Illinois Capital Development Board RFP - 9.9.26~1.docx
DOCX document 465 KB Posted
- Solicitation number
- 27-448DOIT-ADMIN-B-52519
- Issued by
- Illinois
About this file
This is a Request for Proposal issued by the Illinois Department of Innovation and Technology on behalf of the Illinois Capital Development Board for implementation of a cloud-based Construction Management Automation and Modernization Solution (Procurement 27-448DOIT-INFOT-B-52519). The solicitation seeks a comprehensive, integrated cloud-based platform to support the full lifecycle of construction project management, including budgeting and planning, contract management, program and project management, financial management, and asset inventory functions. The solution must integrate seamlessly with the State's SAP ERP system and other enterprise systems including DocuWare, SharePoint, the Illinois Procurement Gateway, and the Committee on Equity and Inclusion database. The current environment includes approximately 500,000 records with 2 GB of structured data and 2,000,000 documents comprising 8 TB of unstructured data, with approximately 1,400 total users (200 CDB staff and 1,200 external users) and peak concurrent bid submissions of 120 users. The pre-submission conference is scheduled for September 16, 2026, with questions due by September 30, 2026, answers posted by October 7, 2026, and proposals due October 28, 2026. Demonstrations are scheduled for February 16-19, 2027, with anticipated notice of award on March 22, 2027, and contract start date of June 1, 2027. The contract will have an initial ten-year term with no extensions permitted.
The solicitation contains a 7% Business Enterprise Program participation goal for NIGP codes 208-11, 920-24, and 958-77, and a 1% Veteran Small Business Program goal. The State will evaluate proposals on technical capabilities (2,505 points), commitment to diversity (501 points), and pricing (601 points), for a maximum of 3,607 total points. The top three scoring offerors on technical and diversity criteria will advance to demonstrations and price evaluation. The State will determine price reasonableness based on the offeror's qualifications, reputation, all submitted prices, project budget, and other relevant factors. The vendor must be registered with the Cloud Security Alliance prior to contract execution and must maintain compliance with State of Illinois Security Requirements, NIST SP 800-53 Revision 5, FedRAMP Moderate, and other applicable federal and state regulations. All work must be conducted within the continental United States. The vendor shall maintain a System Implementor role with full responsibility for all software and implementation services, acting as prime contractor and assuming accountability for any subcontractors. Required submissions include a Vendor Disclosure or IPG Active Registered Vendor Disclosure, technical proposal, commitment to diversity attachment, pricing workbook, BEP utilization plan, and VBP utilization plan through BidBuy.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois Department of Innovation and Technology Request for Proposal Construction Management Automation and Modernization Solution Procurement
27-448DOIT-INFOT-B-52519
Contents
| Section A. | SCOPE OF WORK | 3 |
| A.1. | OVERVIEW AND PURPOSE | 3 |
| A.2. | DESIRED OUTCOMES OF THIS PROJECT/ENGAGEMENT | 5 |
| A.3. | SCHEDULE | 21 |
| A.4. | UNIQUE CONSIDERATIONS | 21 |
| A.5. | TERM | 23 |
| Section B. | CURRENT CONDITIONS | 23 |
| B.1. | OVERVIEW and BACKGROUND | 23 |
| B.2. | CURRENT BUSINESS and OPERATIONAL ENVIRONMENT | 23 |
| B.3. | VOLUMES and QUANTITIES | 24 |
| B.4. | AREAS OF CONCERN/CHALLENGES | 25 |
| B.5. | STRENGTHS | 25 |
| Section C. | PROPOSAL REQUIREMENTS | 26 |
| C.1. | REQUIRED DOCUMENTS TO COMPLETE AND SUBMIT | 26 |
| C.2. | DUE DATE AND TIME FOR SUBMISSION OF OFFERS | 28 |
| C.3. | CONFLICT BETWEEN INFORMATION IN ELECTRONIC DOCUMENTS AND ON BIDBUY | 28 |
| C.4. | PUBLISHED PROCUREMENT INFORMATION | 28 |
| C.5. | INFORMATION CONTACT | 29 |
| C.6. | OFFEROR QUESTIONS AND AGENCY RESPONSE | 29 |
| C.7. | PRE-SUBMISSION CONFERENCE | 29 |
| C.8. | SMALL BUSINESS SET-ASIDE | 30 |
| C.9. | BUSINESS ENTERPRISE FOR MINORITIES, WOMEN, AND PERSONS WITH DISABILITIES ACT PARTICIPATION AND UTILIZATION PLAN | 30 |
| C.10. | VETERAN SMALL BUSINESS PARTICIPATION AND UTILIZATION PLAN | 30 |
| C.11. | SECURITY | 31 |
| C.12. | TERMS AND CONDITIONS | 31 |
| Section D. | EVALUATION PROCEDURES | 31 |
| D.1. | EVALUATION PROCESS | 31 |
| D.2. | RESPONSIVENESS | 31 |
| D.3. | EVALUATION METHODOLOGY | 32 |
| D.4. | COMMITMENT TO DIVERSITY ELEMENTS | 33 |
| D.5. | MINIMUM REQUIRED POINTS | 34 |
| D.6. | PRICE | 34 |
| D.7. | MAXIMUM AVAILABLE POINTS | 34 |
| Section E. | ADMINISTRATIVE REQUIREMENTS | 35 |
| E.1. | GOVERNING LAW AND FORUM | 35 |
| E.2. | PUBLIC RECORDS AND REQUESTS FOR CONFIDENTIAL TREATMENT | 35 |
| E.3. | MINORITY CONTRACTOR INITIATIVE | 35 |
| E.4. | FEDERAL FUNDS | 36 |
| E.5. | EMPLOYMENT TAX CREDIT | 36 |
| E.6. | RESERVATIONS | 36 |
| E.7. | AWARD | 36 |
| E.8. | INVOICING ADDRESS | 37 |
| E.9. | PROTEST REVIEW OFFICE | 37 |
| E.10. | RESPONSIBILITY | 37 |
