These bid documents are for the Illinois Office of Comptroller's Emergency Standby Generator & UPS Improvement Project, located at 325 West Adams St. in Springfield, Illinois. The project involves civil, electrical, and site utility improvements, with engineering services provided by Fuhrmann Engineering and design documentation prepared by WRH Engineers, LLC. The documents are dated April 2025 with an expiration of November 30, 2025.
The electrical scope includes installing a 300 kW natural gas-fired emergency generator, an automatic transfer switch, electrical panel upgrades, and associated electrical infrastructure modifications. The project involves routing new gas and electrical lines, installing conduits, and upgrading existing electrical systems across the building's basement, first, and second levels. Specific components include a new generator pad, gas line connections, electrical panel reconfigurations (panels EMHDP and EMLDP), and electrical system upgrades to improve emergency power capabilities. The site plans also detail utility connections, grading, and site preparation requirements, with involvement from local utility providers including City Water, Light & Power, Ameren Illinois, and Sangamon County utility services.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE LOCATION
W. ADAMS ST.
S.
P
AS
FI
EL
D
S T
S.
C
O
LL
EG
E
ST
W. WASHINGTON ST.
GENERAL NOTES
C-1.00
SITE NOTES GRADING NOTES
1. SEED (CLASS 2), FERTILIZE (RATIO: 1-1-1), APPLY AGRICULTURAL LIME (RATE = 2
TONS/ACRE) AND MULCH IN ACCORDANCE WITH METHOD 2 OF SECTION 251.03 OF
THE STANDARD SPECIFICATIONS AT A RATE OF 2 TONS/ACRE. SEED UNTIL A
SOUND TURF IS ESTABLISHED.
2. INLET AND PIPE PROTECTION SHALL BE PROVIDED ON ALL INLETS. FABRIC SHALL
BE EITHER RINSED CLEAN AND REINSTALLED OR REPLACED WHEN SEDIMENT
ACCUMULATES.
3. ALL EROSION CONTROL SYSTEMS SHALL BE PER I.D.O.T. STANDARD 280001-07
AND SHALL BE MAINTAINED AFTER EVERY STORM EVENT UNTIL FINAL
ACCEPTANCE OF PROJECT.
4. EROSION CONTROL SHALL BE GOVERNED BY THE "ILLINOIS URBAN MANUAL,
LATEST EDITION".
5. CONTRACTOR TO MAINTAIN TEMPORARY EROSION CONTROL UNTIL PERMANENT
VEGETATION OR PAVEMENT HAS BEEN ESTABLISHED.
6. CONTRACTOR SHALL UTILIZE A CONCRETE WASH AREA ON SITE.
1. PLACE MINIMUM 6" TOPSOIL AT PERIMETER OF LOT WHERE EXISTING TOPSOIL HAS BEEN REMOVED
OR DISTURBED. GRADE TO SMOOTH SLOPES AND CONTOURS AS SHOWN. TOPSOIL WILL BE
DEFINED AS SOIL MEETING ALL THE REQUIREMENTS OF ARTICLE 781.08 OF THE LATEST EDITION OF
THE IDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
2. EXCAVATE AND/OR PLACE FILL AS REQUIRED TO ACHIEVE PROPOSED GRADE ELEVATION. IF
UNSUITABLE BEARING MATERIALS ARE ENCOUNTERED AT THE SUBGRADE DEPTH, NOTIFY THE
ENGINEER IMMEDIATELY. COMPACT FILL MATERIALS TO ACHIEVE A MINIMUM DRY DENSITY AS PER ASTM D-698 (STANDARD PROCTOR. OF 98% FOR STRUCTURES, BUILDING SLABS, AND STEPS, 95% FOR BACKFILLING, OUTSIDE OF FOOTINGS AND FOUNDATION WALLS, TRENCHES, WALKWAYS, AND PAVED AREAS; 90% FOR LAWNS AND UNPAVED AREAS. PLACE BACKFILL AND FILL MATERIALS IN LAYERS NOT MORE THAN 9” IN LOOSE DEPTH FOR MATERIALS COMPACTED BY HEAVY COMPACTION
EQUIPMENT, AND NOT MORE THAN 6" IN LOOSE DEPTH FOR MATERIALS COMPACTED BY HAND
OPERATED TAMPERS. FINISH LAWN OR UNPAVED AREAS TO WITHIN 0.10" ABOVE OR BELOW THE
REQUIRED SUBGRADE ELEVATIONS.
3. ANY EXCESS MATERIAL (CLAY OR TOPSOIL).REQUIRED TO BE REMOVED FROM THE SITE SHALL
BE LEGALLY DISPOSED OF OFF CONSTRUCTION SITE.
4. GENERAL CONTRACTOR TO INCLUDE ALL GRADING IN PREPARATION OF LANDSCAPING.
5. SUBBASE PREPARATION SHALL BE IN ACCORDANCE WITH DIVISION 300 OF THE STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGES
CONSTRUCTION" LATEST EDITION (CONTRACTOR TO OBTAIN NOT LESS THAN 95% OF THE
STANDARD LABORATORY DENSITY IN THE FIELD).
6. A PROOF-ROLL SHALL BE PREFORMED ON EACH LANE WITH A FULLY LOADED SEMI-DUMP TRUCK OR VEHICLE WITH EQUAL AXLE WEIGHT. A REPRESENTATIVE OF THE ENGINEER SHALL BE PRESENT
FOR PROOF-ROLL ON THE SUBBASE.
7. ANY LOCALIZED SOFT AREAS IDENTIFIED SHALL BE REPAIRED PRIOR TO PAVING.
8. THE CONTRACTOR SHALL UNDERCUT ANY LOCALIZED SOFT AREAS AND PLACE FABRIC FOR
GROUND STABILIZATION IN ACCORDANCE WITH SECTION 210 OF THE STANDARD SPECIFICATIONS.
GEOTEXTILE FABRIC SHALL BE A MINIMUM OF 6 OZ/SY.
9. THE AREA SHALL THEN BE BACKFILLED WITH GRANULAR MATERIAL CA-6. THE PLACEMENT OF THE
GRANULAR BLANKET SHALL BE IN ACCORDANCE WITH SECTION 210 OF THE STANDARD
SPECIFICATIONS.
EROSION CONTROL NOTES
1. ALL DIMENSIONS AND CURVE DATA THAT REFER TO CURBING REFERENCE
FACE OF CURB, UNLESS OTHERWISE NOTED.
2. THE CONTRACTOR BIDDING THIS PROJECT SHALL VISIT THE SITE AND
DETERMINE THE CHANGES IF ANY, THAT WILL AFFECT THE EXTENT OF THE
PROPOSED WORK. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION. NOTIFY THE
ENGINEER/ARCHITECT REPRESENTATIVE OF ANY DISCREPANCY IMMEDIATELY.
3. PAVEMENT MARKINGS SHALL CONFORM TO THE APPLICABLE REQUIREMENTS
OF THE LATEST EDITION OF STANDARD SPECIFICATIONS FOR TRAFFIC
CONTROL ITEMS OF THE ILLINOIS DEPARTMENT OF TRANSPORTATION. PAINT
SHALL BE AT A MINIMUM, CONTRACTOR GRADE ACRYLIC STRIPING PAINT FOR
NEW PAVEMENT. PAINT STRIPES SHALL BE 4" WIDE AND YELLOW IN COLOR.
HANDICAPPED SYMBOLS SHALL CONFORM TO IDOT STANDARDS.
4. PORTLAND CEMENT CONCRETE SIDEWALK SHALL BE CONSTRUCTED IN
ACCORDANCE WITH SECTION 424 OF THE LATEST EDITION OF THE IDOT
STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
SURFACE FINISH SHALL BE MADE IN ACCORDANCE WITH ARTICLE 424.06. ALL
SIDEWALKS SHALL BE 5" IN THICKNESS UNLESS OTHERWISE NOTED. JOINT
SPACING SHALL BE 6' MAXIMUM.
5. PORTLAND CEMENT CONCRETE CURB AND GUTTER SHALL CONFORM TO
SECTION 606 OF THE LATEST EDITION OF THE IDOT STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. CONTRACTION
JOINTS SHALL BE CONSTRUCTED AT 25' INTERVALS AND CONFORM TO
ARTICLE 606.07. CONCRETE SHALL BE CURED AND PROTECTED IN
ACCORDANCE WITH ARTICLE 1020.13. THE CURB AND GUTTER SHALL BE
FINISHED WITH LIGHT BRUSH, FINISHED IN ACCORDANCE WITH ARTICLE 606.11.
6. NO SITE WORK IS TO BEGIN UNTIL A PERMIT HAS BEEN ISSUED BY THE CITY OF
SPRINGFIELD. CONTRACTOR IS RESPONSIBLE FOR APPLYING FOR ALL
PERMITS AND FOR PAYMENT OF ALL BUILDING PERMIT FEES, RELOCATION
AND/OR EXTENSION OF UTILITIES AND FOR OBTAINING APPROVAL OF ALL
CURB CUTS, IF NECESSARY.
7. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED
ON ABOVE GROUND STRUCTURES AND RECORD DRAWINGS PROVIDED BY THE
SURVEYOR. LOCATIONS OF UNDERGROUND UTILITIES/STRUCTURES MAY
VARY FROM LOCATIONS SHOWN HEREON. ADDITIONAL BURIED
UTILITIES/STRUCTURES MAY EXIST. NO EXCAVATIONS WERE MADE DURING
THE PROGRESS OF THIS SURVEY TO LOCATE BURIED UTILITIES/STRUCTURES.
