Industrial Safety and Health Requirements_Appendix C .pdf
PDF 413 KB Posted
- Attached to
- Paving IDIQ Federal contract opportunity
- Solicitation number
- FA8501-21-R-0002
About this file
This document provides the requirements for a paving indefinite delivery indefinite quantity (IDIQ) contract opportunity at Robins Air Force Base in Georgia. The solicitation seeks offers for repair, maintenance, and minor construction work to miscellaneous surface areas on the base. The contract has a total maximum value of $25,000 and will be awarded on a competitive small business set-aside basis under the NAICS code 237310 for highway, street, and bridge construction. Offerors must submit proposals by the specified due date and send the original bid bond to the address provided. The work will involve individual task orders with separate notices to proceed. Funding is not guaranteed, and the government reserves the right to cancel the solicitation before or after the closing date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 200156 PAVING IDIQ SOW with Specifications rev.1.pdf | ||
| RFI _2.pdf | ||
| Proposal Briefing PAVING IDIQ.ppt | PPT presentation | |
| Solicitation Amendment FA850121R00020001 SF 30.pdf | ||
| RFI _1.pdf | ||
| DEMO Project UHHZ210011 Rpr Asphalt B20166 Site Visit Sign-in Sheet.pdf | ||
| Project 200156 PAVING IDIQ SOW with Specifications.pdf | ||
| Sample Bid Bond.pdf | ||
| AFMAN 32-1084 Civil Engineering Facility Requirements.pdf | ||
| WR-ALC SAFE-T-GRAM.pdf | ||
| Demonstration Project 210011 SOW.docx | DOCX document | |
| SSR UHHZ 200156 Minimum Requirements.pdf - - 02-24.pdf | ||
| Solicitation - FA850121R0002.pdf | ||
| Demonstration Project 210011 Proposal Pricing .docx | DOCX document | |
| Davis-Bacon Act Wage Determination.pdf | ||
| AFMAN 31-116 Motor Vehicle Traffic Supervision.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
File Number: UHHZ 200156
Prepared by: 78 ABW/SEG/Version Feb 2019 1
APPENDIX C
Industrial Safety and Health Requirements for:
PR/Contract/Project#: UHHZ 200156
Date: 14 Oct 20
Type Work: Paving IDIQ, Robins AFB GA
PART I
Instructions: The contractor Safety and Health Plan (required IAW AFI 91-202) shall address in detail the items listed in Part II through Part IV, as applicable. Repeating the referenced standard without addressing the company’s specific processes or procedures will not suffice. If task specific procedures are incorporated into a company local document, those procedures must be attached to the submitted Safety and Health Plan. Referencing the company's local procedure/document in the Safety and Health Plan is not adequate. If the company's local procedure/document is not attached, the submitted Safety Plan will be returned unacceptable.
PART II
1. Environmental, Safety, And Occupational Health (ESOH): The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and
Health Act (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees. The contractor must comply with all Federal, State, Air Force, Department of Defense, and Robins Air Force Base permits, laws, and requirements outlined in the Civil Engineering Specifications, 01560-
Environmental Requirements.
2. Voluntary Protection Programs (VPP): The Air Force is part of OSHA’s VPP. All contractors are required to familiarize themselves with the requirements of VPP. Information on
VPP can be accessed at http://www.osha.gov. The intent of the Air Force Safety Program is to prevent injuries and to communicate our safety expectations with potential offerors as well as those contractors awarded a government contract. The Air Force’s interest is to protect personnel working in or around contractor operations, and to protect Air Force equipment/property.
