ITB_06-25_Bid_Tab.pdf
PDF 233 KB Posted
- Solicitation number
- ITB 06-25
- Issued by
- Volusia County, Orlando City, Florida
About this file
The document is a detailed bid tabulation (ITB 06-25) for an annual electric utility line construction contract issued by New Smyrna Beach Utilities (NSBU) in Florida, covering Volusia County and Orlando City. The invitation to bid seeks multiple qualified contractors to perform transmission and distribution line construction services for overhead and underground electrical infrastructure, specifically for 115kV transmission and 23kV/13kV electrical circuits. The electronic bid submission is due February 20, 2025, at 2:00 PM, with an online bid opening via Microsoft Teams on the same date. The initial contract term is one year, with potential renewals for up to three additional one-year periods, and contractors will be responsible for providing labor, equipment, supervision, and logistics support for electric crews.
The bid tabulation includes comprehensive pricing details across multiple categories, such as mobilization rates, mileage rates, hourly labor rates for different personnel classes, and equipment rates from various contractors including Haugland Energy Group, Hooper Corp, 5 Star Electric, Apex Lineworks, DaVinci EPC, Gridco Inc, Imeprium Utility Services, and others. Contractor qualifications include a minimum of five years in business, comprehensive insurance coverage, and maintaining a drug-free workplace. NSBU will provide materials through their warehouse and plans to award the contract to multiple vendors with specialized expertise in transmission, distribution, or underground work. The procurement does not specify explicit set-aside designations or a precise budget range, but anticipates steady work due to growth activities in the area, with potential for consistent project assignments throughout 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANNED
Description
Mobilization Rate
Mileage Rate (per mile)
PLANNED
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $114.70 $134.20 $126.76 $179.86 $86.00 $146.45 $134.79 $178.98 $115.02 $138.46
Lineman $109.53 $128.15 $121.88 $172.94 $81.00 $139.20 $126.65 $166.81 $106.34 $126.80
Apprentice Lineman $106.73 $128.15 $87.76 $124.52 $71.00 $124.70 $110.36 $142.49
Groundman $66.39 $77.68 $63.38 $89.93 $53.00 $98.60 $91.62 $114.52 $62.41 $76.28
Other $114.70 $134.20 $48.00 $91.35 $147.61 $198.11
Per Diem $150.00 $164.71 $164.71 $150.00 $100.00 $75.00
PLANNED
Description
Mobilization Rate
Mileage Rate (per mile)
PLANNED
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader
NQ $107.26 $152.19 $79.00 $136.30 $134.79 $178.98 $115.02 $138.46
Lineman $97.51 $138.35 $70.00 $123.25 $126.65 $166.81 $106.34 $126.80
Apprentice Lineman $65.28 $92.63 $60.00 $108.75 $110.36 $142.49
Groundman $53.75 $76.27 $50.00 $94.25 $91.62 $114.52 $62.41 $76.28
Other $45.00 $87.00 $147.61 $198.11
Per Diem $164.71 $164.71 $150.00 $100.00 $75.00
PLANNED
Description
Mobilization Rate
Mileage Rate (per mile)
PLANNED
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader
NQ $185.96 $278.95 $91.00 $146.45 $104.07 $148.25 $115.02 $138.46
Lineman $127.86 $191.78 $86.00 $139.20 $95.92 $136.08 $106.34 $126.80
Apprentice Lineman $121.38 $182.07 $76.00 $124.70 $79.63 $111.76
Groundman $70.08 $105.13 $58.00 $98.60 $60.89 $83.79 $62.41 $76.28
Other $53.00 $91.35 $116.88 $167.38
Per Diem $164.71 $164.71 $150.00 $100.00 $75.00
PLANNED
Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Bucket Trucks (up to – 100”) $40.87 $331.20 $331.20 $58.00 $58.00 $67.93 $67.93 Separate sheet in bid docs
Bucket Truck (100ft) $459.66 $459.66 $115.00 $115.00 $89.95 $89.95
Line Truck – Diggers $37.59 $559.49 $559.49 $58.00 $58.00 $91.96 $91.96
Pole Trailers $14.11 $28.36 $28.36 $10.00 $10.00 $9.41 $9.41
Wire Trailer $146.01 $146.01 $5.95 $5.95 $10.45 $10.45
Flat Trailers $6.26 $28.36 $28.36 $7.50 $7.50 $10.45 $10.45
Trac Vehicles $370.64 $370.64 $139.00 $139.00 $119.13 $119.13
Wire Trailers $146.01 $146.01 $23.98 $23.98 $10.45 $10.45
Pick up Truck $12.58 $31.44 $31.44 $25.00 $25.00 $26.99 $26.99
Crew Truck $13.73 $42.44 $42.44 $26.00 $26.00 $26.99 $26.99
Wire Pulling Machine $414.00 $414.00 $64.35 $64.35 $82.50 $82.50
Trencher $101.22 $101.22 $27.82 $27.82 $54.57 $54.57
Backhoe $101.22 $101.22 $32.65 $32.65 $59.57 $59.57
OVERHEAD DISTRIBUTION WORK
ITB 06-25 ANNUAL CONTRACT ELECTRIC CONSTRUCTION
EQUIPMENT RATES
Haugland Energy Group
NQ
NQ
NQ
NQ
NQ
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
Hooper Corp
$0.25 $35.42
Haugland Energy Group Hooper Corp
HOURLY LABOR RATES
NQ $50.00
NQ
NQ
NQ
NQ
NQ
NQ
Haugland Energy Group Hooper Corp
Unit Price Unit Price
$7,500.00 $12,653.04
$12,500.00 $16,292.44
Haugland Energy Group Hooper Corp
Haugland Energy Group Hooper Corp
TRANSMISSION WORK
NQ NQ $68,823.53 $28,000.00
Unit Price Unit Price Unit Price Unit Price
NQ
NQ
NQ
Haugland Energy Group Hooper Corp
Unit Price Unit Price
Unit Price Unit Price
Haugland Energy Group Hooper Corp
$0.25 $27.51
HOURLY LABOR RATES
Unit Price Unit Price Unit Price Unit Price
DaVinci EPC / One Span Gridco Inc
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
5 star electric Apex Lineworks LLC
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
5 star electric Apex Lineworks LLC DaVinci EPC / One Span
NQ NQ $3,174.75 $10,000.00
NQ $3.52 $30.00
NQ
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
HOURLY LABOR RATES
$7,500.00 $12,653.04
$0.25 $27.51
Gridco Inc
5 star electric Apex Lineworks LLC DaVinci EPC / One Span
$4.32 $3.52 $30.00
Unit Price Unit Price Unit Price
$237.60 $5,631.91 $10,000.00
Unit Price
NQ
NQ
NQ
NQ
NQ
NQ
NQ
NQ
Gridco Inc
UNDERGROUND DISTRIBUTION WORK
NQ
NQ
NQ
NQ
NQ
NQ
NQ
NQ
NQ
NQ
STORM/EMERGENCY
Mobilization Rate
Mileage Rate (per mile)
STORM/EMERGENCY
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $169.96 $169.96 $173.20 $196.14 $179.86 $232.96 $146.00 $175.00 $178.98 $244.84 $174.11 $174.11
Lineman $154.08 $154.08 $165.38 $187.29 $172.94 $224.00 $140.00 $167.00 $166.81 $227.12 $159.46 $159.46
Apprentice Lineman $148.78 $148.78 $161.17 $182.52 $124.52 $161.28 $129.00 $151.00 $142.49 $191.67