IT SHALL BE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN THEIR EXACT
LOCATION FROM THE UTILITY COMPANIES AND BY THE FIELD INSPECTIONS.
(J.U.L.I.E. 1-800-892-0123).
8. CONTRACTORS ARE RESPONSIBLE FOR RESTORING ANY ADJACENT
PROPERTIES DISTURBED BY THE CONSTRUCTION PROCESS TO THE ORIGINAL
CONDITION AT NO ADDITIONAL COST TO THE CLIENT.
9. MUD THAT IS TRACKED ONTO THE STREET OR PARKING LOT BY THE
CONSTRUCTION PROCESS SHALL BE REMOVED DAILY BY THE CONTRACTOR.
10. ALL DIRT REQUIRED TO BE REMOVED SHALL BE REMOVED FROM THE SITE AND
DISPOSED OF LEGALLY.
11. PARKING LOT SHALL BE CLEANED BY THE CONTRACTOR IMMEDIATELY PRIOR
TO STRIPING AND OR THE OWNER OCCUPYING THE BUILDING.
12. CONTRACTOR TO SAW CUT ALL EXISTING PAVEMENT EDGES AND CURBS.
13. CONTRACTOR TO INSURE THAT ALL SIDEWALKS, ACCESSIBLE PARKING
STALLS AND/OR CROSSWALKS ARE CONSTRUCTED IN COMPLIANCE WITH THE
2018 ILLINOIS ACCESSIBILITY CODE (IAC) AND THE AMERICAN WITH
DISABILITIES ACT (ADA). ALL DETECTABLE WARNING SYSTEMS (TRUNCATED
DOME) SHALL BE BY ADA SOLUTIONS, INC. OR APPROVED EQUAL, BRICK
RED/CAST-IN-PLACE AND INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS.
14. CONTRACTOR SHALL STRIP THE TOP 6" OF TOPSOIL WITHIN THE PARKING LOT
AREA. PARKING LOT SUBGRADE SHALL BE DISKED TO A DEPTH OF 8", DRIED,
MOISTURE CONDITIONED AND RECOMPACTED TO 95% MAXIMUM DRY DENSITY.
SURPLUS EXCAVATED MATERIAL SHALL BE DISPOSED OF OFF SITE.
15. PRIOR TO PAVEMENT CONSTRUCTION, A PROOF ROLL SHALL BE PERFORMED
ON THE PARKING AREA. THE ENGINEER'S REPRESENTATIVE SHALL BE
PRESENT FOR THE PROOF ROLL. ANY UNSTABLE YIELDING SOILS SHALL BE
REMOVED AND REPLACED WITH ADDITIONAL CA-6.
16. CONTRACTOR SHALL PROVIDE THIRD PARTY TESTING FOR SOIL BEARING, SOIL
REMEDIATION AND COMPACTION, AND CONCRETE INSTALLATION.
TRAFFIC CONTROL
1. ALL STREET LANE CLOSURES SHALL BE KEPT TO A MINIMUM AND MUST BE REOPENED
AT THE END OF EACH WORKING DAY.
2. TRAFFIC CONTROL AND LANE CLOSURES SHALL BE APPLIED FOR AND PERMITTED BY
THE CITY OF SPRINGFIELD AND MUST BE COORDINATED 48 HOURS PRIOR TO
INSTALLATION.
3. TRAFFIC CONTROL SHALL BE PER THE LATEST IDOT STANDARDS: NO. 701801-06,
701601-09, 701501-06 OR 701611-01, AS REQUIRED.
SPECIFICATIONS
SPECIFICATIONS SHALL BE THOSE OF THE STATE OF ILLINOIS DEPARTMENT OF
TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION"
LATEST EDITION, AND THE SUPPLEMENTARY SPECIFICATIONS AND RECURRING SPECIAL
PROVISION, LATEST EDITION, AND THOSE CONTAINED IN THE ORDINANCES FOR THE CITY
OF SPRINGFIELD, ILLINOIS LATEST EDITION.
EROSION CONTROL SPECIFICATIONS
SPECIFICATIONS SHALL BE THOSE OF THE ILLINOIS URBAN MANUAL, LATEST EDITION.
GENERAL NOTES
1. EXISTING CONDITIONS - THE EXISTING CONDITIONS SHOWN IN THE PLANS ARE
BASED UPON A SURVEY CONDUCTED, INFORMATION PROVIDED BY THE CLIENT,
RECORD DRAWINGS AND/OR ELECTRONIC FILES OF EXISTING CONDITIONS AND MAY
NOT DEPICT ALL EXISTING CONDITIONS PERTINENT TO CONSTRUCTION. IT IS THE
RESPONSIBILITY OF ALL BIDDERS TO ACQUAINT THEMSELVES WITH EXISTING
CONDITIONS BY INSPECTION OF THE SITE, PRIOR TO THE SUBMISSION OF BIDS. TO
VIEW THE SITE, INSPECTIONS CAN BE SCHEDULED BY CONTACTING
ENGINEER/ARCHITECT.