3. Contractor Employees: Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note:
The Air Force Occupational Safety Instruction is frequently annotated because many of the Air
Force standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0 http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0
Prepared by: 78 ABW/SEG/Version Feb 2019 2 contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with
OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to
Federal Acquisition Regulation (FAR) Part 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs bilingual speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
4. Inspections: Air Force Environmental, Safety, Occupational Health and Fire protection officials or responsible Quality Assurance Evaluator (QAE) may periodically enter a contractor’s workplace to verify working conditions of Air Force personnel. If an Air Force employee observes improper procedures or unsafe conditions exits which place Air Force personnel or equipment/facilities in jeopardy, the contractor will remove personnel and/or equipment from the unsafe condition and immediately notify the Contracting Officer and the Installation Safety
Office. Department of Labor (DoL), Regulatory inspectors are authorized right of entry to inspect any place of employment operated by an Air Force contractor. They can be considered
“no notice” inspections. Note: Notify the Installation Safety Office at (478)-926-6271 if an
OSHA inspector visits your site unescorted by an Air Force Safety Technician. Notify the
Installation Environmental Office at (478)-327-8104 if an environmental inspector visits your site unescorted by 78 CEG/CEIE Environmental Personnel. Noncompliance with ESOH requirements can result in work stoppage, inexcusable delays, and/or costly fines issued by the
Regulator. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. Fines and additional costs for violations levied against the contractor as a result of OSHA findings, and/or installation safety, fire, health or environmental are the sole responsibility of the contractor and shall not be passed through to the Government.
5. Mishap Notification: The contractor shall notify the Installation Safety Office telephonically at (478)-926-6271 during duty hours and (478)-327-2612 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the
Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Installation Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
Prepared by: 78 ABW/SEG/Version Feb 2019 3
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident
h. Corrective actions (taken or proposed)
i. Other pertinent information
Note: If requested by Government Personnel (PCO/ACO), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the investigating safety office. If the government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the government personnel until the investigation is finalized and closed out.
6. Impoundment Procedures: The contractor shall establish written impoundment procedures, as part of their Safety and Health Plan. Impound data must be included in the Mishap
Notification Procedures as applicable. As a minimum, the procedures must address:
a. Appointment of Impound Authority in writing (copy faxed to QAP and Safety Office)
b. Impound Authority e-mail address and phone numbers
c. Specific instructions (cordon, facility locked facility, etc.) to secure the site or government asset, to prevent tampering with the aircraft, site or government assets
d. Specific instructions or measures to ensure only authorized personnel directly involved in management, SAFING, troubleshooting, or repair of aircraft or equipment gain access to the impound site
e. Additional guidance is located within AFI 21-101, AFMC Supplement 1
7. Contractor Safety and Health Program: The contractor shall establish and maintain an acceptable safety and health program.
a. Contractor Safety and Health Manager. As part of the Contractor Safety and Health
Program, the contractor shall assign in their plan, by name and phone number, a person who will be the primary point of contact for safety and health issues for the on-site operation.
b. Contractor’s Safety and Health Plan. Contractor shall prepare a safety and health plan in accordance with PART I, PART II, and PART III, incorporating the listed elements in PART II and addressing in detail, as applicable, the items below in PART
III of this Appendix. The plan must be accepted by the government and will be incorporated into the awarded contract. Should a master safety and health plan remain on file with the Installation Safety Office, the contractor must ensure that it is current, updated, and includes all elements below. An addendum to the plan must include the processes noted below:
(1) Changes to the Plan. If, during the performance of this contract, changes to the contractor’s Safety and Health Plan are required, the contractor shall submit a revised Safety and Health Plan to the Contracting Monitor and/or Contracting
Prepared by: 78 ABW/SEG/Version Feb 2019 4
Officer’s Representative (COR). The same process of review and negotiation (if applicable) involved in the original submission applies to any revision submitted after contract award. The accepted revised Safety and Health Plan shall then be incorporated by contract modification as an attachment or by reference.
(2) Tracking Rates. The Contractor’s Safety and Health Plan shall identify how their Total Case Incident Rate (TCIR) and Days Away, Restricted and/or
Transferred (DART) rates, or comparable insurance rates or compensation injury rates will be tracked, and the corrective measures to be used if these rates begin to decline. The contractor must also describe the processes and procedures to be used to track their compliance with their Safety and Health Plan and how they will correct any deviations from the plan, when and if identified.
PART III
The following items represent a list of required elements, as applicable, for performance of this contract. The contractor’s safety and health plan shall address how compliance with these requirements will be ensured. The safety plan shall clearly define company procedures on specific tasks/processes, personnel qualifications, how facilities comply with fire requirements to include the electrical wiring and fire protection systems installed (i.e., fire suppression, fire detection, fire extinguishers, firewall ratings, etc.), required equipment used to accomplish tasks and other necessary requirements to ensure the protection of government personnel and property.
The contractor’s safety and health plan shall meet, but may exceed the referenced standards. The contractor must ensure AF Civil Engineering Support Agency (AFCESA) Engineering
Technical Letters (ETL) in PART IV are incorporated into their safety and health plan as applicable.
1. Pedestrian Crosswalks: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians do not have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
2. Motor Vehicles: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", *, para 3-4; DoDI 6055.4, DoD Traffic
Safety Program, *; AFI 91-207, USAF Traffic Safety Program, *; and AFI 91-207, AFMC Supp
1, *. Each applies to all persons at any time on an Air Force installation and includes all leased, owned, or privatized property including housing areas. In addition: AFI 13-213, Airfield
Management, *, paras 1.3.6 and 4.4.2.1 and applicable local guidance applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on an Air Force installation, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission. Note: Installation Commanders of all DoD installations in the United States and over which the United States has exclusive or concurrent legislative jurisdiction are delegated the authority to establish additional vehicular and pedestrian traffic rules and regulations for their installations. All persons on a military installation shall comply with locally established http://www.dtic.mil/whs/directives/corres/pdf/605501p.pdf http://www.e-publishing.af.mil/shared/media/epubs/AFI91-207.pdf
Prepared by: 78 ABW/SEG/Version Feb 2019 5 vehicular and pedestrian traffic rules and regulations. A person found guilty of violating, on a military installation, any State vehicular or pedestrian traffic law or local DoD 5525.4, paragraph
3 – 4: Pursuant to the authority established in Enclosure 1, installation vehicular or pedestrian traffic rule or regulation made applicable to the installation under the provisions of this directive is subject to a fine of not more than $50 or imprisonment for not more than 30 days, or both, for each violation (40 U.S.C., Section 318c (reference d).
3. Walking/Working Surfaces: Contractor shall comply with the standards in: 29 CFR 1910, Subpart D and NFPA 101, Life Safety Code. All interior walking and working surfaces which are part of the means of egress shall remain clear at all times and comply with the requirements of NFPA 101. Floors shall be kept in good condition and free of defects that can endanger workers or interfere with the handling of materials. Housekeeping – methods and controls are in place to minimize tripping hazards, the accumulation of flammable/combustible materials, etc.
Portable metal ladders – methods and controls are in place to ensure inspection and safe use.
Open-sided floors/platforms/runways must be protected and not left uncovered to prevent injury.
4. Housekeeping: Housekeeping shall be conducted according to the requirements in OSHA
Standard 29 CFR 1910.141. Clean as you go will be enforced. Refuse, trash, and debris will be collected daily and not left on site to prevent hazards during high winds and inclement weather.
5. Personal Protective Equipment: Contractor shall comply with the standards in: 29
CFR1910.132, 134, 136, Subpart I and 29 CFR 1926.28, 95, 100, 101, 102 and 951. Personnel protective equipment is required to be worn when employees are exposed to a potential hazard, working overhead, falling objects, etc. Contractor’s Safety Plan shall also address:
- Eye and face protection
- Head protection
- Foot Protection
- Electrical protective equipment
- Hand protection
- Safety harnesses, life lines, and lanyards.
6. Respiratory Protection Program Elements: Contractor shall comply with the standards in:
29 CFR 1910.134 and 29 CFR 1926.134. Respirators are required to be worn if employees are exposed to inhalation hazard. Contractor’s Safety Plan shall also address:
- Training
- Medical evaluation
- Fit tests
- Selection of respiratory equipment
- Storage of respiratory equipment
- Pre-use checks
7. Heat Stress: Contractor shall comply with the standards in: 29 CFR 1908 - General Duty
Clause - The employer will provide a safe and healthful workplace for all employees, AFJI 10-http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10112 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10112 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10118 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10118 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10909 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=12716 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10666
Prepared by: 78 ABW/SEG/Version Feb 2019 6
220 (DCMAI 8210.1, NAVAIRINST 37.10.1D), Contractors Flight and Ground Operations, *, Section E (Procedures), Para 1d. Contractor’s Safety Plan shall also address:
- Pre-hydration
- Acclimatization
8. General Environmental Controls: Contractor shall comply with the standards in: 29 CFR
1910, Subpart G, 29 CFR 1910, Subpart J and 29 CFR 1926, Subpart D. Contractor’s Safety Plan shall also address:
- Sanitation - toilet and washing facilities
- Accident prevention signs and tags
9. Hearing Conservation Program Elements: Contractor shall comply with the standards in:
29 CFR 1910.95 and 29 CFR 1926.52. Note: Noise exposures are based on ACGIH guidelines of
85 dB TWA. Contractor’s Safety Plan shall also address:
- Monitoring (survey of noise producing equipment)
- Audiometric testing
- Hearing Protectors
- Training
- Recordkeeping/Access to information and training material
10. Medical and First Aid: Contractor shall comply with the standards in: 29 CFR 1910, Subparts K and Z, and 29 CFR 1926, Subpart C. Contractor’s Safety Plan shall also address:
- Adequate first aid supplies
- Trained employee to render first aid
- Recordkeeping
- Reporting and investigating accidents/incidents
- Off-site physician(s)
- Maintenance of and employee access to exposure monitoring data and medical records
11. Confined Space Program Elements: Contractor shall comply with the standards in: 29
CFR 1910.120, 146 and 29 CFR 1926.21and 353 and AFMAN 91-203, Air Force Occupational
Safety, Fire and Health Standards, *, Chap 23. A confined space must meet the following three criteria:
(1) Is large enough and so configured that an employee can bodily enter and perform assigned work; and
(2) has limited or restricted means for entry or exit (for example, tanks, vessels, silos, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry);
and
(3) is not designed for continuous employee occupancy. Examples: underground vaults, tanks, storage bins, manholes, pits, silos, process vessels, and pipelines.
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10116 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10116 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10121 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10908 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9735 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10625 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10122 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10122 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10907 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9797 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9797 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10607 http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf
Prepared by: 78 ABW/SEG/Version Feb 2019 7
Contractor’s Safety Plan shall address:
- Hazards of confined space
- Permit and Non-permit confined spaces
- Responsibilities of management, entry supervisor, authorized entrant, and authorized attendants
- Training requirements
- Permit handling and approval
- Emergency and rescue plans
- Testing and monitoring requirements
- Special hazards
- Posting requirements (applicable to subcontractor operated facilities)
12. System Modification Which Alters Form, Fit or Function: Contractor shall comply with: Mil Standard 882D, Standard Practice for System Safety, *, and AFI 63-131, Modification
Program Management, *, for system modifications, which alter form, fit, or function.
13. Protective Barriers/Warning Signs: Contractor shall comply with the standards in: 29
CFR 1926, Subpart G, Sections 200, 201 and 202 and EM 385-1-1, US Army Corps of Engineers
Manual, Safety and Health Requirements, *, Sections 4, 8 and 24. Barricades must be provided by the contractor in an area for excavation, open manholes, overhead work, or the protection of personnel from hazardous operations, moving equipment or cranes. Barricades are required to cover holes in the ground properly (e.g.: rigid/protective – 200 pound load capacity for fall protection, red and white rope for warning barricades. The contractor must barricade the area for overhead work to protect personnel from hazardous operations. For crane operations, the barricaded area must encompass one and one half times the longest extended length of the erected boom. Barricades must be erected before the work begins. If the barricades are in a roadway or walkway, blinking lights must be used after dark. When the work is complete, the barricades must be removed from the job site. Kerosene lamps and open flame pots shall not be used for or with warning signs or devices. Note: Signage is mandatory for contractors working on an AF installation. A sign will be prominently posted on the contractor’s site at the entry/access point and shall contain the following information:
- Company Name, Contract Number, Site Superintendent & Phone Number, Site Safety
Rep & Phone Number, QAP/ QAE Monitors & Phone Number.
14. Demolition: Contractor shall comply with the standards in: 29 CFR 1926, Subpart T.
Contractor’s Safety Plan shall also address:
- Preparatory Operations
- Removal of Materials - walls, floors, and steel construction
- Mechanical Demolition
- Engineering survey by a competent person and service lines shut off
15. Excavations: Contractor shall comply with the standards in: 29 CFR 1926.651 and Subpart
P, Appendix B & C and EM 385-1-1, US Army Corps of Engineers Manual, Safety and Health http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10942
Prepared by: 78 ABW/SEG/Version Feb 2019 8
Requirements, *, Section 25. In all excavations where employees are exposed to danger from moving ground, protection shall be provided by means of a shoring system, sloping of the ground or some other equivalent means. All trenches over five feet deep in either hard and compact or soft and unstable soil shall be sloped, shored, sheeted/braced or otherwise supported.
Trenches less than five feet in depth shall also be effectively protected when hazardous ground movement may be expected.
16. Scaffolding: Contractor shall comply with the standards in: 29 CFR 1910, Subpart D and
29 CFR 1926, Subpart L. Scaffolds are used for persons engaged in work that cannot be done safely from the ground or from solid construction. A competent and qualified person must be on site to make decisions on scaffolding operations. Contractor’s Safety Plan shall also address:
- Safety requirements for construction (as applicable), operation, maintenance, railings, toeboards, inspections, fall protection, and use
- Rails
- Bracing
- Toeboards
- Fall Protection
17. Powered Platforms, Manlifts and Vehicle-Mounted Work Platforms: Contractor shall comply with the standards in: 29 CFR 1910, Subpart F. Manlifts are used for the purpose of allowing workers to perform duties at elevated levels. A competent and qualified person must be onsite to make decisions on manlift operations. Note: Fall restraint is the preferred method for fall protection. Contractor’s Safety Plan shall also address:
- Personal Fall Arrest Systems (PFAS) {body harness, lanyard, lifeline, etc., inspections}
- Manlift – maintenance, inspection, and operation
18. Aerial Lift Equipment: Contractor shall comply with the standards in: 29 CFR 1910.66, Subpart F , American National Standards Institute (ANSI) 92.2, ANSI 92.5, ANSI 92.6, and
AFMAN 91-203, Air Force Occupational Safety, Fire and Health Standards, *, Chap 16.
Aerial lifts have inherent risks associated with their use. The Air Force has established procedures to ensure only trained and qualified personnel are operating aerial lifts. In the past, the lifts were identified that did not meet regulatory safety requirements and foreign objects (FO) were found on the equipment. Based on this negative trend and a fatal mishap in years past, the following policies, procedures and processes will be adhered to when aerial lifts are used to support a contractor mission:
(1) Aerial devices shall include the following types of vehicle mounted aerial devices used to elevate personnel to job sites above ground:
- Extendible boom platforms
- Aerial ladders
- Articulating boom platforms
- Vertical towers and a combination of any of the above
(2) Aerial equipment may be made of metal, wood, fiberglass reinforced plastic, or other material; may be powered or manually operated, and are deemed to be aerial lifts http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10112 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10916 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10115 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10115 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10115
Prepared by: 78 ABW/SEG/Version Feb 2019 9 whether or not they are capable of rotating about a substantially vertical axis.
Note: Scissor Lifts: OSHA Interpretation letters on file, place scissors lifts in the above described category regardless of powered or manual.
19. Contractor Aerial Lift Devices: Contractors shall comply with the standards in: 29 CFR
1910.67, 29 CFR 1926.453, and ANSI 92.2, Standards for Vehicle Mounted Elevating and
Rotating Work Platforms. Contractors, subcontractors, vendors, commercial delivery companies, and all other private business vehicles will comply with the following requirements while operating any type of aerial lift as described above, while on a DoD installation. This includes contractor owned equipment, leased or rented equipment acquired to support the contractual activities. Unless otherwise provided in this section, aerial devices (aerial lifts) acquired on or after July 1, 1975, shall be designed and constructed in conformance with the applicable requirements of the American National Standards for Vehicle Mounted Elevating and Rotating
Work Platforms, ANSI A92.2 - 1969, including the appendix which is incorporated by reference as specified in 29 CFR 1910.66. Aerial lifts acquired for use before July 1, 1975 which do not meet the requirements of ANSI A92.2 - 1969, may not be used after July 1, 1976, unless they shall have been modified so as to conform to the applicable design and construction requirements of ANSI A92.2 - 1969.Prior to bringing an aerial device on a DoD installation, the contractor will ensure: Aerial devices meet the above 29 CFR 1910.66 and 1910.67 requirements. Aerial devices meet certification and classification for the designated work area. Aerial devices are serviceable, and all safety devices, warning devices, and interlocks operate. Aerial devices
(regardless of guardrail, mid-rail or toe board configuration) will have fall protection attach points installed. Aerial devices will contain the manufacturer’s manual and operator’s safety manual. The applicable ANSI Standard will satisfy the requirement for a safety manual. The contractor and operating employee will be trained and certified on the leased/rental device and provide visual certification upon request. Aerial lifts will not be used to deliver employees to higher levels unless so certified.
20. Personal Protective Equipment For Aerial Lift Devices: To ensure compliance with 29
CFR 1910.66, Subpart F, Appendix C, 29 CFR 1910.133, Personal Protective Equipment, 29
CFR 1926.453, Aerial Lifts, 29 CFR 1926.104, Safety Belts, Lifelines & Lanyards, and 29 CFR
1926.501, Duty to Have Fall Protection; the contractor will ensure the following: Contractor employees will use fall restraint on all aerial lift devices unless so certified for fall arrest by the manufacturer. Fall restraint is the preferred standard for DoD installation operations with aerial devices. Fall restraint will consist of a harness (no body belts allowed) and a lanyard shortened to the minimum length to allow work but not allow the employee to leave the platform cage or stand on toe-boards or mid-rails. Energy absorbing lanyards are not authorized for fall restraint.
Lanyards will have self-closing; self-locking keepers which remain closed and locked until unlocked and pressed open for connection or disconnection. Contractor employees operating, observing and spotting for aerial devices will wear approved hard hats.
21. General Fall Protection: Contractor shall comply with the standards in: 29 CFR 1910.66, Subpart F, Appendix C, and 29 CFR 1926.500-502, Subpart M – If a person can fall 4 feet or more; fall protection must be provided to prevent injury. Contractor’s Safety Plan shall also address:
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9732 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9732 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10754 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9732 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10129 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10129
Prepared by: 78 ABW/SEG/Version Feb 2019 10
- Guardrail System (height and load rating)
- Safety Net System (location, inspection, and testing)
- Personal Fall Arrest System (PFAS)- life line, lanyard, component strength, and anchorage
- Fall Protection Plan
- Qualifications of persons
22. Cranes, Derricks, Hoists, Elevators and Conveyors: Contractor shall comply with the standards in: 29 CFR 1926, Subpart N – Cranes are used to move material, simplify materials handling and heavy or bulky supplies and equipment. Load capacities and operating speeds must be posted; special hazard warnings and instructions – visible to operator; hand signals – per
ANSI standard for type of crane in use and inspections are performed by a competent person.
Personnel must be trained/qualified/certified by a nationally recognized crane certification league to operate these items.
23. Compressed Gas and Compressed Air Equipment: Contractor shall comply with the standards in: 29 CFR 1910.169, Subpart M. Contractor’s Safety Plan shall also address:
- Employee Training
- Inspections
- Storage and Handling
24. Materials Handling And Storage: Contractor shall comply with the standards in: 29 CFR
1926.250, 953, 957 and 29 CFR 1910.101, Subparts F, H and N; and 29 CFR 1910.178, Powered Industrial Truck. Contractor’s Safety Plan shall also address:
- Storage and handling of materials
- Disposal of trash from elevations
- Personnel lifting techniques--proper storage to prevent shifting, for stability, etc.
- Rigging (requirements, inspection, components, and qualifications)
- Equipment (use in handling materials)
- Industrial trucks (training, inspection, maintenance, and safe use)
25. Handling, Storage and Use of Flammable/Combustible Liquids: Contractor shall comply with the standards in: NFPA 30, Flammable and Combustible Liquids Code, *, NFPA 33
Spray Application Using Flammable or Combustible Materials, *, DoDI 4145.19-R-1, Storage and Materials Handling, *, Chapters 5 & 6, and DoDI 4140.25-M (for POL storage).
26. Hazardous Materials: Contractor shall comply with the standards in: 29 CFR 1910.120, Subpart H – The Handling and Storing of Hazardous Materials (chemicals, compressed air, acetylene, etc). When handling the hazardous material the following must be accomplished:
Compressed gases – training, handling, storage, use, and PPE; flammable and combustible liquids – training, handling, storage use, and PPE. Contractor’s Safety Plan shall also address:
- Training, handling, storage, use and PPE http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10928 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10129 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10928 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10928 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10117 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10117 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10117
Prepared by: 78 ABW/SEG/Version Feb 2019 11
- Explosives and blasting agents
- Dipping and coating operations
27. Toxic and Hazardous Substances: Contractor shall comply with the standards in: 29 CFR
1910, Subpart Z and 29 CFR 1926, Subpart Z. Contractor’s Safety Plan shall also address: A section related to working with toxic and hazardous substances, such as asbestos, benzene, lead, styrene and bloodborne pathogens, where the following areas are addressed:
- Threshold Limit Values (TLV)-Exposure monitoring
- Medical surveillance
- Work practices
- Engineering controls
- Respiratory protection
- Protective clothing (PPE)
28. Hazardous Communications: Contractor shall comply with the standards in: 29 CFR
1910.1200. Contractor’s Safety Plan shall also address:
- Written Program-list of hazardous chemicals
- Identify the hazardous chemical(s)-labeling system
- MSDS data sheet location
- Employee information and training-methods used to inform employees of the hazards, and precautionary measures
29. Hazardous Waste Operations: Contractor shall comply with the standards in: 29 CFR
1910.120 and 29 CFR 1926.65. Contractor’s Safety Plan shall also address:
- Emergency Response Plan
- Personal Protective Equipment
- Medical Surveillance
- Health and Safety Plan (HASP– required elements have been incorporated)
- Employee Training
30. Welding, Cutting and Brazing: Contractor shall comply with the standards in: 29 CFR
1910.251 thru 255 and 29 CFR 1926.102(b), 153, 453(b), AFMAN 91-203, Air Force
Occupational Safety, Fire and Health Standards, *, Chap 27, AFMAN 91-201, Explosive Safety
Standards, *, NFPA 410 Aircraft Maintenance, *, and NFPA 51B, Fire Prevention During
Welding, Cutting, and Other Hot Work, *. Contractor’s Safety Plan shall also address:
- Welding Permit Required from Fire Department
- Training/worker knowledge
- Equipment inspections, service, and use
- Fire protection and prevention
- Protective equipment & welding shields
- Health protection (PPE)
- Ventilation http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10147 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10147 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10951 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10099 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10099 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9765 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9765 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10133 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10133 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10914
Prepared by: 78 ABW/SEG/Version Feb 2019 12
- Cylinders and containers
- Cylinder storage
31. Electrical: Contractor shall comply with the standards in: 29 CFR 1910, Subpart S, 29 CFR
1926, Subpart K, AFMAN 91-203, Air Force Occupational Safety, Fire and Health Standards, *, Chap 8, and NFPA 70. All electrical wiring must be IAW National Electrical Code (NEC)
70. Electrical wiring and equipment shall be a type listed by UL or another recognized listing agent. Contractor’s Safety Plan shall also address:
- Selection and use of work practices
- Training (basic electrical safety knowledge)
- Use of equipment (handling, visual inspection, rating of equipment)
- GFCI Protection for outside contractor drops and wet/damp areas
- Arc Flash
32. Hazardous Energy Control Program Elements (Lockout-Tagout): Contractor shall comply with the standards in: 29 CFR 1910, Subpart S, 29 CFR 1926, Subpart K, AFMAN 91-
203, Air Force Occupational Safety, Fire and Health Standards, *, Chap 21, and NFPA 70.
- Purpose of hazardous energy control program
- Employee training
- Lockout/tagout procedures - Removal of locks and tags
- Periodic inspections
- Restoring equipment to normal operations
- Arc Flash
- Portable Fire Extinguishers (proper type, inspection, maintenance, testing, and training
33. Electronic/Electrostatic Discharge Sensitive Components: An electrostatic discharge program, when applicable, shall be implemented according to MIL-HDBK-263B, Electrostatic
Discharge Control Handbook for Protection of Electrical and Electronic Parts, Assemblies and
Equipment (Excluding Electrically Initiated Explosive Devices), *, MIL-STD-1686C, Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices), *, and T.O. 00-
25-234, General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical
Equipment, *, or the commercial standard ANSI/ESD S20.20, Electrostatic Discharge Control
Program-Protection of Electrical & Electronic Parts, Assemblies and Equipment, *.
34. Machinery and Machine Guarding: Contractor shall comply with the standards in: 29
CFR 1910, Subpart O. Contractor’s Safety Plan shall also address:
- Control of rotating parts, flying chips, and sparks
- Inspection
- Maintenance http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10135 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10135 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10131 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10131
Prepared by: 78 ABW/SEG/Version Feb 2019 13
35. Hand and Portable Powered Tools and Other Hand-Held Equipment: Contractor shall comply with the standards in: 29 CFR 1910, Subpart P and 29 CFR 1926, Subpart I.
- Inspection
- Proper use
- Guarding
- Maintenance
- Control of rotating parts, flying chips, and sparks
36. Soldering: Soldering shall be conducted in accordance with the requirements in T.O. 00-
25-234, General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical
Equipment, *, Chapter 3 and 29 CFR 1910.253.
37. Painting and Paint Removal: Painting and paint removal shall be accomplished according to: T.O. 1-1-8 Application and Removal of Organic Coatings, Aerospace and Non-aerospace
Equipment, *; NFPA 33, Spray Application Using Flammable or Combustible Materials, *, and
NFPA 410, Aircraft Maintenance, *.
38. Severe Weather Plan: Contractor shall comply with the standards in NAS 3306, AFJI 10-
220, Contractor’s Flight and Ground Operations, *, paras 5.1.2.25 – 5.1.2.25.6. Contractor’s
Safety Plan shall also address instructions for personnel, equipment and debris.
39. Fire Protection for Facilities: Contractor’s procedures shall comply with NFPA 10, Portable Fire Extinguishers, *; NFPA 13, Installation of Sprinkler Systems, *; NFPA 33, Spray
Application Using Flammable or Combustible Materials, *; NFPA 70, National Electrical Code, *; NFPA 72, National Fire Alarm Code, *; NFPA 91, Exhaust Systems for Air Conveying of
Vapors, Gases, Mists, and Noncombustible Particulate Solids, *; NFPA 409, Aircraft Hangars, *; NFPA 410, Aircraft Maintenance, *; NFPA 418, Fire Protection for Heliports, *; NAS 3306, Facility Requirements for Aircraft Operations, *, and RAFBI 32-2001 (if on Robins AFB), The
Fire Protection Operations and Fire Prevention Program, *, para 2.5, and Air Force Civil
Engineer Support Agency (AFCESA) Engineering Technical Letters (ETL) listed in PART IV.
40. Lawn/Ground Services: Contractor furnished landscaping and lawn equipment must comply with the standards in 29 CFR 1910.243, AFMAN 91-203, Air Force Occupational
Safety, Fire and Health Standards, *, Chap 15, Civil Engineering, *, Chapter 3, Landscape and
Ground Maintenance Care and Mowing Safety Guidance, and T.O. 47C1-1, Safety Instructions for Lawn Care Equipment.
41. Foreign Object Damage (FOD) Awareness, Prevention And Responsibilities: Contractor shall comply with the standards in: Robins AFBI 21-112, Logistics Maintenance Management, FOD Program, National Aerospace Standard (NAS) 412, Foreign Object Damage/Foreign
Object Debris (FOD) Prevention Program, *, AFMAN 91-203, Air Force Occupational Safety, Fire and Health Standards, *, Chap 24, and all applicable local guidance. The FOD program must be integrated into the day-to-day operations to reduce/eliminate FOD incidents. Programs will include covering waste dumpsters, waste hauling trucks, barriers in place to stop migrating http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10132 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10913
Prepared by: 78 ABW/SEG/Version Feb 2019 14
FOD from dirt and gravel piles, and end of shift or daily clean-up. The contractor will brief their personnel at least weekly on any FOD requirements. All contractors, subcontractors performing maintenance in a FOD–potential area will receive and have documented initial FOD Awareness and Prevention training. For AFMC organizations, Course number CHPMAS0001300 may be used to satisfy this requirement. Subject training will be given during Flight Line Drivers
Training by the host Base Operations Flight. Temporary contractors/visitors will be required
FOD awareness and prevention training for personnel who, in the performance of their assigned duties, work in or travel through maintenance and flightline areas. To meet the aforementioned requirement, the following Installation FOD training briefing can be found at 78 ABW Safety
SharePoint site under Installation FOD/DOP Visitor FOD Briefing. Documentation of training is mandatory.
* denotes current version/edition of stated instruction/standard/technical order, etc.
PART IV
Air Force Civil Engineering Center (AFCEC) Engineering Technical Letters (ETLs). Offerors should contact AFCEC, 1-888-232-3721, DSN 523-6995, to request access to the current listing of all applicable ETLs.
File details come from the government source that posted it. Updated .