CMaR Request for Qualifications - Addendum #1 3.12.24.pdf
PDF 58 KB Posted
- Solicitation number
- 24-001
- Issued by
- Webster County, Iowa
About this file
This document is an addendum to a Request for Qualifications (RFQ) issued by Iowa Central Community College for Construction Manager at Risk (CMaR) services for the renovation of an existing campus building and re-roofing of another building. The project includes interior and exterior renovations of buildings located at the college's East Campus and main campus. The RFQ responses are limited to a maximum of 20 pages and must include a minimum of 3 and maximum of 5 project examples. Contractors are not required to use Building Information Modeling (BIM) but will be required to carry Professional Liability Insurance. The RFQ was posted on March 1, 2024, with final questions due by March 8th and responses due by March 15th. Iowa Central Community College will evaluate the RFQ responses and select a shortlist of qualified respondents by March 22nd. The selected respondents will then be invited to submit a Request for Proposal (RFP), with final questions due by March 27th and proposals due by April 5th. The college plans to award the CMaR contract by April 12th, with construction anticipated to commence in August 2024 and be substantially complete by November 2024.
The CMaR contract will be a Guaranteed Maximum Price (GMP) contract. The selection process will be based on "best value" criteria, including the respondents' project experience, past performance, safety record, proposed personnel, and methodology. During the RFP stage, qualified respondents will be asked to submit their proposed fees for the project. Iowa Central Community College will select the proposal that offers the best value based on the published selection criteria and ranking evaluation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Aerial Site Plan.pdf | ||
| CMaR RFQ Responses Received.pdf | ||
| Construction Manager Information Sheet.pdf | ||
| East Campus Proposed Floor Plan.pdf | ||
| CMaR Notice of Intent.docx | DOCX document | |
| Iowa Central CMaR SOQ Evaluation Results.pdf | ||
| CMaR Request for Qualifications.pdf | ||
| Sample A133-2019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 01
Architecture + Engineering + Environmental + Planning ISGInc.com
Date: March 12, 2024
Project Name: Iowa Central Community College CMaR RFQ
Architect/Engineer: ISG, 115 Hickory St + Suite Number 300 , Mankato, Minnesota 56001
The following items shall be appended to and become a part of the plans and specification for the above reference project and shall supersede any conflicting provisions of these documents.
CLARIFICATIONS
1. Project examples are limited to a maximum of five (5) and a minimum of three (3)
2. The RFQ responses are limited to twenty (20) pdf pages this means one sided.
a. Page count will exclude cover sheet, table of contents, and back page.
3. Contractors Are not required to use Building Information Modeling (BIM)
4. Contractors will hold Professional Liability Insurance per owners request.