This Addendum 2 document supplements Invitation to Bid 22-060 for Morgan Falls Connector Phase 2A, a trail and infrastructure project administered by the City of Sandy Springs, Georgia. The project encompasses trail construction, boardwalk structures, retaining walls, storm drainage, erosion control, and landscape improvements across four major sections. Key bid items include pervious and heavy-duty concrete trail construction (14,640 square feet and 446 cubic yards respectively), a top-down boardwalk wood structure spanning stations 10+84 to 42+12, multiple retaining walls with Ashlar finishes totaling 533 cubic yards, aluminum rail cable systems, pre-engineered bridges, and associated signage and pavement markings. The addendum also addresses the Georgia Power section of the project, which includes grading, concrete trails and roadways, retaining walls, erosion control, and landscape work. The bid response due date is August 19, 2022 at 2:00 p.m. via the Bonfire Portal, with a non-mandatory pre-bid conference held on July 19, 2022 and a questions deadline of August 2, 2022 at 5:00 p.m. The project completion time is 365 calendar days, with contractor bid pricing held valid for 120 calendar days.
The addendum clarifies critical specifications and requirements through 21 numbered questions and answers addressing bid security (5% of bid bond), project completion timeframes, material specifications, and construction methodology. Significant revisions include confirmation that all exposed concrete walls require Ashlar finish rather than granite veneer, concrete deck specifications of 4 to 5 inches for the boardwalk, 8-inch Class AA concrete with welded wire mesh and 6 inches of graded aggregate base for heavy-duty surfaces, and clarification that the top-down boardwalk wood structure is paid as a lump sum rather than a unit price by linear foot. The contractor must hold a General Contractors License and follow GDOT Specification 202 for clearing and grubbing, with all trees under the boardwalk cleared and stumps left flush with the lake water line. The addendum specifies this is a unit price contract requiring use of units provided on bid schedules, confirms that preferred boardwalk contractors listed are not exclusive and alternatives may be used, and mandates that the boardwalk be constructed without lowering the lake water level using the top-down construction method shown in plans. Updated plans dated August 5, 2022, bid forms dated August 12, 2022, and geotechnical reports dated April 20, 2021 are included in the public files on Bonfire.
Text of this file
Addendum Number 2
ITB #22-060 Morgan Falls Connector Phase 2A
COMPLETE THIS ADDENDUM, SIGN and SUBMIT with the ITB
RESPONSE DUE DATE: August 19, 2022 2:00 p.m.
To All Prospective Offerors: In reference to the ITB listed above, the following answers to questions, additions, deletions, and changes are hereby incorporated into the ITB:
Q1. What is the amount of Bid Security that needs to be documented on the Bid Bond? It doesn't specify in the ITB.
Answer: The bid security is 5% of the bid bond
Q2. The notes in the Trail Lighting plan sheets state that the "Trail Lighting and associated conduit to be a bid alternate". Is this note correct and can you clarify the lighting scope?
Answer: The note is incorrect & has been revised in the updated plan set for Edgewater Apts. plan set attached. All conduit to be installed by contractor for future lighting. Quantities for conduit and electrical boxes are in the bid.
Q3. Please clarify project completion time. Completion time shows 365CD on bid doc page-7, while page-31 asking 60CD
Answer: The completion time is 365 calendar days. Contractor Bid pricing shall be held for 120 calendar days.
Q4. On Sheet S0.0, suggested top down boardwalk contractors are listed. Are these the only contractors who can perform the work or may other contractors be used?
Answer: The boardwalk contractors listed in the plans are preferred. However, contractor can use alternatives.
Q5. Can you please provide the geotechnical reports?
Answer: There will be included as part of this addendum.
Q6. Will the water level of the lake be lowered to facilitate the construction of the boardwalk?
Answer: The water level will not be lowered. Contractor is required to build boardwalk by top-down construction method as shown in the plans.
