CMaR Request for Qualifications - Addendum #1 3.12.24.pdf

PDF 58 KB Posted

Attached to
Construction Manager at Risk Services - GMP Contract
Solicitation number
24-001
Issued by
Webster County, Iowa

About this file

This document is an addendum to a Request for Qualifications (RFQ) issued by Iowa Central Community College for Construction Manager at Risk (CMaR) services for the renovation of an existing campus building and re-roofing of another building. The project includes interior and exterior renovations of buildings located at the college's East Campus and main campus. The RFQ responses are limited to a maximum of 20 pages and must include a minimum of 3 and maximum of 5 project examples. Contractors are not required to use Building Information Modeling (BIM) but will be required to carry Professional Liability Insurance. The RFQ was posted on March 1, 2024, with final questions due by March 8th and responses due by March 15th. Iowa Central Community College will evaluate the RFQ responses and select a shortlist of qualified respondents by March 22nd. The selected respondents will then be invited to submit a Request for Proposal (RFP), with final questions due by March 27th and proposals due by April 5th. The college plans to award the CMaR contract by April 12th, with construction anticipated to commence in August 2024 and be substantially complete by November 2024.

The CMaR contract will be a Guaranteed Maximum Price (GMP) contract. The selection process will be based on "best value" criteria, including the respondents' project experience, past performance, safety record, proposed personnel, and methodology. During the RFP stage, qualified respondents will be asked to submit their proposed fees for the project. Iowa Central Community College will select the proposal that offers the best value based on the published selection criteria and ranking evaluation.

View the file

Other files

File Type Posted
Aerial Site Plan.pdf PDF
CMaR RFQ Responses Received.pdf PDF
Construction Manager Information Sheet.pdf PDF
East Campus Proposed Floor Plan.pdf PDF
CMaR Notice of Intent.docx DOCX document
Iowa Central CMaR SOQ Evaluation Results.pdf PDF
CMaR Request for Qualifications.pdf PDF
Sample A133-2019.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 01

Architecture + Engineering + Environmental + Planning ISGInc.com

Date: March 12, 2024

Project Name: Iowa Central Community College CMaR RFQ

Architect/Engineer: ISG, 115 Hickory St + Suite Number 300 , Mankato, Minnesota 56001

The following items shall be appended to and become a part of the plans and specification for the above reference project and shall supersede any conflicting provisions of these documents.

CLARIFICATIONS

1. Project examples are limited to a maximum of five (5) and a minimum of three (3)

2. The RFQ responses are limited to twenty (20) pdf pages this means one sided.

a. Page count will exclude cover sheet, table of contents, and back page.

3. Contractors Are not required to use Building Information Modeling (BIM)

4. Contractors will hold Professional Liability Insurance per owners request.

File details come from the government source that posted it. Updated .