Site 38 Barn Combined Amendment 1 Drawing.pdf

PDF 2 MB Posted

Attached to
Site 38 Barn Rework
Solicitation number
ISD-351902-RO
Issued by

About this file

This document is a set of architectural and engineering drawings and specifications related to a federal contract opportunity for the "Site 38 Barn Rework" project. The drawings and specifications detail the proposed modifications and renovations to the existing Site 38 Barn, including floor plan layouts, demolition plans, electrical and plumbing plans, and window/door schedules.

The related federal contract opportunity is Solicitation Number ISD-351902-RO, issued by the Department of Energy Fermi National Accelerator Laboratory. The scope of work includes all work described in the "Exhibit C1 & C2 SOW Site 38 Barn Rework" dated November 2, 2023. The contract requires the subcontractor to provide transportation, overhead, bonding, insurance, safety oversight, quality control, and supervision to construct the project as detailed in the drawings and specifications. A pre-proposal meeting and site visit are scheduled for April 15, 2024, and specific access requirements are outlined. The solicitation does not provide information on pricing, set-asides, or the incumbent contractor.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shared Office

Private Office

Maintenance Room

Shared Office

Maintenance Room

Shared Office

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1A1

Site 38 Barn Existing

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Maintenance Room

Maintenance Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath Room

Storage/ Copier

Manager Supervisor Supervisor

Maintenance Room

Zoom Room

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1A2

Site 38 Barn Plan

/2

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Maintenance Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath Room

Storage/ Copier

Manager Supervisor Supervisor

Maintenance Room

Zoom Room

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1A3

Site 38 Barn Interior Buildout

/2

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

1-1

1-41-3 1-5

1-7 1-8

Notes Install new windows per window schedule.

2 Install walls per plan.

- Walls to be Metal partition, 5/8"fire rated gypsum board face, no base, 3-5/8" @ 16" OC framing, same opposite face, sound attenuation insulation.

3 Install new doors.

-Door to be type A metal door, with lever set.

4 Install bathroom fixtures per plan. Plumb per M-1.

- Toilet to be floor mounted, ADA compliant.

- Sink to be 20", wall mounted.

Opening to be made for 5' x 3' picture window.

1-2

Window Schedule Window # Window Type Window Width Window Height Finish

1-1 Double Glazed Low E 22" 35" Metal, White

1-2 Double Glazed Low E 5' 4' Metal, White

1-3 Double Glazed Low E 30" 22" Metal, White

1-4 Double Glazed Low E 30" 22" Metal, White

1-5 Double Glazed Low E 30" 22" Metal, White

1-6 Double Glazed Low E 30" 22" Metal, White

1-7 Double Glazed Low E 5' 3' Metal, White

1-8 Double Glazed Low E 5' 3' Metal, White

2 2

3-1

5 Install sink per plan. Plumb per M-1.

- Sink to be 19" Stainless Steel, 18ga, drop in.

3-1 3-1

3-1

3-1 Install new doors.

-Doors to be hollow metal, 18ga, with full lite insert, leverset.

1-61-6

1-5

Paint Booth

Maintenance Room

Shared Office

Maintenance Room

Shared Office

Demo Concrete Floor

Demo Carpet

Demo VCT

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1D1

Site 38 Barn Flooring Demo

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

VCT and glue tested negative for Asbestos

Concrete floor is 2" thick.

Maintenance Room

Maintenance Room

Shared Office

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1D2

Site 38 Barn Sub Floor Demo

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes

- Remove existing 1" thick sub floor.

- Replace with 2 layers of 3/4" T&G Plywood.

- Install Nora Norament Grano Flooring or equivalent,per manufactures installation instructions.

Maintenance Room

Shared Office

Maintenance Room

Shared Office

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1D3

Site 38 Barn Building Element Demo

/2

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

1 1 1

3 3

7 7

Notes Remove existing windows.

