This is a federal contracting presentation on Mechanical, Electrical, and Plumbing (MEP) Systems projects to be executed across Federal Bureau of Prisons facilities. The initiative addresses critical infrastructure deficiencies including outdated equipment, systems past life expectancy, increasing operational and maintenance costs, unreliable systems, and lack of redundancy. Over the next four fiscal years, 207 MEP projects valued at approximately $660 million will be funded and issued for competitive bid, organized by project type and geographic location.
The presentation details specific projects across five regional divisions: South Central (FCI La Tuna, FCI Seagoville, FCI Three Rivers, FCC Beaumont, FMC Fort Worth), Western (FCI Herlong, FCC Victorville FCI-2, MCC San Diego), Northeast (FCI Berlin, FCI Schuylkill), Southeast (FCC Coleman, FCI Atlanta), Mid-Atlantic (FCI Morgantown, FMC Lexington, FCI Ashland), and North Central (FCI Englewood, FCI Marion). Project scope encompasses installation of chilled water systems, HVAC upgrades with automated controls, electrical system replacements and upgrades, domestic water system replacements, emergency power generation, sewer lift station improvements, and water storage tank construction. Architect/Engineer services are required to provide full construction documents and specifications for all projects. Initiatives prioritize best value to the government, incorporate inmate labor where appropriate, and address historic preservation concerns at applicable facilities. Projects are designed to enhance operational efficiency, system reliability, and redundancy across the federal prison complex infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEC HANIC AL, ELEC TRIC AL
AND
P LUMBING P RO J EC TS
Randal We a the rford
MEP SYSTEMS
Curre nt Conditions
• Outda te d Equipme nt and Te chnology
• Pas t Life Expe c tancy
• Inc re as ing Ope ra tiona l and Mainte nance Cos t
• Unre liable Sys te ms
• Lack of Re dundancy
Goals
• Replace Outdated and Failing Equipment
• Ne w Te chnology
• Re liability
• Re dundant Sys te ms
• Inc re as e Ope ra tiona l Effic ie ncy
• Sta ff and Inmate Tra ining
Proje c t Imple me nta tion
• 207 MEP projects will be funded and issued for bid proposal over the next 4 fiscal years.
• These projects are estimated at a total cost of approximately $660 m.
• Proje c ts will be is s ue d for bid by groups , bas e d on type of work re quire d and ge ographic loca tions .
• Proje c ts to utilize inmate labor, whe re appropria te .
• Fis ca l Re s pons ibility to e ns ure "Be s t Va lue " to the Gove rnme nt.
Proje c ts South Ce ntra l Re gion
FCI La Tuna
FCI La Tuna
• FCI La Tuna was cons truc te d in 19 32 cons is ts of 25 buildings and approximate ly 8 0 ,18 5 s .f. unde r roof.
• Curre ntly doe s not have a chille d wa te r s ys te m.
• Ins ta ll a comple te Chille d Wate r Sys te m: Chille rs , Cooling Towe r, Pumping Sys te ms and as s oc ia te d piping.
• Ins ta ll ne w HVAC s ys te m: Roof Top Units , Make -Up Air Units Automate d Environme nta l Controls , Exhaus t Sys te ms and a ll a s s oc ia te d duc twork/ piping.
• Upgrade the e xis ting Ele c trica l Sys te ms to accommodate ne w powe r de mand.
• A/ E to provide full cons truc tion docume nts and s pe c ifica tions .
FCI Se agoville
FCI Se agoville
• FCI Se agoville was cons truc te d in 19 37, compris e d of 38 building with 50 0 ,314 s .f. unde r roof.
• Inmate hous ing units 5, 7, 10 & 12 (57,746 s q ft) curre ntly have he a ting and ve ntila tion s ys te ms only.
• He ating is accomplis he d with s te am-fire d radia tors loca te d throughout e ach building with s te am de live re d by boile rs loca te d in the Powe rhous e .
• Curre ntly the re a re no chille rs loca te d within the Powe rhous e .
• Provide a comple te HVAC s ys te m for the 4 buildings to inc lude : Chille r(s ), Air Handling Units , Automate d Control Sys te m, duc twork, piping and pumping s ys te ms .
• A/E to provide full construction documents and specifications.
•Historic Preservation concerns.
FCI Thre e Rive rs
FCI Thre e Rive rs
• FCI Thre e Rive rs was cons truc te d in 19 9 0 and occupie s approximate ly 30 0 ac re s .
• Re place two e xis ting 450 kw ge ne ra tors , a s s oc ia te d trans fe r s witche s and cabling loca te d within the e quipme nt room.
• Re place unde rground high voltage cabling in fe e d loop "B".
• Re place le aking high voltage trans forme rs .
• Re place main s witch ge a r and dis tribution pane ls in the Food Se rvice Buildings a t FCI and Camp.
FCC Be aumont
FCC Be aumont
• FCC Be aumont was cons truc te d from 19 9 6 to 19 9 8 , cons is ts of one USP, Two FCIs and one Sa te llite Pris on Camp tota ling 1,6 41,6 23 s .f. and s itua te d on 9 6 0 ac re s .
• Exis ting comple x s e we r lift s ta tion is in a low-lying a re a s ubje c t to ground infiltra tion.
• Ins ta ll ne w s e we r lift s ta tion with prope r e le va tions to e ns ure compliant ope ra tion.
• Exis ting unde rground dome s tic and fire wa te r piping, a ll a s s oc ia te d va lve s and pumping s ys te ms a re s e ve re ly corrode d due to the corros ive e nvironme nt and pas t flooding/ s torms
• Re place a ll unde rground piping s ys te m to inc lude is ola tion va lve s .
• Re place a ll damage d piping in the Re mote Utility Buildings (3 ) to inc lude fire / dome s tic wa te r pumping s ys te ms and as s oc ia te d controls .
•A/ E to provide full construction documents and specifications.
FMC Fort Worth
FMC Fort Worth
• FMC Fort Worth was cons truc te d in 19 34 cons is ts of 31 buildings and occupie s approximate ly 38 ac re s .
• Cons truc t one dome s tic wa te r s torage tank to hold one million ga llons of wa te r.
• Addition of this tank will a llow for 10 days of wa te r to be us e d during e me rge ncy e ve nts .
• Historic Preservation concerns.
Wate r S torage Tanks Proje c ts
• Northe as t Re gion – FCI Be rlin, USP Alle nwood, USP Le wis burg
• Mid-Atlantic Re gion – FCI As hland, FCI Pe te rs burg, FCI Morgantown, FCI Cumbe rland
• North Ce ntra l Re gion – USP Te rre Haute , FCI Cumbe rland
• South Ce ntra l Re gion – FCI La Tuna , FCC Be aumont, FCC Oakda le , FCI Te xarkana , FCI Cars we ll
• We s te rn Re gion – FCI Safford, USP Lompoc
We s te rn Re gion
FCI He rlong
FCI He rlong
• FCI He rlong was cons truc te d in 20 0 5, cons is ts of 23 building with approximate ly 56 0 ,0 0 0 s .f. unde r roof.
• Re place e xis ting he a ting hot wa te r dis tribution loop due to e xce s s ive le aks .
• Curre nt loop e xte nds from Ce ntra l Utility Plant to multiple building e ntrie s throughout the comple x.
FCC Vic torville - FCI-2
FCI Vic torville
• FCC Vic torville was cons truc te d in 20 0 0 , cons is ts of one USP, Two Medium FCIs and one Satellite Prison Camp totaling 1,732,420 s.f. and situated on 960 acres.
• The work will be is ola te d to FCI – 2.
• Re place two ce ntrifuga l Chille rs and two Cooling Towe rs and as s oc ia te d piping loca te d with-in the Ce ntra l Utility Plant.
• Ins ta ll a he a t re cove ry s ys te m to capture re je c te d he a t and utilize it to s upple me nt the hot wa te r boile rs .
MCC San Die go
MCC San Die go
• MCC San Die go was cons truc te d in 19 74 , cons is ts of 23 s torie s and approximate ly 225,0 0 0 s f.
• Re place a ll dome s tic wa te r line s throughout the building with s e le c tion de molition re quire d.
• Acce s s to s ome piping will be re quire de molition of va rious e xis ting building compone nts to re place .
• Building re pa ir to curre nt conditions will be re quire d.
Northe as t Re gion
FCI Be rlin
FCI Be rlin
• FCI Berlin was constructed in 2010 consists of 689,909 s.f. and situated on approximately 707 acres
• Replace existing pre-insulated heating hot water distribution loop due significant leaks.
• Current loop extends from Central Utility Plant to multiple building entries throughout the complex.
FCI Schuylkill
FCI Schuylkill
• FCI Schuylkill was constructed in 1991 consists of 516,397 s.f. and situated on approximately 600 acres
• Replace existing pre-insulated heating hot water distribution loop due to significant leaks.
• Current loop extends from Central Utility Plant to multiple building entries throughout the complex.
Southe as t Re gion
FCC Cole man
USP 1 / USP 2 Cole man
• FCC Cole man was cons truc te d in 19 9 3 , cons is ts of two USPs, Two FCIs and one Prison Camp totaling 2,434 ,578 s.f. and situated on 1,746 acres.
• Re place two ce ntrifuga l Chille rs and as s oc ia te d pumping s ys te ms loca te d with-in the Ce ntra l Utility Plant a t USP-2.
• Re place Automate d Controls Sys te ms and Re pa ir/ Re place Boile rs and as s oc ia te d pumping s ys te ms a t USP-1.
FCI Atlanta
FCI Atlanta
• FCI Atlanta was cons truc te d in 19 0 2 cons is ts of 47 buildings tota ling approximate ly 1.6 million s q.ft.
• Curre ntly the vas t ma jority of the e le c trica l dis tribution s ys te m is in ne e d of major re pa ir or re place me nt.
• Re pa ir e xis ting bas e me nt and s ubs urface dra inage s ys te m to e limina te he avy wa te r intrus ion.
• Ge ne ra tor #3 , a ll pa ra lle ling s witchge a r and automatic trans fe r s witche s a re in ne e d of re place me nt.
• Upgrade a ll e xis ting e le c trica l s witchge ar, dis tribution pane ls and trans forme rs throughout the ins titutiona l grounds .
• Re place a ll High Mas t Light Pole s .
• A/ E to provide full cons truc tion docume nts and s pe c ifica tions .
• His toric Pre s e rva tion conce rns .
Mid-Atlantic Re gion
FCI Morgantown
FCI Morgantown
• FCI Morgantown was cons truc te d in 19 6 8 , cons is ts 22 buildings totaling 36 9 ,0 0 0 s.f. and occupies 400 acres.
• Curre ntly the ins titution has no me ans of s upplying e me rge ncy powe r in the e ve nt of comme rc ia l outage .
• Exis ting main e le c trica l s witch ge a r and dis tribution pane ls a re ove rloade d and/ or in ne e d or re place me nt.
• Ins ta ll two ne w ge ne ra tors with s witchge a r, fue l tanks , e me rge ncy pane ls and a ll unde rground cabling re quire d to ade q ua te ly provide re liable powe r during time s of e me rge ncy or inc le me nt we a the r conditions .
• Upgrade a ll e xis ting e le c trica l s witchge ar, dis tribution pane ls and trans forme rs throughout the ins titutiona l grounds .
FMC Le xington
FMC Le xington
• FMC Le xington was cons truc te d in 19 31 is compris e d of 34 buildings with a tota l of 1,0 51,0 9 6 s quare fe e t.
• Curre ntly the ins titution has no me ans of s upplying e me rge ncy powe r in the e ve nt of comme rc ia l outage .
• Exis ting main e le c trica l s witch ge a r and dis tribution pane ls a re ove rloade d and/ or in ne e d or re place me nt.
• Ins ta ll two ne w ge ne ra tors with s witchge a r, fue l tanks , e me rge ncy pane ls and a ll unde rground cabling re quire d to ade q ua te ly provide re liable powe r during time s of e me rge ncy or inc le me nt we a the r conditions .
• Upgrade a ll e xis ting e le c trica l s witchge ar, dis tribution pane ls and trans forme rs throughout the ins titutiona l grounds .
FCI As hland
FCI As hland
• FCI As hland was cons truc te d in 19 40 is compris e d of approximate ly 50 0 ,0 0 0 and e ncompas s e s 143 ac re s .
• Curre ntly the ins titution dome s tic wa te r ne e ds a re be ing s e rvice a 5" bronze wa te r ma in loca te d within the utility tunne l. Main and a ll la te ra ls have s igns of s ignificant de te riora tion.
• Curre nt pipe s izing is not ade qua te to me e t the de mands .
• Re place the e ntire dome s tic wa te r s ys te m loca te d throughout the ins titution grounds to inc lude piping, va lve s and backflow pre ve ntion de vice s .
North Ce ntra l Re gion
FCI Engle wood
FCI Engle wood
• FCI Engle wood was cons truc te d in 19 38 is compris e d of 15 buildings with a tota l of 26 3 ,0 0 0 s quare fe e t
• Exis ting e le c trica l infras truc ture is up to 35 ye a rs old and pas t it’s s e rvice able life cyc le .
• 13 .2KV s witchge ar loca te d in the Powe rhous e ( fre que nt ope ra tiona l fa ilure s )
• Main and fe e de r re lays (e xis ting GE 750 re lays obs ole te , upgrade to digita l re lays )
• Re place main motor control ce nte r in Powe rhous e ( re liability and ove rhe a ting is s ue s )
• Re place unde rground fe e de r throughout the ins titution ( ins ta lle d in 19 38 , los s of inte grity, unde rs ize d )
• Upgrade me dium voltage , dis tribution pane ls and trans forme rs throughout the ins titutiona l grounds .
FCI Marion
FCI Marion
• FCI Marion was cons truc te d in 19 6 3 is compris e d of 15 buildings and occupie s 9 35 ac re s
• Exis ting e le c trica l infras truc ture is up to 50 ye ars old and pas t it’s s e rvice able life cyc le .
• Re place s ix me dium voltage pad mount trans forme rs .
• Re place e le c trica l s ubs ta tions loca te d within five diffe re nt trans forme r vaults .
• Re place curre nt grounding s ys te m ( e le c tronic e quipme nt and s ta ff s a fe ty is s ue s .)
• Re place high voltage unde rground fe e de rs throughout the FCI
• Re place s ubs ta tion and dis tribution fe e de rs and pane l a t FPC
| Slide Number 1 |
| MEP SYSTEMS� |
| MEP SYSTEMS� |
| MEP SYSTEMS� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Water Storage Tanks Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
| Projects� |
File details come from the government source that posted it. Updated .