This document contains drawings, plans, and specifications for the renovation of the Site 38 Barn at the Fermi National Accelerator Laboratory, a Department of Energy facility. The key details are:

The renovation project includes demolition and construction work, such as removing and replacing windows, doors, walls, floors, and mechanical/electrical systems. The drawings provide detailed plans for the layout, construction, and demolition required. This project is being procured through Solicitation Number ISD-351902-RO, with a pre-proposal meeting and site visit scheduled for April 15, 2024. The Scope of Work is described in "Exhibit C1 & C2SOW Site 38 Barn Rework" dated November 2, 2023. Offerors will be required to provide pricing, overhead, bonding, insurance, and other costs to complete the project as described in the detailed specifications.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shared

Office

Private

Office

Maintenance

Room

Shared

Office

Maintenance

Room

Shared

Office

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O c t p m b l u e F

E S

S F

E S

S O

P S

B e n n e t t P r o j e c t s O p e n S p a c e

P l a n n i n g S i t e

B a r n

M o d i f i c a t i o n s P r o p o s e d

L a y o u t S i t e

B a r n

R e w o r k d w g

K. Bennett 9/12/2023

Site 38 Barn Rework

1A1

Site 38 Barn Existing

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

AutoCAD SHX Text

LIFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text %%USite 38 Barn Existing

AutoCAD SHX Text 1/8"=1'

AutoCAD SHX Text 9/12/23

Maintenance

Room

Maintenance

Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath

Room

Storage/ Copier

Manager

Supervisor Supervisor

Maintenance

Room

Zoom Room

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

t p m b l u e F

E S

S F

E S

S O

P S

B e n n e t t P r o j e c t s O p e n S p a c e

P l a n n i n g S i t e

B a r n

M o d i f i c a t i o n s P r o p o s e d

L a y o u t S i t e

B a r n

R e w o r k d w g

K. Bennett 9/12/2023

Site 38 Barn Rework

1A2

Site 38 Barn Plan

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

AutoCAD SHX Text

LIFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text %%USite 38 Barn Plan

AutoCAD SHX Text 1/8"=1'

Maintenance

Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath

Room

Storage/ Copier

Manager

Supervisor Supervisor

Maintenance

Room

Zoom Room

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

t p m b l u e F

E S

S F

E S

S O

P S

B e n n e t t P r o j e c t s O p e n S p a c e

P l a n n i n g S i t e

B a r n

M o d i f i c a t i o n s P r o p o s e d

L a y o u t S i t e

B a r n

R e w o r k d w g

K. Bennett 9/12/2023

Site 38 Barn Rework

1A3

Site 38 Barn Interior Buildout

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

1-1

1-41-3 1-5

1-7 1-8

Notes Install new windows per window schedule.

2 Install walls per plan.

- Walls to be Metal partition, 5/8"fire rated gypsum board face, no base, 3-5/8" @ 16" OC framing, same opposite face, sound attenuation insulation.

3 Install new doors.

-Door to be type A metal door, with lever set.

4 Install bathroom fixtures per plan. Plumb per M-1

- Toilet to be Wall Mount, Elongated Bowl.

- Sink to be19", counter mounted .

Opening to be made for

5' x 3' picture window.

1-6

1-2

Window Schedule

Window #

Window Type

Window Width

Window Height

Finish

1-1 Double Glazed Low E 22" 35" Metal, White

1-2 Double Glazed Low E

6.5'

4' Metal, White

1-3 Double Glazed Low E 22" 30" Metal, White

1-4 Double Glazed Low E 22" 30" Metal, White

1-5 Double Glazed Low E 18" 72" Metal, White

1-6 Double Glazed Low E 24" 24" Metal, White

1-7 Double Glazed Low E 5' 3' Metal, White

1-8 Double Glazed Low E 5' 3' Metal, White

3-1

5 Install sink per plan. Plumb per M-1.

- Sink to be 19" Stainless Steel, 18ga, drop in.

3-1 3-1

3-1

3-1 Install new doors.

-Doors to be hollow metal, 18ga, with full lite insert, leverset.

AutoCAD SHX Text

LIFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text %%USite 38 Barn Construction

AutoCAD SHX Text 1/8"=1'

Paint

Booth

Maintenance

Room

Shared

Office

Maintenance

Room

Shared

Office

Demo Concrete Floor

Demo Carpet

Demo VCT

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

t p m b l u e F

E S

S F

E S

S O

P S

B e n n e t t P r o j e c t s O p e n S p a c e

P l a n n i n g S i t e

B a r n

M o d i f i c a t i o n s P r o p o s e d

L a y o u t S i t e

B a r n

R e w o r k d w g

K. Bennett 9/12/2023

Site 38 Barn Rework

1D1

Site 38 Barn Flooring Demo

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

VCT and glue tested negative for Asbestos

Concrete floor is 2" thick.

AutoCAD SHX Text

LIFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text %%USite 38 Barn Proposed Flooring Demo

AutoCAD SHX Text 9/12/2023

1/8"=1'

Maintenance

Room

Maintenance

Room

Shared

Office

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

t p m b l u e F

E S

S F

E S

S O

P S

B e n n e t t P r o j e c t s O p e n S p a c e

P l a n n i n g S i t e

B a r n

M o d i f i c a t i o n s P r o p o s e d

L a y o u t S i t e

B a r n

R e w o r k d w g

K. Bennett 9/12/2023

Site 38 Barn Rework

1D2

Site 38 Barn Sub Floor Demo

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes

- Remove existing 1" thick sub floor.

- Replace with 2 layers of 3/4" T&G Plywood.

- Install Nora Norament Grano Flooring or equivalent,per manufactures installation instructions.

AutoCAD SHX Text

LIFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text %%USite 38 Barn Proposed Sub Floor Replacement

AutoCAD SHX Text 1/8"=1'

Maintenance

Room

Shared

Office

Maintenance

Room

Shared

Office

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

t p m b l u e F

E S

S F

E S

S O

P S

B e n n e t t P r o j e c t s O p e n S p a c e

P l a n n i n g S i t e

B a r n

M o d i f i c a t i o n s P r o p o s e d

L a y o u t S i t e

B a r n

R e w o r k d w g

K. Bennett 9/12/2023

Site 38 Barn Rework

1D3

Site 38 Barn Building Element Demo

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

1 1 1

3 3

Notes Remove existing windows.

2 Remove existing exhaust fans.

3 Cut building envelope for future window, as noted.

4 Remove existing doors.

5 Demolish existing walls as shown. Patch ceiling as required.

6 Demo base cabinets, floor cabinets, and countertops as shown. Patch remaining cabinetry and walls.

7 Demo wall to accommodate future 3x7 door.

8 Demo utility sink and plumbing back to first floor wall penetration. 1st floor ceiling height is 114" Floor to Joist.

Opening to be made for

6.5' x 4' picture window.

Opening to be made for

5' x 3' picture window.

Opening to be made for

5' x 3' picture window.

Opening to be made for

24"x24" window.

AutoCAD SHX Text

LIFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text %%USite 38 Barn Proposed Demo

AutoCAD SHX Text 1/8"=1'

Maintenance

Room

Shared

Office

Maintenance

Room

Shared

Office

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

t p m b l u e F

E S

S F

E S

S O

P S

B e n n e t t P r o j e c t s O p e n S p a c e

P l a n n i n g S i t e

B a r n

M o d i f i c a t i o n s P r o p o s e d

L a y o u t S i t e

B a r n

R e w o r k d w g

K. Bennett 9/12/2023

Site 38 Barn Rework

1E1

Site 38 Barn Electrical Demo

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes Relocate existing outlets to locations shown in Note 2, and in E2, Note 1

2 Planned location for relocated outlets.

3 Outlets to be demolished and circuit worked back to nearest junction box.

4 Unwire fans and rework back to nearest junction box.

1 1

2 2 2

3 3

AutoCAD SHX Text

LIFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text %%USite 38 Barn Proposed Electrical Demo

AutoCAD SHX Text 1/8"=1'

Maintenance

Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath

Room

Storage/ Copier

Manager

Supervisor Supervisor

Maintenance

Room

Zoom Room

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

t p m b l u e F

E S

S F

E S

S O

P S

B e n n e t t P r o j e c t s O p e n S p a c e

P l a n n i n g S i t e

B a r n

M o d i f i c a t i o n s P r o p o s e d

L a y o u t S i t e

B a r n

R e w o r k d w g

K. Bennett 9/12/2023

Site 38 Barn Rework

1E2

Site 38 Barn New Electrical

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes Relocated outlets as shown in in E1, Note 2

2 New LED surface mounted light fixtures, LITHONIA

LIGHTING CPX 2X4 ALO8 SWW7 M2, or equivalent.

3 New light switch for room lights. For bathroom, switch also to control exhaust fan.

4 Add GFCI Protection to existing outlets.

1 1

5 Install new 120v duplex outlet off of nearest circuit.

Junction box to be surface mounted 15" afv.

6 Wire in exhaust fan to new switch shown in Note 3.

AutoCAD SHX Text

LIFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text %%USite 38 Barn Electrical

AutoCAD SHX Text 1/8"=1'

Maintenance Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath Room

Storage/ Copier

Manager Supervisor Supervisor

Maintenance Room

Zoom Room

PP-CL-2

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

O ct

, 2

:4

2p m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B ar n R e w or k.

dw g

K. Bennett 9/12/2023

1E3

Site 38 Barn Data Drops

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes Location of new data drops. To be installed by onsite personnel.

11 1

Maintenance Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath Room

Storage/ Copier

Manager Supervisor Supervisor

Maintenance Room

Zoom Room

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

O ct

, 2

:2

0p m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B ar n R e w or k.

dw g

K. Bennett 9/12/2023

1M1

Plumbing

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes Install new 20 gallon, 3KW electric water heater.

2 Install new water supply from existing water supply on 1st floor.

- Plumb to water heater, bathroom sink, toilet, and kitchen sink.

- Plumb hot water line from water heater to bathroom sink and kitchen sink.

- Supply piping to be Type L Copper.

3 - Sanitary discharge to connect to existing 4" discharge in 1st floor men's restroom.

- Discharge to be routed through 2nd floor, into mechanics shop, through block wall. Will require removal of 1st floor toilet and partial demo of wall to access.

- Vent discharge up and out through roof.

- 3" PVC discharge from toilet.

- 1 12" discharge from kitchen sink, bathroom sink, and water heater.

Maintenance Room

103 Sq ft

105 Sq ft

135 Sq ft

Bath Room

Storage/ Copier

Manager Supervisor Supervisor

Maintenance Room

Zoom Room

24/12 R/A

12/12 R/A

0/

R /A

0/

S /A

PP-CL-2

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

O ct

, 2

:4

1p m

Z

B e nn et t\ P ro je ct s\

O pe n\ S p ac e P la n n in g \S ite

B a rn

M o d ifi ca tio n s\

P ro p o se d

L ay ou t\

S ite

B ar n R e w or k.

dw g

K. Bennett 9/12/2023

1M2

Site 38 Barn Mechanical

/1

/2

1/8"=1'-0" 8 0 8 16

SCALE FEET

Notes Vent bathroom exhaust through attic and out the roof.

2 Install (3) new returns.

-Returns to match existing.

-Returns to be routed to existing 12" return and insulated.

2 2