Info-CATO_250011_LOA_20220410-20_41p.pdf

PDF 182 KB Posted

Attached to
CATO 250011 Rehab UtilityInfrstrctre 140P2024R0026
Solicitation number
140P2024R0026
Issued by

About this file

This letter of authorization from the Maryland Department of the Environment Water and Science Administration permits the National Park Service to replace utilities including water, sanitary sewer, electric and communications throughout Catoctin Mountain Park. The project involves multiple stream and wetland crossings using open-trench excavation or trenchless pipe splitting. Approved temporary impacts include 1,545 square feet of emergent wetland, 5,731 square feet of wetland buffer, and 35 linear feet of stream if pipe splitting succeeds at one location. If pipe splitting fails, approved temporary impacts increase to include 255 square feet of forested wetland, larger buffer impacts, 71 linear feet of stream, and 3,625 square feet of floodplain. Best management practices must be followed and restoration is required upon completion. The related federal contract opportunity is for the Catoctin Mountain Park utilities replacement project through the National Park Service's solicitation for proposal number 140P2024R0026.

View the file

Other files

File Type Posted
Sol_140P2024R0026_Amd_0006.pdf PDF
B12_PreProp_Questions_1402024R0026_20240326_Amend_6_0006.pdf PDF
B08_Solicitation_140P2024R00260005_20240320_0005.pdf PDF
B12_PreProp_Questions_1402024R0026_20240320_Amend_5_0005.pdf PDF
B11_CATO_250011_PrePro_Site_Visit2_Mins_Atndc_20240314_0005.pdf PDF
Sol_140P2024R0026_Amd_0005.pdf PDF
B08_Attch_03_Addendum_001_20240320_24R0026_0005.pdf PDF
B11_VirtualPreProp_Conf_Slides_140P2024R0026_CATO_250011__0004.pdf PDF
Sol_140P2024R0026_Amd_0004.pdf PDF
B09_Solicitation_clauses_140P2024R00260004_20240306_0004.pdf PDF
B11_VirtualPreProp_Conf_Attndc_CATO_250011_20240307_0004.pdf PDF
B12_PreProp_Questions_1402024R0026_20240306_Amend_4_0004.pdf PDF
Sol_140P2024R0026_Amd_0003.pdf PDF
B11_PreProposal_Conf_Registration_Instructions_CATO_250011rev03012024_0003.pdf PDF
B08_Solicitation_140P2024R00260002_20240228_0002.pdf PDF
Sol_140P2024R0026_Amd_0002.pdf PDF
B11_CATO_250011_Prepro_Site_Visit_Mins_Attndce_0002.pdf PDF
B11_Virtual_PreProposal_Conf_Registration_Instructions_CATO_250011_0002.pdf PDF
B08_Attch_08_Addendum_002_20240209_24R0026_0001.pdf PDF
Sol_140P2024R0026_Amd_0001.pdf PDF
B08_Solicitation_Clause_set140P2024R00260001_20240209_0001.pdf PDF
B08_0Solicitation_140P2024R0026_20240205.pdf PDF
B08_Attch_02_Drawings_20220223_7_of_7.pdf PDF
B08_Attch_04_WD_MD20240017_20240105.pdf PDF
B08_Attch_01_Specification_20220121.pdf PDF
Sol_140P2024R0026.pdf PDF
INFORMATION-ONLY_Sol_140P2022R0078_Q_R_20220628.pdf PDF
B08_Attch_02_Drawings_20220223_4_of_7.pdf PDF
B08_Attch_05_SubKPlanForm.doc DOC document
B08_Attch_03_Addendum_001_20231228_24R0026.pdf PDF
B08_Attch_02_Drawings_20220223_3_of_7.pdf PDF
B08_Attch_02_Drawings_20220223_2_of_7.pdf PDF
B08_Attch_02_Drawings_20220223_1_of_7.pdf PDF
Info-CATO_250011_22-SF-0017p.pdf PDF
B08_Attch_02_Drawings_20220223_5_of_7.pdf PDF
B08_Attch_02_Drawings_20220223_6_of_7.pdf PDF
B08_Attch_06_Experience.docx DOCX document
B08_Attch_07_PastPerf.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF MARYLAND

DEPARTMENT OF THE ENVIRONMENT

WATER AND SCIENCE ADMINISTRATION

LETTER OF AUTHORIZATION

AUTHORIZATION NUMBER: 21-NT-3151/202161380

EFFECTIVE DATE: April 11, 2022

EXPIRATION DATE: April 11, 2027

AUTHORIZED PERSON: National Park Service 6602 Foxville Road Thurmont, MD 21788 Attn: Rick Slade

IN ACCORDANCE WITH ENVIRONMENT ARTICLE §5-503(a) AND §5-906(b), ANNOTATED CODE OF MARYLAND, COMAR 26.17.04 AND 26.23.01, AND 26.08.02 AND THE ATTACHED CONDITIONS OFAUTHORIZATIONS, National Park Service (AUTHORIZED PERSON"), IS HEREBY AUTHORIZED BY THE WATER AND SCIENCE ADMINISTRATION ("ADMINISTRATION") TO CONDUCT A REGULATED ACTIVITY IN A NONTIDAL WETLAND, BUFFER, OR EXPANDED BUFFER, AND/OR TO CHANGE THE COURSE, CURRENT OR CROSS-SECTION OF WATERS OF THE STATE, IN ACCORDANCE WITH THE ATTACHED PLANS APPROVED BY THE ADMINISTRATION ON March 2, 2022 ("APPROVED PLAN") AND PREPARED BY Jacobs Engineering Group Inc. AND INCORPORATED HEREIN, AS

DESCRIBED BELOW:

Replacement of utilities including water, sanitary sewer, electric and communications throughout Catoctin Mountain Park.

Multiple crossings will be accomplished by open-trench excavation. The waterline crossing of an unnamed tributary to Owens Creek and a Wetland of Special State Concern is specified as installation by trenchless pipe splitting, resulting in no regulated impacts; however, as a construction contingency in case the splitter procedure does not go as planned and excavation is needed, the authorization allows for limited temporary disturbance. If pipe splitting is successful at the Owens Creek tributary, then total approved temporary impacts for the entire project are 1,545 square feet of emergent nontidal wetland, 5,731 square feet of 25-foot nontidal wetland buffer, and 35 linear feet (828 square feet) of stream. If pipe splitting fails then total approved temporary impacts for the entire project are 255 square feet of forested nontidal wetland of special State concern, 1,545 square feet of emergent nontidal wetland, 5,731 square feet of 25-foot nontidal wetland buffer, 2,606 square feet of 100-foot expanded nontidal wetland of special State cconcern buffer, 71 linear feet (1,125 square feet) of stream and 3,625 square feet of nontidal 100-year nontidal floodplain. The project is located along unnamed tributaries to Big Hunting Creek (Use III) and an unnamed tributary to Owens Creek (Use III) in Catoctin Mountain National Park on Park Central Road in Frederick County.

MD Grid Coordinates: N 21850 E 361342

Heather L. Nelson Program Manager

Wetlands and Waterways Program

Attachments: Conditions of Authorization Approved plans cc: MDE Compliance Program w/file Jacobs Engineering Group Inc.

THE FOLLOWING CONDITIONS OF AUTHORIZATION APPLY TO ALL ACTIVITIES AUTHORIZED BY

AUTHORIZATION NUMBER 21-NT-3151/202161380

1. Validity: Authorization is valid only for use by Authorized Person. Authorization may be transferred only with prior written approval of the Administration. In the event of transfer, transferee agrees to comply with all terms and conditions of Authorization.

2. Initiation of Work, Modifications and Extension of Term: Authorized Person shall initiate authorized activities in waterways, including streams and the 100-year floodplain, within two (2) years of the Effective Date of this Authorization or the Authorization shall expire. [Annotated Code of Maryland, Environment Article 5-510(a)-(b) and Code of Maryland Regulations 26.17.04.12]. Authorized Person may submit written requests to the Administration for (a) extension of the period for initiation of work, (b) modification of Authorization, including the Approved Plan, or, (c) not later than 45 days prior to Expiration Date, an extension of term. Requests for modification shall be in accordance with applicable regulations and shall state reasons for changes, and shall indicate the impacts on nontidal wetlands, streams, and the floodplain, as applicable. The Administration may grant a request at its sole discretion. (Annotated Code of Maryland, Environment Article 5-510(c), and Code of Maryland Regulations 26.17.04.12, and Annotated Code of Maryland, Environment Article 5-907 and Code of Maryland Regulations 26.23.02.07).

3. Responsibility and Compliance: Authorized Person is fully responsible for all work performed and activities authorized by this Authorization shall be performed in compliance with this Authorization and Approved Plan. Authorized Person agrees that a copy of the Authorization and Approved Plan shall be kept at the construction site and provided to its employees, agents and contractors. A person (including Authorized Person, its employees, agents or contractors) who violates or fails to comply with the terms and conditions of this Authorization, Approved Plan or an administrative order may be subject to penalties in accordance with §5-514 and §5-911, Department of the Environment Article, Annotated Code of Maryland (2007 Replacement Volume).

4. Failure to Comply: If Authorized Person, its employees, agents or contractors fail to comply with this Authorization or Approved Plan, the Administration may, in its discretion, issue an administrative order requiring Authorized Person, its employees, agents and contractors to cease and desist any activities which violate this Authorization, or the Administration may take any other enforcement action available to it by law, including filing civil or criminal charges.

5. Suspension or Revocation: Authorization may be suspended or revoked by the Administration, after notice of opportunity for a hearing, if Authorized Person: (a) submits false or inaccurate information in Permit application or subsequently required submittals; (b) deviates from the Approved Plan, specifications, terms and conditions; (c) violates, or is about to violate terms and conditions of this Authorization; (d) violates, or is about to violate, any regulation promulgated pursuant to Title 5, Department of the Environment Article, Annotated Code of Maryland as amended; (e) fails to allow authorized representatives of the Administration to enter the site of authorized activities at any reasonable time to conduct inspections and evaluations; (f) fails to comply with the requirements of an administrative action or order issued by the Administration; or (g) does not have vested rights under this Authorization and new information, changes in site conditions, or amended regulatory requirements necessitate revocation or suspension.

6. Other Approvals: Authorization does not authorize any injury to private property, any invasion of rights, or any infringement of federal, State or local laws or regulations, nor does it obviate the need to obtain required authorizations or approvals from other State, federal or local agencies as required by law.

7. Site Access: Authorized Person shall allow authorized representatives of the Administration access to the site of authorized activities during normal business hours to conduct inspections and evaluations necessary to assure compliance with this Authorization. Authorized Person shall provide necessary assistance to effectively and safely conduct such inspections and evaluations.

8. Inspection Notification: Authorized Person shall notify the Administration's Compliance Program at least five (5) days before starting authorized activities and five (5) days after completion. For Allegany, Garrett, Frederick and Washington Counties, Authorized Person shall call 301-689-1480. For Carroll, Howard, Montgomery and Prince George’s Counties, Authorized Person shall call 301-665-2850. For Baltimore City, Anne Arundel, Baltimore, Calvert, Charles, Harford and St. Mary’s Counties, Authorized Person shall call 410-537-3510. For Caroline, Cecil, Dorchester, Kent, Queen Anne’s, Somerset, Talbot, Wicomico and Worcester Counties, Authorized Person shall call 410-901-4020. If Authorization is for a project that is part of a mining site, please contact the Land and Materials Administration’s Mining Program at 410-537-3557 at least five (5) days before starting authorized activities and five (5) days after completion.

9. Sediment Control: Authorized Person shall obtain approval from the Maryland Department of the Environment for a grading and sediment control plan specifying soil erosion control measures. The approved grading and sediment control plan shall be included in the Approved Plan, and shall be available at the construction site.

10. Best Management Practices During Construction: Authorized Person, its employees, agents and contractors shall conduct authorized activities in a manner consistent with the Best Management Practices specified by the Administration.

11. Disposal of Excess: Unless otherwise shown on the Approved Plan, all excess fill, spoil material, debris, and construction material shall be disposed of outside of nontidal wetlands, nontidal wetlands buffers, and the 100-year floodplain, and in a location and manner which does not adversely impact surface or subsurface water flow into or out of nontidal wetlands.

12. Temporary Staging Areas: Temporary construction trailers or structures, staging areas and stockpiles shall not be located within nontidal wetlands, nontidal wetlands buffers, or the 100-year floodplain unless specifically included on the Approved Plan.

CONDITIONS OF AUTHORIZATION AUTHORIZATION NO. 21-NT-3151/202161380

13. Temporary Stream Access Crossings: Temporary stream access crossings shall not be constructed or utilized unless shown on the Approved Plan. If temporary stream access crossings are determined necessary prior to initiation of work or at any time during construction, Authorized Person, its employees, agents or contractors shall submit a written request to the Administration and secure the necessary permits or approvals for such crossings before installation of the crossings. Temporary stream access crossings shall be removed and the disturbance stabilized prior to completion of authorized activity or within one (1) year of installation.

14. Discharge: Runoff or accumulated water containing sediment or other suspended materials shall not be discharged into waters of the State unless treated by an approved sediment control device or structure.

15. Instream Construction Prohibition: To protect important aquatic species, motor driven construction equipment shall not be allowed within stream channels unless on authorized ford crossings. Activities within stream channels are prohibited as determined by the classification of the stream (COMAR 26.08.02.08): the unnamed tributaries to Big Hunting Creek and the unnamed tributary to Owens Creek are Use III waterways; in-stream work may not be conducted from October 1 through April 30, inclusive, of any year.

16. Instream Blasting: Authorized Person shall obtain prior written approval from the Administration before blasting or using explosives in the stream channel.

17. Minimum Disturbance: Any disturbance of stream banks, channel bottom, wetlands, and wetlands buffer authorized by this Authorization or Approved Plan shall be the minimum necessary to conduct permitted activities. All disturbed areas shall be stabilized vegetatively no later than seven (7) days after construction is completed or in accordance with the approved grading or sediment and erosion control plan.

18. Restoration of Construction Site: Authorized Person shall restore the construction site upon completion of authorized activities.

Undercutting, meandering or degradation of the stream banks or channel bottom, any deposition of sediment or other materials, and any alteration of wetland vegetation, soils, or hydrology, resulting directly or indirectly from construction or authorized activities, shall be corrected by Authorized Person as directed by the Administration.

FEDERALLY MANDATED STATE AUTHORIZATIONS

The State of Maryland issued a Water Quality Certification to the U.S. Army Corps of Engineers for projects receiving federal authorization under the Maryland State Programmatic General Permit, Regional General Permit for Chesapeake Bay Total Maximum Daily Load (TMDL) Activities and non-suspended Nationwide Permits. In addition, as applicable, this Authorization constitutes the State’s concurrence with the Applicant’s certification that the activities authorized herein are consistent with the Maryland Coastal Zone Management Program, as required by Section 307 of the Coastal Zone Management Act of 1972, as amended. Activities in the following counties are not subject to the Maryland Coastal Zone Management requirement: Allegany, Carroll, Frederick, Garrett, Howard, Montgomery, and Washington.

U.S. ARMY CORPS OF ENGINEERS AUTHORIZATION

The U.S. Army Corps of Engineers has reviewed this activity and has granted authorization under the Maryland State Programmatic General Permit (MDSPGP-6), as a Category A c (1) activity. The terms and conditions of the MDSPGP-6 as outlined in the documents found on the Maryland Department of the Environment’s website, https://mde.maryland.gov/programs/Water/WetlandsandWaterways/Pages/MDSPGP6_conditions.aspx , should be followed when performing the authorized work.

AUTHORIZATION NO. 21-NT-3151/202161380 PAGE 4 of 4

BEST MANAGEMENT PRACTICES FOR WORKING IN

NONTIDAL WETLANDS, WETLAND BUFFERS,

WATERWAYS AND 100-YEAR FLOODPLAINS

1) No excess fill, construction material, or debris shall be stockpiled or stored in nontidal wetlands, nontidal wetland buffers, waterways, or the 100-year floodplain.

2) Place materials in a location and manner which does not adversely impact surface or subsurface water flow into or out of nontidal wetlands, nontidal wetland buffers, waterways, or the 100-year floodplain.

3) Do not use the excavated material as backfill if it contains waste metal products, unsightly debris, toxic material, or any other deleterious substance. If additional backfill is required, use clean material free of waste metal products, unsightly debris, toxic material, or any other deleterious substance.

4) Place heavy equipment on mats or suitably operate the equipment to prevent damage to nontidal wetlands, nontidal wetland buffers, waterways, or the 100-year floodplain.

5) Repair and maintain any serviceable structure or fill so there is no permanent loss of nontidal wetlands, nontidal wetland buffers, or waterways, or permanent modification of the 100-year floodplain in excess of that lost under the originally authorized structure or fill.

6) Rectify any nontidal wetlands, wetland buffers, waterways, or 100-year floodplain temporarily impacted by any construction.

7) All stabilization in the nontidal wetland and nontidal wetland buffer shall consist of the following species:

Annual Ryegrass (Lolium multiflorum), Millet (Setaria italica), Barley (Hordeum sp.), Oats (Uniola sp.), and/or Rye (Secale cereale). These species will allow for the stabilization of the site while also allowing for the voluntary revegetation of natural wetland species. Other non-persistent vegetation may be acceptable, but must be approved by the Nontidal Wetlands and Waterways Division. Kentucky 31 fescue shall not be utilized in wetland or buffer areas. The area should be seeded and mulched to reduce erosion after construction activities have been completed.

8) After installation has been completed, make post-construction grades and elevations the same as the original grades and elevations in temporarily impacted areas.

9) To protect aquatic species, in-stream work is prohibited as determined by the classification of the stream:

Use I waters: In-stream work shall not be conducted during the period March 1 through June 15, inclusive, during any year.

Use III waters: In-stream work shall not be conducted during the period October 1 through April 30, inclusive, during any year.

Use IV waters: In-stream work shall not be conducted during the period March 1 through May 31, inclusive, during any year.

10) Stormwater runoff from impervious surfaces shall be controlled to prevent the washing of debris into the waterway.

11) Culverts shall be constructed and any riprap placed so as not to obstruct the movement of aquatic species, unless the purpose of the activity is to impound water.