (MALE ONLY), 4" CAL..
700-9400 5 EA SCARLET OAK, 4" CAL.
700-9400 4 EA RED MAPLE 'AUTUMN BLAZE', 4" CAL.
700-9400 11 EA SERVICEBERRY, 3" CAL.
700-9400 7 EA EASTERN REDBUD 'MERLOT', 3" CAL.
700-9400 6 EA SWEETSPIRE, 5 GAL.
700-9400 12 EA DWARF WALTERS VIBURNUM, 5 GAL.
700-9400 20 EA STREAMSIDE TREES 7 GAL
700-9400 44 EA STREAMSIDE SHRUBS 3 GAL.
700-9400 81 EA INDIANGRASS, 5 GAL.
700-9400 27 EA HAPPY RETURN DAYLIILY, 1 GAL.
700-9400 498 EA ELIJAH BLUE FESCUE, 1 GAL.
700-9400 32401 SF STREAMSIDE NATIVE GRASS & WILD FLOWERS MIXED SEED & PLUGS
(PER PLAN)
700-9400 1,800 SY SOD
Section D Subtotal
SECTION A: TRAIL AND ROADWAY
SECTION A: STRUCTURAL ITEMS
SECTION B: STRUCTURAL ITEMS BRIDGE & WALLS
SECTION D: LANDSCAPE & REVEGATATION
TOTAL:
BID PRICE CERTIFICATION
In compliance with the attached Specification, the undersigned offers and agrees that if this Bid is accepted, by the City Council within one hundred and twenty (120) days of the date of Bid opening, that he will furnish any or all of the Items upon which Prices are quoted, at the Price set opposite each Item, delivered to the designated point(s) within the time specified in the Bid Schedule.
TOTAL BID PRICE: ______________________________________________________________
TOTAL BID PRICE IN WORDS: _____________________________________________________
COMPANY: ___________________________________________________________________
ADDRESS: ____________________________________________________________________
AUTHORIZED SIGNATURE: _______________________________________________________
EMAIL ADDRESS: _______________________________________________________________
PRINT / TYPE NAME: ____________________________________________________________
BID BOND
(BID BOND TO BE RETURNED WITH BID)
KNOW ALL MEN BY THESE PRESENTS, THAT _________________ __________________
(Name of Contractor)_________________ (Address of Contractor) at __________________________________
(Corporation, Partnership and or Individual) hereinafter called Principal, and ________________ (Name of Surety) (Address of Surety
A corporation of the State of _________________, and a surety authorized by law to do business in the State of Georgia, hereinafter called Surety, are held and firmly bound unto
The City of Sandy Springs Georgia
1 Galambos Way, Sandy Springs, Georgia 30328 herein after referred to as Obligee, in the penal sum of____________________________________ Dollars ($ _______________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
WHEREAS, the Principal is about to submit, or has submitted, to the City of Sandy Springs, Georgia, a proposal for furnishing materials, labor and equipment for:
22-060 MORGAN FALLS CONNECTOR PHASE 2A
WHEREAS, the Principal desires to file this Bond in accordance with law in lieu of a certified Bidder’s check otherwise required to accompany this Proposal.
NOW, THEREFORE, the conditions of this obligation are such that if the bid is accepted, the Principal shall within ten days after receipt of notification of the acceptance execute a Contract in accordance with the Bid and upon the terms, conditions, and prices set forth in the form and manner required by the City of Sandy Springs, Georgia, and execute a sufficient and satisfactory Performance Bond and Payment Bond payable to the City of Sandy Springs, Georgia, each in an amount of 100% of the total Contract Price, in form and with security satisfactory to said the City of Sandy Springs, Georgia, and otherwise, to be and remain in full force and virtue in law; and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the City of Sandy Springs, Georgia, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.
PROVIDED, FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant, to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as Amended, including, but not limited to, O.C.G.A. § 36-91-1, et. seq., and is intended to be and shall be constructed as a bond in compliance with the requirements thereof.