Groundman $122.32 $122.32 $100.25 $113.53 $89.93 $116.48 $110.00 $125.00 $114.52 $150.91 $96.10 $96.10
Other $114.07 $114.07 $173.20 $196.14 $103.00 $118.00 $198.11 $272.72
Per Diem $125.00 $125.00 $150.00 $164.71 $164.71 $150.00 $100.00 $75.00
STORM/EMERGENCY
Description
Mobilization Rate
Mileage Rate (per mile)
STORM/EMERGENCY
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader
NQ NQ $152.19 $197.12 $124.00 $198.00 $178.98 $244.84 $174.11 $174.11
Lineman
NQ $138.35 $179.20 $113.00 $180.00 $166.81 $227.12 $159.46 $159.46
Apprentice Lineman NQ $92.63 $119.97 $99.00 $156.00 $142.49 $191.67 Separate sheet in bid docs
Groundman
NQ $76.27 $98.78 $83.00 $133.00 $114.52 $150.91 $96.10 $96.10
Other
NQ $75.00 $120.00 $198.11 $272.72
Per Diem
NQ $164.71 $164.71 $150.00 $100.00 $75.00
STORM/EMERGENCY
Description
Mobilization Rate
Mileage Rate (per mile)
STORM/EMERGENCY
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $238.84 $238.84 NQ $185.96 $278.95 $172.00 $250.00 $148.25 $211.98 $174.11 $174.11
Lineman $224.28 $224.28 $127.86 $191.78 $160.00 $233.00 $136.08 $194.03 $159.46 $159.46
Apprentice Lineman $218.40 $218.40 $121.38 $182.07 $142.00 $206.00 $111.76 $172.13 Separate sheet in bid docs
Groundman $189.28 $189.28 $70.08 $105.13 $133.00 $193.00 $83.79 $116.85 $96.10 $96.10
Other $114.07 $114.07 $113.00 $164.00 $167.38 $220.95
Per Diem $125.00 $125.00 $164.71 $164.71 $150.00 $100.00 $75.00
STORM/EMERGENCY
Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Bucket Trucks (up to – 100”) $101.00 $101.00 $331.20 $331.20 $78.00 $78.00 $67.93 $67.93 Separate sheet in bid docs
Bucket Truck (100ft) $132.00 $132.00 $459.66 $459.66 $156.00 $156.00 $89.95 $89.95
Line Truck – Diggers $104.00 $104.00 $559.49 $559.49 $64.00 $64.00 $91.96 $91.96
Pole Trailers $19.00 $19.00 $28.36 $28.36 $17.00 $17.00 $9.41 $9.41
Wire Trailer $42.00 $42.00 $146.01 $146.01 $8.50 $8.50 $10.45 $10.45
Flat Trailers $20.00 $20.00 $28.36 $28.36 $11.68 $11.68 $10.45 $10.45
Trac Vehicles $165.00 $165.00 $370.64 $370.64 $250.00 $250.00 $119.13 $119.13
Wire Trailers $175.00 $175.00 $146.01 $146.01 $41.00 $41.00 $10.45 $10.45
Pick up Truck $24.00 $24.00 $31.44 $31.44 $27.21 $27.21 $26.99 $26.99
Crew Truck $32.00 $32.00 $42.44 $42.44 $30.95 $30.95 $26.99 $26.99
Wire Pulling Machine $123.00 $123.00 $414.00 $414.00 $87.32 $87.32 $82.50 $82.50
Trencher $27.00 $27.00 $101.22 $101.22 $153.85 $153.85 $54.67 $54.67
Backhoe $29.00 $29.00 $101.22 $101.22 $51.00 $51.00 $54.67 $54.67
HOURLY LABOR RATES
UNDERGROUND DISTRIBUTION WORK
HOURLY LABOR RATES
EMERGENCY RESPONSE AND STORM RESTORATION RATES
OVERHEAD DISTRIBUTION WORK
$9,500.00 $16,453.00
$0.25 $35.77
Haugland Energy Group Hooper Corp
Unit Price Unit Price
Haugland Energy Group Hooper Corp
Unit Price Unit Price
$9,500.00 $16,453.00
EQUIPMENT RATES
HOURLY LABOR RATES
$0.25 $43.68
Haugland Energy Group Hooper Corp
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
$0.70 $50.00
Unit Price Unit Price
$15,000.00 $20,092.40
Haugland Energy Group Hooper Corp
Haugland Energy Group Hooper Corp
TRANSMISSION WORK
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
Unit Price Unit Price Unit Price Unit Price
