The document is a Bid Form for the Hobson Road Improvements - Phase 1 Intersection Improvements project in New Mexico, involving roadway reconstruction at two intersections: Hobson Rd / Graves Rd and Hobson Rd / Hummingbird Lane. The bid form details 21 line items for various construction activities, including subgrade preparation (10,580 sq yards), base course (9,699 sq yards), minor paving (8,487 sq yards), culvert pipe installation (96 linear feet of 28"x20" arch culvert and 192 linear feet of 21"x15" arch culvert), traffic control management, construction staking, and class A seeding (60,200 square feet). The project includes the installation of culvert pipes with end sections, some of which will be supplied by the county.
The total bid amount is $21,304.16, which includes a subtotal of $20,000.00 for various construction activities and a gross receipts tax of 6.5208% ($1,304.16). Two specific allowance items are included: $10,000 for soil sampling and remediation, and $10,000 for testing. The bid form does not specify exact response dates, award dates, or contract term, but provides a comprehensive breakdown of quantities and associated costs for the intersection improvement project. The document suggests a detailed, comprehensive approach to road reconstruction with specific provisions for environmental and quality control measures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hobson Plan Set.pdf | ||
| Addendum 2.xlsx | XLSX spreadsheet | |
| Hobson Roadd - Addendum 1.pdf | ||
| Hobson Contract Book.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| ITEM NO. | ITEM | UNIT | QUANTITY | UNIT PRICE | AMOUNT |
| 1 | BORROW | LS | 1 | $ - 0 | |
| 2 | EXCAVATION | LS | 1 | $ - 0 | |
| 3 | SUBGRADE PREPARATION | SQ YD | 10580 | $ - 0 | |
| 4 | BASE COURSE | SQ YD | 9699 | $ - 0 | |
| 5 | PRIME COAT MATERIAL | SQ YD | 8488 | $ - 0 | |
| 6 | MINOR PAVING | SQ YD | 8487 | $ - 0 | |
| 7 | REMOVALS OF STRUCTURES AND OBSTRUCTIONS | LS | 1 | $ - 0 | |
| 8 | SWPPP MANAGEMENT AND IMPLEMENTATION BY CONTRACTOR | LS | 1 | $ - 0 | |
| 9 | 28"X20" ARCH CULVERT PIPE ( COUNTY SUPPLIED) | LF | 96 | $ - 0 | |
| 10 | 28"X20" ARCH CULVERT END SECTION (COUNTY SUPPLIED) | EA | 4 | $ - 0 | |
| 11 | 21"X15" ARCH CULVERT PIPE | LF | 192 | $ - 0 | |
| 12 | 21"X15" ARCH CULVERT END SECTION | EA | 8 | $ - 0 | |
| 13 | RIP RAP CLASS | CU YD | 21 | $ - 0 | |
| 14 | REMOVE AND RESET FENCE | LF | 100 | $ - 0 | |
| 15 | TRAFFIC CONTROL MANAGEMENT | LS | 1 | $ - 0 | |
| 16 | MOBILIZATION | LS | 1 | $ - 0 | |
| 17 | TRAFFIC CONTROL DEVICES FOR CONSTRUCTION | LS | 1 | $ - 0 | |
| 18 | CONSTRUCTION STAKING BY THE CONTRACTOR | LS | 1 | $ - 0 | |
| 19 | CLASS A SEEDING | SF | 60200 | $ - 0 | |
| 20 | SOIL SAMPLING AND REMEDIATION | ALLOW | 1 | $ 10,000.00 | $ 10,000.00 |
| 21 | TESTING ALLOWANCE | ALLOW | 1 | $ 10,000.00 | $ 10,000.00 |
| SUBTOTAL | $ 20,000.00 |
| GRT 6.5208% | $ 1,304.16 |
| TOTAL | $ 21,304.16 |