Signed, sealed, and dated this __________ day of ________________________________A.D., 2021
ATTEST:
(Principal Secretary) (Principal)
(SEAL) BY: ___________________________
(Witness to Principal) (Address)
(Address)
(Surety)
ATTEST
BY: _______________________________
(Attorney-in-Fact) and Resident Agent
(Attorney-in-Fact)
(Seal)
(Address)
(Witness as to Surety)
(Address)
CONTRACT AGREEMENT
For
Morgan Falls Connector Phase 2A (“Project”)
Between
CITY OF SANDY SPRINGS, GEORGIA
(“City”)
And
(“Contractor”)
ITB: 22-060
TABLE OF CONTENTS
ARTICLE I
THE CONTRACT AND THE CONTRACT DOCUMENTS
1.1 The Contract
1.2 The Contract Documents
1.3 Entire Agreement
1.4 Subletting, Assignment, or Transfer
1.5 No Privity with Others
1.6 Intent and Interpretation
1.7 Ownership of Contract Documents
1.8 Hierarchy of Contract Documents
ARTICLE II
THE WORK
2.1 Contractor Responsibility
2.2 “Work” Defined
2.3 Review of Work
2.4 Workday and Restrictions, Suspension and Interruption
2.5 Work to be Peformed by the Prime Contract
ARTICLE III
CONTRACT TIME
3.1 Time and Liquidated Damages
3.2 Substantial Completion
3.3 Time is of the Essence
ARTICLE IV
CONTRACT PRICE
4.1 The Contract Price
ARTICLE V
PAYMENT OF THE CONTRACT PRICES
5.1 Bid Schedule
5.2 Payment Procedure
5.3 Withheld Payment
5.4 Punch List
5.5 Completion and Final Payment
ARTICLE VI
THE CITY
6.1 City Responsibility
6.2 Right to Stop Work
6.3 City’s Right to Carry Out Work
ARTICLE VII
THE CONTRACTOR
7.1 Duties with Respect to Documents
7.2 Manner of Performance
7.3 Supervision
7.4 Compliance
7.5 Warranty
7.6 Permits, Inspections, Fees and Licenses
7.7 Supervision
7.8 Schedules
7.9 Contract to be Maintained at Project Site
7.10 Shop Drawings, Product Data and Samples
7.11 Cleaning the Project Site and the Project
7.12 Access to Work
7.13 Indemnity
7.14 Means, Methods, Techniques, Sequences, Procedures and Safety
7.15 Separate Contracts
7.16 Maintenance of Contract Cost Records
ARTICLE VIII
CONTRACT ADMINISTRATION
8.1 Claims by the Contractor
ARTICLE IX
SUBCONTRACTORS
9.1 Definition
9.2 Award of Subcontracts
ARTICLE X
CHANGES IN THE WORK
10.1 Changes Permitted
10.2 Change Order Defined
10.3 Changes in the Contract Price
10.4 Effect of Executed Change Order
10.5 Notice to Surety; Consent
ARTICLE XI
UNCOVERING AND CORRECTING WORK
11.1 Uncovering Work
11.2 Correcting Work
11.3 City May Accept Defective or Nonconforming Work
ARTICLE XII
CONTRACT TERMINATION
12.1 Termination by the Contractor
12.2 Termination by the City
ARTICLE XIII
INSURANCE
13.1 Insurance Requirements
ARTICLE XIV
DISPUTES
14.1 Mediation
ARTICLE XV
INDEPENDENT CONTRACTOR
15.1 Relationship between Contractor and City
ARTICLE XVI
COVENANT AGAINST CONTINGENT FEES
16.1 Warranty by Contractor
ARTICLE XVII
MISCELLANEOUS
17.1 Governing Law
17.2 Successors and Assigns
17.3 Notices
EXHIBITS
EXHIBIT A SCOPE OF SERVICES
EXHIBIT B BID SCHEDULE
EXHIBIT C BID PRICE CERTIFICATION
EXHIBIT D NOTICE TO CONTRACTORS - COMPLIANCE WITH
TITLE VI OF THE CIVIL RIGHTS ACT
EXHIBIT E CERTIFICATION OF SPONSOR DRUG-FREE WORKPLACE
EXHIBIT F CERTIFICATION OF CONTRACTOR GEORGIA SECURITY
AND IMMIGRATION COMPLIANCE ACT
EXHIBIT G INSURANCE REQUIREMENTS
EXHIBIT H LIST OF SUBCONTRACTORS
EXHIBIT I NOTICE TO CONTRACTORS COMPLAINCE WITH ELECTRICAL SAFETY PROVISIONS
EXHIBIT J AFFIDAVIT VERIFYING STATUS FOR CITY PUBLIC BENEFIT APPLICATION
EXHIBIT K CONTRACTOR AND SUNCONTRACTOR AFFIDAVIT UNDER O.C.G.A. § 13-10-91(b) (1)
EXHIBIT L CORPORATE CERTIFICATE
EXHIBIT M ADDENDUMS
EXHIBIT N BONDS
CONTRACT AGREEMENT
This Agreement is made by and between the City of Sandy Springs, a political subdivision of the State of Georgia (hereinafter referred to as the City) and ______________________(hereinafter referred to as the Contractor) under seal for construction of Morgan Falls Connector Phase 2A(hereinafter referred to as the Project);
WHEREAS, the Contractor desires to enter into this Agreement for construction of the Project and has represented to the City that it is qualified and experienced to provide such services necessary for construction of the Project (the City requires that the Contractor comply with all federal, state and local legal requirements imposed on the Project as the result of federal funding and the City has relied on such representation);
NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, it is agreed by and between the Contractor and the City as follows:
ARTICLE I
THE CONTRACT AND THE CONTRACT DOCUMENTS
1.1 The Contract
1.1.1 The Contract between the City and the Contractor, of which this Agreement is a part, consists of the Contract Documents. It shall be effective on the date this Agreement is executed by the last party to execute it.
