IRFQ_25_26-301_Bid_Tabulation.pdf
PDF 188 KB Posted
- Attached to
- First Street Archway Repair
- Solicitation number
- IRFQ 25/26-301
- Issued by
- Seminole County, Florida
About this file
This is a Bid Tabulation Sheet from the City of Sanford Finance Department Purchasing Division for IRFQ 25/206-301, the First Street Archway Repair project located at 300 N Park Avenue in Sanford, Florida. The solicitation was opened on December 4, 2025, at 2:00 P.M. local time. The project scope includes evaluation and repair of damage to the south entry wall of the Historic Downtown Sanford located on the south side of First Street and French Avenue. The work encompasses careful removal of existing brick from one column measuring approximately 4 feet by 2 feet by 17 feet 5 inches, supply and installation of modular brick to match the existing structure using General Shale (Boral) Bayou brick or equivalent, implementation of full Maintenance of Traffic (MOT) setup for two weeks including sidewalk closure and barricades, and all associated labor, materials, trash removal, and code compliance.
The total contract amount for the single bid received from Booth's Cobblestone is $34,751.50, itemized as follows: Itemized List $3,105.00, Labor Hourly $27,000.00, MOT Set up $3,751.50, and Cleanup $895.00. All line items show 0% markup applied. The solicitation was opened and verified by Frank Mascola and Marisol Ordonez respectively. The project includes all labor and materials for brick removal and installation, job-related trash removal, compliance with applicable codes and standards, and coordination with city representatives as needed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Sanford Finance Department |Purchasing Division IFRQ 25/206-301 300 N Park Ave First Street Archway Repair Sanford, FL 32771 12.4.2025 Telephone: (407) 688-5091 2:00 P.M. Local Time Fax: (407) 688-5021 Email: purchasing@sanfordfl.gov
VENDOR NAME→
Solicitation Evaluation Category ↓ Itemizie List Total Cost $3,105.00 Labor Hourly $27,000.00 MOT Set up 0% $3,751.50 Cleanup 0% $895.00 Total IRFQ Total Amount 0% $34,751.50
Solicitation Tabulation Sheet Form
OPENED BY: Frank Mascola VERIFIED BY: Marisol Ordoñez
Solicitation Number:
Solicitation Title Solicitation Opening Date:
Solicitation Opening Time:
Booth's Cobblestone
Sheet1
File details come from the government source that posted it. Updated .