| E.11. | BIDBUY TERMINOLOGY AND GUIDANCE | 38 |
| Section F. | PROPOSAL FORMS | 38 |
| F.1. | CONTRACT REQUIREMENTS | 39 |
| F.2. | MANDATORY REQUIREMENTS WITH EVIDENCE | 42 |
| F.3. | QUALIFICATIONS AND EXPERIENCE (325 Points) | 43 |
| F.4. | PROPOSED METHODOLOGY AND APPROACH (200 Points) | 44 |
| F.5. | RESPONSE TO BUSINESS CAPABILITIES (500 points) | 45 |
| F.6. | RESPONSE TO TECHNICAL CAPABILITIES (260 Points) | 51 |
| F.7. | RESPONSE TO SERVICES (550 points) | 56 |
| F.8. | RESPONSE TO STATE STANDARD SECURITY REQUIREMENTS (120 Points) | 57 |
| F.9. | COMMITMENT TO DIVERSITY | 58 |
| F.10. | DEMONSTRATIONS (550 Points) | 58 |
| F.11. | PRICING | 65 |
| Section G. | ATTACHMENTS AND EXHIBITS | 69 |
| G.1. | CLOUD SECURITY AND STATE STANDARD SECURITY REQUIREMENTS | 69 |
| G.2. | SLR’S AND PERFORMANCE DEFINITIONS | 76 |
| G.3. | TRACEABILITY MATRIX (TM) | 81 |
| G.4. | RELEVANT OFFEROR EXPERIENCE | 81 |
| G.5. | GLOSSARY | 83 |
| G.6. | PRICING WORKBOOK | 84 |
State of Illinois RFP
Page | 1
SCOPE OF WORK
A.1. OVERVIEW AND PURPOSE
This is a solicitation for a cloud-based solution issued by the Illinois Department of Innovation and Technology (DoIT) on behalf of Illinois Capital Development Board (CDB) in cooperation and agreement with the Chief Procurement Officer for General Services (CPO-GS). The purpose of this solicitation is to establish a contract for implementation of a new system that supports the full lifecycle of construction project management from a governance oversight and management perspective for CDB’s construction and related contracting operations.
The solution must accommodate all activities beginning with project requests and continuing through completion and construction closeout. The solution will be used across multiple agencies to submit requests and manage shared fiscal responsibilities with CDB being the business owner and manager of the programs, capital planning, contracts, financials, and construction project life cycles. It must support projects that span multiple fiscal years, multiple vendors, allow for the identification and management of project funding sources, and provide integrated eProcurement, supplier management, and supplier diversity functions. It must also support the complete contract life cycle, including bidding, evaluation, award, negotiation, change orders and other contract activities. With this solution, CDB expects to retire two legacy systems for which data migration and historical data storage is needed.
The system should also support vendor invoice submission for review and approval by CDB. Efficient and effective project workflow should be maintained in the solution. Document management is also a critical component in which ongoing projects may result in very large files that must be stored, accessed, and shared. However, CDB may continue to use DocuWare for archiving in which the solution will need to be able to easily export and import for this purpose. Overall, the solution must clearly reflect that the administrator agency CDB is the managing and oversight agency and primary user of the solution. Construction and design vendors, among other external parties, will interact with the system as directed by CDB, but they are expected to maintain their own methods for managing awarded contracts, developing design plans, and management of the physical construction activities.
The proposed solution must integrate seamlessly with existing State systems. Specifically, it must fully integrate with the SAP ERP platform and other State enterprise systems, to create a unified digital ecosystem that enhances transparency, efficiency, and accountability in managing State‑funded construction and facility projects. Data exchanged with these external systems must be able to use State required formats and field lengths without the need for crosswalks or additional customizations to the external systems. The proposed solution must also remain flexible, enabling new integrations or updates as other State systems evolve.
A major integration requirement is with the State’s ERP financial management solution, SAP and supporting modules. The proposed solution must exchange information with SAP in areas such as, but not limited to, budget and funds management, contract management (SRM), accounts payable, receipts and receivables (PSCD), asset management, and project systems. SAP is the State’s financial system of record and will remain as such. The CDB solution will complement SAP by providing budget, procurement, financial, bidding, contractual, asset, and project management of vendors who are responsible for construction project management capabilities while ensuring consistency and data alignment across systems for ease of use, reporting, reconciliation, etc.
Finally, beyond SAP, CDB will need to integrate with additional external systems including but not limited to, Committee on Equity and Inclusion (CEI) and Secretary of State (SOS), etc. The proposed solution should support these connections and allow for ongoing adjustments as new integration points emerge or existing ones require updates due to system upgrades and enhancements.