1.2 The Contract Documents
1.2.1 The Contract Documents consist of this Agreement, General Conditions, Special Provisions, the Technical Specifications, the Drawings and Plans, Bidding Documents, all Change Orders and Field Orders issued hereafter, the base bid made by the Contractor in response to the City’s Invitation to Bid No. 22-060 (the “Bid”), and any other amendments hereto executed by the parties hereafter, together with the following (if any):
Documents not enumerated in this Paragraph 1.2 are not Contract Documents and do not form a part of this Contract.
1.3 Entire Agreement
1.3.1 The Contract Documents constitute the entire and exclusive agreement between the City and the Contractor with reference to the Project.
1.4 Subletting, Assignment, or Transfer
1.4.1 It is understood by the parties to this Agreement that the Work of the Contractor is considered personal by the City. The Contractor agrees not to assign, sublet, or transfer any or all of its interest in this Agreement without prior written approval of the City.
1.4.2 The City reserves the right to review all subcontracts prepared in connection with the Agreement, and the Contractor agrees that it shall submit to the City proposed subcontract documents together with Subcontractor cost estimates for the City’s review and written concurrence in advance of their execution.
1.4.3 All subcontracts in the amount of $10,000.00 or more shall include the provisions set forth in this Agreement.
1.5 No Privity with Others
1.5.1 Nothing contained in this Contract shall create, or be interpreted to create, privity or any other contractual agreement between the City and any person or entity other than the Contractor.
1.6 Intent and Interpretation
1.6.1 The intent of this Contract is to require complete, correct and timely execution of the Work. Any Work that may be required, implied or inferred by the Contract Documents, or any one or more of them, as necessary to produce the intended result shall be provided by the Contractor for the Contract Price, as hereinafter defined.
1.6.2 This Contract is intended to be an integral whole and shall be interpreted as internally consistent.
What is required by any one Contract Document shall be considered as required by the Contract.
1.6.3 When a word, term or phrase is used in this Contract, it shall be interpreted or construed, first, as defined herein; second, if not defined, according to its generally accepted meaning in the construction industry; and third, if there is no generally accepted meaning in the construction industry, according to its common and customary usage.
1.6.4 The words include, includes, or including, as used in this Contract, shall be deemed to be followed by the phrase, without limitation.
1.6.5 The specification herein of any act, failure, refusal, omission, event, occurrence or condition as constituting a material breach of this Contract shall not imply that any other, non-specified act, failure, refusal, omission, event, occurrence or condition shall be deemed not to constitute a material breach of this Contract.
1.6.6 Words or terms used as nouns in this Contract shall be inclusive of their singular and plural forms, unless the context of their usage clearly requires a contrary meaning.
