B-52519 Vendor Questions and Answers_100726.docx

DOCX document 230 KB Posted

Attached to
CDB Construction Management Automation and Modernization Solution RFP
Solicitation number
27-448DOIT-ADMIN-B-52519
Issued by
Illinois

About this file

Summary

This is a Vendor Questions and Answers addendum for Illinois Capital Development Board (CDB) and the Department of Innovation and Technology (DoIT) regarding RFP BidBuy #27-448DOIT-ADMIN-B-52519 for a Construction Management Automation and Modernization Solution. The procurement seeks a comprehensive cloud-based system to replace legacy platforms (CDB Main and Trimble Unity Construct) and manage the full lifecycle of CDB's capital construction projects, including budgeting, contracts, financials, project management, and asset management across approximately $1.7 billion in annual construction spending. The solution must support approximately 80 average concurrent users and 120 concurrent bid submissions at peak, with integration to multiple state systems including SAP, Illinois Procurement Gateway (IPG), Supplier Diversity systems, and DocuWare. The RFP requires a System Implementor or prime contractor to assume full responsibility for delivery and implementation, which may be a single vendor, a software provider with implementation partners, or any qualified firm meeting the experience and capability requirements. The original proposal submission deadline was extended by three weeks to November 19, 2026, at 2:00 PM, with an anticipated contract start date of June 1, 2027. The procurement requires migration of all open and active projects plus five years of historical project data, along with approximately 2 million documents and 8 terabytes of unstructured data from multiple repositories.

The solution must be cloud-based with all work performed within the continental United States for all personnel, including those not accessing state data. Critical security requirements include FedRAMP Moderate compliance, NIST SP 800-53 Revision 5, SOC 2 Type 2 certification, bi-annual third-party security audits, and integration with state identity management platforms (Okta, SailPoint, and Zscaler). The solution must support integration with multiple external systems without requiring state system modifications, with the vendor responsible for designing, developing, testing, and implementing all required integrations. CDB and DoIT will provide requirements validation, available system information, and support for state-maintained applications, with designated data owners participating in field mapping and data reconciliation. The RFP explicitly states that BidBuy will remain the state's primary procurement portal for certain CDB procurements, while the new solution will replace legacy construction management platforms for CDB-specific solicitations. Offerors may propose phased delivery approaches and should include detailed assumptions regarding current-state workflows, data volumes, integration requirements, and system configurations not yet fully defined. The state will not provide offshore work exceptions and will not fund legacy system decommissioning or data archiving activities outside the selected migration scope.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JB PRITZKER

Governor

Brandon Ragle Secretary/State CIO

STATE OF ILLINOIS

Department of innovation and technology https://doit.illinois.gov/

Vendor Question & Answers Illinois Capital Development Board Construction Management Automation and Modernization Solution RFP BidBuy # 27-448DOIT-ADMIN-B-52519

The Department of Innovation & Technology (DoIT) is publishing an addendum to BidBuy 27-448DOIT-ADMIN-B-52519 entitled “Vendor Questions & Answers 10/7/2026” based on questions received from potential offerors and answers provided by the agency. If you do not see your question, it is either duplicative to one of the other questions or not applicable to this procurement.

Q#
Date Logged
RFP Document / Topic
Vendor Question
DoIT / CDB Response to Vendor
1.
9/24/2026
Attachment A - Traceability Matrix: MC-303, MF-143
Can you confirm whether the pre-award package and multi-party approval requirements in Attachment A are mandatory, and who on the CDB side can speak to any gaps the CM platform is not expected to cover?
The requirements outlined in Attachment A - Traceability Matrix, reflect the CDBs requirements and should be considered desirable capabilities. Offerors should assume that the requirements in Attachment A are expected capabilities. Offerors should identify any assumptions, dependencies, processes or functionalities, they believe are not supported by their solution in their proposal. Clarifications regarding current-state workflows and functional expectations should be submitted through the formal procurement Q&A process and will be addressed through official solicitation responses, as appropriate.
2.
9/30/2026
Attachment B (Deliverables tab); Data Conversion Costs
F.7.4 includes data migration execution and mock conversions, but the Data Migration section of Attachment B lists only a Data Migration Plan and a Data Migration Strategy. Please clarify where offerors should price data migration execution and mock conversions, and whether offerors may add deliverable rows to Attachment B.
Offerors must include data migration execution and mock conversions in their proposed implementation pricing. Attachment B must be completed as provided, including data migration execution and mock conversions.
3.
9/30/2026
Business Operations
How many Work Orders per day/week are being processed?
This information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions.
4.
9/21/2026
Commitment to Diversity
Regarding Section D.4 & F.9 (Commitment to Diversity Points): If a Prime Vendor utilizes a specialized cybersecurity subcontractor to meet the Technical Capabilities and Security requirements, how should the subcontractor's corporate qualifications be formatted within Section F.3 and F.4 to ensure optimal scoring alongside the Prime Vendor's capabilities?
Regarding Section D.4 & F.9, commitment to diversity is a requirement; however, it is at the vendor's discretion to outline plans to comply. Offerors should present subcontractor qualifications in accordance with Sections F.3.4 and the Subcontractor Experience templates provided in the RFP. Relevant subcontractor experience, personnel qualifications, and specialized capabilities should also be incorporated into the methodology, staffing, and implementation approach sections where those resources will be used to deliver contract requirements. The State's evaluation will consider the qualifications, experience, and capabilities of both the Prime Vendor and proposed subcontractors as presented in the Offeror's response and in accordance with the evaluation criteria defined in the solicitation.
5.
9/30/2026
Commitment to Diversity
Please confirm the intended threshold percentage for the governing board / senior executive metric in Category 6.
Please refer to the attachment in BidBuy titled “C2D Vendor Guidance” for guidance on calculating and reporting the governing board and senior executive diversity percentage for Category 6.
6.
9/30/2026
Contract Requirements
Does RFP Section F.1.6 require vendors to use MuleSoft, or is MuleSoft only an example? If MuleSoft is mandatory, what version/ deployment model is required? If not mandatory, will the State accept an alternative ESB or API management platform?
The RFP does not mandate MuleSoft as the required integration platform. Offerors should propose an integration architecture and supporting technology that satisfy the RFP’s interoperability, security, documentation, and interface requirements.
7.
9/30/2026
Contract Requirements
Section F.1.1; G.1 - Please confirm that F.1.1's requirement that all work be conducted within the continental United States applies to all personnel of the Vendor and its subcontractors, including personnel who do not access State data.
Yes. The RFP states that all work performed under the resulting contract must be conducted within the continental United States and does not provide an exception based on data access.
8.
9/30/2026
Contract Requirements - Audits
Are F.1.1 and F.1.13 describing the same audit obligation, or are two distinct audits (bi-annual third-party SOC checks and a continuous SOC 2 Type 2 report) both required?
Yes, both are required.
9.
9/30/2026
Contracting and Structure
The RFP states that "CDB requires a System Implementor to act as the prime contractor," and elsewhere that "the selected Vendor will be or include a System Implementor." Please provide the State's guidance on who is eligible to serve as prime contractor.
The System Implementor may serve as the Prime Contractor and assume responsibility for the complete solution, implementation services, subcontractor performance and management, and overall project success. A single entity may serve as both solution provider and System Implementor if it meets all applicable requirements, but it is not required for the SI to act as the Prime.

Vendors may propose a team or partnership, but one firm must be clearly identified as the prime contractor. This firm will enter into the contract with CDB, serve as the primary contact, and assume end-to-end responsibility for the implementation. CDB does not limit eligibility to any specific type of company (such as software vendors or consulting firms); the determining factor is the proposing firm’s capability and commitment to perform the system implementation role as defined in the RFP.

10.
9/30/2026
Current Business and Operational Environment
Section B2 - Please provide the anticipated integration/interface inventory for SAP required for initial go-live, including the business objects or processes to be exchanged, direction of each interface, and whether each is expected to operate in real time or batch.
This information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions based on the expected functionalities.
11.
9/30/2026
Current Business and Operational Environment
Section B2 - Please describe the anticipated business processes and data exchanges between the new solution and Illinois Procurement Gateway (IPG), Supplier Diversity, and/or DEI systems, including which specific external systems are required for initial go-live.
This information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions.
12.
9/30/2026
Current Business and Operational Environment
Section B2 - For SAP, IPG, Supplier Diversity/DEI, and other required custom integrations, will the customer provide a partner or SME responsible for any specific interface development required to push/pull data from these systems?
CDB and DoIT will support requirements validation and provide available information concerning State systems. The selected Vendor remains responsible for designing, developing, testing, and implementing the required integrations.
13.
9/30/2026
Current Business and Operational Environment
Section B2 - Please provide an overview of CDB Main's technical architecture and data storage, including the database platform and available extraction mechanisms, and provide the approximate record count/data volume attributable to CDB Main and Trimble Unity Construct.
This information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions.
14.
9/30/2026
Current Business and Operational Environment
Section B2 - Please provide the end date of CDB's current Trimble Unity Construct subscription and indicate whether CDB intends to retain read-only access after go-live.
This information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions. CDB/DoIT intends to retain read-only access after go live.
15.
9/30/2026
Current Business and Operational Environment
Please provide an overview of CDB Main's technical architecture and data storage, including the database platform and available extraction mechanisms, and provide the approximate record count/data volume attributable to CDB Main and Trimble Unity Construct.
DB2 Database with SQL extraction methods. Storage information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions. Refer to B.3 in the RFP.
16.
9/30/2026
Current Business and Operational Environment
Will CDB designate data owners or stewards by functional domain (such as budget, contracts, projects, financials, and assets) to approve field mappings and sign off on reconciliation of migrated data?
Yes, CDB will participate in requirements validation, data mapping, and acceptance activities.
17.
9/30/2026
Current Business and Operational Environment
B.2 notes that DoIT maintains CDB's current applications. Will DoIT staff familiar with CDB Main be available to support schema analysis and data extraction, and do data dictionaries or entity-relationship diagrams exist for CDB Main or Trimble Unity Construct?
DoIT will support the implementation as appropriate for the State-maintained applications. There are data dictionaries and entity-relationship diagrams for CDB main and Trimble Unity Construct. The requested information is not available at this time and will be shared with the awarded vendor if available and applicable.
18.
9/30/2026
Current Business and Operational Environment
Please provide the end date of CDB's current Trimble Unity Construct subscription and indicate whether CDB intends to retain read-only access after go-live.
This information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions. CDB/DoIT intends to retain read-only access after go live.
19.
9/30/2026
Current Conditions
Please provide the following details to ensure the proposed integration architecture is complete and accurately scoped:

a) A full list of existing systems requiring integration with the proposed solution;

b) For each system, the required interface direction – read, write, or bidirectional;

c) Available integration interfaces, APIs, middleware, or data exchange specifications for each system.

The list of integrations has been provided in the RFP. The awarded vendor will be provided with the required details prior to implementation. Offerors should propose a solution with documented assumptions. Refer to Section B.2. in the RFP.

20.
9/30/2026
Current Conditions – Volumes and Quantities
Please provide the primary data entities expected to be migrated from CDB Main and Trimble Unity Construct and approximate record counts for each and clarify whether all historical data is expected to migrate or only active projects plus a defined historical period.
The offerors should expect to migrate all open and active projects plus 5 years of historical project data. Offerors should propose a solution with documented assumptions, as appropriate.
21.
9/30/2026
Current Conditions – Volumes and Quantities
Of the approximately 2 million documents / 8 TB of unstructured data identified across DocuWare, OneDrive, Outlook, and SharePoint, please identify which repositories and document populations are expected to be migrated to the new solution versus retained in place or DocuWare.
This information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions.
22.
9/30/2026
Deadline Extension Request
Given the scope and complexity of the requirements described in this RFP, Offerors respectfully request that CDB consider extending the proposal submission deadline by three weeks to allow sufficient time to develop a complete, well-considered response.
The request for an extension of the bid submission deadline has been granted. The bid submission period has been extended an additional 3 weeks and will now close at 2:00pm on Thursday, November 19, 2026. This is the only extension we will be granting throughout this process. Thank you for your request.
23.
9/30/2026
Desired Outcomes
Section A.2 states the solution will enable the retirement of legacy systems. Is decommissioning of CDB Main and Trimble Unity Construct, including archiving of data not selected for migration, within the Vendor's scope?
The solution is intended to enable retirement of the legacy systems. The Vendor must support migration and transition activities necessary for that outcome. Archiving data not selected for migration will not be considered within vendors scope for this project. Additional information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions.
24.
9/30/2026
Desired Outcomes
A.2 states the solution will enable the retirement of legacy systems. Is decommissioning of CDB Main and Trimble Unity Construct, including archiving of data not selected for migration, within the Vendor's scope?
The solution is intended to enable retirement of the legacy systems. The Vendor must support migration and transition activities necessary for that outcome. Archiving data not selected for migration will not be considered within vendors scope for this project. Additional information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions.
25.
9/30/2026
General Info
Can the Prime Contractor be a solutions aggregator/reseller that assembles and manages a team consisting of software publishers, implementation partners, and other subcontractors, while retaining full responsibility for contract performance? Or must the Prime Contractor also be the entity that performs the primary implementation and system integration services?
Offerors may propose a team or partnership, but one firm must be clearly identified the prime contractor. This firm will enter into the contract with CDB, serve as the primary contract, and assume end‑to‑end responsibility for the implementation. CDB does not limit eligibility to any specific type of company (such as software vendors or consulting firms); the determining factor is the proposing firm’s capability, experience and commitment to serve as prime contractor and ensure the system implementation is completed, as defined in the RFP.
26.
9/30/2026
General Info
The RFP states that CDB requires a System Implementor to act as the prime contractor, assuming full responsibility for all software and implementation services. Please clarify:

a) Is this a mandatory contractual requirement, or may an Offeror who is both the solution developer and the implementation provider serve as the prime contractor in a unified capacity?

b) Does the RFP preclude a single vendor who develops, licenses, and implements the solution from submitting as the prime without a separate designated System Implementor?

a) The System Implementor (SI) to serve as the prime contractor is a not a mandatory contractual requirement as long as there is a Prime Contractor to ensure a single point of accountability. An Offeror that is both the solution developer and the implementation provider may serve as the prime contractor in a unified capacity, provided that the Offeror clearly assumes all responsibilities defined for the SI and SW vendor.

b) The RFP does not preclude a single vendor who develops, licenses, and implements the solution from submitting as the prime contractor. A separate, designated SI is not required as long as the prime contractor meets all SI responsibilities and satisfies the qualifications and requirements outlined in the RFP.

27.
9/30/2026
General Info
Will CDB consider a phased delivery approach for solution implementation?
Yes. Offerors may propose a phased delivery approach where it supports the RFP requirements. The proposal must clearly describe the phases, dependencies, schedule, testing, migration, and go-live approach.
28.
9/30/2026
General Info
For implementation activities that do not involve State or client data, such as configuration, development, or testing performed in isolated environments, will CDB permit offshore resources to perform the work?
No. The RFP states that all work performed under the resulting contract must be conducted within the continental United States.
29.
9/30/2026
General Info
Please confirm total construction spend per year for the duration of the contract.
Construction spends approximate $1.7B annually.
30.
9/30/2026
Integration and Data
The RFP requires that data exchanged with external systems use "State required formats and field lengths without the need for crosswalks." When integrating a capital project management system with an ERP, a crosswalk is normally required, because the cost breakdown structure, funding structure and chart of accounts are maintained at different levels of detail. Please describe the concern this requirement is intended to address.
The requirement is intended to ensure compatibility with State-required formats, field lengths, and external systems without requiring the State to modify its systems. Offerors should propose any mappings or transformation logic or crosswalk, necessary within their solution or integration layer and identify related assumptions.
31.
9/30/2026
Integration and Data
May Offerors propose their own integration middleware, or does the State require the use of a specified platform, such as MuleSoft, which is referenced in Section F.1.6?
Yes. Offerors may propose their own solution that meets all functional, security, interoperability, support, and documentation requirements.
32.
9/30/2026
Integration and Data
Attachment A (MPP-33) references integration with a "historical data warehouse." Please confirm whether this is an existing State system, and if so, name the platform. Please also confirm whether a separately licensed analytics tool is acceptable, or whether reporting must be native to the proposed solution, per Section F.6.9's reference to "embedded reporting and analytics."
Offerors may propose the reporting and analytics tool/architecture, but it must satisfy the RFP’s embedded reporting, accessibility, security, licensing, and data-access requirements.
33.
9/30/2026
Integration and Data
The republished Attachment A no longer includes a requirement to capture certified payroll information, but the RFP's list of external applications still includes the Department of Labor (certified payroll). Please confirm what the requirements are related to certified payroll.
The Department of L+abor collects information regarding certified payroll. CDB must track and report on apprenticeship requirements, employee diversity utilization metrics, and validate that prevailing wage rates are being adhered to thus pulling or integrating from the adjacent state agency’s portal submission makes sense to not create another deliverable or duplicative submission inviting user errors or omissions.
34.
9/30/2026
Integration and Interoperability
Please provide the anticipated integration/ interface inventory for SAP required for initial go-live, including the business objects or processes to be exchanged, direction of each interface, and whether each is expected to operate in real time or batch.
This information will be shared with the awarded vendor if available and applicable. Offerors should propose a solution with documented assumptions.
35.
9/30/2026
Integration and Interoperability
Please describe the anticipated business processes and data exchanges between the new solution and Illinois Procurement Gateway (IPG), Supplier Diversity, and/or DEI systems, including which specific external systems are required for initial go live.
There would be data exchanges to confirm whether the vendor registered in IPG, are they registered as a diverse vendor (Minority, Woman, Veteran Owned), transfer and sharing of supporting documentation housed in those external databases of record for procurement validation without having to leave the application. Go live for any bidding or award modules must be in place for compliance.
36.
9/30/2026
Integration and Interoperability
For SAP, IPG, Supplier Diversity/DEI, and other required custom integrations, will the customer provide a partner or SME responsible for any specific interface development required to push/pull data from these systems?
Yes, CDB will participate in requirements validation, data mapping, and acceptance activities. Offeror will be responsible for design, development, testing and deployment of all interfaces.
37.
9/30/2026
Manage Assets
Attachment A, Business Functionality – MA-17 references triggering maintenance scheduling from real-time sensor data. Does CDB currently operate sensor-based monitoring on any assets, and if so, what sensor platforms or protocols are in use? Or is this a future-state capability CDB is evaluating for potential adoption?
This is not a current functionality but desired functionality. Offerors should propose a solution with documented assumptions.
38.
9/30/2026
Manage Assets
Attachment A, Business Functionality – MA-86 references a "Month End Report for MEA." MEA is not defined in the RFP glossary. What does MEA stand for, and what organizational unit or functional area does this report serve?
MEA stands for Monthly Expenditure Analysis. The Month End Report for MEA is used by the Capital Development Board’s Finance and Project Management functions to review monthly financial activity for capital projects, including expenditures, encumbrances, remaining balances, and variances.
39.
9/30/2026
Manage Assets
Attachment A, Business Functionality – MA-44 requires tracking full furniture plans and re-design adjustments. Section A.2.5 of the RFP explicitly states that scope excludes full enterprise facility management capabilities. Please clarify whether MA-44 is in scope, and if so, what level of furniture inventory and space planning functionality is expected.
For CDBs design projects FF&E packages are developed for bid and solicitation by the end-users’/client agencies that CDB serves. These packages are part of traditional design deliverables and procurement packages and are typically 1 or 2 packages for a project-based deliverable, not an enduring furniture tracking tool after the construction or renovation effort is complete.
40.
9/30/2026
Manage Assets
Attachment A, Business Functionality – MA-110 requires reports on mobile device management by device count, type, user, and carrier. This appears to describe an IT MDM function rather than capital construction asset management. Is this requirement in scope for the CDB Construction Management solution?
This requirement refers to the system being able to be used by mobile devices and the system being able to run reports in the mobile device as well as keep track of the mobile device. Offerors should propose a solution with documented assumptions.
41.
9/30/2026
Manage Budgeting and Planning
Attachment A, Business Functionality – MB-115 references "bottom/forecasting percolation," MB-123 references "middle/out forecasting," and MB-129 references "top/down forecasting/allocation." "Bottom/forecasting percolation" is not a standard industry term. Please define what each methodology means in CDB's budget context and confirm these are distinct required capabilities.
Top/down is Governor’s Office of Management and Budget high level budget allocations for statewide appropriations, capital bills, and CDB’s annual spending authorities. Middle/out is the program level budgeting for each agency CDB supports like IDNR’s active portfolio or each College Campus has their own portfolio that must be analyzed and prepared for levels of spending within a certain geographic market within the state, leveled and ranked, and Bottom/forecasting is upcoming or deferred maintenance items or pending equipment or system failures that are estimated and budgeted by CDB or client agencies and injected into the capital renewal pipeline pending prioritization or emergency declaration.
42.
9/30/2026
Manage Budgeting and Planning
Attachment A, Business Functionality – MB-34 and MB-35 reference "socialization" of draft budgets. Please define what "budget socialization" means in CDB's operational context, specifically, what users are involved, what actions they take, and what the expected system workflow looks like.
Socialization in this requirement refers to sharing the budget with the appropriate personnel with the appropriate access level. Any ranking or prioritization of budgets should be clearly formulated to hide different levels of detail for the pending audience or group of stakeholders. For example, Agency A does not need to see Agency B’s budget priorities. Clean round numbers may be needed at higher level reporting in lieu of detailed dollar for dollar allocations. This is a selection of stakeholders that the report is catered to facilitate intent and a selection of level of detail in said report to share enough without oversharing when appropriate.
43.
9/30/2026
Manage Contracts
Attachment A, Business Functionality – MC-63 contains an unfilled placeholder ("<#>") for the minimum number of commodity codes per vendor record. What is the intended minimum?
The symbol is intended to specify configurable amount but not expectation will encompass the list of commodity codes in NIGP, UNSPC, NAIC, etc. Offerors should propose a solution with documented assumptions.
44.
9/30/2026
Manage Contracts
Attachment A, Business Functionality – MC-304 references a forthcoming eSignature tool currently in the contract phase. Which tool has CDB selected or is evaluating? What is the anticipated go-live timeline for the eSignature tool, and what integration specifications should offerors plan against?
The State of Illinois currently authorizes and supports the use of Adobe Acrobat Sign as its primary, enterprise licensed eSignature platform. Agencies may also use Docusign where a valid, agency specific contract remains in place, and statewide Entrust digital certificate services are authorized for secure digital signatures. These are the tools that comply with State procurement, security, and technical standards and are available for use by CDB. Offerors should propose their solution for integration with these signature tools with documented assumptions.
45.
9/30/2026
Manage Contracts
Attachment A, Business Functionality – MC-425 presents three alternative document management approaches (native in-solution, ServiceNow SPM, or SharePoint integration) without indicating priority. Which approach does CDB prefer, and must the solution support all three or just one?
Offerors should propose the approach that best satisfies the document-management and integration requirements and clearly identify which products perform each function.
46.
9/30/2026
Manage Contracts
Attachment A, Business Functionality – MC-501 references forms "IBEC, BT&C, LOI, COVID, So SC, and others" for vendor qualification monitoring. Please provide the full names and current versions of each form, confirm whether COVID-specific forms are still required, and provide a complete list of "others."
IBEC: Illinois Business Enterprise Certification (Current version: issued by CMS Business Enterprise Program. Vendors provide a copy of their active BEP certificate; CDB does not maintain its own version.)

BT&C: Bidder’s Tax and Certifications Form (Current version: CDB standard form for disclosure and compliance attestations. Form is included in the solicitation attachments.)

LOI: Letter of Intent (Current version: No CDB‑specific version—vendors provide their own standard LOI indicating commitment to participate.)

COVID: COVID‑19 Certification / Health & Safety Compliance Form (These forms are no longer required and are not part of current vendor qualification monitoring.)

So SC: Statement of Subcontractors (Current version: CDB form identifying all subcontractors and their participation levels. Included in solicitation attachments or standard procurement compliance forms.)

Others: Additional standard CDB or statewide certification forms required for vendor compliance during qualification and performance monitoring. These may include:

• Financial Disclosures and Conflicts of Interest Form

• Illinois Registration / Secretary of State Good Standing Certificate

• Insurance certificates (Workers’ Compensation, General Liability, Auto, etc.)

• Certifications required under the Illinois Procurement Code (e.g., Sexual Harassment, FTA/EEO compliance as applicable)

• BEP Utilization Plan (if applicable)

• Prevailing Wage compliance attestations

47.
9/30/2026
Manage Contracts
Attachment A, Business Functionality – MC-489 requires automatic mileage/distance calculation between a prime contractor's HQ address and the project location. What calculation method is required (straight-line vs. driving distance)? What data source should be used? How is this distance used in the QBS evaluation or scoring process?
Straight line is acceptable for this scenario. QBS sometimes measures a vendors ability to access a site for inspections, reporting, site meetings, client meetings and design reviews for example. Numerous trips can add costly travel expenditures over the lifecycle of a project. Facility locations for each state facility are denoted in GPS coordinate form and can be migrated from CDB main when referenced to prime contractors HQ location or satellite location if applicable.
48.
9/30/2026
Manage Contracts
Attachment A, Business Functionality – Multiple requirements (MC-339, MC-355, MC-377, MC-381, MC-382) reference an electronic "lockbox" for bid submissions. Is CDB expecting the new solution to replace BidBuy's bid submission lockbox for CDB-managed solicitations, or must the solution integrate with BidBuy's existing lockbox? If both, which solicitation types are in scope for each platform?
The solicitation process for bid submissions for Construction projects would be through the new system required in this RFP and would have its own lockbox. The integration with BidBuy can be a design decision during implementation but offeror should be able to support both capabilities.
49.
9/30/2026
Manage Financials
RFP Section A primarily describes SAP as the integration system of record, but Traceability Matrix F.5.12 references SAMS (Comptroller's CGI Advantage 4) for COA alignment. Please confirm whether SAMS integration is required or whether COA alignment is achieved solely through SAP. If SAMS integration is required, please describe the required data flows.
Both integrations are part of this project. Offerors should expect there to be integrations with SAP, as well as integrations with SAMS. Required data flows and designs will be determined during the implementation with the winning vendor.
50.
9/30/2026
Managing Financials
Attachment A, Business Functionality – MF-21 references disbursement options including "PayPal, etc." as payment access methods for recipients. Are consumer payment platforms such as PayPal actually in scope for CDB vendor payments? What payment methods does CDB currently use or intend to support?
Offerors should propose payment-access capabilities that meet the stated requirements and applicable State financial controls.
51.
9/30/2026
Managing Financials
Attachment A includes requirements for access to 10 years of detailed historical data (MF-607) and 5 years of budget and actual history (MB-124). May these requirements be satisfied through a read-only archive or reporting repository, or must historical records be migrated as transactional data in the new solution?
Historical information must remain accessible and reportable in accordance with Attachment A. Offerors should propose a compliant migration and archival approach and identify assumptions.
52.
9/30/2026
Mandatories and SLR’S and Performance Definitions
In Section F2. Contract Requirements, the state indicates: "The Vendor shall maintain compliance with all applicable state and federal regulations for cloud environment(s), including but not limited to:

State Of Illinois Security Requirements. Found in Section G.2. of this RFP and NIST SP 800-53 Revision 5, FedRAMP Moderate". However, in section G.2, the state requests general NIST compliance and SOC 2 Type 2 certification, but no mention is made of FedRAMP Moderate. Does the state require FedRAMP moderate, or the security requirements found in G.2?

FedRAMP Moderate is expressly included in the RFP’s cloud compliance requirements and must be addressed together with the applicable requirements in G.2, NIST SP 800-53 Revision 5, and other State security requirements.

53.
9/30/2026
Minimum Required Points
Can CDB confirm whether the down-selection to the top three proposals for the Demonstration phase is based solely on the written Technical score, or whether Commitment to Diversity scores are also factored into the ranking?
The RFP states that the top three Offerors are determined using Technical and Commitment to Diversity points. The scoring mechanism has been explained in the RFP under Section D – Evaluation Procedures, please refer to it for your proposal.
54.
9/30/2026
Operational Environment
At peak concurrent usage, how many users (in total) will need access to the asset management software?
The RFP identifies approximately 80 average concurrent users and approximately 120 concurrent bid submissions at peak. Offerors should size the proposed solution for the stated user population and concurrency requirements.
55.
9/30/2026
Overview and Purpose
Section A1 - Please clarify the intended DocuWare integration model, including whether DocuWare will remain the long-term archive and whether the new solution is expected to (a) send documents and metadata to DocuWare for archival, (b) retrieve/link to documents stored in DocuWare, or (c) support bidirectional document synchronization.
The RFP requires integration with DocuWare and export of finalized project files for import into DocuWare. Offerors should propose an integration approach and identify assumptions.
56.
9/30/2026
Overview and Purpose
Section A.1 states CDB requires a "System Implementor to act as the prime contractor," while later language states the selected Vendor "will be or include a System Implementor" (A.1, p.6). Please confirm: must the System Implementor itself hold the prime contract, or may the software/platform provider serve as prime and subcontract System Implementor services to a qualified SI partner?
CDB does not require that the System Implementor (SI) serve as the prime contractor as long as there is a Prime Contractor to ensure a single point of accountability for the delivery, integration, and overall success of the solution. The prime contractor may be any legally registered firm that meets all RFP requirements related to experience, qualifications, financial capacity, and compliance with State procurement laws. The prime may also engage subcontractors; however, the prime contractor must retain full responsibility for managing the project, meeting all deliverables, and ensuring subcontractor performance.

Vendors may propose a team or partnership, but one firm must be clearly identified as the prime contractor. This firm will enter into the contract with CDB, serve as the primary contact, and assume end to end responsibility for the implementation. CDB does not limit eligibility to any specific type of company (such as software vendors or consulting firms); the determining factor is the proposing firm’s capability and commitment to perform the system implementation role as defined in the RFP.

57.
9/30/2026
Overview and Purpose / Integration
Please clarify the intended DocuWare integration model, including whether DocuWare will remain the long-term archive and whether the new solution is expected to (a) send documents and metadata to DocuWare for archival, (b) retrieve/ link to documents stored in DocuWare, or (c) support bidirectional document synchronization.
The RFP requires integration with DocuWare and export of finalized project files for import into DocuWare. (a) yes (b) yes (c) yes. Offerors should propose an integration approach and identify assumptions.
58.
9/30/2026
Payment Schedule
The Payment Schedule places "Data Migration and Initial Training" before "System Deployment and Acceptance Testing." Please clarify whether "successful migration of legacy data" refers to validated mock conversions in a non-production environment or to the final production conversion.
The Offeror should price and plan for mock conversions, validation, and final production migration as required by F.7.4.
59.
9/30/2026
Pricing
Section F11 -The Payment Schedule places "Data Migration and Initial Training" before "System Deployment and Acceptance Testing." Please clarify whether "successful migration of legacy data" refers to validated mock conversions in a non-production environment or to the final production conversion.
The Offeror should price and plan for mock conversions, validation, and final production migration as required by F.7.4.
60.
9/21/2026
Regulations for Cloud Environments
Regarding Section F.1.1 & G.1 (SIEM Logging Integration): The contract requirements specify forwarding system log information to DoIT’s SIEM system. Could you provide the specific technical ingestion standards required by DoIT's SIEM (e.g., Syslog over TLS, specific JSON schema format, or REST API endpoints)?
The proposed solution must support the forwarding of security, audit, and operational logging information to the State's enterprise security monitoring capabilities in accordance with State security requirements. Detailed integration specifications, logging standards, formats, and transmission methods will be provided during implementation and security design activities. Offerors should assume their solution will be required to support industry-standard logging and monitoring integration capabilities and provide logs in a non-proprietary, readily consumable format consistent with State security requirements.
61.
9/30/2026
Response to Services
Section F.7.4; F.7.8 - Will non-production environments for mock conversions be provided under the Solution Hosting and Provisioning domain, and will the State provide refreshed legacy data extracts for each mock conversion cycle?
Offerors must propose and price the non-production environments necessary to perform mock conversions under the hosting and provisioning requirements.
62.
9/30/2026
Schedule
Section A.3 lists an anticipated contract start date of June 1, 2027, but the RFP does not state a target go-live date or maximum implementation duration. Please indicate CDB's target go-live date or expected implementation duration, if one exists.
Offerors should propose an implementation schedule.
63.
9/30/2026
Schedule
A.3 lists an anticipated contract start date of June 1, 2027, but the RFP does not state a target go-live date or maximum implementation duration. Please indicate CDB's target go-live date or expected implementation duration, if one exists.
Offerors should propose an implementation schedule.
64.
9/30/2026
Scope and Requirements
Please confirm that this solicitation seeks a capital and construction project management solution rather than an ERP implementation. Attachment A (Republished 9/9/26) includes approximately 794 "Manage Financials" requirements, such as trial balances, period close, bank reconciliation, journal vouchers and cash position, which are typically core ERP functions. The RFP also states that the State's SAP system "is the State's financial system of record and will remain as such." Please confirm these requirements may be met by SAP through integration, rather than by the proposed solution.
The requirements stated in “Manage Financials” are expected requirements for the system that the offerors are expected to propose in this solicitation.

The offerors proposed solution would be the agency level system, which will roll-up to the State’s SAP system – that should not preclude the system from having the expected functionalities and offerors are expected to satisfy the requirements in Attachment A, as well as capabilities described in Section F.5 of the RFP.

The proposed solution is expected to support Budgeting, Contracts, Financials, Program and Projects and Asset management functionalities – as documented in Attachment A – Traceability Matrix, as well as Section F.5 of the RFP. The system needs to have functionalities at the agency level for project/program level budgeting, project level contracts management, project/program level financials.

Offerors’ solution is expected to support the requirements in the RFP package. The solution is also expected to integrate from the agency system to the larger State SAP system.

65.
9/30/2026
Scope and Requirements
Does CDB operate an agency-specific ERP instance or SAP environment that rolls up to the statewide SAP system? If so, is configuration of that environment within the scope of this procurement, in addition to the capital project management solution?
Yes. This would be the agency level system, which will roll-up to the State’s SAP system – that should not preclude the system from having the expected functionalities and offerors are expected to satisfy the requirements in Attachment A, as well as capabilities described in Section F.5 of the RFP. The proposed solution is expected to support Budgeting, Contracts, Financials, Program and Projects and Asset management functionalities – as documented in Attachment A – Traceability Matrix, as well as Section F.5 of the RFP. Offerors’ solution is expected to support the requirements in the RFP package. The solution is also expected to integrate from the agency system to the larger State SAP system.
66.
9/30/2026
Scope and Requirements
Attachment A includes approximately 400 requirements for solicitation and bid management, including electronic sealed bid receipt, vendor self-registration, NIGP commodity codes, evaluation scoring and protest management. Offerors are required to respond to this solicitation through BidBuy. Please confirm whether CDB intends the proposed solution to replace BidBuy for CDB construction solicitations. Alternatively, will BidBuy and the Illinois Procurement Gateway continue to be used for solicitation, with the proposed solution supporting prequalification, award and contract administration?
No, the proposed solution is not intended to replace BidBuy, as BidBuy is the State of Illinois’ online procurement system.

The proposed solution will be utilized for CDB’s construction procurement activities. CDB currently utilizes CDB Main for prequalification and Trimble Unity Construct (eBuilder) for construction solicitations. Those are the systems that this solution is intended to replace.

BidBuy will continue to be used for certain CDB procurements, primarily professional services, commodity purchases, and non-construction support services.

67.
9/30/2026
Scope and Requirements
The RFP describes "a comprehensive asset inventory solution… not a full asset management facilities system" and states that "scope excludes full enterprise facility management capabilities." Attachment A, however, includes requirements for work orders, preventive maintenance scheduling, equipment management and an item master, which are functions of a maintenance management system. Please confirm which asset requirements are in scope. Please also indicate whether space management, such as building inventory, square footage and space allocation, is in scope.
The intent is to capture the lifecycle requirements for major building systems, roofs, chillers, AHU’s VRF’s, Windows, Exterior facade, Boilers, Cooling towers, parking lots, driveways, lighting systems, electrical distribution systems, generators and the likes. Day to day maintenance items are not the intent of the system but programming major upgrades, overhauls, rebuilds, replacements, costing and timing of these activities is crucial to the life cycle support of a facility and the capital planning cycle functions. The term work order in this case is interchangeable with task order or job order for medium to moderate sized construction efforts with pre-negotiated vendors with RS means/Gordian style rate tables for scope of work development, costing, forecasting, scheduling, and completion documentation. Knowing when a generator was rebuilt or replaced will feed into the replacement planning for that equipment’s lifecycle for example.
68.
9/30/2026
Scope and Requirements
Will CDB accept a solution made up of multiple integrated products under a single prime contractor? In responding to Attachment A and Section F.5, may Offerors indicate that a requirement is met by an existing State system, such as SAP, BidBuy or IPG, through integration rather than by the proposed solution?
The solution will be an agency level system that supports the requested functionalities on its own, which will roll-up to the State’s SAP system through integration – that should not preclude the system from having the expected functionalities and offerors are expected to satisfy the requirements in Attachment A, as well as capabilities described in Section F.5 of the RFP.

The proposed solution is expected to support Budgeting, Contracts, Financials, Program and Projects and Asset management functionalities – as documented in Attachment A – Traceability Matrix, as well as Section F.5 of the RFP. The system needs to have functionalities at the agency level for project/program level budgeting, project level contracts management, project/program level financials.

Offerors’ solution is expected to support the requirements in the RFP package. The solution is also expected to integrate from the agency system to the larger State SAP system.

69.
9/30/2026
Scope of Work
Section A.1 states CDB requires a "System Implementor to act as the prime contractor," while later language states the selected Vendor "will be or include a System Implementor" (A.1, p.6). Please confirm: must the System Implementor itself hold the prime contract, or may the software/platform provider serve as prime and subcontract System Implementor services to a qualified SI partner?
CDB does not require that the System Implementor (SI) serve as the prime contractor as long as there is a Prime Contractor to ensure a single point of accountability for the delivery, integration, and overall success of the solution. The prime contractor may be any legally registered firm that meets all RFP requirements related to experience, qualifications, financial capacity, and compliance with State procurement laws. The prime may also engage subcontractors; however, the prime contractor must retain full responsibility for managing the project, meeting all deliverables, and ensuring subcontractor performance.

Vendors may propose a team or partnership, but one firm must be clearly identified as the prime contractor. This firm will enter into the contract with CDB, serve as the primary contact, and assume end to end responsibility for the implementation. CDB does not limit eligibility to any specific type of company (such as software vendors or consulting firms); the determining factor is the proposing firm’s capability and commitment to perform the system implementation role as defined in the RFP.

70.
9/30/2026
Services – Cutover, Deployment, Hypercare
How does CDB expect in-flight transactions at cutover to be handled, such as pending approvals, open invoices, active solicitations, and change orders mid-workflow?
Offerors should propose a cutover and transition approach for pending approvals, invoices, solicitations, change orders, and other in-flight transactions. The approach must minimize disruption and preserve data integrity, auditability, and continuity.
71.
9/30/2026
Services – Data Conversion, Solution Hosting and Provisioning
Will non-production environments for mock conversions be provided under the Solution Hosting and Provisioning domain, and will the State provide refreshed legacy data extracts for each mock conversion cycle?
Offerors must propose and price the non-production environments necessary to perform mock conversions under the hosting and provisioning requirements.
72.
9/30/2026
Technology - Access Control & Security
Attachment A, Technical Functionality – TF-23 requires "manual" user management while also referencing Okta and SailPoint — which are automated IAM provisioning platforms. Does "manual" mean CDB administrators must have the ability to manually create, modify, or deactivate user accounts independently of automated Okta/SailPoint provisioning (e.g., for emergency access or exceptions)? Or does this simply mean human-initiated (as opposed to fully autonomous) account management within the Okta/SailPoint workflow?
Both capabilities are expected from the system. Design and workflow will be decided when the vendor initiates the project.
73.
9/30/2026
Technology - Accessibility