To ensure successful implementation, CDB requires a System Implementor to act as the prime contractor, assuming full responsibility for all software and implementation services in collaboration with and under the governance of the Illinois Department of Innovation and Technology Agency (DoIT) and CDB. CDB and DoIT intend to make Offeror selections based on the combined proposal of a qualified Solution, Implementation, and System Implementor with proven experience and capacity to drive a successful implementation and ongoing support for the proposed solution. The prime contractor will be accountable for the performance of any sub-contractors.
Offerors will address all application functionalities and services detailed in this document and associated attachments, ensuring a robust, secure, flexible, and user-friendly platform tailored to the needs of CDB users, client agencies, vendors, contractors, and government officials throughout Illinois.
Per 20 ILCS 1370 1-15, DoIT shall coordinate information technology for State agencies and, when requested and when in the best interests of the State, for State constitutional offices, units of federal or local governments, and public and not-for-profit institutions of primary, secondary, and higher education, or other parties not associated with State government. The Department shall develop and implement standards, policies, and procedures to protect the security and interoperability of State data with respect to those agencies under the jurisdiction of the Governor, including data that is confidential, sensitive, or protected from disclosure by privacy or other laws, while recognizing and balancing the need for collaboration and public transparency. The department also shall control the procurement, retention, installation, maintenance, and operation, as specified by the Department, of information technology equipment used by client agencies in such a manner as to achieve maximum economy and provide appropriate assistance in the development of information suitable for management analysis. The course of these duties may cause involvement between DoIT and the Vendor.
A.2. DESIRED OUTCOMES OF THIS PROJECT/ENGAGEMENT
The following sections define the desired outcome for this solicitation. The selected solution will provide robust support for CDB’s oversight of the full construction management lifecycle and enable the retirement of legacy systems.
The outcome of this procurement will result in a modernized solution that meets CDB business requirements, as outlined in this document, while also providing a scalable foundation to support future growth, needs, and emerging technologies.
The desired outcome is a comprehensive, integrated solution that allows CDB to manage agency level and project level data, automate core business processes, and enhance operational efficiency, compliance, and transparency. The solution must facilitate informed decision making through improved data accessibility and advanced reporting, including timely and accurate State and Federal reporting.
To meet these goals, the proposed solution must support:
· Alignment with the State’s SAP ERP system, which will remain the State’s system of record for the foreseeable future. The proposed solution must maintain all required budget, financial, project, contract, and asset data used for construction procurement and construction project management. All project level data required for the SAP ERP system to remain the system of record, including but not limited to budget, contract, financial, and asset data, must be primarily housed, maintained, and updated accurately within the State’s SAP ERP system.
· Automation and digitization of business processes to improve efficiency and reduce manual intervention across the lifecycles of construction project management.
· Seamless system integration to align business processes with best practice software capabilities across platforms.
· Various data integrations with other State of Illinois’ systems, including but not limited to SAP.
· Enhancement of the user experience through a web-based, intuitive, and user/mobile-friendly interface that supports stakeholders across the entire solution.
· Easy access to data and information to facilitate advanced analytics and informed decision-making aligned with CDB strategic goals. Enhanced reporting capabilities that enable end users to promptly generate accurate State, Federal, and operational reports.
This solicitation seeks Offerors with proven experience in similar implementations and state government coordination, ensuring seamless configuration, migration, deployment, integration, training, and services support for DoIT and CDB operations, procurement, and program project management.
The selected Vendor will deliver a comprehensive, modern cloud-based suite solution that is sustainable, continuously upgradable, and secure. Additionally, the selected Vendor will be or include a System Implementor with a proven track record of successfully implementing technology solutions similar in scope to this solicitation. Further details on the deliverables required of the implementation can be found in Section A.2.7 Service Domains.
The proposed solution must:
· Be tailored to CDB’s specific requirements and fully compliant with DoIT governance.
· Be built in a suite-based model, providing primarily delivered functionality with adaptability for additional enhancements that align with leading industry practices.
· Be offered as a cloud-based solution for all capabilities and functions defined in this solicitation.
· Be hosted in a secure cloud environment and support modern, web-based access without reliance on on-premises infrastructure.
· Meet the standard functionality required for a state agency with complexity of CDB.
· Adhere to State and Federal compliance requirements applicable to CDB and the State of Illinois.
· Synchronize with the State of Illinois current SSO protocols.
The selected Vendor is encouraged to propose and will be fully responsible for any Business Process Optimization of both documented requirements (explicitly defined in the contract) and implementation of best practices defined and agreed to during contract negotiation as part of delivery of the project. Documented requirements include all in-scope functionality detailed in the solicitation.
CDB has a clear objective of minimizing enhancements to reduce complexity, improve maintainability and streamline future software upgrades/maintenance. To support this goal, the Offeror will report the pricing associated with implementing any Offeror requested enhancements as separately priced options in its pricing response.
The intent of the figure below is to illustrate CDB’s full Business Capability Model as it exists today, highlighting the functional capabilities supporting the management and oversight of the existing construction operations landscape at CDB.
Figure 1: BCM Functional Capabilities
Figure 2: BCM Technology and Service Capabilities
Through this initiative, CDB aims to achieve the following capabilities in the proposed solution to support government oversight and management of the full lifecycle of construction project management and operations while ensuring alignment and integration with SAP as the financial system of record:
A.2.1. Manage Budgeting and Planning CDB seeks a comprehensive construction project management focused budgeting and planning solution that enhances financial planning, forecasting, and capital project funding allocation. The solution will improve budgetary transparency, efficiency, and alignment with CDB long-term capital development objectives. It must also be integrated with SAP for financial data alignment.
The proposed solution should:
Support the development of capital budget requests created within the CDB organization and other various state agencies or higher education institutions in a standardized submission format, enabling efficient submission, review, and approval processes for capital planning initiatives.
Facilitate budget setup and programming, allowing for clear documentation of financial objectives based on capital program priorities.
Provide tools to track, amend, and consolidate budgets, ensuring accurate monitoring of financial allocations against project milestones.
Enable budget reappropriations and lapse management, allowing for efficient reallocation of underutilized funds while ensuring compliance with financial governance.
Offer robust forecasting capabilities to predict financial needs based on historical data, economic conditions, and capital program requirements.
Support budget control and variance tracking, ensuring that financial commitments remain within the approved allocations to include but not limited to multiple funding sources.
Provide real-time financial dashboards and reporting with logical graphical and color-coded integrations for leadership visibility into budget utilization and capital project funding status.
A.2.1.1. Develop Budget Requests/Capital Planning Develop budget requests / capital plans, utilizing budget forms / surveys received from agencies, determining through priority ranking with optional weighting criteria applied to varying building system investment prioritization whose list updates can automatically be renumbered. All approved capital planning data must remain consistent with downstream financial records.
A.2.1.2. Setup Budget (Programming & Forecasting) Facilitate the initial setup of project budgets and integrate with appropriations in a manner that preserves consistency with financial accounting requirements. Must be able to forecast budgets for years with historical comparison options for similar project scopes or sizes.
A.2.1.3. Track Budgets Continuously monitor financial expenditures against the project budget to maintain financial discipline and identify discrepancies. This capability enables timely adjustments to ensure project financials align with set forecasts and organizational financial protocols.
A.2.1.4. Amend Budgets Adjust the approved project budget to accommodate changes in project scope / legislation, unforeseen expenses, or updated strategic priorities. Manage the amendment approval process to ensure continued financial integrity and alignment with project goals. Capability for budget rollover to the next fiscal year as required.
A.2.1.5. Transfer Budget Based on business needs, transfer budgets from one program / project to another. There might be a need to transfer budgets from one allotment to another.
A.2.1.6. Consolidate Budgets Aggregate the project budgets as per the organizational structure and provide managers / leadership, with a consolidated view that can be used for day-to-day operational purposes.
A.2.1.7. Manage Budget Re-appropriations Manage the reassignment of funds from underutilized areas to areas with higher need or priority within the budget period, as well as handling funds that are unspent at the end of a completed project. This capability includes evaluating the potential impacts of reappropriating funds on project outcomes and organizational objectives and ensuring compliance with financial governance standards. It allows for the optimization of resource allocation to enhance efficiency and adaptability in achieving strategic goals.
Manage Contracts CDB requires an integrated and modern eProcurement, supplier management, and supplier diversity solution that must also support the complete contract life cycle, including bidding, evaluation, award, negotiation, change orders and other contract activities. It must automate and streamline contract lifecycle processes, ensuring compliance, accountability, and transparency. It must also integrate with SAP for contract and financial data alignment.
The proposed solution should:
Provide an automated workflow for contract drafting, review, approval, and execution, ensuring standardized contract management across projects.
Support a variety of contract types, including creation, negotiation and vendor selection, offering tools for bid comparison and tracking contractual obligations. (e.g., Design-Bid-Build, Design-Build, Progressive Design Build, Emergency, Best Interest of the State, Small Purchase, Direct Purchase, Sole Source, Construction Management) Ability to simply add, remove, or edit standardized sections to meet differing organizational requirements of client agencies.
Enable contract lifecycle monitoring, including awards, renewals, amendments, negotiations, change orders, and terminations.
Offer alert mechanisms to track contract expiration and performance milestones with associated graphical reporting.
Facilitate audit tracking and compliance monitoring to ensure adherence to State procurement regulations and CDB policies.
Provide contract repository and search functionality, allowing users to retrieve and analyze contract documents efficiently.
Integrate with budgeting, procurement, and project management systems for seamless contract-related financial oversight.
The Contract Management solution should support the assumption of existing contracts from client agencies.
Contract forms and awards templates should integrate real calendar functionality across dependent items automatically. When a date in the procurement pipeline shifts, all concurrent dates should automatically update pending user acknowledgement and approval. Blackout dates across an agency curated calendar must be avoided for operational deconfliction.
A.2.1.8. Manage Pre-qualifications and Qualifications Based Selection (QBS) Manage the application/solicitation process for pre-qualifying architecture and engineering (A/E) firms, contractors and construction managers. Ensure a fair and transparent procurement process that aligns with organizational goals.
Establish a structured evaluation and selection framework based on qualifications and technical expertise rather than cost. Facilitate a process that enables procurement managers to assess Vendors based on their experience, capabilities, and past performance relevant to the project scope in compliance with 30 ILCS 535.
A.2.1.9. Manage Solicitations Author solicitations for construction projects based on the designs developed by the A/E firms. Keep a repository of standard solicitation language and templates for simple additions, removals, or edits of historical solicitations to meet the current need. Route drafts through defined approval workflow levels. Publish solicitations in the public facing vendor management and solicitation portal for contractor response.
A.2.1.10. Evaluate and Select Vendor Ensure proposal deadlines are enforced. Electronically score solicitation responses based on defined parameters and evaluation criteria. Allow selection of Vendor based on predefined scoring criteria. Provide the analytics capability to aggregate scoring and defend award decisions. Monitor Vendor protest compliance. Provide the capability to initiate, respond, and track protests for multiple configurable evaluation criteria.
A.2.1.11. Negotiate Award Contracts Support contract negotiations to establish favorable terms and conditions. Manage the contract award process, ensuring that contracts are awarded to the most suitable Vendor with historical trending and analysis capability for similar project scopes and complexities.
A.2.1.12. Manage Contract Life Cycle Continuously monitor contract status, expiration dates and key milestones throughout the contract cycle with alerts and reports/dashboards, including renewals, change orders, and amendments. Manage the entire contract lifecycle from initiation to renewal or termination. Ensure contracts are handled efficiently and comply with organizational and legal standards.
A.2.1.13. Manage Vendor Information Manage the entry and update of required information, including the definition / enforcement of access controls, classification of Vendor, approvals for updates, and sufficient edits to prevent duplicates.
Vendors shall be able to register and maintain their information (i.e., address, payment information, W9, primary contact for varying responsibility categories etc.) through the Vendor portal. Vendor information should sync automatically, with up-to-date information available upon query via company name, physical address, contact personnel, email, distance from project address, trade or specialty or otherwise to facilitate efficient vendor management and lookup.
A.2.1.14. Evaluate Vendor Performance Provide analytical capability to aggregate raw award, order, and spend data to generate performance metrics by Vendor and cross-compare Vendor performance. Allows for the evaluation of Vendor performance by designated evaluators (i.e., Project Manager, Contract Administrator, etc.).
Regularly assess and review Vendor performance against contract specifications and organizational expectations. Maintain a record of accountability actions. Implement performance improvement plans and make decisions regarding contract continuation based on these evaluations. Vendor performance will be available to procurement managers to provide performance information during the procurement phase for contracting with the best performing Vendors.
A.2.1.15. Monitor Vendor / Supplier Diversity Develop and implement strategies to include a diverse range of vendors / suppliers in procurement opportunities. Promote equity in procurement by encouraging participation from minority-owned, women-owned, veteran-owned, persons with disabilities and small businesses to foster a diverse vendor / supplier base. Establish a consistent process for monitoring and reporting on vendor / supplier diversity ensuring easy access to diversity data through system-generated analytics and graphical representation.
Manage Financials CDB requires a construction project level financial management solution that complements SAP, supporting project related accounting, fund management, and financial reporting tied to construction project and program oversight keeping in line with government accounting standards. It must also fully integrate with SAP for financial data alignment.
The proposed solution should:
Support financial tracking related to construction projects only, such as expenditures, commitments, and funding balances.
Enable fund and encumbrance tracking aligned with SAP data, ensuring financial commitments align with available capital program budgets.
Provide tools for project accounting, construction cost tracking, and construction in progress, such as work orders, phases and milestones.
Automate project related accounts payable and accounts receivable processes, supporting invoice processing, payments, aging reports, and adjustments.
Improve internal controls and financial compliance management, ensuring adherence to CDB financial policies and regulatory requirements.
Facilitate audit and financial reporting capabilities, offering a central repository for internal and external financial reviews.
Provide financial analytics and dashboard reporting, enabling data-driven decision-making for capital development and project funding oversight.
A.2.1.16. Perform General Accounting Ability to record project related financial activity such as expenditures, commitments, and construction specific financial documentation, with supporting materials attached as needed for a governmental organization.
A.2.1.17. Manage Fund and Encumbrance Accounting Manage fund (general, capital and other State funds) and encumbrance activities relevant to capital programs and construction projects. Provide the ability to determine available funds and manage budget obligations through encumbrance accounting.
A.2.1.18. Manage Budget Control Manage and track budget versus actuals based on the specific budgets. Support budget controls assigned to the specific budget setup. Manage multiple budget structures. Ensure project finances are managed within the approved budget.
A.2.1.19. Manage Project Accounting Setup direct and indirect projects (including workorders, tasks, phases, milestones, etc.). Manage multiple burden rates and costing. Create project level accounting to track specific transactions, costs, and allocate costs to the appropriate departments and/or funds. Includes the management of various project types that drive cost calculations. This includes cost and event billing, generation of invoices (to generate revenue), and interface with AR. Manage the cost accounting of Construction in Progress (CIP) and interface with fixed assets where applicable.
A.2.1.20. Manage Accounts Payable Receive and process digital invoices, check requests, recurring payments, and payment orders. Perform invoice matching process. Initiate workflow for individual invoice coding, cross check for payments, budget checks, approval, and payment. Adjust the outstanding payable amounts for variances on account of refunds or increases. Audit, review, approve, and submit payment batches to SAP.
A.2.1.21. Manage Accounts Receivable Receive and process contract administration fee assessed on new and amended contracts and record subsequent receipts. Receipts may be in the form of cash, check and wire transfers. Analyze, track, and manage due and overdue receivables; credits; generate aging report for outstanding and adjusting receivables and bills (e.g., removing errant billing). Process write-offs, as necessary.
A.2.1.22. Manage Internal Control and Compliance Develop and manage compliance programs including contract reviews, legal research, recordkeeping, provide due diligence, and manage compliance documentation.
A.2.1.23. Manage Internal and External Auditor Request Capability to review and provide requested access, reports, and financial information to internal and external auditors.
