B11_CATO_250011_Prepro_Site_Visit_Mins_Attndce_0002.pdf

PDF 3 MB Posted

Attached to
CATO 250011 Rehab UtilityInfrstrctre 140P2024R0026
Solicitation number
140P2024R0026
Issued by

About this file

This document provides details on a federal contract opportunity for utility infrastructure replacement. The solicitation number is 140P2024R0026 for the CATO 250011 Rehab Utility Infrastructure project. The National Park Service National Office is seeking to replace park owned and operated utility infrastructure systems. The description indicates the contract involves upgrading or replacing various utility systems within the park to maintain critical operational functions. The response due date and award timing are not specified, nor are any pricing, local/small business set-aside terms or incumbent contractor information provided.

View the file

Other files

File Type Posted
Sol_140P2024R0026_Amd_0006.pdf PDF
B12_PreProp_Questions_1402024R0026_20240326_Amend_6_0006.pdf PDF
B08_Solicitation_140P2024R00260005_20240320_0005.pdf PDF
B12_PreProp_Questions_1402024R0026_20240320_Amend_5_0005.pdf PDF
B11_CATO_250011_PrePro_Site_Visit2_Mins_Atndc_20240314_0005.pdf PDF
Sol_140P2024R0026_Amd_0005.pdf PDF
B08_Attch_03_Addendum_001_20240320_24R0026_0005.pdf PDF
B11_VirtualPreProp_Conf_Slides_140P2024R0026_CATO_250011__0004.pdf PDF
Sol_140P2024R0026_Amd_0004.pdf PDF
B09_Solicitation_clauses_140P2024R00260004_20240306_0004.pdf PDF
B11_VirtualPreProp_Conf_Attndc_CATO_250011_20240307_0004.pdf PDF
B12_PreProp_Questions_1402024R0026_20240306_Amend_4_0004.pdf PDF
Sol_140P2024R0026_Amd_0003.pdf PDF
B11_PreProposal_Conf_Registration_Instructions_CATO_250011rev03012024_0003.pdf PDF
B08_Solicitation_140P2024R00260002_20240228_0002.pdf PDF
Sol_140P2024R0026_Amd_0002.pdf PDF
B11_Virtual_PreProposal_Conf_Registration_Instructions_CATO_250011_0002.pdf PDF
B08_Attch_08_Addendum_002_20240209_24R0026_0001.pdf PDF
Sol_140P2024R0026_Amd_0001.pdf PDF
B08_Solicitation_Clause_set140P2024R00260001_20240209_0001.pdf PDF
B08_0Solicitation_140P2024R0026_20240205.pdf PDF
B08_Attch_02_Drawings_20220223_7_of_7.pdf PDF
B08_Attch_04_WD_MD20240017_20240105.pdf PDF
B08_Attch_01_Specification_20220121.pdf PDF
Sol_140P2024R0026.pdf PDF
Info-CATO_250011_LOA_20220410-20_41p.pdf PDF
INFORMATION-ONLY_Sol_140P2022R0078_Q_R_20220628.pdf PDF
B08_Attch_02_Drawings_20220223_4_of_7.pdf PDF
B08_Attch_05_SubKPlanForm.doc DOC document
B08_Attch_03_Addendum_001_20231228_24R0026.pdf PDF
B08_Attch_02_Drawings_20220223_3_of_7.pdf PDF
B08_Attch_02_Drawings_20220223_2_of_7.pdf PDF
B08_Attch_02_Drawings_20220223_1_of_7.pdf PDF
Info-CATO_250011_22-SF-0017p.pdf PDF
B08_Attch_02_Drawings_20220223_5_of_7.pdf PDF
B08_Attch_02_Drawings_20220223_6_of_7.pdf PDF
B08_Attch_06_Experience.docx DOCX document
B08_Attch_07_PastPerf.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Trip Report

Traveler: Ben Marnell & Fran Chronister

Destination: CATO

Date of Trip: 22-Feb-24

Project: Park Wide Utility Replacement

PMIS: 250011

Met With: See Sign In Sheet

Discussion & Follow-up Items:

• 0800 Ben and Fran arrived at the Camp Round Meadow Maintenance Area and met with Troy, Jared and Jason from CATO Maintenance, and chatted ref the project and the plan for the morning.

0900 Met up with the contractors for the site visit in the gym parking lot. Ben passed around the sign in sheet.

0905: Drove to area 5A where the back up well will be going and discussed that location.

0910: walked up to the water plant and tank area outside Camp David. Discussed this area and the restrictions associated with Camp David.

0945: Drove over to the Blue Blazes well site near the VC. Linked up with some additional contractors after some confusion over the meeting site. Ben had the additional folks sign in. Contractors and NPS personnel walked over the Blue Blazes well house to allow them access. The other well houses were not able to access due to snow and mud. Ben and LJ announced the solicitation closes on 11 March and all written questions due to Aaron Vollbracht by 1 March. A couple of contractors mentioned requesting an extension, LJ made clear that needed to happen quickly if they were to request one.

1010: Drove back over to the Water Plant site for the contractors who had missed this. Discussed per above the area and its restrictions. Ben re-iterated the solicitation closing date and questions, and we wrapped up the site visit.

R0026-PreProposal-SignIn-22Feb24.pdf
IMG_0089
IMG_0090