This is a Request for Proposals (RFP) issued by the Little Rock Municipal Airport Commission (LRMAC) for comprehensive Internet Services, with supporting Industry Day materials and pre-solicitation market research documentation. The RFP (Solicitation Number 26004RFP) seeks two separate Internet Service Providers to deliver dedicated fiber-optic connectivity, managed router solutions, and related services to multiple airport facilities including the terminal at 1 Airport Road, the Airport Business Park at 2400 Grundfest Drive, the Air Cargo Facility at 1000 Temple Street, and several other locations. The solicitation was issued on Friday, August 28, 2026, with a pre-response meeting scheduled for 2:00 PM local time (Little Rock, Arkansas) and a deadline for questions by 11:45 PM on an unspecified date. Responses must be submitted by 2:00 PM on an unspecified submission deadline, with submissions accepted online via the Airport's B2GNow Portal or by paper delivery to the Procurement Department at 1 Airport Road, Little Rock, AR 72202-4489. The contract term will be five years with the option for one additional one-year renewal term upon mutual written agreement, and additional renewal terms may be permitted if both parties agree and applicable law permits. The RFP includes a mandatory pre-response site tour and encourages attendance at an Industry Day held on July 16, 2026, which served as market research to validate procurement assumptions and gather vendor feedback.
The Airport requires a minimum guaranteed symmetrical bandwidth of 10 Gbps without bursting, unlimited data usage without throttling, a minimum of 32 IPv4 static addresses, at least one /56 subnet of IPv6 addresses, and a managed router solution with redundant power supplies and security features including SIP ALG support. The service must guarantee 99.999% monthly uptime and demonstrate physical route diversity through direct ownership and operation of fiber-optic network infrastructure. Pricing must follow a predictable monthly recurring model with clearly identified charges for recurring services, optional managed services, and one-time installation or construction costs, with no price increases permitted during the initial five-year term. The Airport will manage load balancing, failover, and traffic routing through its own infrastructure, meaning respondents need not provide built-in load balancing mechanisms but must ensure compatibility with active/active and active/passive deployment scenarios. All Company personnel assigned to the contract must pass SIDA training, FBI fingerprint-based Criminal History Records checks, and TSA Security Threat Assessments, with badges issued and maintained by the Commission. Minimum qualifications require five years of work-related experience providing Internet services with three current client references and a minimum of five years of service experience in the Little Rock market. The evaluation scoring allocates 30% weight to compensation model (pricing), 20% to proposed scope of services, 20% to team qualifications and escalation procedures, 10% to years of experience, 15% to implementation schedule, and 5% to clarity and effectiveness of submission, with a maximum total score of 1000 points.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Day Notice 26004 Internet Services Project
The Little Rock Municipal Airport Commission (LRMAC), invites interested Internet Service Providers and industry partners to participate in an upcoming Industry Day regarding the Airport's future Internet Services Project.
The purpose of this event is to provide information regarding the Airport's current environment, anticipated needs, project objectives, and procurement timeline, while gathering industry feedback to assist in the development of a future solicitation.
Topics may include:
• Internet service technologies and industry trends
• Service reliability and redundancy
• Scalability and future growth considerations
• Performance expectations and service levels
• Pricing structures and contract approaches
• Industry best practices and lessons learned
The Airport encourages participation from all interested providers and industry stakeholders.
Important Notice
This Industry Day is being conducted solely for market research and planning purposes. Participation in this event:
• Is voluntary
• Is not required for participation in any future solicitation
• Will not provide any competitive advantage
• Will not influence future evaluations or award decisions
This event is not a solicitation, request for proposals, request for bids, or request for qualifications, and no contract award will result from this process.
Cone of Silence
All communication regarding this event must be directed to the Procurement Department at procurement@clintonairport.com. The Commission has established a "Cone of Silence," which prohibits any communication regarding this event between interested parties and any Airport employee, Commission member, consultant, or other representative of the Commission, except through the Procurement Department. The Cone of Silence begins upon publication of this notice and remains in effect until an agreement resulting from the related solicitation is fully executed, unless otherwise authorized by the Procurement Department. The Cone of Silence is suspended only during Commission-sponsored and publicly announced meetings. Failure to comply with this requirement may result in the rejection of a submission, proposal, or bid from the offending party in response to a solicitation.
Event Information Date: July 16, 2026 Time: 2:00 – 3:30 CST Location: Virtual via Microsoft Teams Link: https://teams.microsoft.com/meet/295741638943208?p=77Ioj7i6e3cfWTLIpV Meeting ID: 295 741 638 943 208 Passcode: Y6LS9Zi6 mailto:procurement@clintonairport.com https://teams.microsoft.com/meet/295741638943208?p=77Ioj7i6e3cfWTLIpV
The Airport has prepared a series of questions in advance of the Industry Day event and encourages all interested companies to provide their feedback by Tuesday, July 14, 2026. All responses will be collected anonymously.
Link: Industry Day Vendor Questions - 26004 Internet Services – Fill out form
Additional information, presentation materials, and a written summary of questions and answers will be made publicly available following the event. For questions regarding this Industry Day, please contact the Procurement Department at (procurement@clintonairport.com).
https://forms.office.com/r/dKpiK0dKJA
View results
Anonymous 23:36 Time to complete
Respondent
Solicitation Development
Given what we have requested in the RFP, are our capacity expectations realistic? 1.
Yes, provided the airport's capacity, based on projected operational growth over the contract term. We recommend requiring scalable bandwidth options (for example, 1 Gbps, 10 Gbps, and higher as needed) with the ability to upgrade without requiring a contract amendment. Capacity requirements should also distinguish between committed bandwidth and burst capability.
Is our dual-provider strategy appropriate? 2.
Yes. A dual-provider strategy is considered a best practice for critical infrastructure such as airports. Using two independent carriers reduces the risk of outages, improves resiliency, and supports business continuity. To maximize redundancy, providers should utilize separate backbone networks and physically diverse entrance facilities whenever possible.
What are best practices for route diversity? 3.
Best practices include:
Physically diverse fiber paths entering the facility from different directions.
Separate conduit systems and entrance locations.
Independent central offices or points of presence.
Diverse long-haul backbone routes.
Documentation demonstrating physical path diversity rather than logical separation alone.
Periodic validation that routes remain diverse after maintenance or network changes.
What information is often missing or unclear in internet service solicitations? 4.
Common areas that benefit from additional detail include:
Existing network topology and demarcation locations.
Current bandwidth utilization and projected growth.
Required Service Level Agreements (SLAs).
Expectations for installation timelines.
Fiber availability and existing infrastructure.
Requirements for managed equipment versus provider handoff.
Expectations for monitoring, reporting, maintenance windows, and support response times.
Security, DDoS mitigation, and IPv6 requirements, if applicable.
What solicitation requirements or contract terms make it difficult for vendors to compete or submit their best proposal? 5.
Examples include:
Overly restrictive technical specifications that unnecessarily limit equivalent solutions.
Insufficient time to perform site surveys.
Unclear evaluation criteria.
Mandatory technologies that exclude functionally equivalent alternatives.
Short implementation schedules that do not account for fiber construction, permitting, or utility coordination.
Contract terms that place unlimited liability or unreasonable risk on vendors.
Additionally, agencies should consider allowing responses through established cooperative purchasing programs and pre-competed contract vehicles, such as Equalis Group, GSA Schedule, or equivalent state and regional cooperative contracts. These vehicles can reduce procurement timelines, broaden participation by qualified small and minority-owned businesses, and provide agencies with competitively awarded contracts while maintaining procurement compliance. This approach allows agencies to acquire services more efficiently without compromising transparency or competition.
How can the Airport encourage innovation while still maintaining a fair and competitive procurement process? 6.
The Airport can encourage innovation by:
Defining desired performance outcomes instead of prescribing specific technologies.
Allowing vendors to propose alternative technical solutions that meet or exceed requirements.
Including optional value-added services as separately evaluated items.
Conducting open Industry Day discussions and publishing all questions and answers equally to all participants.
Using objective, transparent evaluation criteria focused on technical capability, reliability, scalability, security, and overall value rather than solely on lowest price.
The Airport may also benefit from leveraging cooperative purchasing vehicles such as Equalis Group, GSA Schedule, or other competitively awarded cooperative contracts for future technology procurements where appropriate. These procurement pathways help agencies accelerate implementation, reduce administrative burden, expand access to innovative solutions from both large and small businesses, and shorten acquisition timelines while preserving fair competition through contracts that have already undergone a competitive solicitation process.
Technology and Industry Trends
What new technologies, services, or industry trends should the Airport be aware of when planning for future internet services? 7.
The Airport should consider technologies and trends that improve resiliency, performance, security, and operational flexibility, including:
Multi-gigabit and scalable fiber connectivity capable of supporting future bandwidth demands.
Software-Defined Wide Area Networking (SD-WAN) to improve traffic management, resiliency, and application performance.
Secure Access Service Edge (SASE) and Zero Trust security architectures to better protect distributed users and connected systems.
IPv6 adoption to support continued growth of connected devices.
AI-powered network monitoring and predictive analytics for proactive issue detection and performance optimization.
5G and private wireless networks to supplement fiber connectivity for operational mobility and redundancy.
Cloud-first networking with direct connectivity to major cloud providers.
Enhanced DDoS protection, DNS security, and managed cybersecurity services as standard offerings.
Environmentally sustainable infrastructure with improved energy efficiency and reduced operational costs.
What changes do you expect to see in internet services over the next five to ten years? 8.
Over the next five to ten years, internet services will become increasingly intelligent, automated, and cloud-centric. Organizations should expect:
Continued growth in bandwidth requirements driven by AI, cloud applications, IoT, security systems, and high-definition video.
Greater use of AI to automate network monitoring, fault detection, capacity planning, and performance optimization.
Increased adoption of Zero Trust cybersecurity models integrated directly into network services.
More flexible consumption-based service models that allow organizations to scale bandwidth as operational needs evolve.
Expansion of edge computing to reduce latency for operational technologies and mission-critical applications.
Greater emphasis on service resiliency through geographically diverse infrastructure and automated failover capabilities.
Continued convergence of networking, security, and cloud services into unified managed solutions.
What can airports do today to ensure their internet services can support future growth and changing technology? 9.
The Airport can position itself for long-term success by:
Designing the network with scalability as a primary requirement rather than sizing only for today's demand.
Requiring physically diverse fiber routes and redundant providers to maximize resiliency.
Utilizing open, standards-based architectures that avoid unnecessary vendor lock-in.
Ensuring infrastructure supports future upgrades to higher bandwidth without significant redesign.
Incorporating cybersecurity requirements, including Zero Trust principles, into the network architecture from the outset.
Investing in comprehensive network monitoring, reporting, and performance analytics to support proactive operations.
Planning for increased connectivity demands from passengers, tenants, airlines, IoT devices, smart building systems, security technologies, and AI-enabled operational tools.
Periodically reviewing technology roadmaps and conducting market research, such as Industry Days, ensures procurement strategies remain aligned with evolving industry capabilities and best practices.
Scope & Service Requirements
What information should the Airport provide to help vendors understand our needs, maximize vendor participation, reduce ambiguity, and develop the best solution?
10.
The Airport should provide as much operational and technical context as possible, including:
Current network architecture and existing internet environment.
Existing bandwidth utilization, peak traffic patterns, and anticipated growth.
Facility locations, demarcation points, and available fiber infrastructure.
Current providers and contract expiration timelines (if appropriate).
Required implementation schedule and any operational constraints.
Desired Service Level Agreements (SLAs) and performance expectations.
Security, compliance, and resiliency requirements.
Evaluation criteria and the relative weighting of technical, operational, and pricing factors.
Expectations regarding managed services, monitoring, reporting, and customer support.
Site drawings or network diagrams, where appropriate, to reduce assumptions and improve proposal accuracy.
What requirements or considerations are often overlooked in internet service projects? 11.
Commonly overlooked considerations include:
Physical route diversity rather than simply using multiple logical providers.
Scalability to accommodate future bandwidth growth without major infrastructure changes.
Cybersecurity services such as DDoS protection, DNS security, and Zero Trust integration.
Network monitoring, performance analytics, and historical reporting.
Clearly defined maintenance windows and communication procedures.
Disaster recovery and business continuity planning.
Installation lead times, permitting, and construction coordination.
Cloud connectivity requirements for Microsoft Azure, AWS, Google Cloud, and SaaS applications.
Operational support expectations, including escalation procedures and executive-level service management.
What service levels, performance standards, or reporting requirements should the Airport consider including? 12.
The Airport should consider measurable Service Level Agreements that include:
Network availability of 99.99% or greater.
Clearly defined latency, packet loss, and jitter thresholds.
Guaranteed mean time to respond (MTTR) and mean time to restore service.
Proactive 24×7 network monitoring and incident notification.
Scheduled monthly performance reports including uptime, utilization, outages, trends, and SLA compliance.
Root cause analysis reports following significant outages.
Defined escalation procedures with named technical and management contacts.
Service credits for failure to meet agreed-upon performance standards.
Quarterly service reviews to evaluate performance, capacity planning, and continuous improvement opportunities.
What backup, redundancy, or failover capabilities are considered best practice for a high availability environment? 13.
For mission-critical environments such as airports, best practices include:
Two independent internet service providers utilizing separate backbone networks.
Physically diverse fiber entrance paths and conduit systems enter facilities from different directions.
Automatic failover with no manual intervention required.
Redundant edge routers, firewalls, and core networking equipment configured for high availability.
Diverse power sources and backup power protection for critical networking infrastructure.
Continuous health monitoring with automated alerting and failover testing.
Regular disaster recovery exercises and documented failover validation.
Clearly documented resiliency architecture demonstrating that no single point of failure exists within the internet connectivity design.
These practices help ensure uninterrupted operations for airline systems, public safety communications, passenger services, security technologies, and other mission-critical airport functions.
Price Proposal
What pricing structure works best for internet service contracts? 14.
A predictable monthly recurring pricing model works best for internet service contracts. Monthly pricing should clearly identify recurring service charges, optional managed services, and any one-time installation or construction costs. Where applicable, vendors should also provide scalable pricing options that allow the Airport to increase bandwidth or add locations without requiring an entirely new contract.
What factors have the biggest impact on pricing? 15.
The primary factors affecting pricing include:
Required bandwidth and scalability.
Whether existing fiber infrastructure is already available at each location.
New fiber construction or permitting requirements.
Physical route diversity and redundancy requirements.
Contract term length.
Required Service Level Agreements (SLAs).
Managed equipment and network monitoring services.
Cybersecurity services such as DDoS protection and managed firewalls.
Number of service locations and implementation complexity.
Installation timelines and any after-hours work required to support airport operations.
What background or current state information can the Airport provide to help vendors develop accurate and competitive pricing?
16.
The Airport can improve pricing accuracy by providing:
Existing internet providers and contract expiration dates (where appropriate).
Current bandwidth utilization and anticipated future growth.
Building locations, demarcation points, and existing fiber availability.
Site maps and network diagrams, when available.
Required implementation timeline.
Expected Service Level Agreements (SLAs).
Security and compliance requirements.
Any known construction, permitting, or operational constraints.
Whether existing network equipment will be reused or replaced.
In looking at this RFP, are there any areas that you think we can save money? 17.
The Airport may realize significant time and administrative savings by leveraging competitively awarded cooperative purchasing contracts or established procurement vehicles, such as Equalis Group, GSA Schedule, or equivalent state and regional cooperative contracts, where permitted by Airport procurement policies.
These contract vehicles have already undergone a competitive solicitation process and can:
Reduce procurement timelines.
Lower administrative costs associated with developing and evaluating a full RFP.
Increase access to qualified national, regional, and small business providers.
Allow the Airport to focus resources on implementation rather than procurement administration.
Accelerate deployment while maintaining procurement compliance and competitive pricing.
Whether you have fiber optic in the building or not, what would your build out, equipment, and implementation timeline look like?
18.
Implementation timelines vary depending on existing infrastructure:
If fiber is already available, implementation can typically be completed within 30 to 60 days, including engineering, equipment installation, testing, and service activation.
If new fiber construction is required, typical implementation ranges from 90 to 180 days, depending on permitting, right-of-way approvals, utility coordination, construction requirements, and weather conditions.
A typical deployment includes:
Site survey and engineering review.
Installation of provider demarcation equipment.
Edge routers and any required managed network equipment.
Circuit testing and performance validation.
Redundancy and failover testing.
Final acceptance testing and transition into production with ongoing monitoring and support.
Allowing vendors to conduct a pre-award site assessment can improve implementation planning, reduce unforeseen costs, and produce more accurate schedules.
Lessons Learned
What are the biggest mistakes companies make when procuring internet services? 19.
Common mistakes include:
Focusing primarily on lowest price instead of overall value, resiliency, and long-term performance.
Overlooking physical route diversity and redundancy requirements.
Underestimating future bandwidth growth and scalability needs.
Not clearly defining Service Level Agreements (SLAs) and support expectations.
Limiting competition by overlooking qualified small businesses that often provide highly responsive service, personalized support, and greater flexibility than larger national providers.
Delaying engagement with vendors until after the solicitation is released instead of leveraging market research and Industry Days to refine requirements.
What challenges are most common during implementation or transition to a new provider? 20.
The most common challenges include:
Delays related to permitting, construction, or utility coordination.
Incomplete documentation of existing infrastructure.
Unexpected fiber availability or pathway issues.
Coordinating cutover activities without disrupting airport operations.
Equipment lead times.
Testing and validating failover capabilities before production.
Communication and coordination among multiple stakeholders, including IT, facilities, operations, and service providers.
Maintaining continuity of critical airport services throughout the transition.
What is the most important piece of advice you would give the Airport before we issue a solicitation? 21.
Continue engaging industry early and focus on desired outcomes rather than prescribing a specific technical solution. Consider leveraging qualified small businesses that can provide responsive, hands-on support and act as long-term partners throughout the lifecycle of the project.
Where permitted under Airport procurement policies, consider utilizing established cooperative purchasing vehicles such as Equalis Group, GSA Schedule, or comparable cooperative contracts. These competitively awarded contract vehicles can significantly reduce procurement timelines, lower administrative costs, increase participation from qualified small businesses, and accelerate project delivery while maintaining procurement compliance and competitive pricing.
What question should we be asking that we have not asked? 22.
"How will vendors partner with the Airport over the life of the contract, beyond simply providing internet connectivity?"
Internet connectivity is no longer just a utility. It is foundational infrastructure supporting cybersecurity, cloud services, operational technology, passenger experience, AI-enabled applications, and future smart airport initiatives. Understanding how a vendor will support ongoing innovation, capacity planning, cybersecurity, reporting, and continuous improvement can be just as important as the initial price or bandwidth offered.
Other
Is there anything else that you would like to share that will help information the process? 23.
Thank you for engaging the industry before issuing the solicitation. Industry Days like this help agencies develop clearer requirements, encourage broader competition, and ultimately result in stronger procurements.
As the Airport moves forward, we encourage maintaining a technology-neutral, performance-based approach that allows vendors to propose innovative solutions while meeting the Airport's operational objectives. Where permitted by procurement policy, the Airport may also benefit from leveraging competitively awarded cooperative purchasing vehicles, such as Equalis Group, GSA Schedule, or equivalent contracts, to reduce procurement timelines, lower administrative costs, and expand access to qualified providers, including small businesses.
Finally, we encourage viewing internet connectivity as strategic infrastructure rather than simply a commodity service. The selected partner should be capable of supporting not only today's bandwidth requirements but also future initiatives involving cybersecurity, AI-enabled operations, cloud services, smart airport technologies, passenger experience, and long-term digital transformation.
Thank you for the opportunity to provide feedback. We look forward to participating in the Industry Day discussion and supporting the Airport's continued success.
Clinton National Airport | Internet Services Pre-Solicitation Market Research
Internet Services Pre-Solicitation Industry Day
Introductions
• Procurement • Information Systems
Overview of Industry Day
• Please submit questions through Teams chat
• Use Raise Hand feature to speak
• Session will be recorded; materials and Q&A will be published afterwards
Purpose of Today
• Share high-level overview of upcoming Internet Services procurement
• Provide context on current environment and future needs
• Validate assumptions with industry
• Gather general feedback to strengthen final solicitation
Disclaimer
• This session is for market research purposes only and is not a solicitation for services
• No award will be made from this process
• Participation will not influence evaluation or award decisions
• All responses today are non-binding
• Final requirements will be addressed in the upcoming solicitation
Current Enviroment
• Fiber Optic
• Windstream Primary
• 2GB
• Managed Router
• Multiple /28 Subnets
• Fiber Optic
• AT&T Backup
• Multiple 1Gbps U-Verse Internet
What Our Internet Supports Today
• Airport operations (parking, baggage systems)
• Telephony and communications
• Airport-wide WiFi (public + tenant use)
• Administrative and business systems
• Common Use Passenger Processing Systems (CUPPS)
• Backup and disaster recovery systems
Why We Are Going Out to Bid
• Increasing reliance on internet for critical airport systems
• Airport Switching over to Cloud Based Infrastructure for most systems.
• Common Use (Future Project), FIDS, Financial, Cybersecurity, Phones, etc.