Manage Programs and Projects CDB seeks a comprehensive construction project and program management solution that enhances project execution, performance tracking, and stakeholder coordination. The system will support capital project planning, execution, resource allocation, and reporting.
The proposed solution should:
Enable program and project scoping, providing templates for defining project needs, phases, objectives, budgets, and quality standards.
Support construction project request and approval workflows, ensuring projects comply with CDB’s policies and funding priorities.
Facilitate budgeting and forecasting capabilities, allowing project managers to estimate costs, staffing plans, and financial viability.
Provide tools for construction project execution and performance monitoring, including dashboards for budget vs. actual tracking, timeline management, legally compliant signature application and risk mitigation.
Offer comprehensive project reporting, enabling real-time status updates, risk assessments, and executive-level dashboards.
Support resource management, ensuring personnel, equipment, and material availability align with project schedules and deliverables.
Automate project closure procedures, ensuring all deliverables are met, lessons learned are documented, and financial closeouts are completed.
Facilitate the entire submittal management workflow with dynamic review stamps, comments, and redlines throughout the design, construction, and closeout phases of construction with automated reminders and digital tracking of ball in court or similar to streamline data sharing and deliverables.
Incorporate baseline Gantt schedule uploads and ability to revise baseline versus actual pending modifications to programmatic, design or construction schedules. Highlighting critical path items and impacting delays to the critical path to predict project or program outcomes.
A.2.1.24. Scope Programs / Projects Document scope using templates and content (e.g., project needs, objectives and goals, description, pricing, value, and quality of products/services as well as availability, delivery timelines, constraints).
A.2.1.25. Request & Approve Programs / Projects Request and approve project requests (via integrated workflow) that meet set criteria and are in compliance with policies and statutes and appropriate internal controls.
A.2.1.26. Setup Plan, Budget, and Forecast Programs / Projects Ability to setup project workplan, generate budget amounts from the workplan, staffing plan, or a financial plan. Calculate cost and revenue amounts from the entered quantity or copy amounts from an existing plan version for the project.
A.2.1.27. Manage Programs / Projects Execution and Performance Provide analytical capability to compare against baseline plan and report on progress, generate performance metrics by project (e.g., planned versus actual budget, timelines etc.,) and cross-compare performance across projects. Ability to forecast various design and construction budget burn rates using varying S-Curve charting of budget expenditures and allocate for alerting when a project S-Curve falls outside a variable delta for allowable expenditures to forecast actual completion date for either design, construction, or design build initiatives.
A.2.1.28. Manage Programs / Projects Reporting Manage Programs / Project reporting with the ability to report status, risks, executive dashboards, variance reports for construction projects. Including escalation notifications on delayed actions/steps. Such items would include but may not be limited to speedometer or percentage base charting visuals of the overall performance of the project based on user or industry guided metrics.
A.2.1.29. Close Programs / Projects Manage Programs / Projects with the ability to ensure that all the agreed upon work has been completed on time within budget (e.g., tracking deliverable signoffs, tracking benefits realized, tracking against business case, etc.), lessons learned have been documented and final signoffs have been obtained for construction projects.
A.2.1.30. Monitor Time and Schedule Track and manage project time, including logging personnel (CDB Staff/Contractor) hours, tracking progress against schedules, and ensuring deadlines are met. Set up time management frameworks and workflows that align with project goals.
A.2.4.8. Manage Resources Provide comprehensive resource management capabilities to optimize the allocation and utilization of personnel, equipment, and materials across programs and projects. The system shall support resource planning, scheduling, and tracking to ensure efficient deployment aligned with project timelines and deliverables.
Manage Assets (Building Inventory) CDB seeks a comprehensive asset inventory solution specific to State owned buildings constructed or maintained through CDB programs, not a full asset management facilities system. Capabilities of the proposed solution must include functionality for inventory management that streamlines the asset lifecycle from acquisition to utilization and maintenance, ensuring transparency, compliance, and accountability. It must also integrate with SAP for asset and related financial data alignment.
The proposed solution should:
Record newly constructed assets with both financial and descriptive information (asset master data); capture acquisition/construction date as well as valuation information that will be used over the lifecycle of the asset.
Record improvements to assets and the impact to the asset’s useful life.
Maintain master asset register (e.g., asset number, asset type) tied to other systems (e.g., SAP, ArcGIS, DocuWare, etc.) for tracking, inspections, maintenance, betterment, etc.
Capitalize the expenditure on new or existing assets (major repairs/ overhauls) as the work continuously progresses.
Manage buildings/facilities including maintaining building/facilities inventory, preventative maintenance, and maintenance/repair (i.e., roof repair).
A.2.1.31. Record New Assets Record newly constructed assets with both financial as well as descriptive information (asset master data); capture acquisition/construction date as well as valuation information that will be used over the lifecycle of the asset. Record the expenditure on new or existing assets (major repairs/overhauls) as the work continuously progresses. Record relevant information pertaining to the asset (i.e., square footage, floors, owner status, historic status, GIS location, warranty information, etc.).
A.2.1.32. Asset Improvements and Useful Life Record improvements to assets and impact to assets useful life. Calculate the asset’s useful life based on the assets classification, age, value, and any improvement made to the assets. Reconciles asset and facility based financial activities to the general ledger and automates "capital budget" projections, carryovers, unspent project allocation etc.