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
Haugland Energy Group Hooper Corp5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
Unit Price Unit Price Unit Price Unit Price
$68,436.77 NQ $28,000.00
NQ NQ $3,898.76 $10,000.00
NQ $3.25 $30.00
Unit Price Unit Price Unit Price Unit Price
5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc
$33,960.00 $237.60 $6,703.74 $10,000.00
$0.70 $4.32 $4.19 $0.25 $35.77$30.00
Haugland Energy Group Hooper Corp
Mobilization Rate
Mileage Rate (per mile)
PLANNED
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $99.87 $139.82 $132.81 $169.22 $132.00 $172.00 $114.82 $154.96 $133.09 $193.17 $95.68 $116.72
Lineman $95.28 $133.39 $128.83 $163.79 $125.00 $168.00 $105.83 $142.84 $121.87 $176.49 $91.66 $111.82
Apprentice Lineman $82.46 $115.44 $118.86 $150.17 $103.00 $160.00 $91.85 $123.98 $70.70 $100.59 $86.38 $105.38
Groundman $61.68 $86.35 $62.02 $78.04 $88.00 $130.00 $75.88 $102.42 $71.29 $101.51 $57.30 $69.90
Other $84.50 $118.30 rate sheet attached $100.00 $145.00 $68.45 $92.39
Per Diem $150.00 $165.00 $125.00 $125.00 $10.00
PLANNED
Description
Mobilization Rate
Mileage Rate (per mile)
PLANNED
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader
$82.46 $115.44 $122.84 $155.61 NQ $87.34 $118.59 NQ $95.68 $116.72
Lineman $73.67 $103.14 $104.92 $131.14 $77.88 $105.11 $91.66 $111.82
Apprentice Lineman $67.80 $94.92 $96.94 $120.24 $69.89 $94.33 $86.38 $105.38
Groundman $45.80 $64.13 $77.02 $93.04 $52.42 $70.74 $57.30 $69.90
Other rate sheet attached $61.90 $83.55
Per Diem $150.00 $165.00 $125.00
PLANNED
Description
Mobilization Rate
Mileage Rate (per mile)
PLANNED
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $99.87 $139.82 $131.85 $172.63 $132.00 $172.00 $95.79 $136.22 $133.09 $193.17 $108.35 $153.86
Lineman $95.28 $133.39 $125.64 $164.17 $125.00 $168.00 $91.41 $130.00 $121.87 $176.49 $104.30 $148.11
Apprentice Lineman $82.46 $115.44 $113.21 $147.25 $103.00 $160.00 $71.84 $102.16 $70.70 $100.59 $72.30 $102.67
Groundman $61.68 $86.35 $80.08 $102.15 $88.00 $130.00 $49.90 $70.97 $71.29 $101.51 $65.56 $93.10
Other $84.50 $118.30 rate sheet attached $100.00 $145.00 $80.43 $114.39
Per Diem $150.00 $165.00 $125.00 $200.00 $10.00 $75.00
PLANNED
Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Bucket Trucks (up to – 100”) Separate sheet in bid docs $73.10 $73.10 $80.00 $80.00 $150.33 $150.33 $150.87 $150.87 $60.29 $60.29
Bucket Truck (100ft) $138.70 $138.70 $105.00 $105.00 $136.90 $136.90 $166.60 $166.60 $70.56 $70.56
Line Truck – Diggers $80.30 $80.30 $100.00 $100.00 $65.06 $65.06 $110.60 $110.60 $47.72 $47.72
Pole Trailers $7.00 $7.00 $15.00 $15.00 $9.05 $9.05 $9.33 $9.33 $14.03 $14.03
Wire Trailer $29.40 $29.40 $20.00 $20.00 $40.00 $40.00 $10.67 $10.67 $10.06 $10.06
Flat Trailers $13.00 $13.00 $20.00 $20.00 $14.09 $14.09 $33.25 $33.25 $15.00 $15.00
Trac Vehicles $144.50 $144.50 $175.00 $175.00 $235.65 $235.65 $75.00 $75.00 see price sheet see price sheet
Wire Trailers $86.10 $86.10 $20.00 $20.00 $8.05 $8.05 $10.67 $10.67 $15.00 $15.00
Pick up Truck $21.60 $21.60 $25.00 $25.00 $18.11 $18.11 $30.50 $30.50 $19.94 $19.94