• Growth in passenger demand and connected services
• Wi-Fi Connectivity (Video on-demand, content creation, etc)
• Need for higher capacity, reliability, and resilience
• Desire for long-term cost predictability
• Alignment with airport expansion and infrastructure upgrades
• Expiring Contract Obligations
Why This Matters
• Internet is mission-critical infrastructure
• Outages impact:
• Operations
• Passenger experience
• Safety and compliance
• We require high availability and consistent performance
High-Level Direction (Preliminary)
• Dual-provider strategy (two ISPs)
• Dedicated fiber-based connectivity
• High-capacity service (10 Gbps class or greater)
• Scalable and future-ready design
Architecture Approach
• Airport will manage:
• Load balancing
• Failover
• Traffic routing
• Providers will deliver:
• Reliable, dedicated connectivity
Goal: Flexible architecture (active/active or active/passive)
Preliminary Requirements (Subject to Change)
• High-capacity symmetrical bandwidth
• High availability (targeting “five nines” reliability)
• No throttling or restrictive usage policies
• IPv4 and IPv6 support
• Managed equipment and support
Infrastructure Considerations
• Fiber route diversity is critical
• Coordination with ongoing airport construction
• Integration with existing network environment
• Long-term scalability and resilience
What We Are Trying to Validate
• Are our capacity expectations realistic?
• Is dual-provider strategy appropriate?
• What are best practices for route diversity?
• What are realistic implementation timelines?
• Are we missing anything critical?
Expanded Customer Base Across Airport Tenants An airport contract opens the door to dozens of co-located tenants — each a potential customer for connectivity, network, and managed services.
Airlines
Delta · American · Southwest · United · Allegiant · Frontier · Regional carriers
★ Federal Agencies
TSA · FAA control tower · U.S. Customs & Border Protection · FBI / DHS field offices
▲ Ground Services & Cargo
FedEx & UPS air cargo · Fuel providers (Signature, Atlantic) · Aircraft maintenance / FBOs
● Concessions & Retail
HMSHost / · Hertz, Avis, Enterprise, National · Hudson News, local retail · Parking & shuttle operators
PROCUREMENT OVERVIEW
• Walkthrough of DRAFT solicitation document
• Construction documents
• Anticipated solicitation schedule
INDUSTRY FEEDBACK DISCUSSION
GROUP 1: SOLICITATION DEVELOPMENT
GROUP 2: TECHNOLOGY AND INDUSTRY TRENDS
GROUP 3: SCOPE & SERVICE REQUIREMENTS
GROUP 4: PRICE PROPOSALS
GROUP 5: LESSIONS LEARNED
Thank you for participating in today’s Pre-Solicitation Industry Day for
26004 Internet Services
• Publication of presentation materials and written feedback
• Incorporate feedback into final RFP
• Release formal solicitation
26004RFP Internet Services Page 1 of 15 Revised 05/11/2026
Request For Proposals (RFP) Solicitation Number 26004RFP
Solicitation Name Internet Services NAICS Code(s) 518210-Computing Infrastructure Providers, Data
Processing, Web Hosting, and Related Services Department Information Systems
Important Dates & Times Note: All times referenced in this RFP, and associated documents, are the local time for Little Rock, Arkansas.
Solicitation Issue Date Friday, August 28, 2026.
Pre-Response Meeting Time 2:00 PM (local time) Deadline for Questions Answers & Addenda Submission Due Date Time 2:00 PM (local time)
The above is an anticipated schedule. The Little Rock Municipal Airport Commission (the “Commission” or, for convenience, the “Airport”) reserves the right to modify any part of this schedule.
Submissions will not be accepted after the designated response due date and time. Each Company is responsible for ensuring its submission is delivered to the designated location on or before the submission due date and time. Submissions received after the designated submission due date and time will be considered late and will be returned to the Company without further review.
Pre-Response Meeting and Site Tour The Pre-Response Meeting will be held in the Commission Meeting Room located in the Airport’s administrative offices, with a Site Tour immediately following. All prospective Companies and Subcontractors are encouraged to attend in-person to participate in the Site Tour. A Microsoft Teams (“Teams”) meeting option is available for the pre-response meeting.
In-person: Please bring your parking ticket with you, the receptionist will validate your parking.
Teams: Click here to join the meeting - Meeting ID: 222 473 889 748 - Passcode: GktgML Language Assistance: If your Company needs language assistance, please contact procurement@clintonairport.com a minimum of 48 business hours in advance of this meeting.
Questions and Clarifications
1. All questions and requests for clarification(s) or additional information must be submitted in writing by 11:45 PM on the Deadline for Questions date as stated above.
a. Questions must be asked on the Airport’s B2GNow Portal (B2GNow).
b. For each question submitted, the Company must reference the specific solicitation number and section to which the question refers.
2. All questions and answers, clarification of, and addenda to this solicitation will be published on the Airport’s
B2GNow Portal by the Answers & Addenda date as stated above. It is the Company’s responsibility to register on the portal to review the Commission’s solicitation information, obtain all available information, and all updated requirements for this solicitation.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_MmQ2MTYxZGEtMGY5ZC00ZjM5LTllOGQtMzYzYmI1NzZlMTdi%40thread.v2/0?context=%7b%22Tid%22%3a%22bc96e740-06af-4e71-844e-5dd7b4a26d4b%22%2c%22Oid%22%3a%22812a68c0-eb8d-47f8-8446-af947f12fef3%22%7d https://clintonairport.gob2g.com/
26004RFP Internet Services Page 2 of 15 Revised 05.11.2026
Contents Request For Proposals (RFP) Important Dates & Times Pre-Response Meeting and Site Tour Questions and Clarifications 1 Cone of Silence 2 Introduction and Project Overview 3 Requirements 4 Evaluation Criteria 5 Definitions 6 Miscellaneous 7 Attachments Appendix A: Insurance Requirements Appendix B: Standard Terms and Conditions Appendix C: Non-AIP Title VI Solicitation Notice ....................................................................................Error! Bookmark not defined.