1.6.7 The Contractor shall have a continuing duty to read, carefully study and compare each of the Contract Documents, the shop drawings and the product data and shall give written notice to the City of any inconsistency, ambiguity, error or omission which the Contractor may discover with respect to these documents before proceeding with the affected Work. The issuance or the express or implied approval by the City of the Contract Documents, shop drawings or product data shall not relieve the Contractor of the continuing duties imposed hereby, nor shall any such approval be evidence of the Contractor’s compliance with this Contract. HOWEVER, THE CITY MAKES NO REPRESENTATION OR WARRANTY OF ANY NATURE WHATSOEVER TO THE CONTRACTOR CONCERNING THE DOCUMENTS FOR THE PROJECT, INCLUDING THE DRAWINGS AND SPECIFICATIONS FOR THE PROJECT. By the execution hereof, the Contractor acknowledges and represents that it has received, reviewed and carefully examined such documents, has found them to be complete, accurate, adequate, consistent, coordinated and sufficient for construction, and that the Contractor has not, does not, and will not rely upon any representation or warranties by the City concerning such documents as no such representation or warranties have been or are hereby made.
1.6.8 Neither the organization of any of the Contract Documents into divisions, sections, paragraphs, articles, (or other categories), nor the organization or arrangement of the design, shall control the Contractor in dividing the Work or in establishing the extent or scope of the Work to be performed by Subcontractors.
1.7 Ownership of Contract Documents
1.7.1 The Contractor may be provided, have access to or become aware of the City’s Confidential Information including the City’s strategic plans, employee data, customer data and other technical and business information of the City (collectively referred to as the “Confidential Information”). The term Confidential Information includes the deliverables as well as all information generated by the Contractor that contains, references or is derived from the Confidential Information and the Services including, without limitation, the Contractor’s summaries, analysis, extracts, working papers and notes relating to the Services and the Deliverables (referred to as the “Working Papers”). The Contractor agrees not to disclose the Confidential Information to third parties without the prior written approval of the City and not to make use of the Confidential Information other than as needed to perform the Services. The Contractor further agrees that it will only disclose the Confidential Information to its personnel on a need-to-know basis solely for the performance of the Services and will protect the Confidential Information with the same degree of care that the Contractor uses to protect its own confidential information, but no less than reasonable care or as the various laws may require or impose.
All Confidential Information as well as other documents, data and information provided to the Contractor by the City is and will remain the property of the City to the extent that it was the property of the City at the time it was provided to the Contractor.
All Confidential Information shall be returned to the City by the Contractor within five (5) business days of the completion of the Services under this Contract. The Contractor will keep no copies of the Confidential Information except that the Contractor may retain one copy of the Working Papers as required by law, regulation, professional standards or reasonable business practice. If requested by the City, an officer of the Contractor will certify in writing that, to the best of his/her knowledge, information and belief, all Confidential Information and all copies thereof (except for one copy of the Working Papers) have been delivered to the City or destroyed.
The Contract Documents, and each of them, shall remain the property of the City. The Contractor shall have the right to keep one record set of the Contract Documents upon completion of the Project; provided, however, that in no event shall Contractor use, or permit to be used, any or all of such Contract Documents on other projects without the City’s prior written authorization.
1.8 Hierarchy of Contract Documents
1.8.1 In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents, the following hierarchy shall control: (a) as between figures given on drawings and the scaled measurements, the figures shall govern; (b) as between large scale drawings and small scale drawings, the large scale shall govern; (c) as between drawings and specifications, the requirements of the specifications shall govern; (d) as between the Contract Agreement and General and the specifications, the requirements of the Contract Agreement shall govern. As set forth hereinabove, any and all conflicts, discrepancies, or inconsistencies shall be immediately reported to the City in writing by the Contractor.
ARTICLE II
THE WORK
2.1 Contractor Responsibility
2.1.1 The Contractor shall perform all of the Work required, implied or reasonably inferable from, this Contract.
2.2 “Work” Defined
2.2.1 The term Work shall mean whatever is done by or required of the Contractor to perform and complete its duties under this Contract, including the following: construction of the whole or a designated part of the Project; furnishing of any required surety bonds and insurance; and the provision or furnishing of labor, supervision, services, materials, supplies, equipment, fixtures, appliances, facilities, tools, transportation, storage, power, permits and licenses required of the Contractor, fuel, heat, light, cooling and all other utilities as required by this Contract. The Work to be performed by the Contractor is generally described in Exhibit A, SCOPE OF SERVICES, attached hereto and incorporated herein.
2.3 Review of Work
2.3.1 Authorized representatives of the City and affected state or federal agencies may at all reasonable times review and inspect the activities and data collected under the terms of the Contract and any amendments thereto, including but not limited to, all reports, drawings, studies, specifications, estimates, maps, and computations, prepared by or for the City.
