Attachment A - Traceability Matrix - Republish 9.9.26~1.xlsx
XLSX spreadsheet 171 KB Posted
- Solicitation number
- 27-448DOIT-ADMIN-B-52519
- Issued by
- Illinois
About this file
This document is a Traceability Matrix (Attachment A) for the Illinois Capital Development Board (CDB) Construction Management Automation and Modernization Solution RFP Bid 27-448DOIT-ADMIN-B-52519. The matrix details comprehensive functional and technical requirements for an enterprise asset management and construction management system. The solution must support extensive asset inventory management capabilities, including tracking building inventories, equipment, and infrastructure across multiple classification systems. Key functional areas include asset improvements and useful life management, asset maintenance scheduling and planning, building and facilities management with condition assessments, equipment tracking with barcode and RFID capability, and comprehensive record management for new assets. The system must enable mobile device functionality for asset creation, editing, and verification, support multiple forecasting methods and algorithms, and provide integration with purchasing, inventory, and warranty management systems. Additionally, the solution requires extensive budgeting and planning capabilities, contract management functionality with vendor evaluation and selection features, and support for capital improvement projects spanning multiple fiscal years.
The traceability matrix specifies that the solution must provide robust reporting and analytics capabilities, including customizable dashboards, ad hoc reporting tools, and AI-enhanced analytics with real-time performance monitoring. The system must support role-based security and permission levels, audit trail functionality, and version control for all document management. Integration requirements include connections to external data warehouse and business analytics tools, with capability to export data in multiple formats including Excel, CSV, XML, and PDF. The solution must accommodate multiple forecasting techniques such as trend analysis, regression analysis, exponential smoothing, and what-if scenarios, while supporting configuration flexibility to adapt to CDB's business process changes and regulatory requirements. The matrix encompasses over 190 budgeting and planning requirements alone, plus extensive contract management, asset management, and reporting specifications designed to modernize CDB's construction and asset management operations across all organizational levels and departments.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
| IL Capital Development Board (CDB) Traceability Matrix - Table of Contents | |
| Table of Contents | |
| Tab | Section |
| 2 | Introduction |
| 3 | Business Functionality |
| 4 | Technical Functionality |
Introduction
| IL Capital Development Board (CDB) |
| CDB Construction Management Automation and Modernization Solution RFP |
| Bid 27-448DOIT-ADMIN-B-52519 |
| Attachment A - Traceability Matrix (TM) |
| Instructions |
| This worksheet serves as the table of contents for this workbook. The contents below provide hyperlinked worksheet titles and descriptions to support the review and response to this Traceability Matrix (TM) and will be utilized during the requirements validation period of the implementation. |
It is highly recommended that all Excel documents included in this RFP package be opened using the desktop version of Microsoft Excel. This ensures full compatibility and functionality, which may not be fully supported in web-based or mobile version. After opening the documents, please verify that all row heights are correctly set to display all content within each cell. This step is crucial to ensure no information is overlooked or hidden due to compressed row height settings.
| Worksheet Title | |||
| Hyperlinked | Description | ||
| 1. Business Functionality | Details all business functionalities for the Solution. | ||
| 2. Technical Functionality | Details all technical functionalities for the Solution. |
Business Functionality
| IL Capital Development Board (CDB) |
| CDB Construction Management Automation and Modernization Solution RFP |
| Bid 27-448DOIT-ADMIN-B-52519 |
| Attachment A - Traceability Matrix (TM) |
| ID# | Level 0 Capability | Level 1 Capability | Functionality Description |
| MA-1 | Manage Assets (Building Inventory) | Asset Improvements and Useful Life | The Solution should have the ability for users with appropriate security/permission/authority levels to manually flag assets that are nearing end of life. |
| MA-2 | Manage Assets (Building Inventory) | Asset Improvements and Useful Life | The Solution should have the ability to configure and manage repair vs replacement thresholds. |
| MA-3 | Manage Assets (Building Inventory) | Asset Improvements and Useful Life | The Solution should have the ability to manage asset age (i.e., store the install date in EAM (Enterprise Asset Management) or utilize data from GIS(Geographic Information System)). |
| MA-4 | Manage Assets (Building Inventory) | Asset Improvements and Useful Life | The Solution should have the ability to track full asset lifecycles including asset activities and history for unlimited years (e.g. repairs, replacement, maintenance, calibration, upgrades, retirement, abandon-in-place, etc.). |
| MA-5 | Manage Assets (Building Inventory) | Asset Improvements and Useful Life | The Solution should have the ability to forecast capital asset improvements and replacement based on defined planning criteria. |
| MA-6 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability for users with appropriate security/permission/authority levels to manually schedule maintenances and other work. |
| MA-7 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to add/edit/delete comments/notes to individual assets with the proper security/permission/authority levels. |
| MA-8 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to allow users with appropriate security/permission/authority levels to create custom inspections against any asset class managed in the system. |
| MA-9 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to allow users with appropriate security/permission/authority levels to plan and prioritize work based on inspection of asset age, condition, remaining useful life. |
| MA-10 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to assign inspections to multiple staff or a single staff person. |
| MA-11 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to attach multiple photos to assets to maintain a historical record of the asset. |
| MA-12 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to attach/upload other documents (manuals, graphs, videos, audio, etc.) and associate them with assets. |
| MA-13 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to automatically generate alerts/notifications when a maintenance or inspection is automatically scheduled for any reason. |
| MA-14 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to automatically identify and flag assets that are being serviced more than usual compared to other similar assets. |
| MA-15 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to automatically identify and flag assets that are experiencing more downtime than usual compared to other similar assets. |
| MA-16 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to automatically schedule maintenances and other work based on asset class/type, including cyclical/recurring maintenances. |
| MA-17 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to automatically schedule maintenances and other work based on real-time data, such as data from a sensor, that alarms due to a specified criteria being met/exceeded. |
| MA-18 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to capture information related to the cause of asset failure. |
| MA-19 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to compare asset repair, replace, and renewal and associated costs across the entire enterprise. |
| MA-20 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to easily search/retrieve maintenance records/reports on individual facilities by all fields or metadata tags. |
| MA-21 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to provide an intuitive interface to create, complete, manage, and search inspections to maintain assets. |
| MA-22 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to record photographs for asset inspections and automatically associate the picture to the correct inspection. |
| MA-23 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to support asset maintenance forecasting based on work order details of labor, equipment, and material used. |
| MA-24 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to track resources (labor, equipment, material) spent on a specific asset to determine cost/benefit of repair vs replacement of asset. |
| MA-25 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to track resources (labor, equipment, material) spent on a specific work order to determine cost/benefit of repair vs replacement of asset. |
| MA-26 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to view inspection assignments in a color-coded manner so the types of inspection and status are easily distinguishable. |
| MA-27 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should have the ability to view the impact on asset repair, replace, and renewal of deferred maintenance and spending restrictions. |
| MA-28 | Manage Assets (Building Inventory) | Asset Maintenance | The Solution should manage Asset Records such as maintenance schedule, warranties, transfers, disposition, divestment, and conveyance between financial units and locations. |
| MA-29 | Manage Assets (Building Inventory) | Asset Under Construction | The Solution should have the ability to provide functionality and capability to facilitate enterprise project/work order based planning and execution. |
| MA-30 | Manage Assets (Building Inventory) | Asset Under Construction | The Solution should manage Assets Under Construction to capitalize expenditures on new assets or capitalized expenses for existing assets as the work progresses. |
| MA-31 | Manage Assets (Building Inventory) | Asset Under Construction | The Solution should automatically create assets from Construction In Progress items when the project is completed and closed. |