Appendix D: References Appendix E:
Appendix F: Official Price Sheet Appendix G: Certification for Boycott Restrictions Appendix H: Signature Page/Non-Collusion Affidavit ..............................................................................Error! Bookmark not defined.
26004RFP Internet Services Page 3 of 15
1 Cone of Silence All communication regarding this solicitation must be directed to the Procurement Department at (procurement@clintonairport.com). The Commission has imposed an absolute prohibition against any communication or contact with any other Airport personnel, Commission member, or Consultant regarding the solicitation, generally referred to as a “Cone of Silence.” The prohibition begins with the publication of this solicitation document and remains in place through Commission selection. It ends only after successful negotiations with the selected Company have concluded in an executed agreement. The prohibition is suspended only during Commission sponsored and publicly announced meetings conducted to clarify the solicitation. A violation of this provision may result in a rejection of the submission from the offending Company.
2 Introduction and Project Overview
2.1 Introduction
The Commission is now seeking a qualified and experienced Company to provide internet services. The Commission provides internet connectivity to a wide array of essential systems that directly support both operational efficiency and passenger experience. These systems include, but are not limited to, Airport Parking Infrastructure, Telephone Systems, the Baggage Handling System, Airport-wide Wi-Fi services, Airport Commission administrative networks, the Common Use Passenger Processing System (CUPPS), and mission-critical backup and recovery systems. In recent years, as airport operations have become increasingly reliant on real-time data, secure communications, and system interoperability, these internet services have become a foundational component of day-to-day functionality. Any disruption to these services can significantly impact airport operations, safety, customer service, and regulatory compliance.
Therefore, maintaining a highly reliable, secure, and scalable internet infrastructure is imperative to ensuring the continued success and resilience of the Airport.
2.2 Project Overview
The Commission seeks a comprehensive and highly reliable Internet solution encompassing predictable costs, the latest innovations in communication technology, scalability, redundancy, and robust security features. The Commission intends to select two separate Internet Service Providers (ISPs) to ensure high availability and network resilience. While both providers must meet all service and performance requirements independently, it is important to note that the Commission will manage internet traffic distribution, load balancing, and redundancy through its own internal firewall and networking infrastructure. The Airport's architecture is designed to support both active/active (load balancing) and active/passive (failover) configurations, depending on operational needs.
Respondents are not required to provide built-in load balancing or failover mechanisms but should be aware of this design approach and ensure compatibility with such deployment scenarios. Additionally, ISPs must provide stable, dedicated connectivity that supports seamless integration into this environment.
All new fiber routes entering the Airport or its facilities must be coordinated in advance with airport staff. The Airport is currently undergoing major utility infrastructure renovations, including the development of a new Central Utility Plant and a broader airport expansion program. As such, the location and routing of fiber-optic infrastructure may be impacted by ongoing or planned construction activities. Respondents must coordinate closely with Airport engineering personnel to ensure that any proposed fiber paths are feasible, conflict-free, and aligned with current and future utility planning. Early engagement is essential to prevent delays and ensure compliance with Airport construction protocols and access requirements.
The Airport has a primary service location at 1 Airport Road, for Airport terminal and Fire Station, and provides services to 2400 Grundfest Drive (Airport Business Park), 1000 Temple Street (Air Cargo Facility), 1701 Bond Street (FSDO), 1701 Kellett Road (Kellett Road Facility), 1605 Temple Street (Airfield Maintenance Facility), and other locations as needed.
26004RFP Internet Services Page 4 of 15
3 Requirements
3.1 Minimum Qualifications
Submissions must include all the minimum qualifications listed in this Section 3.1 or will be deemed non-responsive.
A. By submitting a Response to this RFP, the Company confirms that it meets the following minimum qualifications:
i. The Company is familiar, and in compliance with, all Federal, State, and Local laws, ordinances, and regulations applicable to all work performed resulting from this RFP for the Little Rock Municipal Airport Commission.
B. The Company has a minimum of five (5) years of work-related experience providing internet services.
i. The Company must provide three (3) current client references. Use Appendix D: References to comply with this requirement.
C. The Company must submit a Statement of Qualifications to confirm that they meet the following requirements:
ii. A minimum of five (5) years providing internet services in the Little Rock market.
3.2 Scope of Services
Submissions must include Attachment A – Responsibility Checklist confirming that the Company’s proposed solution meets all requirements of this Section 3.2 or will be deemed non-responsible.
A. The company must provide dedicated fiber-optic internet connectivity with a guaranteed symmetrical bandwidth of at least 10Gbps, without bursting.
