This file is an image document related to a construction project bid opportunity issued by the Oregon Parks and Recreation Department (OPRD) for the Jessie M. Honeyman Memorial State Park Raw Water System Improvements project located in Florence, Oregon. The scope of work encompasses comprehensive water infrastructure improvements including piping and electrical enhancements at the existing raw water pump station, installation of a new raw water pipeline extending from the pump station to the treatment plant, utility trench work, waterline installation along Highway 101 with optional directional drilling capabilities, an auger bore crossing under Highway 101, modifications to pump station and treatment plant facilities, electrical transformer pad installation, access road improvements, and site restoration. The project is divided into 15 line items covering permits, mobilization, erosion control, traffic control, tree and stump removal, and related ancillary work. Bids are due November 2, 2026 at 2:00 PM PST via the OregonBuys electronic system, with a voluntary pre-bid conference scheduled for October 14, 2026 at 10:00 AM PST at the project site. Construction is scheduled to commence January 1, 2027, with substantial completion required by February 22, 2027 and final completion by March 1, 2027. The contract term extends one year from substantial completion.

The estimated project cost ranges from $850,000 to $1 million, funded through OPRD Capital Construction funds contingent upon receipt of sufficient funding. Bid security equal to 10% of the total bid amount is required, and award will be made to the responsible bidder submitting the lowest responsive bid. Liquidated damages of $500 per calendar day apply for each day exceeding both substantial and final completion dates. All contractors must hold current Oregon Construction Contractors Board licensing prior to bidding, and all subcontractors must register before commencing work. OPRD is exempt from Oregon's Public Contracting Code, including prevailing wage requirements. Mandatory work restrictions limit operations to 7 a.m. to 5 p.m., Monday through Friday, with no weekend or holiday work permitted without written approval. Contractors must obtain all necessary permits from Lane County, local utilities, and ODOT and submit a Gantt-chart construction schedule within 14 days of Notice to Proceed. Mandatory requirements include an Erosion and Sediment Control Plan with a certified inspector, Cultural Resources Work Plan, Traffic Control Plan, tree protection compliance, and an Inadvertent Discovery Plan. Joshua Herron, Senior Procurement Specialist, serves as the single point of contact.

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .