Exhibit C1 - SOW Site_38_Barn_Rework.pdf
PDF 202 KB Posted
- Attached to
- Site 38 Barn Rework
- Solicitation number
- ISD-351902-RO
About this file
The document is a Statement of Work (SOW) for the rework of the second floor of Site 38 Barn at Fermilab. The scope of work includes demolition of existing building components, such as doors, furniture, walls, flooring, and windows, as well as the buildout of the space, including installation of new windows, subfloor, walls, doors, plumbing, HVAC, and finishes. The estimated period of performance is from January 1, 2024, to July 31, 2024.
The related federal contract opportunity is a solicitation (Solicitation Number: ISD-351902-RO) for the Site 38 Barn Rework project. The solicitation includes details on a pre-proposal meeting and site visit, as well as access requirements for attendees. The work shall be performed as described in the SOW, and the solicitation provides information on the project's scope, pricing terms, and other relevant details.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW TEMPLATE 04.24.2023
SOW DATE: 11/2/2023
PROJECT TITLE: WO910731 Site 38 Barn Rework FRA POINT OF CONTACT: Kristian Bennett COUNTY THAT WORK WILL BE COMPLETED IN: DuPage☒ Kane☐ Fermilab County Line
INTRODUCTION
This work is intended to rework the second floor of Site 38 to accommodate a growing FM organization.
SCOPE OF WORK
1. Demolish building components per plan.
a. Salvage and demolish 3 Doors.
b. Deconstruct and salvage any remaining office furniture in the office area.
c. Demolish existing sink and eyewash.
i. Demo water supply and drain.
d. Relocate and demolish outlets per plan.
e. Demolish walls per plan.
f. Demolish concrete floor per plan.
g. Demolish existing laminate flooring per plan.
h. Demolish existing laminate flooring per plan.
i. Demolish sub floor per plan.
j. Demolish 5 windows and exhaust fans per plan.
k. Demolish countertop and cabinets per plan.
2. Buildout Space
a. Cut and install 7 picture windows per plan.
b. Install new 1 ½” subfloor per plan.
c. Build walls per plan.
d. Cut door openings per plan.
i. Install doors per plan.
e. Install water heater.
f. Install sanitary discharge, water supply, and venting per plan.
g. Install sink per plan.
h. Install lavatory per plan.
i. Install resilient flooring (Nora plan or similar).
j. Install new lights and exhaust fan per plan.
k. Install (3) HVAC returns in newly subdivided office space.
l. Patch and paint 2nd floor
GOVERNMENT FURNISHED PROPERTY
None
PLACE OF PERFORMANCE
Site 38 Barn, Second Floor above Carpenter Shop
ESTIMATED SCHEDULE/PERIOD OF PERFORMANCE
Statement of Work Infrastructure Services Division https://fermipoint.fnal.gov/org/os/FESS/web_docs/Shared%20Documents/Fermilab%20-%20with%20County%20Lines-compressed.pdf
SOW TEMPLATE 04.24.2023
EST START DATE: 1/1/2024 EST END DATE: 7/31/2024
Additional justification for hard stop / start dates
File details come from the government source that posted it. Updated .