B. The Company must provide unlimited data usage without traffic shaping, throttling, or other restrictions.
C. The company must provide a managed router solution:
i. The managed router solution must be capable of supporting provided bandwidth and services, including:
a. Ongoing maintenance
b. Monitoring
c. Configuration updates
d. Hardware replacement as needed
ii. The managed router solution must include regular security updates and patches to ensure protection against known vulnerabilities.
iii. The managed router solution must support redundant power supplies to maintain continuous operation in the event of a primary power failure.
iv. The managed router solution must also include support for Session Initiation Protocol (SIP)-aware Network Address Translator (NAT) traversal mechanisms, such as SIP ALG (Application Layer Gateway).
a. This feature must be configurable and capable of being disabled, depending on the Airport’s telephony configuration requirements, to ensure compatibility with SIP-based cloud telephone systems and avoid interference with signaling or media streams.
D. The Company must provide internet service that will be used by Airport staff, tenants, the traveling public, passengers, vendors, and other authorized users.
i. The service must be designed, provisioned, and supported with this user base in mind, ensuring adequate capacity, performance, and reliability to meet the needs of all intended users.
E. The Company must provide a minimum of 32 IPv4 static addresses.
F. The Company must provide at least one /56 subnet of IPv6 static addresses.
G. The Company must guarantee a minimum uptime of 99.999% monthly.
H. The Company must provide a document with the physical route diversity and redundancy measures implemented to ensure continuous service.
I. The Company must demonstrate direct ownership, operation, and maintenance of their fiber-optic network infrastructure.
i. The Company must provide a statement confirming that it can meet this requirement.
a. Companies that rely on reselling, brokering, or outsourcing primary internet transport via third
26004RFP Internet Services Page 5 of 15 parties may be deemed non-responsive unless the respondent can demonstrate full operational control, end-to-end accountability, and direct escalation authority equivalent to that of infrastructure ownership.
J. The Company must provide documentation confirming the nature of their infrastructure control and network operations.
i. To meet this requirement, the Company must provide a map showing fiber infrastructure within one
(1) mile of Airport’s perimeter.
a. If a map cannot be provided, the Company must provide their installation plans.
K. The Company must provide a company organizational flow-chart that details all personnel responsible for our account (sales, maintenance, account management) that connects to all senior level positions. Any personnel located outside the Little Rock market should include their location.
L. The Company must identify their proposed transition team for each service. This may be combined with the org charts, if so, please note in your response.
i. If your company will rely on any transition services not physically located in the Little Rock market, please detail those personnel and where located.
3.3 Submissions
At the time and location indicated on the first page of this solicitation, all submissions will be recorded publicly and will become public information pursuant to the Arkansas Freedom of Information Act (“FOIA”). All documents submitted in connection with this solicitation will remain the property of the Commission.
A. Late submissions will be rejected.
B. Email submissions will be rejected.
C. Submissions must be in English.
D. Prices must be in U.S. currency E. Companies are directed to prepare their submissions in the format set forth in this solicitation to facilitate a streamline review and evaluation process. This includes:
i. Being presented in the same sequence, with the same numbering scheme and headings, as shown in 4.
Evaluation Criteria of this solicitation.
ii. Limited to 50 pages, in an 8.5” x 11” format with all standard text no smaller than eleven (11) point font.
a. Page 1 must be reserved for the Cover page.
b. Page 2 must be reserved for the Table of Contents.
c. Pages 3–52 must contain the proposed solution for Categories 1-4 as shown in 4. Evaluation
Criteria of this solicitation.
• Submissions that exceed the 50-page limit will be subject to point deductions as follows:
1–10 pages over: -1 point 11–20 pages over: -2 points 21–30 pages over: -3 points 31–40 pages over: -4 points 41+ pages over: -5 points
iii. The required forms are not included in the total page count.
F. Submissions must include how the Company will meet the specifications and requirements of this RFP.
i. Submissions must include the Appendices listed below. These forms are not included in the 50-page count limit.
a. Appendix D – References
b. Appendix F – Official Pricing Sheet
c. Appendix G – Certification for Boycott Restrictions
d. Appendix H – Signature Page/Non-Collusion Affidavit
e. Attachment A – Responsibility Checklist
G. Online Submissions In an effort to support the Commission’s sustainability goals, online submissions are preferred. If submitting online, do not submit a paper submission.
26004RFP Internet Services Page 6 of 15
i. Online submissions must be made using the Airport’s B2GNow Portal (B2GNow).
ii. Online submissions should include the following two (2) separate attachments:
a. Required Forms – All required forms should be compiled and submitted as a single attachment, separate from the technical submission, and is not included in the 50-page limit.
Technical Submission – This includes the Company’s response to the evaluation criteria of the RFP and is included in the 50-page limit.
H. Paper Submissions If online submissions create a barrier, the following steps may be used.
i. Paper submissions must be in a sealed envelope.
ii. Should include only one (1) signed paper submission.
iii. Should include one (1) electronic copy of the response, preferably on a flash drive.
a. The electronic copy should include all elements of the response
iv. Must be sent to the address below:
26004RFP-Internet Services
DELIVER TO:
Little Rock Municipal Airport Commission Procurement Department 1 Airport Rd Little Rock, AR 72202-4489
v. Tracking information should be sent to procurement@clintonairport.com, and must show a scheduled delivery date and time prior to response opening.
3.4 Terms of Award
Any terms specified in this Section 3.4 will supersede Appendix B: Standard Terms and Conditions.
I. The contract term will be for an initial five (5) years.
J. Upon mutual agreement, in writing signed by the parties, the contract may be extended for an additional one
(1) one (1)-year term, or a portion thereof.