Q6. If the water level is not lowered, will there be consideration for revising the bracing requirements?
Answer: Boardwalk bracing shall be place at the waterline of the lake.
Q7. Are there any special provisions for Clearing and Grubbing?
Answer: No, contractor is required to follow GDOT Spec 202. All trees shall be cleared and mulched with in the Limits of Disturbance (LOD). All trees under boardwalk must be cleared, stumps may be left flush with lake water line.
Q8. The retaining wall details call for an Ashlar Finish, but the bid form shows all of the walls having a granite veneer. Can you please clarify which is correct and provide a detail for the granite veneer if required?
Answer: All exposed concrete walls shall be Ashlar Finish, per the plans. The bid form has been updated.
Q9. Detail 1 on S-3.6 shows a 4" elevated concrete deck for the boardwalk. The bid form calls out a 5" concrete deck. Can you please verify which is correct?
Answer: The bid form has been revised to 4”-5” concrete. Contractor shall follow structural details.
Q10. The detail for the Heavy Duty concrete pavement on the Edgewater plans shows 6" of GAB and 8" of 4000 PSI concrete while the bid form calls for 8" of GAB and 6" of 3000 PSI concrete. Can you please clarify which is correct?
Answer: Contractor shall use 8” Class AA concrete with welded wire mesh & 6” GAB. Bid forms have been updated.
Q11. Could you please clarify the limits of the pervious concrete in relation to the heavy duty concrete in the Edgewater plans? There are station callouts for the vehicular concrete that overlap with the pervious concrete hatching on CP-02.
Answer: The updated bid schedule and plans, sheet CP-02 station callouts indicate the correct locations for heavy duty vehicular concrete & pervious concrete. Heavy duty concrete is to be used, per station callouts, where the trail falls within the Fulton County sewer and force main easements.
Q12. Typically, installation of timber piles is paid for by the LF. Could a separate per LF bid item be added to separate the piles from the boardwalk bid item?
Answer: Top Down Boardwalk Wood Structure will be paid as lump sum per Stations shown in the plan set.
Q13. Can a bid item please be added for the Infiltration Trench in the Edgewater plans?
Answer: An Infiltration Trench detail has been revised on sheet CP-02A. Bid Items have been updated.
Q14. Due to the cost of Stainless Steel vs. Galvanized, would the Simpson Z-Max Coating be an approved alternate for the clips and straps on the boardwalk?
Answer: Contractor shall install clips and straps as specified in the plans. Galvanized will not be excepted.
Q15. is GC license required?
Answer: Contractor shall have a General Contractors Licenses (GC) to perform work shown in this bid.
Q16. Is there a place on site to borrow or export dirt?
Answer: No, a location is not provided to borrow or export dirt.
Q17. Can we balance the site if not?
Answer: Contractor(s) are required follow details & grade project as designed.
Q18. Is this a unit price contract or a lump sum contract?
Answer: This is a unit price contract.
Q19. Are we to use units provided on the bid schedules?
Answer: Yes, please use the units associated with the bid schedules.
Q20. Can we extend the question period?
Answer: if it is deemed necessary.
Q21. Please clarify project completion time. Completion time shows 365CD on bid doc page-7, while page-31 asking 60CD
Answer: See Response to question #3.
Document Updates:
The Geotechnical Report are included and dated 4/20/21.
Plans for Morgan Falls Connector Phase 2A Edgewater Apt dated 8/5/22. (Located in Public Files in Bonfire)
Plans for Morgan Falls Connector Phase 2A Georgia Power dated 8/5/22. (Located in Public Files in Bonfire)
Bid Form Morgan Falls Connector Phase 2A Edgewater Apt date 8/12/22.
Bid Form Morgan Falls Connector Phase 2A Georgia Power date 8/12/22.
Geotechnical Report dated 4/20/21. (Located in Public Files in Bonfire)
Bid Form Morgan Falls Connector Phase 2A Edgewater Apt dated 8/12/22.
Sandy Springs - Morgan Falls Connector 2A - Edgewater Apts- Quantities for Bid
DATE 8/12/2022
SECTION A: TRAIL AND ROADWAY
Item Number
Quantity Units Item Description Unit Price
Cost
150-1000 1 LS MOBILIZATION
150-1000 1 LS TRAFFIC CONTROL
210-0100 1 LS GRADING COMPLETE (INCLUDING DEMOLITION &
TREE REMOVALS)
222-1002 1640 SY #57 STONE 3 IN, (PERVIOUS CONCRETE)
310-5080 1980 SY GR AGGR SUBBASE CRS, 6 IN, INCL MATL (HEAVY
DUTY TRAIL)
439-0300 14640 SF PERVIOUS CONCRETE TRAIL, 6IN, 3000 PSI, ADA
PADS (YELLOW)
500-3002 446 CY CONCRETE TRAIL, 8IN, 4000 PSI, MED BROOM
FINISH, ADA PADS, (HEAVY DUTY TYP)
500-3101 225 CY CONCRETE TRAIL, 5IN, 3000 PSI, MED BROOM
FINISH, ADA PADS (YELLOW)
444-1000 7971 LF SAWED JOINTS IN CONCRETE TRAIL&SIDEWALK
PAVEMENTS @ 10'-12' O.C.
457-1005 1640 SY GEO GRID BIAXAL (TENSAR BX1 100)- PERVIOUS
CONCRETE
222-1002 216 SY #57 STONE (CLEAN), 6 IN, (ROOT BRIDGING
AREAS)
603-7000 216 SY PLASTIC FILTER FABRIC (ROOT BRIDGING AREAS)
643-8200 2300 LF BARRIER TREE FENCE (ORANGE), 4 FT
400-0000 1 LS RECONSTRUCT ASPH SPEED HUMP, PER PLANS
441-6718 1505 LF CONC CURB & GUTTER, 6 IN X 24 IN, TP ROLL TO
MATCH EXIST.
441-5001 340 LF CONCRETE HEADER CURB, 6 IN, TP 2
441-5002 23 LF CONCRETE HEADER CURB, 9-12 IN, TP 2 (CHEEK
WALL)
611-8120 6 EA ADJUST EXISTING UTILITY VAULT, METER, BOX , OR
VALVE TO FINAL GRADE (COM, IR, WATER, ETC.)
611-8050 3 EA ADJUST EXISTING MANHOLE TO GRADE
682-9950 180 LF DIRECTIONAL BORE CONDUIT NM TP2, 2IN, 18IN
DEPTH- 2 LINES
668-6222 9966 LF CONDUIT NM TP2, 2IN, 18IN DEPTH, INCL WIRE
TRACE (LIGHTS BY GEORGIA POWER)
668-6222 5976 LF CONDUIT NM TP2, 2IN, INCL WIRE TRACE (UNDER
BOARDWALK INCL ELBOWS) 2-LINES
682-9022 52 EA UTILITY BOXES ON BOARDWALK AND TRAIL
LIGHTS
515-1000 23 EA ALUMINUM SIGN POST SQ, 8FT, PER TRAIL SIGN
DETAIL
515-1000 3 EA CUSTOM METAL SIGN POST ATTACHEMENT ON
BOARDWALK, PER DETAIL
636-1033 53 SF HIGHWAY SIGNS TP9 MAT
636-1041 208 SF TRAIL SIGNAGE, DIRECT PRINT PER
SPECIFICATIONS
636-3010 70 LF HIGHWAY SIGNS POST SQUARE STEEL TUBE W/
BREAKAWAY SLEVE
652-0105 12 EA MMA PAVEMENT MARKING, BIKE SHARED LANE
SYMBOL, INCL ARROWS (SHARROW)
652-6501 3985 LF MMA SKIP TRAF STRIPE, 4 IN, YELLOW (TRAIL CL)
653-2804 10 SY MMA CROSSWALK TRAF STRIPING, WHITE,
653-2804 40 SY MMA CROSSWALK TRAF STRIPING, GREEN,
653-1704 25 LF THERMOPLASTIC SOLID TRAF STRIPE, 24 IN WHITE
(STOP BARS)
652-9001 30 SY THERMOPLASTIC TRAF STRIPING, HATCH, WHITE
Section A Subtotal
SECTION B: STRUCTURAL ITEMS
Item Number
Quantity Units Item Description Unit Price
Cost
500-1005 3984 SY CONCRETE DECK COMPLETE, CLASS A, WWM, 4IN
TO 5IN, INCL PAN, POUR STOP, MED BROOM
FINISH
500-3800 10 CY CONC ABUTMENT WALLS ASHLAR FINISH (STA
40+12)
502-1200 1 LS TOP-DOWN BOARDWALK WOOD STRUCTURE,
INCL OVERLOOKS (STA 10+84 - 42+12)
515-1000 6026 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT:
"CORTEN" COLOR)
500-3800 25 CY CONC ABUTMENT WALLS ASHLAR FINISH (STA
43+57, 44+32)
515-1000 630 LF HELICAL PIERS
534-1000 1 LS PRE-ENGINEERED TRAILBLAZER BRIDGE, 75
LF("CORTEN") STA 43+57 - STA 44+32
500-3800 4 CY SPILLWAY BRIDGE APPROACH/ABUTMENT WALLS
ASHLAR FINISH (STA 10+50)
515-1000 92 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT:
534-1000 27 LF SPILLWAY BRIDGE - (BUILT IN PLACE OR PRE-
ENGINEERED, STA 10+55 - STA 10+80)
500-3107 7 CY RETAINING WALL ASHLAR FINISH (STA 7+08 -8+15)
516-0001 89 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT:
500-3107 111 CY RETAINING WALL ASHLAR FINISH (STA 7+80 -
9+45)
516-0001 185 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT:
626-0501 330 LF CAST IN PLACE COPING, B (4IN X 12IN)
500-3107 211 CY RETAINING WALL ASHLAR FINISH STA 100+65 -
103+95 (SPUR TRAIL)
516-0001 330 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT:
626-0501 165 LF CAST IN PLACE COPING, B (4IN X 12IN)
500-3107 91 CY TURNDOWN WALL (STA 42+62 - 43+57) W/
ASHLAR FINISH, (101 LF)
516-0001 141 LF ALUMINUM RAIL CABLE SYSTEM (POWDER COAT:
500-3107 20 CY STA 49+60 -51+15 GRAVITY WALL FOOTING, PER
DETAIL, 155 FT
607-1000 73 CY STA 49+60 -51+15 GRAVITY WALL, MORTOR
RUBBLE STONE, PER DETAIL, 155 FT
500-3800 43 CY STA 53+15 - 53+46 CUSTOM STRUCTURAL
SPAN/CANTILEVER SLAB, 31 FT
500-3107 19 CY STA 58+25 - 58+63, TURNDOWN WALL W/
ASHLAR FINISH, 38 FT
Section B Subtotal
SECTION C: EROSION CONTROL/STORM DRAINAGE
Number
Quantity Units Item Description Unit Price
Cost
163-0300 6 EA CONSTRUCTION EXIT
163-0301 12 MO EROSION CONTROL INSPECTIONS, WEEKLY AND
MONTHLY
163-0402 1 LS TEMPORARY CONC. WASHDOWN
163-0528 3384 LF CONSTRUCT AND REMOVE TEMPORARY
SEDIMENT BARRIER, TYPE C
163-0529 5550 LF CONSTRUCT AND REMOVE TEMPORARY
SEDIMENT BARRIER, TYPE S
163-0550 2 EA CONSTRUCT AND REMOVE INLET SEDIMENT TRAP,
TYPE P
165-0030 1000 LF MAINTENANCE OF EROSION CONTROL FENCE
165-0101 6 EA MAINTENANCE OF CONSTRUCTION EXIT
165-0105 2 EA MAINTENANCE OF INLET SEDIMENT TRAP
167-1000 12 MO WATER QUALITY MONITORING AND SAMPLING
700-6910 3 AC PERMANENT GRASSING
700-8000 3 AC FERTILIZER MIX GRADE
716-2000 490 SY EROSION CONTROL MATS, SLOPES
222-1002 250 SY #57 STONE, DEPTH 24 IN, (CLEAN)
573-2004 20 LF UNDDR PIPE 4IN PERFORATED
573-1006 1490 LF UNDDR PIPE 6IN PERFORATED
603-1002 250 SY RIVER ROCK (DEPTH 2IN), SIZE 1"-2"
603-7000 902 SY PLASTIC FILTER FABRIC
611-3000 2 EA RECONSTRUCT CB TOP INCL CONCRETE FLUME
550-1180 60 LF STORM DRAIN PIPE, 18 IN, HDPE, H 1-10
550-4218 4 EA FES, 18IN HDPE
603-1006 18 SY RIVER ROCK, 6" (PLACE OVER RIP RAP AT
OUTFALLS)
603-2180 18 SY STN DUMPED RIP RAP, TP3,8 IN
603-2997 18 SY FILTER BLANKET
Section C Subtotal
SECTION D: LANDSCAPE & REVEGETATION
Number
Quantity Units Item Description Unit Price
Cost
900-0526 8 EA FIXED STEEL BOLLARD
900-0527 6 EA REMOVABLE STEEL BOLLARDS, INCL ALL
ATTACHMENTS
900-0528 7 EA FLEXIBLE BOLLARD DELINEATOR
900-0528 8 EA BENCH
900-0529 4 EA TRASH RECEPTACLE
900-0540 2 EA JAZZY DELUXE PULL DOG STATION
700-9300 2000 SY SOD
700-9400 4 EA GINKO BILOBA (MALE ONLY), 4" CAL..
700-9401 5 EA SCARLET OAK, 4" CAL.
700-9402 5 EA RED MAPLE 'AUTUMN BLAZE', 4" CAL.
700-9405 6 EA SWEETSPIRE, 5 GAL.
700-9406 12 EA DWARF WALTERS VIBURNUM, 5 GAL.
700-9411 498 EA ELIJAH BLUE FESCUE, 1 GAL.
700-9412 32401 SF STREAMSIDE NATIVE GRASS & WILD FLOWERS
MIXED SEED & PLUGS (PER PLAN)
700-9413 11 EA SERVICEBERRY, 3" CAL.
700-9414 7 EA EASTERN REDBUD 'MERLOT', 3" CAL.
700-9507 20 EA STREAMSIDE TREES 7 GAL
700-9508 44 EA STREAMSIDE SHRUBS 3 GAL.
700-9509 81 EA INDIANGRASS, 5 GAL.
700-9510 27 EA HAPPY RETURN DAYLIILY, 1 GAL.
ESTIMATED Section D Subtotal
SECTION A: TRAIL
SECTION A: ROADWAY
SECTION B: STRUCTURAL ITEMS
SECTION C: EROSION CONTROL/STORM DRAINAGE
SECTION D: LANDSCAPE & REVEGATION
TOTAL:
Bid Form Morgan Falls Connector Phase 2A Georgia Power dated 8/12/22.
