CMaR Notice of Intent.docx
DOCX document 76 KB Posted
- Solicitation number
- 24-001
- Issued by
- Webster County, Iowa
About this file
This document is an Addendum No. 1 Notice of Intent to Enter into a Guaranteed Maximum Price Contract issued by Iowa Central Community College. The college intends to enter a guaranteed maximum price contract for the renovation of an existing campus building located at their East Campus and re-roofing of an existing building on their main campus. The East Campus renovation includes interior renovations of approximately 4,000 SF and exterior renovations including new siding and roofing around a garage. The project construction drawings are currently in the Schematic Design Phase, and the Design Development Phase will commence 4-5 weeks after a Construction Manager at Risk (CMaR) is awarded. Construction is anticipated to commence in August 2024 and be substantially complete by November 2024. Iowa Central Community College will publish an RFQ for CMaR services on March 1, 2024, and will select the CMaR using a two-step solicitation process based on "best value" criteria including project experience, past performance, safety record, proposed personnel, and proposed methodology.
During the proposal stage, qualified respondents will be asked to submit their proposed fees for the project. Iowa Central Community College will select the proposal that offers the best value based on the published selection criteria and ranking evaluation. The key dates for this procurement process are provided, including the RFQ posting, final questions due, RFQ response due, qualified CMaR shortlist approval, RFP posting, RFP questions and addendum, RFP due, and notice of award to the selected CMaR.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1 Notice of Intent to Enter into a Guaranteed Maximum Price Contract
Iowa Central Community College intends to enter a guaranteed maximum price contract for the renovation of an existing campus building located at their East Campus and re-roofing of an existing building on their main campus. The East Campus renovation is to include interior renovations of a portion of the main building and exterior renovations of another portion. The East Campus is located at 2031 Quail Ave, Fort Dodge, Iowa 50501 The interior renovation will include the renovation of approximately 4,000 SF of the SE end of the existing building. The exterior renovations will include removal and install of new siding and roofing around the garage on the west end of the facility, the siding will be the perimeter of the building which is approximately 215 LF and the roof approximately 4,712 SF. The project construction drawings are in Schematic Design Phase. The Design Development Phase will commence 4-5 weeks after a Construction Manager at Risk is awarded. Construction is anticipated to commence in August 2024 and tentatively scheduled to be substantially complete by November 2024.
Iowa Central Community College will publish a request for qualifications (RFQ) for Construction Manager at-Risk (CMaR) services for the project on March 1st, 2024. The CMaR will be chosen using a two-step solicitation process and chosen on “best value”. All CMaR submittals who have demonstrated sufficient qualifications based on the following criteria will be offered the opportunity to submit a request for proposal (RFP) to serve as CMaR for the project:
· Projects of similar size and scope in either the public or private sector
· Past Performance
· Safety Record
· Proposed Personnel
· Proposed Methodology
· Responsiveness to Owner During the proposal stage, qualified respondents shall be asked to submit their proposed fees for the project. Iowa Central Community College will select the proposal that offers the best value based on the published selection criteria and on its ranking evaluation.
Questions Please direct all questions to:
| Owner | Architect | |||
| Ryan Gruenberg | Kalob Hays | |||
| Vice President of Operations | Assistant Project Manager | |||
| Iowa Central Community College | ISG | |||
| One Triton Circle | 115 E Hickory Street, Suite 300 | |||
| Fort Dodge, Iowa 50501 | Mankato, MN 56001 | |||
| gruenberg@iowacentral.edu | kalob.hays@isginc.com | |||
| Office: (515) 574-1053 | Office: (507) 469-0750 |
7900 International Drive + Suite 550 + Minneapolis, MN 55425
952.426.0699 + ISGInc.com Architecture + Engineering + Environmental + Planning Architecture + Engineering + Environmental + Planning | ISGInc.com Page 2 of 2 image1.jpg image2.png