K. While it is anticipated that no more than one (1) renewal term will be executed, should the parties mutually desire to continue the Agreement and such continuation is not contrary to applicable law, then additional renewal terms will be permitted subject to the same conditions applicable to the original renewal terms.
L. The contract will be awarded, on an all or none basis, to the most responsive and responsible Company that scores the highest based on the evaluative criteria in Section 4 below, subject to successful negotiations.
M. The Company must be registered to do business within the State of Arkansas and submit a copy of their Certificate of Good Standing, if awarded the contract.
N. The Company must be accessible to the Commission on short notice, and
i. Available during business hours between 8:00 AM to 5:00 PM, and
ii. Available to respond via telephone/e-mail within 4 hours, and
iii. Available 24/7 and able to respond immediately in the event of an emergency.
O. At no time during the initial term of this agreement may the Company increase the price for any services or deliverables.
i. Price reductions are permitted at any time upon written notification to the Commission.
P. Invoicing
i. The Company must:
a. Issue invoices for internet services on a monthly basis.
b. Waive any late fees, penalties, interest, or finance charges on overdue or delayed payments by the
Commission.
Q. The Company must not submit any Acceptable Use Policies (AUPs) or terms of service that restrict, limit, or otherwise interfere with access or use by the Airport’s broad user base or the Company will be deemed non-responsive.
i. No future amendments to Company’s AUPs will go in effect unless approved by both parties.
R. Any Company proposing to install telecommunications equipment in the Airport’s Main Distribution Frame (MDF) must comply with the following requirements.
i. Written approval from Airport IT and Facilities is required before any work begins.
26004RFP Internet Services Page 7 of 15
ii. The Company must coordinate with Airport staff on all aspects of rack placement, power, cooling, and cable management.
iii. Detailed as-built documentation must be provided upon completion and it must be updated as changes occur.
iv. The Company is responsible for ongoing maintenance, immediate incident notification, and full removal of equipment at end of service.
S. Any easement requirement must be submitted to the Airport as part of your proposal for review.
T. In accordance with Arkansas Code § 10-4-424, the Company agrees that any software, information systems, or computer applications provided, developed, maintained, or used to fulfill this Agreement must be subject to audit by the Arkansas Legislative Audit (ALA). The Company must treat any request or inquiry from the ALA with the highest level of urgency and shall notify the Little Rock Municipal Airport Commission (the "Commission") in writing within one (1) business day—and no later than the close of the same business day— of any request for audit, inspection, or access received from the ALA or any other governmental auditing authority related to this Agreement or any associated information systems.
U. Badging Requirements
i. All Company personnel assigned to this contract must pass the Airport Security Identification
Display Area (SIDA) training.
ii. All Company personnel assigned to this contract must be badged by the Commission prior to performing duties at the Airport. No Exceptions.
iii. All Company personnel assigned to this contract must pass the Federal Bureau of Investigation (FBI) fingerprint-based Criminal History Records Check (CHRC).
iv. The Commission will immediately remove the Company employee’s access if the employee ceases to meet the FBI’s CHRC requirement upon notification from the FBI.
v. All Company personnel assigned to this contract must pass the Transportation Security Administration
(TSA) Security Threat Assessment (STA).
vi. The Company must designate at least one (1) signatory authority.
a. The Company’s signatory must be badged by the Commission.
b. The Company’s signatory must maintain all company badging records.
c. The Company’s signatory must ensure the completeness, correctness, and accuracy of badge applications for all Company employees applying for and receiving Airport ID.
vii. There will be no charge for the initial Airport-issued badge or CHRC.
viii. The Company must be responsible for replacement cost to any lost or damaged badge.
a. The current replacement cost for a damaged badge is $10.
b. Lost badges cost $50 for the first, $100 for the second and $150 for the third.
c. These charges will be applied via a deduction to your monthly invoice.
d. These rates are subject to change during the length of this contract.
ix. The Commission will charge the Company for any badge not returned due to a change in personnel.
a. A badge is due immediately upon termination for any reason and is currently subject to the following charges via a deduction to your monthly invoice:
• $100.00 for SIDA
• $250.00 for Sterile Area or Temporary badges
b. These rates are subject to change during the length of this contract.
4 Evaluation Criteria
All submissions will be evaluated by the Procurement Department for responsiveness. All submissions deemed responsive will then be sent to a Selection Panel to be scored individually based on the evaluation criteria below:
Note: The submission provided by the Company awarded the contract will be incorporated into the contract and will be used as a basis for measuring performance and ensuring compliance.
26004RFP Internet Services Page 8 of 15
Proposed Scope of Services and Deliverables Please showcase how your Company is best suited to meet our needs as described in section
3.2 highlighting any specific strengths or offerings that make your Company stand out in the industry, as well as the following criteria:
Provide a detailed methodology for infrastructure installation, testing, and certification processes.
• Responses from any Company that does not have required service connection(s) into the airport must detail what they will need to provide services to the Airport, and a timeline needed to connect those services once you have a notice to proceed from the Airport.
Provide any easement requirement as part of your response for review.
The Company is encouraged to identify and propose any emerging technologies, value-added services, sustainability practices, or efficiency-improving enhancements that the Airport should consider.
Maximum Raw Points
Qualifications of Team assigned to this Account and Escalation Procedures
Please provide the resumes of the Team assigned to our account and identify who will be the Point of Contact.
Please provide a detailed customer support structure including escalation procedures, dedicated support contacts, and proactive monitoring capabilities.
• Provide a full…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .