Iowa Central CMaR SOQ Evaluation Results.pdf

PDF 623 KB Posted

Attached to
Construction Manager at Risk Services - GMP Contract
Solicitation number
24-001
Issued by
Webster County, Iowa

About this file

This document is the Iowa Central Community College Construction Manager at Risk Statement of Qualification Evaluation Summary. It outlines the process and results for selecting a Construction Manager at Risk (CMaR) for a renovation project at the college's East Campus and re-roofing project at the main campus. The RFQ was issued on March 1, 2024, and SOQs were due on March 15, 2024. Four firms responded, and their qualifications were evaluated across seven categories including relevant experience, team experience, local market knowledge, project understanding, project management, safety, and timely completion of recent projects. The evaluation scores are detailed in a table, and the top four firms will be invited to submit proposals. The RFP responses are due on April 5, 2024, and the selected CMaR firm will be announced on April 12, 2024.

The contract opportunity involves a guaranteed maximum price contract for the renovation and re-roofing projects. The college is seeking to select the best value proposal based on the published selection criteria. The project construction drawings are currently in the schematic design phase, and construction is anticipated to commence in August 2024 and be substantially complete by November 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

515-576-7201 / 800-362-2793 www.iowacentral.edu

Iowa Central Community College Construction Manager at Risk

Statement of Qualification Evaluation Summary SOQ’s Due: Friday, March 15th

Evaluation Period: Monday, March 18th – Wednesday, March 21st Summary Released: Friday, March 22nd

Evaluation Process:

On Monday, March 18th, 2024, the Iowa Central President, the Vice President of Finance, the Vice President of Operations, and a representative with ISG, Inc. were provided copies of the submitted Statement of Qualifications (SOQs) for the four (4) firms which responded to the Request for Qualifications (RFQs) for Construction Manager at Risk services.

Over the course of the last few days, each evaluator individually reviewed the submittals.

The basis of the scoring was seven categories outlined in the RFQ. Each section was valued on a varying point scale.

The table below indicates the average of the four evaluator’s scores for each category, as well as the firm’s total composite score. All firms listed will receive a Request for Proposal for further consideration in this process.

Request for Proposal responses will be due Friday, April 5th at 2:00 P.M.

Iowa Central CMaR RFQ Evaluation Summary

Firm

Firm Relevant

Experience (30)

Team Experience and Qualifications

(30)

Local Market

(10)

CMaR Project Understanding and Approach

(20)

Project Management

(20)

Safety (10)

Timely Completion of Recent Projects

(30)

Total Scores (150)

Jensen Builders

25.5 28.25 9.5 18.75 19 9 28.5 138.5

McGough Construction

26 27.75 6.25 19.5 19 9.25 27.5 135.25

Ball Team, LLC.

20.25 21 6.25 14.5 14.75 9 18.25 104

Kolacia Construction

17.75 24.5 7.25 10 17 8.25 15.5 100.25