2. THE EXISTENCE AND LOCATION OF EXISTING UNDERGROUND FACILITIES SHOWN ON
THESE PLANS WERE OBTAINED BY FIELD INVESTIGATING AND SEARCH OF AVAILABLE
RECORDS TO THE BEST OF OUR KNOWLEDGE. THE CONTRACTOR IS REQUIRED TO
TAKE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING FACILITY SHOWN ON
THESE PLANS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN
THEIR EXACT LOCATION FROM THE UTILITY COMPANIES AND BY FIELD INSPECTIONS.
(J.U.L.I.E.).
3. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT INCLUDING THE SAFETY OF ALL PERSONS AND
PROPERTY. THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE
LIMITED TO NORMAL WORKING HOURS. NEITHER THE ARCHITECT NOR THE
ENGINEER WILL ENFORCE SAFETY REQUIREMENTS OR REGULATIONS. THE
CONTRACTOR SHALL BE SOLELY RESPONSIBLE THEREOF.
4. UNSUITABLE MATERIAL SHALL BE LEGALLY DISPOSED OF OFF SITE. CLEAN EXCESS
DIRT SHALL BE DISTRIBUTED ON SITE AS DIRECTED BY THE
ENGINEER/ARCHITECT/OWNER.
5. ALL FIELD TILES ENCOUNTERED AND DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED BY THE CONTRACTOR, AT NO ADDITIONAL COST. THE SIZE, LOCATION,
MATERIAL TYPE AND DEPTH SHALL BE INDICATED ON THE RECORD DRAWINGS.
WHERE DAMAGE FIELD TILES CANNOT BE REPAIRED, PROVISIONS SHALL BE MADE
TO REROUTE THE FIELD TILE TO THE NEAREST AVAILABLE STORM SEWER.
6. WHERE SECTION STONES OR PROPERTY MARKERS ARE ENCOUNTERED, ALL
MARKERS SHALL BE PROTECTED AND PRESERVED UNTIL A SITE FOREMAN FOR THE
ENGINEER OR PROFESSIONAL LAND SURVEYOR HAS WITNESSED AND REFERENCED
THEIR LOCATION.
7. THE CONTRACTOR SHALL MAINTAIN ROADWAYS AND PARKING LOTS ADJOINING THE
PROJECT SITE, KEEPING THEM FREE FROM MUD AND DEBRIS AT ALL TIMES.
8. ALL ELEVATIONS AS SHOWN REFER TO U.S.G.S. DATUM AT MEAN SEA LEVEL.
9. THE CONTRACTOR SHALL TAKE REASONABLE PRECAUTIONS TO PROTECT PUBLIC
AND PRIVATE PROPERTY. IF ANY TIME HE/SHE DAMAGES OR DESTROYS PUBLIC OR
PRIVATE PROPERTY. THE CONTRACTOR SHALL AT HIS/HER OWN EXPENSE RESTORE
SUCH PROPERTY TO A CONDITION EQUAL TO THAT EXISTING BEFORE SUCH
DAMAGE.
10. THE CONTRACTOR SHALL MAINTAIN ACCURATE RECORDS - LOCATION, ELEVATION,
ETC. TO PROVIDE THE ARCHITECT/ENGINEER WITH AS-BUILT DRAWINGS
SITE UTILITY NOTES
1. THE CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRS TO ANY UTILITY LINES
AND EXISTING IMPROVEMENTS TO REMAIN THAT ARE DAMAGED AS A RESULT OF
THE WORK.
2. CONTRACTORS ARE RESPONSIBLE FOR VERIFYING LOCATION OF ALL UTILITIES
WITH J.U.L.I.E. AND LOCAL UTILITY COMPANIES PRIOR TO EXCAVATING.
3. CONTRACTORS ARE RESPONSIBLE FOR ALL UTILITY CONNECTIONS AND
EXTENSIONS.
4. CONTRACTORS ARE RESPONSIBLE FOR VERIFYING LOCATION OF ALL UTILITIES
WITH J.U.L.I.E. AND LOCAL UTILITY COMPANIES PRIOR TO EXCAVATING.
5. CONTRACTORS TO PROVIDE BUILDING LOAD DATA TO UTILITY PROVIDER, AS
REQUIRED.
6. CONTRACTOR TO COORDINATE IRRIGATION AND ELECTRIC CONDUITS AS
REQUIRED FOR LANDSCAPING AND SITE LIGHTING.
7. SEE ARCHITECTURAL PLANS FOR UTILITY CONNECTIONS AT THE BUILDING.
8. WHERE SELECTED GRANULAR BACKFILL IS REQUIRED, THE BACKFILL
ABOVE THE TOP OF THE GRAVEL CRADLE TO THE LEVEL AS PROPOSED
ON THE PLANS SHALL BE MADE WITH "SELECTED GRANULAR BACKFILL"
IN LIFTS NOT EXCEEDING 6 INCHES IN DEPTH. SELECTED GRANULAR
BACKFILL SHALL BE REQUIRED FOR ALL PAVEMENT CROSSINGS WHERE
THE INNER EDGE OF THE TRENCH IS WITHIN 2 FEET OF THE EDGE OF
THE PAVEMENT. EACH LIFT SHALL BE THOROUGHLY TAMPED TO THE
SATISFACTION OF THE ENGINEER. ALL BACKFILL TO BE COMPACTED
TO 95% STANDARD PROCTOR. AT ALL PAVEMENT CROSSINGS BACKFILL
TO EXTEND 2' PAST THE EDGE OF THE IMPROVEMENTS, SERVICES AND
CONDUIT INCLUSIVE, AND CAPPED WITH 12" CA-6 DITCH CAP, JETTING
WILL BE ALLOWED WITH THE APPROVAL OF THE ENGINEER/ARCHITECT.
9. CONTRACTOR IS RESPONSIBLE TO ENSURE ALL WATER AND SEWER MAIN
REQUIREMENTS ARE MET.
10. ALL CONDUIT SHALL BE REQUIRED TO HAVE A PULL STRING WITH BENDS
HAVING 36" RADIUS.
11. CONTRACTOR SHALL POTHOLE EXISTING UTILITIES PRIOR TO CONSTRUCTION OF
PROPOSED UTILITY AND ENSURE ALL SEPARATION REQUIREMENTS ARE MET.
COORDINATE ANY POSSIBLE CONFLICTS WITH ENGINEER AND UTILITY COMPANY.
12. ALL WATER SERVICES AND SEWER SERVICES SHOULD BE DESIGNED AND
CONSTRUCTED IN ACCORDANCE WITH THE ILLINOIS PLUMBING CODE.
CALL J.U.L.I.E.
JOINT UTILITY LOCATING INFORMATION FOR EXCAVATION
BEFORE EXCAVATING
PHONE NUMBER - 1-800-892-0123
SHEETS C-1.00 - C-3.00
EXPIRES: 11/30/25
2852 SOUTH 11TH STREET
SPRINGFIELD. ILLINOIS 62703
P: 217.529.5577
WWW.FUHRMANN-ENG.COM
ISSUED FOR BID
N
SITE LOCATION MAP
UTILITY PROVIDERS:
SANITARY SEWER- SANGAMON COUNTY WATER RECLAMATION DISTRICT
3000 NORTH 8th STREET ROAD
SPRINGFIELD, IL 62707
217-528-0491
WATER SUPPLY- CITY WATER, LIGHT & POWER
MUNICIPAL CENTER WEST, ROOM 101
300 S. 7th ST.
SPRINGFIELD, IL 62757
217-789-2000
ELECTRIC SERVICE- CITY WATER, LIGHT & POWER
MUNICIPAL CENTER WEST, ROOM 101
300 S. 7th ST.
SPRINGFIELD, IL 62757
217-789-2000
PUBLIC WORKS- CITY WATER, LIGHT & POWER
MUNICIPAL CENTER WEST, ROOM 101
300 S. 7th ST.
SPRINGFIELD, IL 62757
217-789-2000
GAS SUPPLY- AMEREN ILLINOIS
825 NORTH MACARTHUR BLVD.
SPRINGFIELD, IL 62702
217-753-5118
TELEPHONE - FRONTIER COMMUNICATIONS
JACKSONVILLE, IL 62650
SITE PLANS FOR
ILLINOIS OFFICE OF COMPTROLLER
EMERGENCY STANDBY GENERATOR & UPS IMPROVEMENT PROJECT
325 WEST ADAMS ST., SPRINGFIELD, IL 62704
INDEX OF SHEETS
SHEET NO. DESCRIPTION
C - 1.00 GENERAL NOTES
C - 2.00 EX. TOPOGRAPHIC SURVEY / DEMOLITION PLAN
C - 3.00 SITE PLAN / GRADING PLAN
E - 1 ELECTRICAL - BASEMENT
E - 2 FIRST LEVEL - ELECTRICAL
E - 3 SECOND LEVEL - ELECTRICAL
AutoCAD SHX Text
ILLINOIS OFFICE OF COMPTROLLER
AutoCAD SHX Text JOB No: 25-2332
AutoCAD SHX Text
DATE: 15MAY2025
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
GM
WM
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
WV
WV
X
XX
X X
X X
X X
X X X X X X X X X X X X X
X
X
X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X
FO FO FO FO FO FO FO FO FO
FO FO FO FO FO FO FO FO FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO
EX. RAMP
LANDSCAPE
LANDSCAPE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
EX. RETAINING
WALL (TYP.)
EX. SIDEWALK
EX
. S
ID
EW
AL
K
EX. BUILDING
W. ADAMS ST.
S.
P
AS
FI
EL
D
S T.
ASPHALT
CONCRETE
SAWCUT FULL DEPTH,
REMOVE & LEGALLY
DISPOSE OF 150 S.F.
EX. ASPHALT
25.00'
6.00'
3.41'
8.13' 11.49'
3.99' 3.41'
2852 SOUTH 11TH STREET
SPRINGFIELD. ILLINOIS 62703
P: 217.529.5577
WWW.FUHRMANN-ENG.COM
ISSUED FOR BID
EX. TOPOGRAPHIC SURVEY / DEMOLITION PLAN
C-2.00
N
AutoCAD SHX Text
ILLINOIS OFFICE OF COMPTROLLER
AutoCAD SHX Text JOB No: 25-2332
AutoCAD SHX Text
DATE: 15MAY2025
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GM
WM
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
WV
WV
X
XX
X X
X X
X X
X X X X X X X X X X X X X
X
X
X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X
FO FO FO FO FO FO FO FO FO
FO FO FO FO FO FO FO FO FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO
EX. RAMP
LANDSCAPE
LANDSCAPE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
EX. RETAINING
WALL (TYP.)
EX. SIDEWALK
EX
. S
ID
EW
AL
K
EX. BUILDING
W. ADAMS ST.
S.
P
AS
FI
EL
D
S T.
ASPHALT
CONCRETE
PROP. CONCRETE PAD
(SEE DETAIL THIS SHEET)
570.86 CONC.
570.20 EX. HMA
70.86 CONC.
69.61 EX. H
MA
0.8 6 C
ONC.
9.6 1 E
X. H
MA
570.86 CONC.
569.78 EX. HMA
TEMPORARY CONCRETE
WASH OUT AREA
(SEE DETAIL THIS SHEET)
25.00'
6.00'
PROP. 6' TALL
SECURITY FENCE
X X
3.41'
3.41'
4.00' 4.06'
11.48'
PROP. DUAL 4'
SWINGING GATE
8.18'
PROP. PIPE BOLLARD
(SEE DETAIL THIS SHEET)
CONTRACTOR SHALL UTILIZE THIS AREA
FOR CONTRACTOR PARKING, LAYDOWN
AND STORAGE AREAS
NOTE: REFER TO ELECTRICAL AND/OR
PLUMBING SHEETS FOR ROUTING OF
ELECTRIC AND GAS LINES TO PROPOSED
GENERATOR PAD
2852 SOUTH 11TH STREET
SPRINGFIELD. ILLINOIS 62703
P: 217.529.5577
WWW.FUHRMANN-ENG.COM
ISSUED FOR BID
SITE PLAN / GRADING PLAN
C-3.00
N
NOTES:
1. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL
INCLUDE REMOVING AND DISPOSING OF HARDENED CONCRETE
AND/OR SLURRY AND RETURNING THE FACILITIES TO A
FUNCTIONAL CONDITION.
2. FACILITY SHALL BE CLEANED OR RECONSTRUCTED IN A NEW AREA
ONCE WASHOUT BECOMES TWO-THIRDS FULL.
3. EACH STRAW BALE IS TO BE STAKED IN PLACE USING (2) 2"X2"X4'
WOODEN STAKES.
STRAW BALE ANCHOR SECTIONS
Liner Anchor
6" Wire Staple or Sandbag
30-MIL POLYETHYLENE
STRAW BALE
Straw Bale 3' Min
10' Min
' M in
PLAN VIEW
Native Soil 2' Max
30-Mil Polyethylene
Entrench 3"
6" WIRE STAPLE OR SANDBAG
(ANCHOR EVERY 2')
TEMPORARY CONCRETE WASHOUT FACILITY
V
AR
IE
S8"
VA
R
IE
S
TOOLED OR SCORED JOINT
BETWEEN WALK AND CURB2" RADIUS
TOP OF PAVING
PREPARED SUBGRADE 6"
10"
INTEGRAL CONCRETE PAD & CURB
8" REINFORCED P.C. CONCRETE, CLASS SI
FIBER MESH REINFORCEMENT @ 2 LBS./C.Y.
4" COMPACTED AGGREGATE CA-6
(95% COMPACTION)
PREPARED SUBGRADE
(95% COMPACTION)
4' -0
2'
-6
CROWN CONCRETE
BOLLARD TO BE
FILLED WITH 2500
PSI CONCRETE,
PER ASTM A53
SEAL WITH SONNEBORN SL-2 JOINT
SEALANT IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS
(TYPICAL) OR APPROVED EQUAL.
GRADE
1/2" COMPRESSIBLE
FILLER, TYP.
CONCRETE
ENCASEMENT
1'-2"
6"
CONCRETE FILLED
4" DIA., SCH. 40
PIPE
INSTALL BOLLARD COVER ANCHOR AS PER
MANUFACTURER SPECIFICATIONS. BOLLARD
PLASTIC COVER TO BE YELLOW IN COLOR.
SCALE: NTS
PIPE BOLLARD DETAIL
AutoCAD SHX Text
ILLINOIS OFFICE OF COMPTROLLER
AutoCAD SHX Text JOB No: 25-2332
AutoCAD SHX Text
DATE: 15MAY2025
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
UP
UP
UP
UP
UP
UP
H
S
S
SS
SSS
S
SS
S
P
P
H
S P
FE
Room B102
Exercise
Office -- Men
Women
JC
Elevators
Mechanical Room B106
Room B112A
Records Storage B112
Records Storage B112
Fire Alarm B112
Records Storage B109
Mechanical
Room
Admin Services B107
Building Maintenance B106
Room B108
Storage B105
Mail Room B103
Office
Office
Room B101
12 13
2852 SOUTH 11TH STREET
SPRINGFIELD. ILLINOIS 62703
P: 217.529.5577
WWW.FUHRMANN-ENG.COM
BID DOCUMENTS
R24-111
DATE: 04-09-2025
EXPIRES: 11-30-2025
1/8" = 1'-0"
BASEMENT - ELECTRICAL
NORTH
E-1
1. PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE 2020 EDITION OF
THE NATIONAL ELECTRIC CODE.
2. PROVIDE A TYPED CIRCUIT DIRECTORY FOR ALL PANELBOARDS.
X
1. ROUTE 4-500 MCM & #3 AWG GND IN A 3" RGS CONDUIT EXPOSED UP
COLUMN.
2. ROUTE 4-500 MCM & #3 AWG GND IN A 3" RGS CONDUIT EXPOSED
VERTICALLY ON SIDE OF BUILDING.
3. ROUTE 4-500 MCM & #3 AWG GND IN A 3" EMT CONDUIT ABOVE CEILING.
4. INSTALL A 600V, 400A, THREE PHASE AUTOMATIC TRANSFER SWITCH
AutoCAD SHX Text
ILLINOIS OFFICE OF COMPTROLLER
AutoCAD SHX Text JOB No: 25-2332
AutoCAD SHX Text
DATE: 14MAY2025
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
REVISIONS
DN
P
RAMP UP
UP
DN
DN
DN
DN UP
DN
DN
FE
FE
FE
KB
ALARM
ANNUNCIATOR
PANEL
FE
FE
P
Men -- Women
Print Dept
Print Dept
Print Dept
Print Dept
Print Dept
Elevators
Print Shop Supplies
Room
EARS Office
EARS Office
EARS Office
EARS Office
Copier
Room
Office
Office
Office
Office
Room
Office 128 Conference Room
Office
Human Resources
Office
Office
Office
Kitchen
Vault
Security Desk
Entry
HR Server
Office
Alarms
Office
Office
Vestibule
Conference Room
Union Office 110A
Room
Mechanical Room
Records Center
Office
Vault
Office
Office
Office
Break Room
Office
Office
Internal Audit
Office
Records Center
Supplies Procurement
Supplies Procurement
Computer Lab
Room 118A
Break Rm 109A
Room 109B
JC
2852 SOUTH 11TH STREET
SPRINGFIELD. ILLINOIS 62703
P: 217.529.5577
WWW.FUHRMANN-ENG.COM
BID DOCUMENTS
R24-111
DATE: 04-09-2025
EXPIRES: 11-30-2025
1/8" = 1'-0"
FIRST LEVEL - ELECTRICAL
NORTH
E-2
1. PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE 2020 EDITION OF
THE NATIONAL ELECTRIC CODE.
2. PROVIDE A TYPED CIRCUIT DIRECTORY FOR ALL PANELBOARDS.
X
1. INSTALL 300 KW, NATURAL GAS FIRED EMERGENCY GENERATOR IN THIS
LOCATION. INSTALL GENERATOR ON A 8" THICK CONCRETE PAD. PAD
SHALL EXTEND 6" PAST GENERATOR FOOTPRINT ON ALL SIDES.
2. ROUTE A 3-1/2" GAS LINE BURIED 30" BELOW GRADE. REMOVE SECTION
OF ASHPALT AS REQUIRED. RESTORE SURFACES TO ORIGINAL
CONDITIONS.
3. ROUTE A 3-1/2" GAS LINE EXPOSED ON THE BUILDING. MOUNT GAS LINE
TO BUILDING. GAS LINE ELEVATION SHALL BE ABOVE THE ENTRY CANOPY
INTO THE BUILDING.
4. CONNECT NEW GAS LINE AT EXISTING GAS METER. COORDINATE WITH
GAS UTILITY.
5. ROUTE
BURIED 30" BELOW GRADE. REMOVE SECTION OF ASHPALT AS REQUIRED.
RESTORE SURFACES TO ORIGINAL CONDITIONS.