A.2.1.33. Asset Maintenance Maintain master asset register (e.g., asset number, asset type) tied to other systems (e.g., SAP, ArcGIS, etc.) for tracking, inspections, maintenance, betterment, etc. Record maintenance related information relevant to construction oversight, such as the asset’s maintenance schedule, warranties, and any movements of the asset between financial units and locations.
A.2.1.34. Asset Under Construction Capitalize the expenditure on new or existing assets (major repairs/overhauls) as the work continuously progresses supporting SAP’s capitalization processes for construction‑related building assets.
A.2.1.35. Manage Buildings/Facilities Manage buildings/facilities including maintaining building/facilities inventory, preventative maintenance, and maintenance/repair (i.e., roof repair). Enable building tracking (i.e., geolocation) and maintenance of building/facilities register. Manage inspections/assessments for repairs, developments, useful life, and salvage value, etc. Facilitates tracking, monitoring, and managing requests including building/facility inspections and maintenance schedule requests with automated calendar features and notifications. Manages documents and seamlessly provides support to program/project management modules, contracts, financials, and budget systems. Scope excludes full enterprise facility management capabilities.
A.2.1.36. Manage Equipment Manage equipment (HVAC, boiler, etc.) including inventory monitoring, preventative maintenance, and repair. Enable asset tracking and maintenance of equipment master of asset register. Manage inspections and assessments for useful life and salvage value. Facilitate tracking, monitoring, and managing requests including equipment inspections and maintenance schedule requests with automated calendar features and notifications. Manages documents and seamlessly provides support information feeding directly to program/project management modules, contracts, financials, and budget systems.
Technology and Service Delivery Capabilities All items listed in Section A.2.6 below must be done in collaboration with and under the governance of the Illinois Department of Innovation and Technology Agency (DoIT).
DoIT and CDB requires a modern, scalable technology platform that enhances system usability, accessibility, and operational efficiency. The proposed solution will provide a secure, high-performance cloud-based infrastructure while supporting user-friendly service delivery mechanisms.
The proposed solution should:
Be built on a modern, scalable cloud infrastructure, ensuring high availability, reliability, and security.
Provide integration with existing enterprise content management (ECM) systems, enabling the storage, retrieval, and governance of critical documents, images, and reports.
Offer comprehensive system administration tools, including user access controls, system performance monitoring, and administrative delegation.
Ensure system flexibility, allowing for scalable expansions, workflow customizations, and seamless integration with other enterprise systems.
Include advanced reporting and analytics tools, enabling data-driven decision-making, predictive modeling, and performance evaluation.
Provide accessibility features, ensuring compliance with State Accessibility Standards, including multi-language support, assistive technologies, and user-friendly interfaces.
Support self-service capabilities, allowing end users to access system functionalities with minimal IT intervention.
Facilitate continuous system upgrades, container deployments and if necessary, patch management, ensuring the system remains current, secure, and adaptable to evolving business needs and emerging technology.
A.2.1.37. Access Control and Security Supports User onboarding, authentication and authorization via State of Illinois Single Sign-on standard Okta. Support Okta and SailPoint's creation and management of accounts for contractors, with the potential for specific roles. Access to the System is role-based and can be further restricted by user or other criteria from Okta and support similar modern authentication platforms. External users must not be required to utilize a custom email created by the state.
A.2.1.38. Architecture (Scalability, Availability, Performance, etc.)
The System should be scalable to handle the initial load of many users with the capability to scale up, as necessary. The architecture should support high availability and fault tolerance to minimize downtime. The performance of the System should not degrade significantly with an increase in the number of users or attachments. The System should support load balancing to distribute the load across multiple servers to ensure optimal performance.
A.2.1.39. Audit The System should provide detailed audit logs for all user activities, including login attempts, data changes, and system configuration changes. Audit logs should be stored securely and tamper evident. The System should allow for the configuration of audit log retention policies to ensure logs are kept for a specified period. The system should provide a self-service portal for authorized users to query audit data.
A.2.1.40. Configurability / Flexibility The System should be highly configurable to meet the specific needs of the organization. This includes the ability to configure workflows, user roles, access permissions and regulatory compliance updates (Fed, State, etc.). The System should support customization of the user interface to match the organization's branding and design standards. The System should allow for the creation and management of custom fields and data types to capture information specific to the organization's processes.
A.2.1.41. Data The System should support both manual and automated import and export of data in various formats, including but not limited to MPP, PDF, DWG, XLSX, CSV, XML, and JSON. Data should be validated upon entry to ensure data quality and consistency. The System should support data encryption both at rest and in transit to protect sensitive information. Data should be backed up regularly, and the System should provide tools for data recovery in case of data loss or corruption.
A.2.1.42. Data Conversion The System should support the conversion of data from legacy systems (CDB Main and Trimble Unity Construct). This includes mapping data fields from the legacy system to the new system and transforming data as needed to match the new system's data structure. The System should provide tools for verifying the accuracy and completeness of the converted data. The System should allow for the scheduling of data conversion tasks to minimize downtime during the migration process.
A.2.1.43. Data Storage & Archiving The System should provide efficient data storage and archiving capabilities to manage large volumes of data and upload of large file sizes. Data should be stored in a structured format that allows for easy retrieval and analysis. The System should support automated archiving of historical data based on configurable retention policies. Archived data should remain accessible and be retrievable as needed for reporting and analysis. The system should allow access to all historical data related to prior CDB operations. Finalized project related files shall be exportable and formatted for direct import into DocuWare in the user defined folder structure and location of the appropriate project documents.
A.2.1.44. Integration The System must support integration with other systems and applications. This includes providing APIs and web services for data exchange. The System should support real-time integration with external systems to ensure data consistency across platforms. The System should provide tools for monitoring and managing integration workflows to ensure they are functioning correctly.
The System must also integrate seamlessly with existing State systems, including full integration with the State’s SAP ERP platform, DocuWare, SharePoint and other required systems, to support transparency, efficiency, and accountability in managing State funded construction projects. All data exchanged with external systems must be able to use State required formats and field lengths without requiring crosswalks or custom modifications to the external systems. The System must remain flexible to support new integrations and updates as State systems evolve.
A.2.1.45. Advanced Reporting and Data Visualization Capabilities Coordinate and manage the process of gathering data from various operational sectors within the organization, analyzing it, and presenting it in formats that assist decision-making and performance evaluation. This includes the creation of dashboards, analytics, and standardized reports that provide insights into the organization's operations, contracts, finances, and other critical areas, ensuring stakeholders have a clear and accurate understanding of the status and progress of various initiatives.
A.2.5.10. System Administration The System should provide a comprehensive set of tools for system administration. This includes tools for user management, system configuration, and monitoring system performance. The System should allow for the delegation of administrative tasks to different roles within the organization. The System should provide detailed logs and reports on system activities to help administrators identify and resolve issues. Simplified and standardized roles shall be easily assignable to new users as well as modifying access to existing users as required.
1. System Capacity and Performance The System should be designed to handle high volumes of large data sets and user activity without significant performance degradation. The System should provide tools for monitoring system capacity and performance to ensure it is operating within acceptable limits. The System should support the scaling of resources to accommodate increased demand, including adding more servers or storage as needed.
A.2.1.47. System Flexibility The System should be flexible enough to adapt to changing business requirements. This includes the ability to add new features and functionalities without significant disruption to existing operations. The System should support the customization of workflows and processes to match the organization's specific needs. The System should provide tools for configuring and managing system settings to ensure it aligns with the organization's policies and standards.
A.2.1.48. Technology Platform The System should be built on a modern technology platform that supports scalability, reliability, and security. The platform should support the use of industry-standard technologies and protocols to ensure compatibility with other systems for years to come. The System shall be designed to take advantage of cloud-based infrastructure for improved scalability and availability. The platform should provide tools for managing and deploying system updates and patches to ensure the System remains secure and up to date.
A.2.1.49. Usability The System should provide an intuitive and user-friendly interface that is easy to navigate. The System should support multiple languages and be accessible to users with disabilities. The System should provide comprehensive help and documentation to assist users in using the System effectively. The System should support customizable dashboards and reports to allow users to track key metrics and performance indicators.
A.2.1.50. Accessibility Provides the ability to conform with the applicable requirements of the Illinois Information Technology Accessibility Act (30 ILCS 587) Standards as published at https://doit.illinois.gov/accessibility/iitaa (i.e., shall provide the State of Illinois their most recent Voluntary Product Accessibility Template/Accessibility Conformance Report (VPAT). This includes providing text equivalents for non-text elements, alternatives to color-based displays, options for non-animated modes, and ensuring webpages load properly even when scripts are disabled. Documents should be organized for readability without requiring an associated style sheet, and the System should allow users to adjust color and contrast settings. Provides access to policy and training materials, and links to required applets or plug-ins.)
A.2.1.51. Enterprise Content Management (ECM) Manage the life cycle of information from initial publication or creation all the way through archival and eventually disposal. This includes handling a wide range of content types including documents, images, emails, and other digital content across various platforms and repositories. ECM ensures that access to these materials is controlled and auditable, to enhance efficiency, information governance, and regulatory compliance.
Service Domains These services listed below are expected as part of the awarded contract of this RFP and will be completed throughout the project. The Offeror will describe their methodology if they partly differ from the service domains and explain their methodology for a successful implementation that successfully embraces a transformation and modernization effort.
Project Management — Including: Schedule Management, Status Reporting, Deliverables Management, Documentation Management, Meeting Management, Security Management, Staff Management, Phase Gates Management for Entry and Exit criterias, Risks, Actions, Issues, and Decisions (RAID) Management, etc.
Requirements Validation — Including: Requirements Validation Report, Requirements Management, etc.
Solution Design and Development/Configuration — Including: Design, Solution Design Documents, Configuration Management, Role Bases Access Control (RBAC), System Security Plan that aligns with DoIT requirements, etc.
Data Conversion — Including: Data Migration Plan and Designs, Data Migration, Mock Conversions, etc.
Multi-Vendor Integration — Including: Multi-vendor integration Plan and Designs, Plan and Support, etc.
Testing — Including: Test Planning, Test Scripts Development, Test Execution, Integrated System Testing, User Acceptance Testing, Defect Resolution, etc.
End User Training — Including: Training Planning and Preparation, Training Curriculum and Materials development, Train the Trainer Plan, Training Execution, Training Report, etc.
Solution Hosting and Provisioning — Including: Downtime, Processes and Protocols (including SLAs), Infrastructure Management Plan, Compliance, Security, Solution Data, Environments, Solution Performance, Disaster Recovery Plan, etc.
Cutover/Deployment/Hypercare — Including: Deployment and Go-Live Readiness (including at least 3 go-live readiness assessments), Cutover & Deployment Planning,…