Sandy Springs - Morgan Falls Connector Georgia Power- Quantities for Bid
DATE 8/12/2022
SECTION A: TRAIL AND ROADWAY
Item Number
Quantity Units Item Description Unit Price
Cost
150-1000 1 LS TRAFFIC CONTROL
210-0100 1 LS GRADING COMPLETE (INCLUDING DEMOLITION &
TREE REMOVALS)
310-5080 1220 SY GR AGGR SUBBASE CRS, 6 IN, INCL MATL, (HEAVY
DUTY TYP)
441-0105 1245 SY CONCRETE TRAIL, 5IN, 3000 PSI, MED BROOM
FINISH, INCL ADA RAMPS AND PADS (YELLOW)
441-0106 1220 SY CONCRETE, 8IN, 4000 PSI, MED BROOM FINISH,
(HEAVY DUTY TYP)
444-1000 2000 LF SAWED JOINTS IN NEW TRAIL&SIDEWALK
PAVEMENTS @ 10' O.C.
457-1005 350 SY GEO GRID BIAXAL (TENSAR BX1 100)- WET AREAS AS
DIRECTED ONLY
222-1002 275 SY #57 STONE (CLEAN), 6 IN, (ROOT BRIDGING AREAS)
603-7000 275 SY PLASTIC FILTER FABRIC (ROOT BRIDGING AREAS)
643-8200 510 LF BARRIER TREE FENCE (ORANGE), 4 FT
310-5080 1430 SY GR AGGR SUBBASE CRS,8 IN, INCL MATL (INCL
DRIVEWAYS AND OTHER AREAS)
402-4012 140 TN 4 IN RECYCLED ASPH CONC 19 MM SUPERPAVE,
TYPE II, GP 2 ONLY, INCL BITUM MATL & H LIME
402-4506 70 TN 2 IN RECYCLED ASPH CONC 9.5 MM SUPERPAVE,
TYPE II, GP 2 ONLY, INCL BITUM MATL & H LIME
413-1000 66 GL BITUM TACK
432-0208 620 SY FULL DEPTH MILL ASPH CONC PVMT
441-0018 305 SY DRIVEWAY CONCRETE,8IN
441-5002 950 LF CONCRETE HEADER CURB, 6 IN, TP 2
441-5012 55 LF CONCRETE HEADER CURB, 12 IN MAX, TP 2
441-6718 890 LF CONC CURB & GUTTER, 6 IN X 24 IN, TP ROLL
441-9000 5 EA CONCRETE WHEEL (10FT)
515-1000 8 EA METAL SIGN POST SQ, 8FT, PER TRAIL SIGN DETAIL
636-1033 13 SF MUTCD HIGHWAY SIGNS
636-1041 75 SF TRAIL SIGNAGE, DIRECT PRINT PER SPECIFICATIONS
636-3010 42 LF MUTCD HIGHWAY SQ. POST. 14 FT, BREAKAWAY
652-6501 1945 LF MMA SKIP TRAF STRIPE, 4 IN, YELLOW (TRAIL CL)
Section A Subtotal
Number
Quantity Units Item Description Unit Price
Cost
500-3800 110 CY RETAINING WALL ASHLAR FINISH (STA 8+75 - 10+05)
Section B Subtotal
Item Number
Quantity Units Item Description Unit Price
Cost
163-0300 2 EA CONSTRUCTION EXIT
163-0301 12 MO EROSION CONTROL INSPECTIONS, WEEKLY AND
MONTHLY
163-0402 1 LS TEMPORARY CONC. WASHDOWN
163-0542 2 LS CONSTRUCT AND REMOVE STONE FILTER RING
163-0529 3373 LF CONSTRUCT AND REMOVE TEMPORARY SEDIMENT
BARRIER, TYPE S
163-0550 1 EA CONSTRUCT AND REMOVE INLET SEDIMENT TRAP,
TYPE F
163-0550 2 EA CONSTRUCT AND REMOVE INLET SEDIMENT TRAP,
TYPE P
165-0030 3373 LF MAINTENANCE OF SILT FENCE
165-0101 2 EA MAINTENANCE OF CONSTRUCTION EXIT
165-0105 3 LS MAINTENANCE OF INLET SEDIMENT TRAP
167-1000 12 MO WATER QUALITY MONITORING AND SAMPLING
700-6910 1.2 AC PERMANENT GRASSING
700-8000 1.2 AC FERTILIZER MIX GRADE
716-2000 220 SY EROSION CONTROL MATS, SLOPES
203-2000 10 LF CORE DRILL EXISTING 36IN PIPE
550-1180 22 LF STORM DRAIN PIPE, 18 IN, RCP, H 1-10
550-1240 58 LF STORM DRAIN PIPE, 24 IN, RCP, H 1-10
550-1300 294 LF STORM DRAIN PIPE, 30 IN, RCP, H 1-10
550-1360 242 LF STORM DRAIN PIPE,36 IN, RCP, H 1-10
550-4224 3 EA FES, 24IN HDPE
668-5000 4 EA JUNCTION BOX (1011A)
668-1100 2 EA SINGLE WING CATCH BASIN (1033 G)
668-2000 3 EA PEDESTAL TOP (48IN)
668-2100 1 EA GRATE INLET (1019B)
603-1300 18 SY TYPE 3 RIP RAP 6"-8"
603-2997 18 SY FILTER BLANKET
ESTIMATED Section C Subtotal
SECTION D: LANDSCAPE & REVEGETATION
Number
Quantity Units Item Description Unit Price
Cost
643-0000 1 LS ELECTRIC CANTILEVER GATE CHAINLINK VEHICULAR
AND TRAIL GATE SYSTEM 36FT,(STA. 8+75), INCL
MATL
643-8400 4 EA 6' CHAIN LINK GATE , BLACK VINYL COATED, 9 GA,
8FT GATE (16 FT OPENING)
643-8400 2 EA 6' CHAIN LINK GATE , BLACK VINYL COATED, 9 GA,
10FT GATE (20 FT OPENING)
643-8400 952 LF 6' CHAIN LINK FENCE , BLACK VINYL COATED, 9 GA
700-9300 1800 SY SOD
700-9401 3 EA SCARLET OAK, 4" CAL.
700-9404 3 EA APPALACHIAN SPRING DOGWOOD, 3" CAL
700-9405 5 EA SWEETSPIRE, 5 GAL
700-9406 12 EA DWARF WALTERS VIBURNUM, 5 GAL
700-9407 10 EA AMERICAN BEAUTYBERRY, 3 GAL
700-9411 96 EA ELIJAH BLUE FESCUE, 1 GAL
700-9412 15000 SF STREAMSIDE NATIVE GRASS & WILD FLOWERS
MIXED SEED & PLUGS (PER PLAN)
700-9413 8 EA SERVICEBERRY, 3" CAL
700-9414 8 EA EASTERN REDBUD 'MERLOT', 3" CAL
700-9509 75 EA INDIANGRASS, 5 GAL
900-0526 4 EA FIXED STEEL BOLLARDS , INCL FOOTER
900-0527 7 EA REMOVABLE STEEL BOLLARDS, INCL ALL
ATTACHMENTS
900-0528 1 EA BENCH
900-0529 1 EA TRASH RECEPTACLE
900-0530 1 EA BIKE RACK
900-0540 1 EA JAZZY DELUXE PULL DOG STATION
ESTIMATED Section D Subtotal
SECTION A: ROADWAY AND TRAIL
SECTION D: LANDSCAPE & REVEGATION
TOTAL:
I hereby acknowledge receipt of Addendum Number 2 for #22-060 Invitation to Bid for Morgan Falls
Connector Phase 2A and have incorporated the changes into my response for the above mentioned ITB
COMPANY NAME:
CONTACT PERSON:
ADDRESS:
CITY: _________________________________STATE: ___________ ZIP: ________________________
PHONE: ________________ FAX: _______________
EMAIL ADDRESS: ______________________________________
SIGNATURE: ____________________________________________
DATE: ______________________________________
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| Addendum 1 | — | |
| 22-060 Bid Tabulation | — | |
| ITB 22-060 | — | |
| Geotechnical Report | — | |
| Special Provisions | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .