ITB 11568R Attachment A Form A-2 Pricing Form.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- 11568R Historic Hughes House Exterior Repairs and Preservation at Cape Blanco State Park (Roofing)
- Solicitation number
- S-63400-00012811
- Issued by
- Crook County, Oregon
About this file
This is a pricing submittal form (Form A-2) for ITB #11568R issued by the State of Oregon (OregonBuys #S-63400-000XXXXXX) for Historic Hughes House Exterior Repairs and Preservation at Cape Blanco State Park, specifically focused on the roofing phase. The project involves roofing preparation, installation of metal shingle roof, and sheet metal gutters and downspouts at the Historic Hughes House.
The pricing form requires bidders to submit costs for two line items: Mobilization/Overhead (Line 1) and Roofing Preparation and Installation (Line 2), both as lump sum amounts. All work described in the contract documents but not specifically itemized is considered incidental to the work and must be included in the total bid price. The state reserves the right to increase or decrease quantities or remove items as needed to meet budgetary constraints. Bidders must complete all required information, and failure to supply required information may result in bid rejection as non-responsive.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment A | |
| Form A-2 Pricing Form | |
| OregonBuys #S-63400-000XXXXXX | |
| ITB # 11568R Historic Hughes House Exterior Repairs and Preservation |
at Cape Blanco State Park (Roofing Phase)
| PRICING SUBMITTAL INSTRUCTIONS: |
| Bidders must enter pricing and other required information for all Bid Items listed in this Pricing Submittal Form. If this Pricing Submittal Form is replaced by Addenda then Bidders must use the Addenda forms to provide pricing and other required information. If the Pricing Submittal Form is modified by Addenda, then Bidders must follow the instructions in the Addenda for making modifications to the Pricing Submittal Form. Failure to supply the required information in the Pricing Submittal Form or subsequent Addenda may result in Bid rejection as non-responsive. |
The undersigned has carefully examined the Contract Documents and the site of the work, and agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set below. All Work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work, and Bidder agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all incidental Work at no additional cost to the Owner.
| BASE BID ITEMS | |||||
| Ln # | Item | Unit | Qty | Unit Cost | Total Cost |
| 1 | Mobilization/Overhead | 1 | L.S. | ||
| 2 | Roofing Preparation and Installation of Metal Shingle Roof and Sheet Metal Gutters and Downspouts | 1 | L.S. | ||
| TOTAL BID (Lines 1-2) | $ - 0 | ||||
| NOTE: Bid price is total contract price including contractor’s profit and overhead. Items not explicitly listed in the bid schedule above are considered incidental. |
The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as shown or to remove items as necessary to meet budgetary constraints
Bid submitted by:
(Type or print legibly, name and company)
(Signature)