2 Remove existing exhaust fans.

3 Cut building envelope for future window, as noted.

4 Remove existing doors.

5 Demolish existing walls as shown. Patch ceiling as required.

6 Demo base cabinets, floor cabinets, and countertops as shown. Patch remaining cabinetry and walls.

7 Demo wall to accommodate future 3x7 door.

8 Demo utility sink and plumbing back to first floor wall penetration. 1st floor ceiling height is 114" Floor to Joist.

Opening to be made for 6.5' x 4' picture window.

Opening to be made for 5' x 3' picture window.

Opening to be made for 5' x 3' picture window.

Opening to be made for

(2) 22"x30" window.

Confirm location in field.

Maintenance Room

Shared Office

Maintenance Room

Shared Office

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1E1

Site 38 Barn Electrical Demo

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes Relocate existing outlets to locations shown in Note 2, and in E2, Note 1

2 Planned location for relocated outlets.

3 Outlets to be demolished and circuit worked back to nearest junction box.

4 Unwire fans and rework back to nearest junction box.

1 1 1

2 2 2

2 2

3 3

5 Remove existing light.

Maintenance Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath Room

Storage/ Copier

Manager Supervisor Supervisor

Maintenance Room

Zoom Room

PP-CL-2

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1E2

Site 38 Barn New Electrical

/2

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes Relocated outlets as shown in in E1, Note 2

New LED surface mounted light fixtures, LITHONIA

LIGHTING CPX 2X4 ALO8 SWW7 M2, or equivalent. Utilize new circuit ran in Note 2.

- Bathroom Switch to also control fan.

New 20 amp circuit for bathroom and zoom room.

- Bathroom to use PP-CL-2 CKT #6.

- Zoom Room to use PP-CL-2 CKT #4.

4 Add GFCI Protection to existing outlets.

1 1 1

2 2

3 3

5 Install new 120v duplex outlet off of new circuit in Note

2. Junction box to be surface mounted 15" afv.

6 Wire in exhaust fan to new switch shown in Note 3.

7 Conduit to be 12" EMT.

8 Wire to be 12 AWG THHN/THWN-2 Solid Wire

9 Update panel legend.

10 Add occupancy sensors to offices and open office/conference space.

11 Follow applicable LOTO procedures for working inside panel and working on circuits.

10 10

Maintenance Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath Room

Storage/ Copier

Manager Supervisor Supervisor

Maintenance Room

Zoom Room

PP-CL-2

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1E3

Site 38 Barn Data Drops

/2

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes Location of new data drops. To be installed by onsite personnel.

11 1

Maintenance Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath Room

Storage/ Copier

Manager Supervisor Supervisor

Maintenance Room

Zoom Room

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1M1

Plumbing

/2

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes

2 Install new water supply from existing water supply on 1st floor.

- Plumb to water heater, bathroom sink, toilet, and kitchen sink.

- Plumb hot water line from water heater to bathroom sink and kitchen sink.

- Supply piping to be Type L Copper.

3 - Sanitary discharge to connect to existing 4" discharge in 1st floor men's restroom.

- Discharge to be routed through 2nd floor, into mechanics shop, through block wall. Will require removal of 1st floor toilet and partial demo of wall to access.

- Vent discharge up and out through roof.

- 3" PVC discharge from toilet.

- 1 12" discharge from kitchen sink, bathroom sink, and water heater.

Maintenance Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath Room

Storage/ Copier

Manager Supervisor Supervisor

Maintenance Room

Zoom Room

24/12 R/A

12/12 R/A

0/

R /A

0/

S /A

PP-CL-2

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

A p r

1:

a m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B a rn R ew or k A m m en dm en t

1.

dw g

K. Bennett 9/12/2023

1M2

Site 38 Barn Mechanical

/2

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes Vent bathroom exhaust through attic and out the roof.

2 Install (3) new returns.

-Returns to match existing.

-Returns to be routed to existing 12" return and insulated.

2 2

File details come from the government source that posted it. Updated .