| MA-32 | Manage Assets (Building Inventory) | Asset Under Construction | The Solution should support job costing for Capital projects that are creating assets. |
| MA-33 | Manage Assets (Building Inventory) | Manage Buildings/Facilities | The Solution should be designed to incorporate a condition assessment feature that enables staff to perform and record assessments of different buildings across campuses. This feature should allow for the logging of detailed condition reports, including photographic evidence, severity ratings of any damages or wear, and recommendations for maintenance or upgrades. The system should also support scheduling regular assessments and tracking changes in building conditions over time. |
| MA-34 | Manage Assets (Building Inventory) | Manage Buildings/Facilities | The Solution should include comprehensive capabilities for managing fixed assets or facilities. This should encompass functionalities such as tracking the location, status, and detailed specifications of each asset within the building or facility. Additionally, the system should allow for the integration of maintenance schedules, historical repair data, and compliance tracking to ensure effective and efficient asset management. |
| MA-35 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability for users with appropriate security/permission/authority levels to manually update status of assets. |
| MA-36 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to add, edit, manage, and search equipment records. |
| MA-37 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to allow CVL (Custom Value List)-defined configurable asset statuses based on events (creation, staging, approval, etc.). |
| MA-38 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to allow placement and visualizations of equipment items and provide links/access to specifications of these items. |
| MA-39 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to automatically update status of assets when changes occur in real time. |
| MA-40 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to enter and update non-tagged equipment (e.g. fire extinguishers, furniture, other fixtures, etc.). |
| MA-41 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to enter and update tagged equipment (e.g. lockers, data jacks, telephone jacks, printers, capital equipment, etc.). |
| MA-42 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to support a "verification" status separate from regular asset status. |
| MA-43 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to support statuses of assets (e.g., In Use, Capitalized, Maintenance Needed, Maintenance Ongoing, Lost, Stolen, etc.) in real time. |
| MA-44 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to track full furniture plans and re-design adjustments. |
| MA-45 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have the ability to track the following data via provided functionality or user-defined fields: |
Equipment ID, Name, Asset Class (i.e. Uniformat Level III Classification at minimum), Building ID, Floor ID, Space ID, Category, Type, Serial Number, Owner, Condition, Manufacturer, Model, Warranty, and Costs.
MA-46 Manage Assets (Building Inventory) Manage Equipment The Solution should have the ability to track the following data via provided functionality or user-defined fields:
Equipment ID, Name, Asset Class, Building ID, Floor ID, Space ID, Category, Type, Serial Number, Owner, Condition, Manufacturer, and Model.
| MA-47 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should have condition monitoring with the ability to attach equipment pictures. |
| MA-48 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should enable asset tracking to physically broadcast equipment location by using barcodes or RFID tags. |
| MA-49 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should enable trend reporting for preventative maintenance. |
| MA-50 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should facilitate tracking, monitoring, and managing requests including facility inspections and maintenance schedule requests with automated calendar features and notifications. |
| MA-51 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should maintain a equipment master of asset register (e.g., asset number, asset class, asset type) tied to other systems for tracking, inspections, maintenance, depreciation, and divestures. |
| MA-52 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should provide visibility to preventative maintenance schedules (calendar and meter-based) and visibility to predictive maintenance and trend reporting. |
| MA-53 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should provide the functionality to plan for long term capital budgets, spanning across multiple years. |
| MA-54 | Manage Assets (Building Inventory) | Manage Equipment | The Solution should track equipment inventory including the purchase date, make, manufacturer, serial numbers, and warranty dates. |
| MA-55 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability for users to adjust information displayed for each asset on their screen (i.e. configure visible fields per user) without impacting how other users view information. |
| MA-56 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability for users to author reports without any SQL or programming skills required. |
| MA-57 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to allow fields on assets to be configured to CDB terminology and support business needs. |
| MA-58 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to allow users to group items (work orders, inspections, etc.) for facilities-level reporting and budget management. |
| MA-59 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to assign a single Asset Custodian to each asset. |
| MA-60 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to assign asset management security/permission/authority levels based on Read / Write access user groups. |
| MA-61 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to assign asset management security/permission/authority levels based on various clearance/access levels, including Read / Write access levels. |
| MA-62 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to assign asset management security/permission/authority levels on an individual basis. |
| MA-63 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to assign reporting-related security/authority/permission levels based on general security/authority/permission levels. |
| MA-64 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to assign reporting-related security/authority/permission levels on an individual basis. |
| MA-65 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to attach/upload other documents (files, images, videos, etc.) and associate them with individual inventory or embed links to such other documents and similarly associate them. |
| MA-66 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to automatically alert/notify relevant stakeholders when assets require calibration (as applicable). |
| MA-67 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to automatically generate alerts when assets are flagged (both automatically and manually). |
| MA-68 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to automatically generate alerts/notifications based upon asset status changes when they occur. |
| MA-69 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to automatically identify mandatory fields that have not been populated. |
| MA-70 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to automatically populate and update asset information fields. Examples: Populating the Asset Contact field with the name of the user that added a newly purchased asset; Populating the Last Verify Date field with the current date when an Asset Custodian verifies an asset. |
| MA-71 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to automatically schedule asset calibration (as applicable) based on calibration history, a regular schedule, or real-time data (such as data from a sensor). |
| MA-72 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to capture and categorize asset in hierarchical levels. |
| MA-73 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to categorize all CDB assets into major asset groupings (e.g., Buildings & Structures, IT/IM, Fleet, Materials & Equipment, Utility Distribution, Roads & Grounds). |
| MA-74 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to classify assets as consumable or non-consumable. |
| MA-75 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to classify assets as owned or leased. |
| MA-76 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to configure fields as mandatory, optional, hidden, etc. as appropriate. |
| MA-77 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to create ad hoc reports through integrated query and/or reporting tools. |
| MA-78 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to create and have configurable asset condition ratings. |
| MA-79 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to create daily, weekly, monthly, and yearly activity reports for various work order management. |
| MA-80 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to create dashboards/scorecards to view information or leverage Add-Ons/Bolt-Ons/Low Code/No Code solutions to enhance reporting, analysis and visualization capabilities. Use Comments section to expand if required. |
| MA-81 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to create inspection plans for assets. |
| MA-82 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to create, edit, and delete asset information on mobile devices with appropriate security/permission/authority levels. |
| MA-83 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to display a 100% Material Status Report that lists the material requirements for a work order task including requisitions, quantities, statuses, dates, and locations. |
| MA-84 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to display a Closed Work Order Report that shows all work orders that have been closed and includes total costs and materials for closed work orders. |
| MA-85 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to display a Material Requirements Summary Report that shows information for a group of work order tasks over a specified time period and/or work order status. |
| MA-86 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to display a Month End Report for MEA that includes total costs and materials for completed work orders. |
| MA-87 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to display a Report of Completed Work Orders that includes the work order task, status, items required/issued, and location of each work order. |
| MA-88 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to display a Total Asset Summary Report on the number of assets per department that have been verified by the Asset Custodian. |
| MA-89 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to display an Asset Category Summary Report that shows the number of active records, quantity of active records, and total replacement costs for assets. |
| MA-90 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to display an Inventory Change Summary Report that details the number of new assets and number of disposed assets based on configurable periods of time. |
| MA-91 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to download and upload asset data and other documents (such as images, plans, etc.) on mobile devices. |
| MA-92 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to easily sort/filter stored information by all fields or metadata tags. |
| MA-93 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to enter and maintain asset records online and properly account for assets in accordance with CDB's Chart of Accounts. |
| MA-94 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to export reports and data to MS Excel, CSV, TXT, XML, Cognos, and/or other text file formats directly from the user interface without the need for programming or customization. |
| MA-95 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to facilitate analysis, assessment, and reporting on financials and related staffing level capacity for work completion and requirements. |
| MA-96 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to generate security and authentication summary and detail reports including, but not limited to user access, usage logs, audit logs, failed and/or unauthorized access attempts based on user defined parameters (e.g., audit requirements). |
| MA-97 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to generate the following standard reports: |
Building Summary, Building Detail, Building Contacts, Space Summary, Space Detail, and Space Rollup by Department/Branch/Zone.
| MA-98 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to generate trending reports based on data comparisons between weeks, months, quarters, and years. |
| MA-99 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to group smaller assets into a single line item and have an associated "Quantity" field to capture the number of grouped smaller assets. |
| MA-100 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to have an intuitive reporting interface to generate standard reports as well as ad hoc reports. |
| MA-101 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to index asset information and easily search/retrieve records/reports on individual assets by all fields or metadata tags. |
| MA-102 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to lock/unlock asset database for quarterly reporting so that changes can't be made while reporting reconciliation is ongoing. |
| MA-103 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to mass edit and update asset information. |
| MA-104 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to partner or integrate with external business warehouse / data analytics tools for decision support. |
| MA-105 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to perform real-time analysis and response. |
| MA-106 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to provide AI-enhanced reporting and analytics. Please elaborate on your AI-driven reporting and analytics capabilities in the Comments section. |
| MA-107 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to provide an intuitive interface to create, edit, manage, search, and verify asset information. |
| MA-108 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to provide Analytics capabilities inherently or separately as an additional offering. Elaborate in the Comments section on the technical/architectural nature of this offering. |
| MA-109 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to provide end-user flexibility to slice and dice reports and save individual versions without the need to customize standard reports. |
| MA-110 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to provide reports on management of mobile device by device count, type, user, and carrier. |
| MA-111 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to provide reports to track costs associated with work orders and perform off-line analysis. |
| MA-112 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to provide statistical analysis of forecast accuracy with suggestions for improving forecasts. |
| MA-113 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to provide the capability and functionality to create dashboards, tailored to user login, that display key performance indicators (KPI), metrics, work assignments, work status, etc. |
| MA-114 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to reassign/transfer assets to a different Asset Custodian. |
| MA-115 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to report on facility condition based on aggregated asset management data. |
| MA-116 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to report on work orders that are in progress/completed/etc. for a given facility. |
| MA-117 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to search and view asset information on mobile devices. |
| MA-118 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to see the database field names easily on the software program screens to help build analysis reporting. |
| MA-119 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to select database fields for reporting and analysis. |
| MA-120 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to show information in charts and graphs. |
| MA-121 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to specify only one space record per line on space reports (i.e. if more than one person is assigned to a space, then in a space detail report that space should only be listed once and not duplicated. Likewise, in a space summary report, the space area should not be duplicated and multiplied by the number of users assigned to the space). |
| MA-122 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to store asset information fields (Asset Type, Class, Location, Installation Date, Maintenance History, Life Expectancy, Original Cost, Description, Department #, Division, Status, Contact, Building, Quantity, Unit of Measure, Current Replacement Value, Disposal Date [if applicable], Last Verify Date, Verified By, etc.). |
| MA-123 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support a Read-Only access level that only allows searching and reviewing of asset data. |
| MA-124 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support asset location tracking via GPS, GIS, OT etc. |
| MA-125 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support display of historical information and forecasted amounts for a user-defined period. |
| MA-126 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support inventory management forecasting based on work order details of equipment and material used. |
| MA-127 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support multiple forecasting methods/algorithms with ability to use various combinations to improve forecast accuracy. |
| MA-128 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support multiple units of measure (Metric and Imperial). |
| MA-129 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support QR barcoding technology for asset labeling and tracking. |
| MA-130 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support RFID technology for asset labeling and tracking. |
| MA-131 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support standard barcoding technology for asset labeling and tracking. |
| MA-132 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to support version management, control, and retrieval of documents attached to assets. |
| MA-133 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to track asset age, usage, downtime, and condition in order to support and determine what is most critical to replace as part of budgeting process. |
| MA-134 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to transfer an asset and all related records and history to another person, location, facility, or equipment/asset. |
| MA-135 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to view and compare space utilization data for a given date range. |
| MA-136 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to view the historical work and inspections that have been completed on selected asset(s). |
| MA-137 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to view, print, and email information. |
| MA-138 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to automate the creation of quality assurance records tied to incoming material inspections and quality assurance actions for service acceptance. Connects into the quality assurance reporting used in MRO. |
| MA-139 | Manage Assets (Building Inventory) | Record New Assets | The Solution should support the creation of goods & service records tied to the vendor invoices, updates departmental warehouse inventory / service fulfillment records, and validates invoice receipts. |
| MA-140 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have a comprehensive system to manage equipment and tools, facilitating the tracking of make, manufacturer, serial numbers, installation, and warranty dates. The system should support real-time tracking and tracing, allow attachment of equipment images, and integrate seamlessly with Purchasing, Catalog, Work Order, and Inventory Management systems. Additional capabilities will include customer lookup by equipment serial numbers, a centralized tool assignment system, and condition monitoring for proactive parts and tools management. |
| MA-141 | Manage Assets (Building Inventory) | Record New Assets | The Solution should enable Asset Capture & Record creation of financial and descriptive information that includes cost basis, insured valued, and fair market value (asset master data) information that automatically populates amortization schedules based on capitalization rules that include assets above and below capitalization thresholds and automatically ties to asset inventory records. Additionally, periodic review of exceptions that are identified through quality control and those exceptions are easily integrated back into the Fixed Asset database and tagged as assets. |
| MA-142 | Manage Assets (Building Inventory) | Record New Assets | The Solution should manage documents and integrates to purchasing, catalog management, inventory management, warranty management, and budget systems. |
| MA-143 | Manage Assets (Building Inventory) | Record New Assets | The Solution should provide geo-location functionality for asset. |
| MA-144 | Manage Assets (Building Inventory) | Record New Assets | The Solution should accrue costs (e.g., re-build costs) across multiple assets that comprise the parent asset. |
| MA-145 | Manage Assets (Building Inventory) | Record New Assets | The Solution should allow Purchase Order lines to be retrieved from an item master file including: |
- item number
- item description
- unit of measure
- default General Ledger account number
- receiving location
| MA-146 | Manage Assets (Building Inventory) | Record New Assets | The Solution should be able to attach photos and other scanned documents to the asset. |
| MA-147 | Manage Assets (Building Inventory) | Record New Assets | The Solution should have the ability to record and accumulate multiple betterments for individual fixed assets. |
| MB-1 | Manage Budgeting and Planning | Amend Budgets | The Solution should adjust budgets to account for contract extensions or reappropriations to the budget. |
| MB-2 | Manage Budgeting and Planning | Amend Budgets | The Solution should allow for role-based budget transfer access across all departments, with audit trail capability to monitor all budget transfers. |
| MB-3 | Manage Budgeting and Planning | Amend Budgets | The Solution should provide automated notifications for changes sent to original budget submitter. |
| MB-4 | Manage Budgeting and Planning | Amend Budgets | The Solution should automate reconciliation activities that require consolidating data from other ERP modules. |
| MB-5 | Manage Budgeting and Planning | Amend Budgets | The Solution should leverage effectivity dates to update budget actuals and reflects new information across other functions. |
| MB-6 | Manage Budgeting and Planning | Amend Budgets | The Solution should offer the ability to simplify business rules and reduce the number of customized workflows. |
| MB-7 | Manage Budgeting and Planning | Amend Budgets | The Solution should streamline and automate the budget monitoring and transfer process while ensuring proper compliance and oversight. |
| MB-8 | Manage Budgeting and Planning | Amend Budgets | The Solution should permit users to carry data from one screen to another without re-keying. |
| MB-9 | Manage Budgeting and Planning | Amend Budgets | The Solution should have the ability to support amendment of budgets due to changes in contract or other business reasons to amend said budget. |
| MB-10 | Manage Budgeting and Planning | Amend Budgets | The Solution should provide an interface from internal billing to budgets so that internal billing amounts can be used in budget projections and creation. |
| MB-11 | Manage Budgeting and Planning | Amend Budgets | The Solution should provide the ability to enter data through user defined document templates (e.g., entering a quick code, or alias, that will pull the desired chart of accounts into the document). |
| MB-12 | Manage Budgeting and Planning | Amend Budgets | The Solution should provide the ability to identify out of balance or incorrectly entered transactions (e.g. invalid account number) using on-line error messages or automatic generation of edit listing reports. |
| MB-13 | Manage Budgeting and Planning | Amend Budgets | The Solution should provide the ability to perform revenue and expenditure inquiry at any level or grouping of line items. |
| MB-14 | Manage Budgeting and Planning | Amend Budgets | The Solution supports account distributions which are validated real-time against the General Ledger system. |
| MB-15 | Manage Budgeting and Planning | Amend Budgets | The Solution supports budget input from other data warehouse systems; not limited to spreadsheets (i.e., spreadsheets entered into a system once). |
| MB-16 | Manage Budgeting and Planning | Amend Budgets | The Solution supports searching for account number by name or partial description. |
| MB-17 | Manage Budgeting and Planning | Amend Budgets | The Solution should provide the ability to track and manage budget movement across all departments. |
| MB-18 | Manage Budgeting and Planning | Amend Budgets | The Solution should allow for the updates to the General Ledger to be performed: |
- immediately
- at user-controlled time
- once per period
| MB-19 | Manage Budgeting and Planning | Consolidate Budgets | The Solution should have the capability to lapse budget amounts based on system jobs that are configurable by fund, contracts, purchase orders, programs, etc. and also allow manual lapse capability of the same. |
| MB-20 | Manage Budgeting and Planning | Consolidate Budgets | The Solution should provide the capability to consolidate agency budget requests from various departments or projects into a single unified budget. This consolidation process should be automated to replace the current manual method, allowing for real-time updates and adjustments. The Solution should support the aggregation of data, ensuring that all entries are correctly aligned and eliminating discrepancies. Additionally, it should offer reporting tools to visualize consolidated budgets, track changes, and analyze budget performance over time. |
| MB-21 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to allow users with appropriate security/permission/authority levels to plan and prioritize work based on inspection of asset age, condition, remaining useful life, etc. |
| MB-22 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to carry forward unspent capital appropriations. Functionality should be there for carry forward manually or through batch-process/automatic process. |
| MB-23 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to see on column fashion, all the changes made to the budget development in the sequential stages, with notes and explanations. |
| MB-24 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should accommodate "New Program Request" entry, which if approved, will be added into the budget. |
| MB-25 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should accommodate the allocation of resources across cost centers, which may be different than the resources current budget allocation. |
| MB-26 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should accommodate the dynamic insertion of budget data into narrative portions of the budget. |
| MB-27 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should adapt quickly to business processes changes or updates to the budget due to regulatory requirements. |
| MB-28 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should automate the transmission of final budget data, in multiple formats, to the State website, budget book printing, specified emails, etc., based on established business rules. |
| MB-29 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have backward linkage of updates applied to budget, if and when changes occur at the last minute. |
| MB-30 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have comparative reporting on prior year history. Allows you to consolidate multiple data types/models to conduct this comparative reporting with prior years. |
| MB-31 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should define project phases that are reflected in budget forecasts, schedule planning, etc. (e.g., approving a pilot project with funding held, resources forecasted, etc. for the full project if the pilot is determined to be successful). |
| MB-32 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to establish budget control at any level of the organizational account structure. |
| MB-33 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to facilitate adjustments to budget inputs and allocations and perform impact analysis. |
| MB-34 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to facilitate and ensure seamless: |
Budget distribution Budget Socialization Finalization of budget approval Format of budget distribution Distribution of budget Socialization of budget Printing of budget
| MB-35 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to facilitate socialization of draft budgets incorporating roles-based access and sandboxes or other collaboration tools or applications. |
| MB-36 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to forecast by applying analytics to historical budget information and other budgetary assumptions. |
| MB-37 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to generate customizable reports, (e.g., 3-year history report, budget summary). |
| MB-38 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to integrate manage budget and planning activities with the rest of the modules, as applicable, such as financials, contracts, projects, etc. |
| MB-39 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to manage different kind of allocations within the system business rules. Allocation types include but are not limited to allocation by department, expenditure element, type of expense. |
| MB-40 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to perform a what-if analysis, forecasting calculations, and predictive analytics to develop budget assumptions. (e.g. salary and benefit adjustments). |
| MB-41 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability for Project Managers to submit requests for budget changes. |
| MB-42 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability for capacity planning features and functionality. |
| MB-43 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to generate charts and graphs to visually depict budget data. |
| MB-44 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to print, download, and upload budget development information. |
| MB-45 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to roll-up accounts across any level of the organizational structure based on user defined criteria. |
| MB-46 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to record audit trail information when changes are made to budget information, maintaining version control and track changes. |
| MB-47 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to support printing of budget book for distribution. |
| MB-48 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to support annual and off-cycle project requests (e.g., ideas, proposals, work requests, projects, etc.) with corresponding data, content and business rules. |
| MB-49 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to support configurable budget templates/worksheets based on user defined criteria. |
| MB-50 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to support configuration of workflows based on defined criteria (e.g., project size, portfolio, owner, dollar thresholds, etc.) to include support for fast-tracking of small, repeatable and/or low-risk projects. Workflows may be set up for project intake and approval (annual basis and off-cycle), resource requests and assignments, invoice approvals, change requests, time entry approvals, resource or other change requests and approvals, project issue/risk escalation etc. |
| MB-51 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to support different budget structures, budget setup, COA changes, budget modeling, budget entry templates, YE budget processing, budgeting for projects, integration to GL, variance reporting and automated workflow for approvals. |
| MB-52 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to support digital publication and allows for searchable budget data. |
| MB-53 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide the ability to support multiple fiscal year timelines during budget development cycle. |
| MB-54 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide multiple forecast techniques such as: |
- trend analysis and projections
- regression analysis
- exponential smoothing
- what-if scenarios
— straight line fit
— exponent forecast
— best forecast
| MB-55 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should allow accounts flagged for Budget use only. |
| MB-56 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should allow departments and other organizational units/elements to be flagged for Budget use only. |
| MB-57 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should capture the assumptions that were made when developing the different Budget Planning scenarios. |
| MB-58 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have Global Consolidation functionality (e.g., "CDB-Wide" or "Total Fund"). |
| MB-59 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to define budget worksheets based on user defined criteria. |
| MB-60 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to maintain a budget history at a department and at the enterprise level. |
| MB-61 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to save vendor spend planning data for each phase of the budget cycle or each phase of the project's budget. |
| MB-62 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the flexibility to have multiple hierarchies and maintain historical hierarchies for simulation purposes. |
| MB-63 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should have the ability to integrate the revenue and expense plans into short term and long term financial forecasts, incorporating the following capabilities: |
— Scenario ("What-If") Modeling
— Cash Generation
— Capital and Expense Projects (CapEx) MB-64 Manage Budgeting and Planning Develop Budget Requests / Capital Planning The Solution should integrate with the following modules:
— Contracts
— Financials
— Projects
— Assets MB-65 Manage Budgeting and Planning Develop Budget Requests / Capital Planning The Solution should produce fiscal year end budget reports in user-defined formats including, but not limited to:
- Budgeted Expenditures
| MB-66 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide a Budget Forecast Report for user defined time period. |
| MB-67 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide a fully featured modeling function to perform "what if" analysis for initial budget preparation, subsequent revisions at all levels. And for multiple future years. |
| MB-68 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide a Mid-Year, Qtr.., Periodic Projection Report. |
| MB-69 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide ability to query on accounts, history and related transactions, and other pertinent information (e.g., journal and payment vouchers). The Solution should support click and view supporting detail at each level of the hierarchy. |
| MB-70 | Manage Budgeting and Planning | Develop Budget Requests / Capital Planning | The Solution should provide an adjustment report that reconciles all adjustments to the budget from approved to final adjusted budget, with ad hoc reporting capabilities including but not limited to the ability to specify a time frame or account segment such as "Capital only". |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .