Industry Day Roofing new.pdf
PDF 2 MB Posted
- Solicitation number
- Not on record
- Issued by
-
Department of Justice Bureau of Prisons
About this file
This document is a presentation on roofing projects for the Federal Bureau of Prisons (BOP) under the Department of Justice. The initiative encompasses 31 roofing replacement projects across BOP facilities nationwide, estimated at approximately $61.2 million in total cost, to be funded and issued for bid over the next four fiscal years. Projects will be grouped by type of work required and geographic location.
The existing roofing systems at BOP facilities are past their life expectancy, requiring constant maintenance and repairs, and have caused interior damage, structural deterioration, mold growth, and safety concerns. The government's goals include replacing damaged and failing roof systems with new TPO (thermoplastic polyolefin) or standing seam metal systems, incorporating new technology, ensuring uniform standards across all U.S. facilities, and providing staff and inmate training. Contractors must employ factory-certified workforces and train facility staff and inmate crews in problem identification, debris handling, deck preparation, system installation, flashing, and maintenance procedures. Inmate work crews will be screened by BOP for program compatibility, with staff supervision provided at all times. The document details nine specific projects across multiple regions: FCI Bastrop (South Central), FMC Carswell (South Central), MDC Houston (South Central), FTC Oklahoma City (Western), FCI Three Rivers (South Central), FCC Yazoo City–FCI 1 (Southeast), FDC Miami (Southeast), FMC Devens (Northeast), FCI Lewisburg (Northeast), FCI Fort Dix (Northeast), FCI Memphis (Mid-Atlantic), USP Lee (Mid-Atlantic), and FCI Waseca (North Central), with roof areas ranging from approximately 30,000 to 250,000 square feet per project, requiring removal of existing systems, structural repairs, new insulation, drain bodies, flashing, and parapet work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RO O FING
P RO J EC TS
Randal We a the rford
Roofing Sys te ms
Curre nt Conditions
• Pas t Life Expe c tancy \ S torm Re la te d Is s ue s
• Re quire s cons tant ma inte nance and re la te d re pa ir
• De te riora te d roofing s ys te ms le ad to :
• Inc re as e d de cking and s ubs tra te damage
• Damage d inte rior finis he s and e quipme nt
• Pote ntia l s a fe ty re la te d is s ue s
• Inhe re nt mold growth and othe r indoor a ir qua lity is s ue s .
Roofing Proje c ts
Goals
• Replace Damaged and Failing Roof Systems
• Ne w Te chnology
• Provide a s a fe e nvironme nt tha t prote c ts occupants a s we ll conte nts .
• Uniformity throughout the Unite d S ta te s
• Sta ff and Inmate Tra ining
Tra ining
• Proje c ts to utilize inmate labor, whe re appropria te .
• Inmate work c re ws would be s c re e ne d by BOP to e ns ure compatibility with this program.
• Sta ff Supe rvis ion will be provide d a t a ll time s .
• Contrac tor will be re quire d to tra in fac ility s ta ff a s we ll a s inmate work c re ws to:
• Prope rly ide ntify proble m a re as .
• Re move and prope rly handle cons truc tion de bris .
• Pre paring the e xis ting de ck and s ubs tra te to re ce ive ne w s ys te ms .
• Ins ta lla tion of ne w s ys te ms and re quire d fla s hing.
• Prope r mainte nance proce dure s to mainta in longe vity of the ne w s ys te m
• Provide a knowle dge able e xpe rie nce d "Fac tory" ce rtifie d work force .
Proje c t Imple me nta tion
• 31 Roofing projects will be funded and issued for bid proposal over the next 4 fiscal years.
• These projects are estimated at a total cost of approximately $61.2 m.
• Proje c ts will be is s ue d for bid by groups , bas e d on type of work re quire d and ge ographic loca tions .
• Proje c ts to utilize inmate labor, whe re appropria te .
• Fis ca l Re s pons ibility to e ns ure "Be s t Va lue " to the Gove rnme nt.
Proje c ts South Ce ntra l Re gion
FCI Bas trop
FCI Bas trop
• FCI Bas trop was cons truc te d in 19 79 cons is ts of 39 3 ,348 s .f. unde r roof and occupie s 175 ac re s .
•Exis ting TPO on Hous ing Units (4 ) and as pha lt built-up roofs ove r othe r a re as a re pas t life cyc le .
• Hous ing Units – approx. 40 ,0 0 0 s .f.
• Re move e xis ting TPO roof s ys te m and re pa ir damage d De cking.
• Ins ta ll ne w TPO roof s ys te m with ins ula tion, pa rape t coping/ cap and roof dra in bodie s
•Re maining Roof Are a – approx. 58 ,0 0 0 s .f.
• Thoroughly c le an the e xis ting as pha lt built-up roof
• Ove rlay ne w TPO roof s ys te m ove r e xis ting
• Ins ta ll ne w dra in bodie s , pa rape t coping and caps
FMC Cars we ll
FMC Cars we ll
• FMC Cars we ll was cons truc te d in 19 9 5, compris e d of 20 buildings with 171,18 5 s .f. unde r roof.
• Exis ting roofing s ys te ms of va rious type s ins ta lle d and a re pas t life cyc le and be yond re pa ir.
• Roof le aks have caus e d s ome damage to s e c tions of the me ta l de cking and as s oc ia te d s upports .
• De ck type s va ry from concre te (approx. 6 3 ,0 0 0 s .f.) to me ta l (approx. 40 ,0 0 0 s .f.)
• Le aks have caus e d damage to inte rior finis he s and s us pe c te d mold is pre s e nt.
• Ne w Work will cons is ts of •Re move a ll damage d roof s ys te m ( approx. 10 3 ,0 0 0 s .f.) and re pa ir a ll damage d de cking/ s upports •Ins ta ll ne w TPO roof s ys te m to inc lude ins ula tion, roof dra in bodie s , pa rape t coping/ cap and fla s hing.
•Pe rform comple te mold re me dia tion in a ffe c te d a re as .
•Re pa ir damage d inte rior finis he s .
MDC Hous ton
MDC Hous ton
• MDC Hous ton was cons truc te d in 19 9 8 and cons is t of 30 0 ,0 0 0 s .f. and 11 floors .
• Exis ting as pha lt built-up roof is pas t life cyc le and de s pite re gula r ma inte nance continue s to de te riora te .
• Evalua te e xis ting roof a re a (approx. 30 ,0 0 0 s .f.) and re pa ir damage d a re as .
• Ins ta ll ne w TPO roof s ys te m ove rlay with ne w dra in bodie s , pa rape t coping/ cap and fla s hing.
• Pos s ible difficultie s :
• Working in conge s te d s tre e t conditions .
• Roof a re as on multiple floors and loca tions .
• Handling of ma te ria l and cons truc tion de bris .
FTC Oklahoma City
We s te rn Re gion FTC Oklahoma City
• FTC Oklahoma City was cons truc te d in 19 9 5, cons is ts of 5 buildings with approximate ly 58 5,0 0 0 s .f. unde r roof.
• The main FTC building cons is ts of 5 floors and approximate ly 10 0 ,0 0 0 s .f. of roof a re a . This a re a has a modifie d bitume n roof s ys te m tha t is e xce e de d it 's life cyc le and multiple a re as a re le aking, caus ing roof de ck and inte rior finis h damage .
• Re move e xis ting roof s ys te m and re pa ir damage d de cking and s upports .
• Ins ta ll ne w TPO roof with ins ula tion, dra in bodie s , pa rape t coping/ cap and fla s hing.
• Possible difficulties:
• Working in close vicinity to an active airport operation
• Handling of material and construction debris.
FCI Thre e Rive rs
FCI Thre e Rive rs
• FCI Thre e Rive rs was cons truc te d in 19 9 0 and occupie s approximate ly 30 0 ac re s .
• Exis ting roofs a re approx. 110 ,0 0 0 s .f. and cons truc te d of s tanding s e am me ta l with s kylights .
• Me ta l roofs a re le aking throughout and have caus e d damage d to e xis ting wood s truc ture and de cking.
• Re place a ll roofs with ne w s tanding s e am me ta l roofing s ys te m to inc lude ne w de cking and ins ula tion.
•Re move s kylights and re frame the ope nings to a llow prope r tie -in to e xis ting s lope s .
•No s us pe c te d e nvironme nta l is s ue s a re e xpe c te d.
Southe as t Re gion
FCC Yazoo City – FCI 1
FCC Yazoo – FCI 1
• FCC Yazoo was cons truc te d in 19 9 7, cons is ts of 4 fac ilitie s and occupie s approx. 10 0 0 ac re s .
• FCI 1 has approximate ly 43 ,50 0 s .f. of a s pha lt built-up roofing tha t is pas t life cyc le .
• Are as a ffe c te d – Spe c ia l Hous ing Unit, GP Hous ing Unit (1),,Adminis tra tive , Me dica l, Re cre a tion Buildings
• Re move e xis ting roofing s ys te m and re pa ir damage d me ta l de cking
• Ins ta ll ne w TPO roofing s ys te m with ins ula tion, roof dra in bodie s , pa rape t coping/ cap and fla s hing.
FDC Miami
FDC Miami
• FDC Miami was constructed in 1999 consists of 550,965 s.f. and 13 floor levels
• Existing 44,000 s.f. asphalt built-up roof located on the 4th and 13th floor levels are is past life cycle and leaking.
• Remove existing roof system and repair metal decking and supports.
• Install new TPO roof system with new insulation drain bodies, parapet coping/cap and flashing.
• Possible difficulties:
• Working in congested street conditions.
• Roof areas on multiple floors and locations.
• Handling of material and construction debris.
Northe as t Re gion
FMC De ve ns
FMC De ve ns
• FMC Devens was originally constructed in 1960 and converted to BOP Facility in 1998
• Consists of 22 buildings and situated on approximately 222 acres
• Existing asphalt built-up roof approximately 120,000 s.f. is severely deteriorated and past life cycle.
•Remove existing roof system and repair existing metal roof deck and supports
• Install new TPO roof system with new insulation drain bodies, parapet coping/cap and flashing.
• No asbestos or environmental concerns are expected.
FCI Le wis burg
FCI Le wis burg
• FCI Le wis burg was cons truc te d in 19 32, cons is ts 1,158 ,514 s .f. and situated on 950 acres.
• Existing asphalt built-up roof on the UNICOR Factory (approximately 105,000) s.f. is severely deteriorated and past life cycle.
• Remove existing roof system and repair existing metal roof deck and supports
• Install new TPO roof system with new insulation drain bodies, parapet coping/cap and flashing.
• No asbestos or environmental concerns are expected.
• Historical Preservation Concerns.
FCI Fort Dix
FCI Fort Dix
• FCI DIX was cons truc te d in 19 9 2 cons is ts of 1,228 ,428 s .f. and occupie s 210 acre s .
• Existing roofing system is EPDM with gravel ballast and is past life cycle.
• Remove existing roof system (approx. 225,000 s.f.) and repair existing metal roof deck and supports
• Install new TPO roof system with new insulation drain bodies, parapet coping/cap and flashing.
• New gutters, scuppers and downspout.
• Mold Re me dia tion Expe c te d
• Re pa ir/ Re place damage d inte rior ce ilings and finis he d.
• Minor brick re pa ir and tuck pointing.
Mid-Atlantic Re gion
FCI Me mphis
FCI Me mphis
• FCI Me mphis was cons truc te d in 19 77, cons is ts 24 buildings totaling 30 4 ,0 0 0 s.f. and occupies 111 acres.
• Existing roof is a mixture of TPO and EPDM roofing systems and are severely deteriorated.
• Remove existing roof systems (approx. 245,000 s.f.) and repair existing metal roof deck and supports
• Install new TPO roof system with new insulation, drain bodies, parapet coping/cap and flashing.
USP Le e
USP Le e
• USP Le e was cons truc te d in 20 0 1, cons is ts of 6 75,6 47 s.f. and occupies 265 acres.
• Existing EPDM roofing systems are past life cycle and severely deteriorated.
• Remove existing roof systems (approx. 128,000 s.f.) and repair existing metal roof deck and supports
• Repair existing lightning protection system to eliminate on-going ground fault issues.
North Ce ntra l Re gion
FCI Was e ca
North Ce ntra l Re gion
FCI Was e ca
• FCI Was e ca was origina lly an Agricultura l Colle ge for the Unive rs ity of Minne s ota and conve rte d to a BOP Fac ility in 19 9 6 .
• Cons is ts of 6 75,6 47 s.f. and occupies 265 acres.
• Existing gravel ballast EPDM roofing systems are past life cycle and severely deteriorated.
• Concrete decking is present however roofs have significant ponding throughout.
• Remove existing roof systems on Special Housing Unit, Medical, Food Service and Recreation Buildings (approx. 250,000 s.f.).
| Slide Number 1 |
| Roofing Systems� |
| Roofing Projects� |
| Roofing Systems� |
| Roofing Systems� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
File details come from the government source that posted it. Updated .