Crew Truck $26.60 $26.60 $25.00 $25.00 $24.01 $24.01 $27.60 $27.60 $19.94 $19.94
Wire Pulling Machine $109.80 $109.80 $20.00 $20.00 $166.75 $166.75 $78.67 $78.67 $24.61 $24.61
Trencher $9.21 $9.21 $40.00 $40.00 $52.90 $52.90 $39.00 $39.00 $36.44 $36.44
Backhoe $53.90 $53.90 $50.00 $50.00 $31.71 $31.71 $48.00 $48.00 $25.30 $25.30
ITB 06-25 ANNUAL CONTRACT ELECTRIC CONSTRUCTION
OVERHEAD DISTRIBUTION WORK
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
$25.00 $0.70 $7.19
HOURLY LABOR RATES
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$18,750.00/ Waived if awarded $15,000.00 $5,000.00 $2,500.00
UNDERGROUND DISTRIBUTION WORK
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
$25.00 $6.32
HOURLY LABOR RATES
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$18,750.00/ Waived if awarded $15,000.00 NQ $2,000.00 NQ
TRANSMISSION WORK
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$18,750.00/ Waived if awarded $50,000.00 $5,000.00 $26,839.91
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
$170.00 $0.70 $1.00
HOURLY LABOR RATES
EQUIPMENT RATES
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
Caleb Fisher Highlight
Caleb Fisher Highlight
Mobilization Rate
Mileage Rate (per mile)
STORM/EMERGENCY
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $139.82 $169.78 $132.81 $169.22 $220.00 $131.71 $185.07 $279.68 $197.26 $241.79
Lineman $133.39 $161.98 $128.83 $163.79 $210.00 $122.33 $171.26 $255.40 $188.96 $231.63
Apprentice Lineman $115.44 $140.18 $118.86 $150.17 $195.00 $102.59 $143.62 $144.83 $167.21 $205.06
Groundman $86.35 $104.86 $62.02 $78.04 $160.00 $86.05 $120.48 $146.31 $118.31 $145.22
Other $118.30 $143.65 rate sheet attached $175.00 $80.24 $112.47
Per Diem $150.00 $165.00 3 meals $175.00 $10.00 $75.00
STORM/EMERGENCY
Description
Mobilization Rate
Mileage Rate (per mile)
STORM/EMERGENCY
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader
$115.44 $140.18 $122.84 $155.61 NQ $100.44 $104.97 NQ $197.26 $241.79
Lineman $103.14 $125.24 $104.92 $131.14 $89.56 $93.60 $188.96 $231.63
Apprentice Lineman $94.92 $115.26 $96.94 $120.24 $80.37 $83.99 $167.21 $205.06
Groundman $64.13 $77.86 $77.02 $93.04 $60.28 $63.01 $118.13 $145.22
Other rate sheet attached $71.19 $71.85
Per Diem $150.00 $165.00 $175.00 $75.00
STORM/EMERGENCY
Description
Mobilization Rate
Mileage Rate (per mile)
STORM/EMERGENCY
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $139.82 $169.78 $131.85 $172.63 $220.00 $136.22 $136.22 $279.68 $197.59 $250.94
Lineman $133.39 $161.98 $125.64 $164.17 $210.00 $130.00 $130.00 $255.40 $189.29 $240.40
Apprentice Lineman $115.44 $140.18 $113.21 $147.25 $195.00 $102.16 $102.16 $144.83 $157.20 $199.64
Groundman $86.35 $104.86 $80.08 $102.15 $160.00 $70.97 $70.97 $146.31 $149.82 $190.27
Other $118.30 $143.65 rate sheet attached $175.00 $114.39 $114.39
Per Diem $150.00 $165.00 3 meals $200.00 $10.00
STORM/EMERGENCY
Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Bucket Trucks (up to – 100”) Separate sheet in bid docs $73.10 $73.10 $145.00 $145.00 $150.33 $150.33 $210.91 $60.29 $60.29
Bucket Truck (100ft) $138.70 $138.70 $200.00 $200.00 $136.90 $136.90 $290.50 $70.56 $70.56
Line Truck – Diggers $80.30 $80.30 $65.06 $65.06 $189.51 $47.72 $47.72
Pole Trailers $7.00 $7.00 $35.00 $35.00 $9.05 $9.05 $21.88 $14.03 $14.03
Wire Trailer $29.40 $29.40 $30.00 $30.00 $40.00 $40.00 $25.00 $10.06 $10.06
Flat Trailers $13.00 $13.00 $30.00 $30.00 $14.09 $14.09 $50.31 $15.00 $15.00
Trac Vehicles $144.50 $144.50 $265.00 $265.00 $235.65 $235.65 $82.50 see price sheet see price sheet
Wire Trailers $86.10 $86.10 $8.05 $8.05 $12.00 $15.00 $15.00
Pick up Truck $21.60 $21.60 $40.00 $40.00 $18.11 $18.11 $47.56 $19.94 $19.94
Crew Truck $26.60 $26.60 $55.00 $55.00 $24.01 $24.01 $32.31 $19.94 $19.94
Wire Pulling Machine $109.80 $109.80 $40.00 $40.00 $166.75 $166.75 $86.00 $24.61 $24.61
Trencher $9.21 $9.21 $52.90 $52.90 $42.00 $36.44 $36.44
Backhoe $53.90 $53.90 $80.00 $80.00 $31.71 $31.71 $52.13 $25.30 $25.30
EMERGENCY RESPONSE AND STORM RESTORATION RATES
OVERHEAD DISTRIBUTION WORK
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$18,750.00/ Waived if awarded $15,000.00 $5,000.00 $2,500.00
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
UNDERGROUND DISTRIBUTION WORK
$25.00 $0.70 $7.19
HOURLY LABOR RATES
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$18,750.00/ Waived if awarded $15,000.00 NQ $2,000.00 NQ
$25.00 $6.32
TRANSMISSION WORK
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
HOURLY LABOR RATES
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$18,750.00/ Waived if awarded $50,000.00 labor & Equip $35,665.70
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
EQUIPMENT RATES
$170.00 $0.70 $1.00
HOURLY LABOR RATES
Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services
Mobilization Rate
Mileage Rate (per mile)
PLANNED
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $84.91 $116.66 $108.46 $151.85 $107.74 $152.88 $95.32 $127.01 $136.56 $191.71 $93.87 $136.54
Lineman $81.51 $112.00 $104.37 $146.12 $103.60 $147.00 $87.63 $116.43 $130.16 $182.72 $86.17 $124.98
Apprentice Lineman $59.43 $81.66 $75.72 $106.01 $74.59 $105.84 $71.85 $96.62 $85.35 $119.82 $50.57 $71.10
Groundman $42.45 $58.33 $42.97 $60.16 $53.87 $76.44 $52.53 $68.16 $53.34 $74.89 $51.22 $72.78
Other $93.40 $128.33 $72.25 $95.25 $97.73 $142.31
Per Diem
$150.00 $140.00 $140.00 $140.00 $7.50 NA $15.25
PLANNED
Description
Mobilization Rate
Mileage Rate (per mile)
PLANNED
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader
$71.32 $98.00 $85.30 $119.42 $91.17 $129.36 $95.32 $127.01 $136.56 $191.71 NQ
Lineman $54.34 $74.66 $85.30 $119.42 $82.88 $117.60 $87.63 $116.43 $130.16 $182.72
Apprentice Lineman $45.85 $63.00 $64.98 $90.97 $55.49 $78.73 $71.85 $96.62 $85.35 $119.82
Groundman $39.06 $53.67 $35.61 $49.86 $45.69 $64.83 $52.53 $68.16 $53.34 $74.89
Other $93.40 $128.33 $72.25 $95.25
Per Diem
$150.00 $140.00 $140.00 $140.00 $7.50 NA
PLANNED
Description
Mobilization Rate
Mileage Rate (per mile)
PLANNED
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader
$91.78 $126.11 $126.74 $177.45 $158.07 $237.11 $98.85 $132.72 NA $93.87 $136.54
Lineman $79.81 $109.66 $120.56 $168.77 $108.66 $163.01 $91.10 $121.86 $86.17 $124.98
Apprentice Lineman $71.83 $98.70 $92.70 $129.78 $103.17 $154.76 $77.41 $96.62 $50.57 $71.10
Groundman $39.91 $54.83 $51.90 $72.65 $59.57 $89.36 $52.53 $68.16 $51.22 $72.78
Other $96.79 $133.00 $72.25 $95.25 $97.73 $142.31
Per Diem $150.00 $185.00 $140.00 $140.00 $7.50 $15.25
PLANNED
Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Bucket Trucks (up to – 100”) $101.54 $101.54 $48.92 $48.92 $281.52 $281.52 $34.00 $34.00 $63.17 $65.00 $65.00
Bucket Truck (100ft) $113.24 $113.24 $72.15 $72.15 $390.71 $390.71 $90.00 $90.00 $85.00 $85.00
Line Truck – Diggers $105.43 $105.43 $41.99 $41.99 $475.57 $475.57 $36.00 $36.00 $63.17 $50.00 $50.00
Pole Trailers $10.50 $10.50 $6.38 $6.38 $24.11 $24.11 $9.00 $9.00 $12.60 $12.00 $12.00
Wire Trailer $22.26 $22.26 $7.45 $7.45 $124.11 $124.11 $20.00 $20.00 $12.60 $12.00 $12.00
Flat Trailers $13.47 $13.47 $6.38 $6.38 $24.11 $24.11 $10.00 $10.00 $12.60 $12.00 $12.00
Trac Vehicles $79.55 $79.55 $121.30 $121.30 $315.04 $315.04 $100.00 $100.00 $55.28 $85.00 $85.00
Wire Trailers $22.26 $22.26 $7.45 $7.45 $124.11 $124.11 $20.00 $20.00 $12.60 $12.00 $12.00
Pick up Truck $23.11 $23.11 $26.01 $26.01 $26.72 $26.72 $22.00 $22.00 $24.77 $18.00 $18.00
Crew Truck $49.75 $49.75 $26.01 $26.01 $36.07 $36.07 $22.00 $22.00 $31.59 $18.00 $18.00
Wire Pulling Machine $97.54 $97.54 $22.69 $22.69 $351.90 $351.90 $33.00 $33.00 $55.28 $28.00 $28.00
Trencher $19.56 $19.56 cost+10% cost+10% $86.04 $86.04 $40.00 $40.00 $25.00 $25.00
Backhoe $40.97 $40.97 $17.68 $17.68 $86.04 $86.04 $40.00 $40.00 $39.48 $28.00 $28.00
OVERHEAD DISTRIBUTION WORK
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
ITB 06-25 ANNUAL CONTRACT ELECTRIC CONSTRUCTION
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$5,000.00 $4,800.00 $4,787.13 $460.00 $1,660.33 $5,000.00
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
UNDERGROUND DISTRIBUTION WORK
$7.00 $2.99 $1.75 $1.35
HOURLY LABOR RATES
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$5,000.00 $4,800.00 $2,698.54 $460.00 $1,660.33
$7.00 $2.25 $1.50
TRANSMISSION WORK
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
HOURLY LABOR RATES
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$5,000.00 $16,000.00 $58,500.00 $650.00 $5,000.00
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
EQUIPMENT RATES
$7.00 $1.75 $1.35
HOURLY LABOR RATES
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
Caleb Fisher Highlight
Mobilization Rate
Mileage Rate (per mile)
STORM/EMERGENCY
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $101.89 $140.00 rate sheet attached $152.88 $198.02 $127.01 $221.66 $169.28 $211.59 $93.87 $136.54
Lineman $97.81 $134.40 $147.00 $190.40 $116.43 $202.55 $166.50 $208.13 $86.17 $124.98
Apprentice Lineman $71.32 $98.00 $105.84 $137.09 $71.25 $173.87 $157.34 $196.68 $50.57 $71.10
Groundman $50.94 $70.00 $76.44 $99.01 $68.16 $123.19 $157.34 $196.68 $51.22 $72.78
Other $112.08 $154.00 $95.25 $144.18 $97.73 $142.31
Per Diem cost + 15% $140.00 $140.00 $7.50 $15.25
STORM/EMERGENCY
Description
Mobilization Rate
Mileage Rate (per mile)
STORM/EMERGENCY
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $85.59 $117.60 rate sheet attached $129.36 $167.55 $127.01 $221.66 $169.28 $211.59 NQ
Lineman $65.21 $89.60 $117.60 $152.32 $116.43 $202.55 $166.50 $208.13
Apprentice Lineman $55.02 $75.60 $78.73 $101.98 $71.25 $173.87 $157.34 $196.68
Groundman $46.87 $64.40 $64.83 $83.97 $68.16 $123.19 $157.34 $196.68
Other $112.08 $154.00 $95.25 $144.18
Per Diem cost + 15% $140.00 $140.00 $7.50
STORM/EMERGENCY
Description
Mobilization Rate
Mileage Rate (per mile)
STORM/EMERGENCY
Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Line Crew Leader $110.14 $151.34 rate sheet attached $158.07 $237.11 $132.72 $221.66 NA $93.87 $136.54
Lineman $95.77 $131.60 $108.68 $163.01 $121.86 $202.55 $86.17 $124.98
Apprentice Lineman $86.20 $118.44 $103.17 $154.76 $79.44 $173.87 $50.57 $71.10
Groundman $47.89 $65.80 $59.57 $89.36 $68.16 $123.19 $51.22 $72.78
Other $116.15 $159.60 $95.25 $144.18 $97.73 $142.31
Per Diem cost + 15% $140.00 $140.00 $7.50 $15.25
STORM/EMERGENCY
Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate
Bucket Trucks (up to – 100”) $108.63 $108.63 rate sheet attached $281.52 $281.52 $34.00 $60.00 $63.17 $63.17 $65.00 $65.00
Bucket Truck (100ft) $121.15 $121.15 $390.71 $390.71 $90.00 $105.00 $85.00 $85.00
Line Truck – Diggers $112.78 $112.78 $475.57 $475.57 $36.00 $64.00 $63.17 $63.17 $50.00 $50.00
Pole Trailers $11.23 $11.23 $24.11 $24.11 $9.00 $12.00 $12.60 $12.60 $12.00 $12.00
Wire Trailer $23.81 $23.81 $124.11 $124.11 $20.00 $25.00 $12.60 $12.60 $12.00 $12.00
Flat Trailers $14.41 $14.41 $24.11 $24.11 $10.00 $12.00 $12.60 $12.60 $12.00 $12.00
Trac Vehicles $85.10 $85.10 $315.04 $315.04 $100.00 $120.00 $55.28 $55.28 $85.00 $85.00
Wire Trailers $23.81 $23.81 $124.11 $124.11 $20.00 $25.00 $12.60 $12.60 $12.00 $12.00
Pick up Truck $24.75 $24.75 $26.72 $26.72 $22.00 $26.00 $24.77 $24.77 $18.00 $18.00
Crew Truck $53.27 $53.27 $36.07 $36.07 $22.00 $26.00 $31.59 $31.59 $18.00 $18.00
Wire Pulling Machine $104.14 $104.14 $351.90 $351.90 $30.00 $35.00 $55.28 $55.28 $28.00 $28.00
Trencher $20.88 $20.88 $86.04 $86.04 $40.00 $45.00 $25.00 $25.00
Backhoe $43.81 $43.81 $86.04 $86.04 $40.00 $45.00 $39.48 $39.48 $28.00 $28.00
OVERHEAD DISTRIBUTION WORK
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
EMERGENCY RESPONSE AND STORM RESTORATION RATES
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$7,500.00 $5,698.18 $870.00 $5,000.00
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
UNDERGROUND DISTRIBUTION WORK
$9.00 $3.56 $1.75 $1.35
HOURLY LABOR RATES
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$7,500.00 $3,313.95 $870.00
$9.00 $2.76 $1.75
TRANSMISSION WORK
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
HOURLY LABOR RATES
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
$9.00 $1.75 $1.35
HOURLY LABOR RATES
Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price
$7,500.00 T&E Portal to Portal $1,200.00 $5,000.00
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline
EQUIPMENT RATES
Sheet1
File details come from the government source that posted it. Updated .