CATO 250011 Rehab UtilityInfrstrctre 140P2024R0026
Solicitation number
140P2024R0026
Issued by

About this file

This document provides an overview of a federal contract opportunity to replace park-owned utility infrastructure systems. The National Park Service is soliciting proposals to rehabilitate utility infrastructure at Catoctin Mountain Park in Maryland under solicitation number 140P2024R0026. The project scope involves replacing water, sewer and electrical systems serving park facilities. The original solicitation from 2022 has been reduced in scope due to funding constraints. Base bid work has been reduced and some tasks moved to optional items. The pre-proposal conference slides describe the revised project scope and provide additional context. Offerors are advised to review contract documents for details on permits, work restrictions, traffic control and other requirements. Evaluation criteria include technical approach, schedule, experience, past performance and small business participation. Proposals are due by March 21, 2024.

View the file

Other files

File Type Posted
Sol_140P2024R0026_Amd_0006.pdf PDF
B12_PreProp_Questions_1402024R0026_20240326_Amend_6_0006.pdf PDF
B08_Solicitation_140P2024R00260005_20240320_0005.pdf PDF
B12_PreProp_Questions_1402024R0026_20240320_Amend_5_0005.pdf PDF
B11_CATO_250011_PrePro_Site_Visit2_Mins_Atndc_20240314_0005.pdf PDF
Sol_140P2024R0026_Amd_0005.pdf PDF
B08_Attch_03_Addendum_001_20240320_24R0026_0005.pdf PDF
Sol_140P2024R0026_Amd_0004.pdf PDF
B09_Solicitation_clauses_140P2024R00260004_20240306_0004.pdf PDF
B11_VirtualPreProp_Conf_Attndc_CATO_250011_20240307_0004.pdf PDF
B12_PreProp_Questions_1402024R0026_20240306_Amend_4_0004.pdf PDF
Sol_140P2024R0026_Amd_0003.pdf PDF
B11_PreProposal_Conf_Registration_Instructions_CATO_250011rev03012024_0003.pdf PDF
B08_Solicitation_140P2024R00260002_20240228_0002.pdf PDF
Sol_140P2024R0026_Amd_0002.pdf PDF
B11_CATO_250011_Prepro_Site_Visit_Mins_Attndce_0002.pdf PDF
B11_Virtual_PreProposal_Conf_Registration_Instructions_CATO_250011_0002.pdf PDF
B08_Attch_08_Addendum_002_20240209_24R0026_0001.pdf PDF
Sol_140P2024R0026_Amd_0001.pdf PDF
B08_Solicitation_Clause_set140P2024R00260001_20240209_0001.pdf PDF
B08_0Solicitation_140P2024R0026_20240205.pdf PDF
B08_Attch_02_Drawings_20220223_7_of_7.pdf PDF
B08_Attch_04_WD_MD20240017_20240105.pdf PDF
B08_Attch_01_Specification_20220121.pdf PDF
Sol_140P2024R0026.pdf PDF
Info-CATO_250011_LOA_20220410-20_41p.pdf PDF
INFORMATION-ONLY_Sol_140P2022R0078_Q_R_20220628.pdf PDF
B08_Attch_02_Drawings_20220223_4_of_7.pdf PDF
B08_Attch_05_SubKPlanForm.doc DOC document
B08_Attch_03_Addendum_001_20231228_24R0026.pdf PDF
B08_Attch_02_Drawings_20220223_3_of_7.pdf PDF
B08_Attch_02_Drawings_20220223_2_of_7.pdf PDF
B08_Attch_02_Drawings_20220223_1_of_7.pdf PDF
Info-CATO_250011_22-SF-0017p.pdf PDF
B08_Attch_02_Drawings_20220223_5_of_7.pdf PDF
B08_Attch_02_Drawings_20220223_6_of_7.pdf PDF
B08_Attch_06_Experience.docx DOCX document
B08_Attch_07_PastPerf.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Proposal Conference & Project Overview Replace Parkwide Utilities

E X P E R I E N C E Y O U R A M E R I C A

PMIS #: CATO 250011

Solicitation: 140P2024R0026

March 7, 2024

AGENDA

• Introductions

• Project Overview

• Solicitation Information

• Solicitation Questions

• Conclusion

E X P E R I E N C E Y O U R A M E R I C A

PROJECT OVERVIEW

Owens Creek

Round Meadow

Post 5A

Visitor Center

Misty Mount

Greentop

Central Treatment Building and Tank

Project Scope

• This Project was previously solicited for construction in 2022 (Solicitation 140P2022R0078). Due to funding constraints, the Government has reduced the scope of work of the original 100% Construction Documents:

• a. Original Base Bid work has been reduced.

• b. Some Base Bid work has become Option work.

• c. The originally-designed Option work has been eliminated.

• Geotechnical Engineering Report (DMY Engineering Consultants, Inc. dated October 5, 2023) provides additional information to supplement the Specifications’ Geotechnical Data Report (Jacobs Engineering Group, Inc.)

• Base Bid Work east of the central treatment plant shall end after the air release and vacuum valve assembly at STA 4+13.08 and shall include the addition of a manual air release hydrant to provide flushing capability.

• Note: this site is directly adjacent to Camp David.

Park coordination will be required.

E X P E R I E N C E Y O U R A M E R I C A

Addendum 1 – Base Bid

Addendum 1 – Options

Addendum 1 – Eliminated Options

Addendum 2 – Tree Removal by Others

Tree Removal Performed by Others:

• Tree and shrub clearing is not permitted between April 1 – November 14.

Some tree removal indicated in the specifications and drawings will be performed by others, and removal will occur by April 1, 2024.

• Stump removal will not be performed by others and remains part of this CATO 250011 scope of work.

• A total of 226 trees will be removed under a separate contract along Manahan and Park Central Road.

• A total of 53 trees at the Central Treatment Facility site will be removed by others through the Park’s Feller Training in March 2024.

Addendum 2 – Tree Removal by Others

Tree Removal Performed by Others:

226 Trees 53 Trees

Additional Info

Contractors are advised to review the Contract Documents for details that are specific to this project and location, including but not limited to the following:

• Permits

• Stream Crossing work restrictions

• Tree and shrub clearing work restrictions

• Camp work restrictions

• Traffic Control requirements

If clarification is required, please direct specific questions to the Contracting Officer via email. Send all questions to aaron_vollbracht@nps.gov AND kyle_gonynor@nps.gov mailto:aaron_vollbracht@nps.gov mailto:kyle_gonynor@nps.gov

1. FORMAT: Submit proposal via email to aaron_vollbracht@nps.gov AND kyle_gonynor@nps.gov

2. ORGANIZATION:

BUSINESS & PRICE PROPOSAL

FACTOR 2 – Technical Approach FACTOR 3 – Schedule FACTOR 4 – Technical Experience FACTOR 5 -- Past Performance FACTOR 6 – Small Business Participation

SECTION L: Instructions for the Submission of Offers mailto:aaron_vollbracht@nps.gov

• Best Value Continuum Tradeoff Process pursuant to FAR 15.101-1

• Selection of the offer that provides the overall best value, considering all evaluation factors, to the Government for award

• Non-Price Factors 2, 3, 4, and Factor 6 Small Business Participation are of equal importance.

• Past Performance: Factor 5 Past Performance is more important than non-price Factors 2, 3 & 4, and 6 combined.

• All evaluation factors other than cost or price, when combined, are approximately equally important to price.

SECTION M EVALUATION PROCESS

SMALL BUSINESS PARTICIPATION

• Solicitation Section L, and Solicitation Section M describe this requirement

• If at any point during the performance of the contract it becomes apparent that the plan will not be met a recovery plan will be requested, and adherence to the plan will be appropriately documented in the past performance record

• Small Business Participation is separate from the Small Business Subcontracting Plan requirements at FAR 52.219-9

• A sample plan template is attached to the solicitation. The Subcontracting Plan does not receive a rating and the award is not made until the subcontracting plan is acceptable. The clauses 52.219-9 and 52.219-16 provide further detail.

The plan is only required to be submitted by large businesses. Small businesses prime contract offerors do not need to submit a subcontracting plan.

• The plan should demonstrate the contractor’s proposed subcontracting percentages as they relate to the proposed subcontracted amount and the small business goals identified in the solicitation.

SMALL BUSINESS SUBCONTRACTING PLAN

• Wage Determination:

• See current solicitation and any amendments for applicable Wage

Determination

• Ensure all subcontractor’s wages incorporate the current wage determination rates into their proposals.

• Work Hours:

• Ensure the work hours identified in Division 1 are considered when developing your proposed schedule

• Self-Performance:

• Clause 52.236-1 identifies the prime contractor self-performance requirement, the prime contractor is required to perform on site, with its own organization 12% of the total amount of work to be performed under the contract.

WAGE DETERMINATION / WORK HOURS / SELF

PERFORMANCE

• The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

• A formal organized site visit at the work location was conducted 02/22/2024

• This virtual pre-proposal conference is not implied to relieve an offeror’s responsibilities pursuant to inspect the work area pursuant to the clauses at 52.236- 2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work.

• (See Amendment 0004) A second pre-proposal site visit is scheduled for Wednesday, March 13, 2024, 10:00AM – 12:00PM at the Round Meadow parking lot.

14840 Manahan RD, Sabillasville, MD 21780

DISCLAIMER:

Any information obtained from either site visit meeting shall not be interpreted as additional contract requirements or changes to the contract requirements. All terms and conditions are documented within the solicitation and its amendments.

All proposals shall be based upon those documents.

SITE VISIT

• Submit all questions in writing to:

• aaron_vollbracht@nps.gov

• kyle_gonynor@nps.gov

• Government responses will be provided to all offerors via the SAM.gov advertisement

• Identities of offerors will be redacted

• Submit questions no later than 10 calendar days prior to proposal due date

• Questions submitted after this time may not receive a Government response

SOLICITATION QUESTIONS

mailto:aaron_vollbracht@nps.gov mailto:kyle_gonynor@nps.gov

Pre-Proposal Conference & Project Overview�Replace Parkwide Utilities
AGENDA
PROJECT OVERVIEW
PROJECT OVERVIEW

Project Scope

PROJECT OVERVIEW

Addendum 1 – Base Bid

PROJECT OVERVIEW

Addendum 1 – Options

PROJECT OVERVIEW

Addendum 1 – Eliminated Options

PROJECT OVERVIEW

Addendum 2 – Tree Removal by Others

PROJECT OVERVIEW

Addendum 2 – Tree Removal by Others

PROJECT OVERVIEW

Additional Info

SECTION L: Instructions for the Submission of Offers
SECTION M EVALUATION PROCESS
Slide Number 13
SMALL BUSINESS SUBCONTRACTING PLAN
WAGE DETERMINATION / WORK HOURS / SELF PERFORMANCE
SITE VISIT
SOLICITATION QUESTIONS