6. ROUTE
EXPOSED DOWN COLUMN.
AutoCAD SHX Text
ILLINOIS OFFICE OF COMPTROLLER
AutoCAD SHX Text JOB No: 25-2332
AutoCAD SHX Text
DATE: 14MAY2025
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
FE
P
H
DN
UP
UPDN
FE
P
Men
Women
Office
Office
Pre-Audit
Voucher Processing
Office
Elevators
Mechanical
Office
Office
Funds, Receipts, & Collections
Office
Office
Adjustments
Office
Tape Library
Tape Library
Computer Room 213/222
Office
Office
Office
Office
IOC Support
Office
Office
Office
Office
Office 236 Office
Obligations
Office
Office
Conference
Room
Executive Staff
JC
2852 SOUTH 11TH STREET
SPRINGFIELD. ILLINOIS 62703
P: 217.529.5577
WWW.FUHRMANN-ENG.COM
BID DOCUMENTS
R24-111
DATE: 04-09-2025
EXPIRES: 11-30-2025
1/8" = 1'-0"
SECOND LEVEL - ELECTRICAL
NORTH
E-3
1. PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE 2020 EDITION OF
THE NATIONAL ELECTRIC CODE.
2. PROVIDE A TYPED CIRCUIT DIRECTORY FOR ALL PANELBOARDS.
X
AutoCAD SHX Text
ILLINOIS OFFICE OF COMPTROLLER
AutoCAD SHX Text JOB No: 25-2332
AutoCAD SHX Text
DATE: 14MAY2025
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
3 PH 4 WIRE
MAIN BREAKER600 AMPS
277/480 VOLTS
CIRCUIT DESCRIPTIONAMP AMP
125 250
20 --
G
A B
N
C
SURFACE MOUNTED PANELBOARD
TAG: PANEL "EMHDP"
PANEL SCHEDULE - PANEL "EMHDP"
CIRCUIT DESCRIPTION
BOILER BLOWER MOTOR
BLANK
BLANK
EXG EMERGENCY PANEL EXG 2ND FLOOR TRANSFORMER
600/3
3 PH 4 WIRE
MAIN BREAKER225 AMPS
120/208 VOLTS
CIRCUIT DESCRIPTIONAMP AMP
100 100
G
A B
N
C
SURFACE MOUNTED PANELBOARD
TAG: PANEL "EMLDP"
PANEL SCHEDULE - PANEL "EMLDP"
CIRCUIT DESCRIPTION
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
MAIL ROOM PANELS SPARE
225/3
-- BLANK
--BLANK -- BLANK
--BLANK -- BLANK
--BLANK -- BLANK
--BLANK -- BLANK
--BLANK -- BLANK
--BLANK -- BLANK
--BLANK -- BLANK
--BLANK -- BLANK
--BLANK -- BLANK
2852 SOUTH 11TH STREET
SPRINGFIELD. ILLINOIS 62703
P: 217.529.5577
WWW.FUHRMANN-ENG.COM
BID DOCUMENTS
R24-111
DATE: 04-09-2025
EXPIRES: 11-30-2025
X
277/480V, 600A
DISCONNECT
SWITCH
300 KW
GENERATOR
EXG 277/480V
MAIN
SWITCHGEAR
600A
AUTOMATIC
TRANSFER
SWITCH
277/480V, 600A
PANEL EMHDP
480V x 120/208V, 75 KVA
TRANSFORMER 5
120/208V, 225A
PANEL EMLDP
NO SCALE
ONE LINE POWER DIAGRAM1
E-4
3 4 6
120/208V, 100A
MAIL ROOM
PANEL
EXG 277/480V,
125A
EMERGENCY
PANEL
EXG 480V x 120/208V, 225
KVA
TRANSFORMER
EXG BOILER
BLOWER
MOTOR
LIGHTING SCHEDULE
TAG MANUF. CAT. NO. VOLT DESCRIPTION
A
WATTS
STONCO UNV VARIES WALL MOUNTED LED FLOOD LIGHT. PROVIDE WITH INTEGRAL
PHOTOCELL.
SF80SCTG310PCBBZ
AutoCAD SHX Text
ILLINOIS OFFICE OF COMPTROLLER
AutoCAD SHX Text JOB No: 25-2332
AutoCAD SHX Text
DATE: 14MAY2025
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
| C-1.00_GN.pdf |
| Sheets and Views |
| C-1.0 |
| C-2.00_ET.pdf |
| Sheets and Views |
| ET |
| C-3.00_SP.pdf |
| Sheets and Views |
| SP |
| E-1.pdf |
| Sheets and Views |
| Work |
| E-2.pdf |
| Sheets and Views |
| Work |
| E-3.pdf |
| Sheets and Views |
| Work |
| E-4.pdf |
| Sheets and Views |
| Work |
File details come from the government source that posted it. Updated .