ITB_06-25_Bid_Tab.pdf

PDF 233 KB Posted

Attached to
ITB 06-25 Annual Contract Electric Utility Line Construction
Solicitation number
ITB 06-25
Issued by
Volusia County, Orlando City, Florida

About this file

The document is a detailed bid tabulation (ITB 06-25) for an annual electric utility line construction contract issued by New Smyrna Beach Utilities (NSBU) in Florida, covering Volusia County and Orlando City. The invitation to bid seeks multiple qualified contractors to perform transmission and distribution line construction services for overhead and underground electrical infrastructure, specifically for 115kV transmission and 23kV/13kV electrical circuits. The electronic bid submission is due February 20, 2025, at 2:00 PM, with an online bid opening via Microsoft Teams on the same date. The initial contract term is one year, with potential renewals for up to three additional one-year periods, and contractors will be responsible for providing labor, equipment, supervision, and logistics support for electric crews.

The bid tabulation includes comprehensive pricing details across multiple categories, such as mobilization rates, mileage rates, hourly labor rates for different personnel classes, and equipment rates from various contractors including Haugland Energy Group, Hooper Corp, 5 Star Electric, Apex Lineworks, DaVinci EPC, Gridco Inc, Imeprium Utility Services, and others. Contractor qualifications include a minimum of five years in business, comprehensive insurance coverage, and maintaining a drug-free workplace. NSBU will provide materials through their warehouse and plans to award the contract to multiple vendors with specialized expertise in transmission, distribution, or underground work. The procurement does not specify explicit set-aside designations or a precise budget range, but anticipates steady work due to growth activities in the area, with potential for consistent project assignments throughout 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLANNED

Description

Mobilization Rate

Mileage Rate (per mile)

PLANNED

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $114.70 $134.20 $126.76 $179.86 $86.00 $146.45 $134.79 $178.98 $115.02 $138.46

Lineman $109.53 $128.15 $121.88 $172.94 $81.00 $139.20 $126.65 $166.81 $106.34 $126.80

Apprentice Lineman $106.73 $128.15 $87.76 $124.52 $71.00 $124.70 $110.36 $142.49

Groundman $66.39 $77.68 $63.38 $89.93 $53.00 $98.60 $91.62 $114.52 $62.41 $76.28

Other $114.70 $134.20 $48.00 $91.35 $147.61 $198.11

Per Diem $150.00 $164.71 $164.71 $150.00 $100.00 $75.00

PLANNED

Description

Mobilization Rate

Mileage Rate (per mile)

PLANNED

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader

NQ $107.26 $152.19 $79.00 $136.30 $134.79 $178.98 $115.02 $138.46

Lineman $97.51 $138.35 $70.00 $123.25 $126.65 $166.81 $106.34 $126.80

Apprentice Lineman $65.28 $92.63 $60.00 $108.75 $110.36 $142.49

Groundman $53.75 $76.27 $50.00 $94.25 $91.62 $114.52 $62.41 $76.28

Other $45.00 $87.00 $147.61 $198.11

Per Diem $164.71 $164.71 $150.00 $100.00 $75.00

PLANNED

Description

Mobilization Rate

Mileage Rate (per mile)

PLANNED

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader

NQ $185.96 $278.95 $91.00 $146.45 $104.07 $148.25 $115.02 $138.46

Lineman $127.86 $191.78 $86.00 $139.20 $95.92 $136.08 $106.34 $126.80

Apprentice Lineman $121.38 $182.07 $76.00 $124.70 $79.63 $111.76

Groundman $70.08 $105.13 $58.00 $98.60 $60.89 $83.79 $62.41 $76.28

Other $53.00 $91.35 $116.88 $167.38

Per Diem $164.71 $164.71 $150.00 $100.00 $75.00

PLANNED

Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Bucket Trucks (up to – 100”) $40.87 $331.20 $331.20 $58.00 $58.00 $67.93 $67.93 Separate sheet in bid docs

Bucket Truck (100ft) $459.66 $459.66 $115.00 $115.00 $89.95 $89.95

Line Truck – Diggers $37.59 $559.49 $559.49 $58.00 $58.00 $91.96 $91.96

Pole Trailers $14.11 $28.36 $28.36 $10.00 $10.00 $9.41 $9.41

Wire Trailer $146.01 $146.01 $5.95 $5.95 $10.45 $10.45

Flat Trailers $6.26 $28.36 $28.36 $7.50 $7.50 $10.45 $10.45

Trac Vehicles $370.64 $370.64 $139.00 $139.00 $119.13 $119.13

Wire Trailers $146.01 $146.01 $23.98 $23.98 $10.45 $10.45

Pick up Truck $12.58 $31.44 $31.44 $25.00 $25.00 $26.99 $26.99

Crew Truck $13.73 $42.44 $42.44 $26.00 $26.00 $26.99 $26.99

Wire Pulling Machine $414.00 $414.00 $64.35 $64.35 $82.50 $82.50

Trencher $101.22 $101.22 $27.82 $27.82 $54.57 $54.57

Backhoe $101.22 $101.22 $32.65 $32.65 $59.57 $59.57

OVERHEAD DISTRIBUTION WORK

ITB 06-25 ANNUAL CONTRACT ELECTRIC CONSTRUCTION

EQUIPMENT RATES

Haugland Energy Group

NQ

NQ

NQ

NQ

NQ

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

Hooper Corp

$0.25 $35.42

Haugland Energy Group Hooper Corp

HOURLY LABOR RATES

NQ $50.00

NQ

NQ

NQ

NQ

NQ

NQ

Haugland Energy Group Hooper Corp

Unit Price Unit Price

$7,500.00 $12,653.04

$12,500.00 $16,292.44

Haugland Energy Group Hooper Corp

Haugland Energy Group Hooper Corp

TRANSMISSION WORK

NQ NQ $68,823.53 $28,000.00

Unit Price Unit Price Unit Price Unit Price

NQ

NQ

NQ

Haugland Energy Group Hooper Corp

Unit Price Unit Price

Unit Price Unit Price

Haugland Energy Group Hooper Corp

$0.25 $27.51

HOURLY LABOR RATES

Unit Price Unit Price Unit Price Unit Price

DaVinci EPC / One Span Gridco Inc

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

5 star electric Apex Lineworks LLC

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

5 star electric Apex Lineworks LLC DaVinci EPC / One Span

NQ NQ $3,174.75 $10,000.00

NQ $3.52 $30.00

NQ

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

HOURLY LABOR RATES

$7,500.00 $12,653.04

$0.25 $27.51

Gridco Inc

5 star electric Apex Lineworks LLC DaVinci EPC / One Span

$4.32 $3.52 $30.00

Unit Price Unit Price Unit Price

$237.60 $5,631.91 $10,000.00

Unit Price

NQ

NQ

NQ

NQ

NQ

NQ

NQ

NQ

Gridco Inc

UNDERGROUND DISTRIBUTION WORK

NQ

NQ

NQ

NQ

NQ

NQ

NQ

NQ

NQ

NQ

STORM/EMERGENCY

Mobilization Rate

Mileage Rate (per mile)

STORM/EMERGENCY

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $169.96 $169.96 $173.20 $196.14 $179.86 $232.96 $146.00 $175.00 $178.98 $244.84 $174.11 $174.11

Lineman $154.08 $154.08 $165.38 $187.29 $172.94 $224.00 $140.00 $167.00 $166.81 $227.12 $159.46 $159.46

Apprentice Lineman $148.78 $148.78 $161.17 $182.52 $124.52 $161.28 $129.00 $151.00 $142.49 $191.67

Groundman $122.32 $122.32 $100.25 $113.53 $89.93 $116.48 $110.00 $125.00 $114.52 $150.91 $96.10 $96.10

Other $114.07 $114.07 $173.20 $196.14 $103.00 $118.00 $198.11 $272.72

Per Diem $125.00 $125.00 $150.00 $164.71 $164.71 $150.00 $100.00 $75.00

STORM/EMERGENCY

Description

Mobilization Rate

Mileage Rate (per mile)

STORM/EMERGENCY

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader

NQ NQ $152.19 $197.12 $124.00 $198.00 $178.98 $244.84 $174.11 $174.11

Lineman

NQ $138.35 $179.20 $113.00 $180.00 $166.81 $227.12 $159.46 $159.46

Apprentice Lineman NQ $92.63 $119.97 $99.00 $156.00 $142.49 $191.67 Separate sheet in bid docs

Groundman

NQ $76.27 $98.78 $83.00 $133.00 $114.52 $150.91 $96.10 $96.10

Other

NQ $75.00 $120.00 $198.11 $272.72

Per Diem

NQ $164.71 $164.71 $150.00 $100.00 $75.00

STORM/EMERGENCY

Description

Mobilization Rate

Mileage Rate (per mile)

STORM/EMERGENCY

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $238.84 $238.84 NQ $185.96 $278.95 $172.00 $250.00 $148.25 $211.98 $174.11 $174.11

Lineman $224.28 $224.28 $127.86 $191.78 $160.00 $233.00 $136.08 $194.03 $159.46 $159.46

Apprentice Lineman $218.40 $218.40 $121.38 $182.07 $142.00 $206.00 $111.76 $172.13 Separate sheet in bid docs

Groundman $189.28 $189.28 $70.08 $105.13 $133.00 $193.00 $83.79 $116.85 $96.10 $96.10

Other $114.07 $114.07 $113.00 $164.00 $167.38 $220.95

Per Diem $125.00 $125.00 $164.71 $164.71 $150.00 $100.00 $75.00

STORM/EMERGENCY

Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Bucket Trucks (up to – 100”) $101.00 $101.00 $331.20 $331.20 $78.00 $78.00 $67.93 $67.93 Separate sheet in bid docs

Bucket Truck (100ft) $132.00 $132.00 $459.66 $459.66 $156.00 $156.00 $89.95 $89.95

Line Truck – Diggers $104.00 $104.00 $559.49 $559.49 $64.00 $64.00 $91.96 $91.96

Pole Trailers $19.00 $19.00 $28.36 $28.36 $17.00 $17.00 $9.41 $9.41

Wire Trailer $42.00 $42.00 $146.01 $146.01 $8.50 $8.50 $10.45 $10.45

Flat Trailers $20.00 $20.00 $28.36 $28.36 $11.68 $11.68 $10.45 $10.45

Trac Vehicles $165.00 $165.00 $370.64 $370.64 $250.00 $250.00 $119.13 $119.13

Wire Trailers $175.00 $175.00 $146.01 $146.01 $41.00 $41.00 $10.45 $10.45

Pick up Truck $24.00 $24.00 $31.44 $31.44 $27.21 $27.21 $26.99 $26.99

Crew Truck $32.00 $32.00 $42.44 $42.44 $30.95 $30.95 $26.99 $26.99

Wire Pulling Machine $123.00 $123.00 $414.00 $414.00 $87.32 $87.32 $82.50 $82.50

Trencher $27.00 $27.00 $101.22 $101.22 $153.85 $153.85 $54.67 $54.67

Backhoe $29.00 $29.00 $101.22 $101.22 $51.00 $51.00 $54.67 $54.67

HOURLY LABOR RATES

UNDERGROUND DISTRIBUTION WORK

HOURLY LABOR RATES

EMERGENCY RESPONSE AND STORM RESTORATION RATES

OVERHEAD DISTRIBUTION WORK

$9,500.00 $16,453.00

$0.25 $35.77

Haugland Energy Group Hooper Corp

Unit Price Unit Price

Haugland Energy Group Hooper Corp

Unit Price Unit Price

$9,500.00 $16,453.00

EQUIPMENT RATES

HOURLY LABOR RATES

$0.25 $43.68

Haugland Energy Group Hooper Corp

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

$0.70 $50.00

Unit Price Unit Price

$15,000.00 $20,092.40

Haugland Energy Group Hooper Corp

Haugland Energy Group Hooper Corp

TRANSMISSION WORK

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

Unit Price Unit Price Unit Price Unit Price

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

Haugland Energy Group Hooper Corp5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

Unit Price Unit Price Unit Price Unit Price

$68,436.77 NQ $28,000.00

NQ NQ $3,898.76 $10,000.00

NQ $3.25 $30.00

Unit Price Unit Price Unit Price Unit Price

5 star electric Apex Lineworks LLC DaVinci EPC / One Span Gridco Inc

$33,960.00 $237.60 $6,703.74 $10,000.00

$0.70 $4.32 $4.19 $0.25 $35.77$30.00

Haugland Energy Group Hooper Corp

Mobilization Rate

Mileage Rate (per mile)

PLANNED

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $99.87 $139.82 $132.81 $169.22 $132.00 $172.00 $114.82 $154.96 $133.09 $193.17 $95.68 $116.72

Lineman $95.28 $133.39 $128.83 $163.79 $125.00 $168.00 $105.83 $142.84 $121.87 $176.49 $91.66 $111.82

Apprentice Lineman $82.46 $115.44 $118.86 $150.17 $103.00 $160.00 $91.85 $123.98 $70.70 $100.59 $86.38 $105.38

Groundman $61.68 $86.35 $62.02 $78.04 $88.00 $130.00 $75.88 $102.42 $71.29 $101.51 $57.30 $69.90

Other $84.50 $118.30 rate sheet attached $100.00 $145.00 $68.45 $92.39

Per Diem $150.00 $165.00 $125.00 $125.00 $10.00

PLANNED

Description

Mobilization Rate

Mileage Rate (per mile)

PLANNED

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader

$82.46 $115.44 $122.84 $155.61 NQ $87.34 $118.59 NQ $95.68 $116.72

Lineman $73.67 $103.14 $104.92 $131.14 $77.88 $105.11 $91.66 $111.82

Apprentice Lineman $67.80 $94.92 $96.94 $120.24 $69.89 $94.33 $86.38 $105.38

Groundman $45.80 $64.13 $77.02 $93.04 $52.42 $70.74 $57.30 $69.90

Other rate sheet attached $61.90 $83.55

Per Diem $150.00 $165.00 $125.00

PLANNED

Description

Mobilization Rate

Mileage Rate (per mile)

PLANNED

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $99.87 $139.82 $131.85 $172.63 $132.00 $172.00 $95.79 $136.22 $133.09 $193.17 $108.35 $153.86

Lineman $95.28 $133.39 $125.64 $164.17 $125.00 $168.00 $91.41 $130.00 $121.87 $176.49 $104.30 $148.11

Apprentice Lineman $82.46 $115.44 $113.21 $147.25 $103.00 $160.00 $71.84 $102.16 $70.70 $100.59 $72.30 $102.67

Groundman $61.68 $86.35 $80.08 $102.15 $88.00 $130.00 $49.90 $70.97 $71.29 $101.51 $65.56 $93.10

Other $84.50 $118.30 rate sheet attached $100.00 $145.00 $80.43 $114.39

Per Diem $150.00 $165.00 $125.00 $200.00 $10.00 $75.00

PLANNED

Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Bucket Trucks (up to – 100”) Separate sheet in bid docs $73.10 $73.10 $80.00 $80.00 $150.33 $150.33 $150.87 $150.87 $60.29 $60.29

Bucket Truck (100ft) $138.70 $138.70 $105.00 $105.00 $136.90 $136.90 $166.60 $166.60 $70.56 $70.56

Line Truck – Diggers $80.30 $80.30 $100.00 $100.00 $65.06 $65.06 $110.60 $110.60 $47.72 $47.72

Pole Trailers $7.00 $7.00 $15.00 $15.00 $9.05 $9.05 $9.33 $9.33 $14.03 $14.03

Wire Trailer $29.40 $29.40 $20.00 $20.00 $40.00 $40.00 $10.67 $10.67 $10.06 $10.06

Flat Trailers $13.00 $13.00 $20.00 $20.00 $14.09 $14.09 $33.25 $33.25 $15.00 $15.00

Trac Vehicles $144.50 $144.50 $175.00 $175.00 $235.65 $235.65 $75.00 $75.00 see price sheet see price sheet

Wire Trailers $86.10 $86.10 $20.00 $20.00 $8.05 $8.05 $10.67 $10.67 $15.00 $15.00

Pick up Truck $21.60 $21.60 $25.00 $25.00 $18.11 $18.11 $30.50 $30.50 $19.94 $19.94

Crew Truck $26.60 $26.60 $25.00 $25.00 $24.01 $24.01 $27.60 $27.60 $19.94 $19.94

Wire Pulling Machine $109.80 $109.80 $20.00 $20.00 $166.75 $166.75 $78.67 $78.67 $24.61 $24.61

Trencher $9.21 $9.21 $40.00 $40.00 $52.90 $52.90 $39.00 $39.00 $36.44 $36.44

Backhoe $53.90 $53.90 $50.00 $50.00 $31.71 $31.71 $48.00 $48.00 $25.30 $25.30

ITB 06-25 ANNUAL CONTRACT ELECTRIC CONSTRUCTION

OVERHEAD DISTRIBUTION WORK

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

$25.00 $0.70 $7.19

HOURLY LABOR RATES

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$18,750.00/ Waived if awarded $15,000.00 $5,000.00 $2,500.00

UNDERGROUND DISTRIBUTION WORK

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

$25.00 $6.32

HOURLY LABOR RATES

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$18,750.00/ Waived if awarded $15,000.00 NQ $2,000.00 NQ

TRANSMISSION WORK

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$18,750.00/ Waived if awarded $50,000.00 $5,000.00 $26,839.91

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

$170.00 $0.70 $1.00

HOURLY LABOR RATES

EQUIPMENT RATES

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

Caleb Fisher Highlight

Caleb Fisher Highlight

Mobilization Rate

Mileage Rate (per mile)

STORM/EMERGENCY

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $139.82 $169.78 $132.81 $169.22 $220.00 $131.71 $185.07 $279.68 $197.26 $241.79

Lineman $133.39 $161.98 $128.83 $163.79 $210.00 $122.33 $171.26 $255.40 $188.96 $231.63

Apprentice Lineman $115.44 $140.18 $118.86 $150.17 $195.00 $102.59 $143.62 $144.83 $167.21 $205.06

Groundman $86.35 $104.86 $62.02 $78.04 $160.00 $86.05 $120.48 $146.31 $118.31 $145.22

Other $118.30 $143.65 rate sheet attached $175.00 $80.24 $112.47

Per Diem $150.00 $165.00 3 meals $175.00 $10.00 $75.00

STORM/EMERGENCY

Description

Mobilization Rate

Mileage Rate (per mile)

STORM/EMERGENCY

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader

$115.44 $140.18 $122.84 $155.61 NQ $100.44 $104.97 NQ $197.26 $241.79

Lineman $103.14 $125.24 $104.92 $131.14 $89.56 $93.60 $188.96 $231.63

Apprentice Lineman $94.92 $115.26 $96.94 $120.24 $80.37 $83.99 $167.21 $205.06

Groundman $64.13 $77.86 $77.02 $93.04 $60.28 $63.01 $118.13 $145.22

Other rate sheet attached $71.19 $71.85

Per Diem $150.00 $165.00 $175.00 $75.00

STORM/EMERGENCY

Description

Mobilization Rate

Mileage Rate (per mile)

STORM/EMERGENCY

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $139.82 $169.78 $131.85 $172.63 $220.00 $136.22 $136.22 $279.68 $197.59 $250.94

Lineman $133.39 $161.98 $125.64 $164.17 $210.00 $130.00 $130.00 $255.40 $189.29 $240.40

Apprentice Lineman $115.44 $140.18 $113.21 $147.25 $195.00 $102.16 $102.16 $144.83 $157.20 $199.64

Groundman $86.35 $104.86 $80.08 $102.15 $160.00 $70.97 $70.97 $146.31 $149.82 $190.27

Other $118.30 $143.65 rate sheet attached $175.00 $114.39 $114.39

Per Diem $150.00 $165.00 3 meals $200.00 $10.00

STORM/EMERGENCY

Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Bucket Trucks (up to – 100”) Separate sheet in bid docs $73.10 $73.10 $145.00 $145.00 $150.33 $150.33 $210.91 $60.29 $60.29

Bucket Truck (100ft) $138.70 $138.70 $200.00 $200.00 $136.90 $136.90 $290.50 $70.56 $70.56

Line Truck – Diggers $80.30 $80.30 $65.06 $65.06 $189.51 $47.72 $47.72

Pole Trailers $7.00 $7.00 $35.00 $35.00 $9.05 $9.05 $21.88 $14.03 $14.03

Wire Trailer $29.40 $29.40 $30.00 $30.00 $40.00 $40.00 $25.00 $10.06 $10.06

Flat Trailers $13.00 $13.00 $30.00 $30.00 $14.09 $14.09 $50.31 $15.00 $15.00

Trac Vehicles $144.50 $144.50 $265.00 $265.00 $235.65 $235.65 $82.50 see price sheet see price sheet

Wire Trailers $86.10 $86.10 $8.05 $8.05 $12.00 $15.00 $15.00

Pick up Truck $21.60 $21.60 $40.00 $40.00 $18.11 $18.11 $47.56 $19.94 $19.94

Crew Truck $26.60 $26.60 $55.00 $55.00 $24.01 $24.01 $32.31 $19.94 $19.94

Wire Pulling Machine $109.80 $109.80 $40.00 $40.00 $166.75 $166.75 $86.00 $24.61 $24.61

Trencher $9.21 $9.21 $52.90 $52.90 $42.00 $36.44 $36.44

Backhoe $53.90 $53.90 $80.00 $80.00 $31.71 $31.71 $52.13 $25.30 $25.30

EMERGENCY RESPONSE AND STORM RESTORATION RATES

OVERHEAD DISTRIBUTION WORK

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$18,750.00/ Waived if awarded $15,000.00 $5,000.00 $2,500.00

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

UNDERGROUND DISTRIBUTION WORK

$25.00 $0.70 $7.19

HOURLY LABOR RATES

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$18,750.00/ Waived if awarded $15,000.00 NQ $2,000.00 NQ

$25.00 $6.32

TRANSMISSION WORK

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

HOURLY LABOR RATES

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$18,750.00/ Waived if awarded $50,000.00 labor & Equip $35,665.70

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

EQUIPMENT RATES

$170.00 $0.70 $1.00

HOURLY LABOR RATES

Imeprium Utility Services Irby Construction M. Gay Constructors Mastec NA Michels Power Inc Utility Lines Construction Services

Mobilization Rate

Mileage Rate (per mile)

PLANNED

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $84.91 $116.66 $108.46 $151.85 $107.74 $152.88 $95.32 $127.01 $136.56 $191.71 $93.87 $136.54

Lineman $81.51 $112.00 $104.37 $146.12 $103.60 $147.00 $87.63 $116.43 $130.16 $182.72 $86.17 $124.98

Apprentice Lineman $59.43 $81.66 $75.72 $106.01 $74.59 $105.84 $71.85 $96.62 $85.35 $119.82 $50.57 $71.10

Groundman $42.45 $58.33 $42.97 $60.16 $53.87 $76.44 $52.53 $68.16 $53.34 $74.89 $51.22 $72.78

Other $93.40 $128.33 $72.25 $95.25 $97.73 $142.31

Per Diem

$150.00 $140.00 $140.00 $140.00 $7.50 NA $15.25

PLANNED

Description

Mobilization Rate

Mileage Rate (per mile)

PLANNED

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader

$71.32 $98.00 $85.30 $119.42 $91.17 $129.36 $95.32 $127.01 $136.56 $191.71 NQ

Lineman $54.34 $74.66 $85.30 $119.42 $82.88 $117.60 $87.63 $116.43 $130.16 $182.72

Apprentice Lineman $45.85 $63.00 $64.98 $90.97 $55.49 $78.73 $71.85 $96.62 $85.35 $119.82

Groundman $39.06 $53.67 $35.61 $49.86 $45.69 $64.83 $52.53 $68.16 $53.34 $74.89

Other $93.40 $128.33 $72.25 $95.25

Per Diem

$150.00 $140.00 $140.00 $140.00 $7.50 NA

PLANNED

Description

Mobilization Rate

Mileage Rate (per mile)

PLANNED

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader

$91.78 $126.11 $126.74 $177.45 $158.07 $237.11 $98.85 $132.72 NA $93.87 $136.54

Lineman $79.81 $109.66 $120.56 $168.77 $108.66 $163.01 $91.10 $121.86 $86.17 $124.98

Apprentice Lineman $71.83 $98.70 $92.70 $129.78 $103.17 $154.76 $77.41 $96.62 $50.57 $71.10

Groundman $39.91 $54.83 $51.90 $72.65 $59.57 $89.36 $52.53 $68.16 $51.22 $72.78

Other $96.79 $133.00 $72.25 $95.25 $97.73 $142.31

Per Diem $150.00 $185.00 $140.00 $140.00 $7.50 $15.25

PLANNED

Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Bucket Trucks (up to – 100”) $101.54 $101.54 $48.92 $48.92 $281.52 $281.52 $34.00 $34.00 $63.17 $65.00 $65.00

Bucket Truck (100ft) $113.24 $113.24 $72.15 $72.15 $390.71 $390.71 $90.00 $90.00 $85.00 $85.00

Line Truck – Diggers $105.43 $105.43 $41.99 $41.99 $475.57 $475.57 $36.00 $36.00 $63.17 $50.00 $50.00

Pole Trailers $10.50 $10.50 $6.38 $6.38 $24.11 $24.11 $9.00 $9.00 $12.60 $12.00 $12.00

Wire Trailer $22.26 $22.26 $7.45 $7.45 $124.11 $124.11 $20.00 $20.00 $12.60 $12.00 $12.00

Flat Trailers $13.47 $13.47 $6.38 $6.38 $24.11 $24.11 $10.00 $10.00 $12.60 $12.00 $12.00

Trac Vehicles $79.55 $79.55 $121.30 $121.30 $315.04 $315.04 $100.00 $100.00 $55.28 $85.00 $85.00

Wire Trailers $22.26 $22.26 $7.45 $7.45 $124.11 $124.11 $20.00 $20.00 $12.60 $12.00 $12.00

Pick up Truck $23.11 $23.11 $26.01 $26.01 $26.72 $26.72 $22.00 $22.00 $24.77 $18.00 $18.00

Crew Truck $49.75 $49.75 $26.01 $26.01 $36.07 $36.07 $22.00 $22.00 $31.59 $18.00 $18.00

Wire Pulling Machine $97.54 $97.54 $22.69 $22.69 $351.90 $351.90 $33.00 $33.00 $55.28 $28.00 $28.00

Trencher $19.56 $19.56 cost+10% cost+10% $86.04 $86.04 $40.00 $40.00 $25.00 $25.00

Backhoe $40.97 $40.97 $17.68 $17.68 $86.04 $86.04 $40.00 $40.00 $39.48 $28.00 $28.00

OVERHEAD DISTRIBUTION WORK

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

ITB 06-25 ANNUAL CONTRACT ELECTRIC CONSTRUCTION

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$5,000.00 $4,800.00 $4,787.13 $460.00 $1,660.33 $5,000.00

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

UNDERGROUND DISTRIBUTION WORK

$7.00 $2.99 $1.75 $1.35

HOURLY LABOR RATES

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$5,000.00 $4,800.00 $2,698.54 $460.00 $1,660.33

$7.00 $2.25 $1.50

TRANSMISSION WORK

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

HOURLY LABOR RATES

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$5,000.00 $16,000.00 $58,500.00 $650.00 $5,000.00

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

EQUIPMENT RATES

$7.00 $1.75 $1.35

HOURLY LABOR RATES

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

Caleb Fisher Highlight

Mobilization Rate

Mileage Rate (per mile)

STORM/EMERGENCY

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $101.89 $140.00 rate sheet attached $152.88 $198.02 $127.01 $221.66 $169.28 $211.59 $93.87 $136.54

Lineman $97.81 $134.40 $147.00 $190.40 $116.43 $202.55 $166.50 $208.13 $86.17 $124.98

Apprentice Lineman $71.32 $98.00 $105.84 $137.09 $71.25 $173.87 $157.34 $196.68 $50.57 $71.10

Groundman $50.94 $70.00 $76.44 $99.01 $68.16 $123.19 $157.34 $196.68 $51.22 $72.78

Other $112.08 $154.00 $95.25 $144.18 $97.73 $142.31

Per Diem cost + 15% $140.00 $140.00 $7.50 $15.25

STORM/EMERGENCY

Description

Mobilization Rate

Mileage Rate (per mile)

STORM/EMERGENCY

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $85.59 $117.60 rate sheet attached $129.36 $167.55 $127.01 $221.66 $169.28 $211.59 NQ

Lineman $65.21 $89.60 $117.60 $152.32 $116.43 $202.55 $166.50 $208.13

Apprentice Lineman $55.02 $75.60 $78.73 $101.98 $71.25 $173.87 $157.34 $196.68

Groundman $46.87 $64.40 $64.83 $83.97 $68.16 $123.19 $157.34 $196.68

Other $112.08 $154.00 $95.25 $144.18

Per Diem cost + 15% $140.00 $140.00 $7.50

STORM/EMERGENCY

Description

Mobilization Rate

Mileage Rate (per mile)

STORM/EMERGENCY

Personnel Class Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Line Crew Leader $110.14 $151.34 rate sheet attached $158.07 $237.11 $132.72 $221.66 NA $93.87 $136.54

Lineman $95.77 $131.60 $108.68 $163.01 $121.86 $202.55 $86.17 $124.98

Apprentice Lineman $86.20 $118.44 $103.17 $154.76 $79.44 $173.87 $50.57 $71.10

Groundman $47.89 $65.80 $59.57 $89.36 $68.16 $123.19 $51.22 $72.78

Other $116.15 $159.60 $95.25 $144.18 $97.73 $142.31

Per Diem cost + 15% $140.00 $140.00 $7.50 $15.25

STORM/EMERGENCY

Equipment Type Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate Regular Rate OT Rate

Bucket Trucks (up to – 100”) $108.63 $108.63 rate sheet attached $281.52 $281.52 $34.00 $60.00 $63.17 $63.17 $65.00 $65.00

Bucket Truck (100ft) $121.15 $121.15 $390.71 $390.71 $90.00 $105.00 $85.00 $85.00

Line Truck – Diggers $112.78 $112.78 $475.57 $475.57 $36.00 $64.00 $63.17 $63.17 $50.00 $50.00

Pole Trailers $11.23 $11.23 $24.11 $24.11 $9.00 $12.00 $12.60 $12.60 $12.00 $12.00

Wire Trailer $23.81 $23.81 $124.11 $124.11 $20.00 $25.00 $12.60 $12.60 $12.00 $12.00

Flat Trailers $14.41 $14.41 $24.11 $24.11 $10.00 $12.00 $12.60 $12.60 $12.00 $12.00

Trac Vehicles $85.10 $85.10 $315.04 $315.04 $100.00 $120.00 $55.28 $55.28 $85.00 $85.00

Wire Trailers $23.81 $23.81 $124.11 $124.11 $20.00 $25.00 $12.60 $12.60 $12.00 $12.00

Pick up Truck $24.75 $24.75 $26.72 $26.72 $22.00 $26.00 $24.77 $24.77 $18.00 $18.00

Crew Truck $53.27 $53.27 $36.07 $36.07 $22.00 $26.00 $31.59 $31.59 $18.00 $18.00

Wire Pulling Machine $104.14 $104.14 $351.90 $351.90 $30.00 $35.00 $55.28 $55.28 $28.00 $28.00

Trencher $20.88 $20.88 $86.04 $86.04 $40.00 $45.00 $25.00 $25.00

Backhoe $43.81 $43.81 $86.04 $86.04 $40.00 $45.00 $39.48 $39.48 $28.00 $28.00

OVERHEAD DISTRIBUTION WORK

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

EMERGENCY RESPONSE AND STORM RESTORATION RATES

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$7,500.00 $5,698.18 $870.00 $5,000.00

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

UNDERGROUND DISTRIBUTION WORK

$9.00 $3.56 $1.75 $1.35

HOURLY LABOR RATES

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$7,500.00 $3,313.95 $870.00

$9.00 $2.76 $1.75

TRANSMISSION WORK

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

HOURLY LABOR RATES

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

$9.00 $1.75 $1.35

HOURLY LABOR RATES

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

$7,500.00 T&E Portal to Portal $1,200.00 $5,000.00

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

Phillips & Jordan Inc Pike Electric Primoris PSC SPE Group Team Fishel Xtreme Powerline

EQUIPMENT RATES

Sheet1

File details come from the government source that posted it. Updated .