2.4 Workday and Restrictions, Suspension and Interruption
2.4.1 Normal workday for the Work shall be from 8:00 A.M. to 5:00 P.M. and the normal work week shall be Monday through Friday. The City will consider extended workdays or work weeks upon written request on a case-by-case basis. The City may restrict work hours in certain locations or at certain times of the day.
No work will be allowed on national holidays (i.e., Memorial Day, July 4th, Labor Day, etc.). The City may order the Contractor in writing to suspend, delay or interrupt all or any part of the Work for such period of time as it may determine appropriate for the convenience of the City. The time for completion of the Work shall be extended by the number of days the Work is suspended. The City shall not be responsible for any claims, damages or costs stemming from any delay of the Project.
2.5 Work to be Performed by the Prime Contract
2.5.1 Tasks constituting of at least fifty-one percent (51%) of the value of this contract must be performed directly by the prime contractor and shall not be sub-contracted to other firms.
2.5.2 The Contractor shall identify which tasks shall be self-performed.
ARTICLE III
CONTRACT TIME
3.1 Time and Liquidated Damages
3.1.1 The Contractor shall not proceed to furnish such services and the City shall not become obligated to pay for same until a written authorization to proceed (“Notice to Proceed”) has been sent to the Contractor from the City. The Contractor shall commence the Work no later than ten (10) days after the effective date of the Notice to Proceed and shall achieve Substantial Completion of the Work, as hereinafter defined, no later than sixty (60) Calendar Days, in accordance with the Contract Documents. The sixty (60) calendar days from the date on which the Work is permitted to proceed, through the date set forth for Substantial Completion, shall constitute the Contract Time. The Work shall be carried on expeditiously, it being understood, however, that this Agreement may be extended or continued in force by the parties hereto in writing as provided herein.
3.1.2 The Contractor shall pay the City the sum of $500.00 per day for each and every calendar day of unexcused delay in achieving Substantial Completion beyond the date set forth herein for Substantial Completion of the Work. Any sums due and payable hereunder by the Contractor shall be payable, not as a penalty, but as liquidated damages representing an estimate of delay damages likely to be sustained by the City, estimated at or before the time of executing this Contract. When the City reasonably believes that Substantial Completion will be inexcusably delayed, the City shall be entitled, but not required, to withhold from any amounts otherwise due the Contractor an amount then believed by the City to be adequate to recover liquidated damages applicable to such delays. If and when the Contractor overcomes the delay in achieving Substantial Completion, or any part thereof, for which the City has withheld payment, the City shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages.
3.2 Substantial Completion
3.2.1 Substantial Completion shall mean the stage of the work when Sandy Springs has determined all pay items are sufficiently complete allowing the newly constructed facilities to be used for their intended purpose. Partial use or occupancy of the Project shall not result in the Project being deemed substantially complete, and such partial use or occupancy shall not be evidence of Substantial Completion.
3.3 Time is of the Essence
3.3.1 All limitations of time set forth in the Contract Documents are of the essence of this Contract.
ARTICLE IV
CONTRACT PRICE
4.1 The Contract Price
4.1.1 The total contract amount for the Project (the “Contract Price”) shall be as set forth in the bid schedule (“Bid Schedule”) attached hereto as EXHIBIT B, BID SCHEDULE and incorporated herein. Payment to the Contractor pursuant to the Bid Schedule is full payment for the complete scope of services. The total contract amount shall be certified by the Bid Price Certification (“Bid Price Certification”) attached hereto as EXHIBIT C, BID PRICE CERTIFICATION and incorporated herein. Payment to the Contractor pursuant to the Bid Schedule is full payment for the complete scope of services. The Contract Price shall not be modified except by Change Order as provided in this Contract.
ARTICLE V
PAYMENT OF THE CONTRACT PRICE
5.1 Bid Schedule
5.1.1 The Contractor shall invoice and be paid pursuant to the Bid Schedule contained in the Contract Documents.
5.2 Payment Procedure
5.2.1 The City shall pay the Contract Price to the Contractor as provided below.
5.2.2 Based upon the Contractor’s invoices for payment submitted to the City, the City shall make progress payments to the Contractor on account of the Contract Price.
5.2.3 On or…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| Addendum 1 | — | |
| 22-060 Bid Tabulation | — | |
| Geotechnical Report | — | |
| Addendum 2 | — | |
| Special Provisions | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .