14546 Jessie M. Honeyman SP Water Intake Replacement (Construction)
Solicitation number
S-63400-00018144
Issued by
Lane County, Oregon

About this file

This document is a Questions and Answers record related to Oregon Parks and Recreation Department (OPRD) Invitation to Bid #14546 for the Jessie M. Honeyman Memorial State Park Raw Water System Improvements project in Florence, Oregon. The project encompasses piping and electrical improvements to the raw water intake system, including installation of a new raw water pipeline from the pump station to the treatment plant, utility trench work, waterline installation along Highway 101, an auger bore crossing under Highway 101, pump station and treatment plant modifications, electrical transformer pad installation, access road improvements, and site restoration. The bid submission deadline is November 2, 2026 at 2:00 PM PST via the OregonBuys electronic system. A voluntary pre-bid conference was scheduled for October 14, 2026 at 10:00 AM PST at the project site. Construction is scheduled to commence January 1, 2027, with substantial completion required by February 22, 2027, and final completion by March 1, 2027. The contract end date is one year from substantial completion.

The estimated project cost ranges from $850,000 to $1 million, funded through OPRD Capital Construction funds contingent upon receipt of sufficient funding. Bid security equal to 10% of the total bid amount is required. Liquidated damages of $500 per calendar day apply for each day exceeding both substantial and final completion dates. The Questions and Answers document clarifies key technical specifications, including that the 12-inch casing under Highway 101 shall not be installed by horizontal directional drilling but rather with open cut installation, water and power pipelines cannot be pulled in a single bore, and the common trench shall be installed with 4 feet of cover as specified on detail drawings. OPRD is exempt from Oregon's Public Contracting Code, including prevailing wage requirements. All contractors must hold current Oregon Construction Contractors Board licensing prior to bidding, and all subcontractors must register before commencing work. Joshua Herron, Senior Procurement Specialist, serves as the single point of contact at Joshua.a.herron@oprd.oregon.gov or 503-953-0536.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

OPRD ITB #14546

OregonBuys Solicitation# S-63400-00018144

Jessie M. Honeyman Memorial State Park

Raw Water System Improvements

Q: Can the 4 inch and the electric be drilled to the lift station? (HDD).

A: No, the preference is for open cut installation of the common trench along the pump station access road.

Q: Can the 12 in casing under the highway be done more north?

A: Yes, as long as it doesn’t create any issues with the required ODOT Permit.

Q: Can it be installed via hdd?

A: The crossing shall not be installed by HDD. ODOT requires a casing.

Q: Want more information about the depth of the 12 in casing under the highway. ODOT usually has specific rules for doing that.

A: The elevations of the casing installation are shown on the profile on Drawing C2.6.

Q: Will CLPUD be providing handhole, transforming pads and grounding equipment.

A: See CLPUD VS Contractor Scope Matrix on Sheet E0.01 of the drawings. 16120 Part 1 of the Specs covers the scope.

Q: Sheet C2.1-C2.4 call out 3.5’ min cover on common trench of 4” HDPE and Power conduit. Detail 1/C5.1 calls out 4’ minimum cover for water main and electrical common trench. Which is Required?

A: The conduits and water pipe in the common trench shall be installed with 4 feet of cover as shown on detail 1/C5.1.

Q: If it is elected to HDD the water and power going to the pump station can this be pulled in a single bore?

A: No.

Q: Since this is a Raw Waterline is bacterial testing required?

A: No.

Q: The bid on OregonBuys says 12 PM on November 2nd, 2026 but the ITB says 2 PM. What is the bid submission time?

A: November 2nd, 2026 at 2 PM. OregonBuys is now accurate.

Q: Were there pre-bid meeting minutes?

A: No.