This Project Specifications document outlines the requirements for an interior remodel of the State of Colorado Capital Garage Entrance located at 1350 S Lincoln Street in Denver, prepared by Koch Covotsos Architects, PC. The project involves selective demolition and renovation of specific scope areas on levels 1 and 4 of the building, encompassing multiple construction divisions including product requirements, demolition, pipe and tube railings, hollow metal doors and frames, aluminum storefronts, and door hardware. The specifications detail comprehensive requirements for materials, fabrication, installation tolerances, and quality assurance across all trade disciplines. The work will be constructed under a separate contract between the State of Colorado Capital Complex (owner) and a contractor to be negotiated by both parties, with the architect overseeing project administration and approvals. Contractors must provide a minimum one-year warranty on all products and installation, with consideration given to proposals offering extended warranties.

The specifications establish detailed performance requirements, material standards, and testing procedures for all components, with all submittals to be provided electronically to the architect for initial review within five working days. Shop drawings, product data, samples, and coordination drawings are required as action and informational submittals throughout construction. Project record documents, operation and maintenance manuals, warranties, and demonstration and training of owner's personnel are required before final completion. The document specifies compliance with applicable codes, regulations, and reference standards including NFPA, ASTM, AAMA, and SDI standards. No specific pricing, funding sources, or set-asides are identified in this specifications document, as it serves as the technical requirements framework for the bidding and construction process rather than a procurement notice or solicitation document with financial terms.

View the file

Other files

File Type Posted
IH-25043 CDs.pdf PDF
IH-25043 DQ.pdf PDF
ADD-001.pdf PDF
ADD-002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SPECIFICATIONS DIVISION 01 – PROJECT REQUIREMENTS

Issued for Construction Koch Covotsos Architects, PC Revision No. 000

SUMMARY-1

©2026, Koch Covotsos Architects, PC. All rights reserved.

State of Colorado Capital Garage Entrance 1350 S Lincoln Street, Denver Project Specifications 0

Koch Covotsos Architects, PC Issued for Construction 01/08/26

TABLE OF CONTENTS

011000 SUMMARY

016000 PRODUCT REQUIREMENTS

024120 SELECTED DEMOLITION

055213 PIPE AND TUBE RAILINGS

081113 HOLLOW METAL DOORS AND FRAMES

084111 ALUMINUM STOREFRONTS

087100 DOOR HARDWARE

092600 GYPSUM BOARD ASSEMBLIES

099123 PAINTING

SUMMARY-2

©2026, Koch Covotsos Architects, PC. All rights reserved.

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: Project consists of an interior remodel of specific scope areas on levels 1 and 4 of the building as outlined in the drawings.

2. Owner and tenant: State of Colorado Capital Complex 3 Landowner rep: Richard Sartirana

B. Architect Identification: Koch Covotsos Architects, PC

1.3 CONTRACT

A. Project will be constructed under a separate contract between the owner and the Contractor as negotiated by both parties.

1.4 WARRANTEES

A. Contractor shall provide a minimum of a one year on products and installation. Consideration will be given to contractors who offer extended warrantees. Please present those in your proposal.

PART 2 — SUBMITTAL PROCEDURES

2.1 SUMMARY

a. The project will be administered by the owner’s representative with the assistance of the architect. All questions, submittals, RFIs shall be submitted to the architect, or person designated by the owner for administration.

b. Action Submittals: Information that requires the architect’s responsive action.

c. Informational Submittals: Information that does not require architect’s approval.

Submittals may be rejected for not complying with requirements.

2.2 PROCEDURES

d. Processing Time:

i. Initial Review: 5 working days.

e. Action Submittals:

i. Number of Copies: Electronic copies are required

ii. Action Submittals:

1. Shop Drawings.

f. Informational Submittals:

i. Number of Copies: one for architect, one for owner

ii. Informational Submittals:

1. Product Data.

2. Coordination Drawings.

3. Samples.

4. Contractor's Construction Schedule.

5. Application for Payment.

6. Schedule of Values.

g. Contractor's Review:

SUMMARY-3

©2026, Koch Covotsos Architects, PC. All rights reserved.

i. Submittals: Marked with approval stamp before submitting to owner.

h. Owner's Action:

i. Action Submittals: copy given to owner for review if needed

ii. Informational Submittals: Reviewed and not returned.

iii. Submittals Not Required: Not reviewed and may be discarded

2.3 CLOSEOUT PROCEDURES

A. PROCEDURES

1. Substantial Completion: Before inspection by Architect:

a. List of incomplete items (punch list) prepared

b. Owner advised of insurance changeover.

c. Warranties submitted.

d. Releases, occupancy permits, and operating certificates obtained.

e. Project Record Documents submitted.

f. Spare parts and extra materials delivered.

g. Final changeover of locks performed.

h. Startup testing completed.

i. Test/adjust/balance records submitted.

j. Temporary facilities removed.

k. Owner advised of utility changeover.

l. Final cleaning performed.

m. Touchup performed.

2. Final Completion: Before final inspection by Architect:

a. Final Application for Payment submitted.

b. List of incomplete items (punch list) endorsed by Architect as completed.

c. Evidence of continuing insurance coverage submitted.

d. Final pest-control inspection report and warranty submitted.

e. Owner's personnel instructed in operation, adjustment, and maintenance of equipment and systems

3. Project Record Documents:

a. Record Drawings: One set of blue- or black-line white prints of the Contract Drawings and Shop Drawings marked to show actual installation.

b. Record Specifications: One copy of Project's Specifications, including addenda and contract modifications marked to indicate actual product installation.

c. Record Product Data: One copy of each Product Data submittal marked to indicate actual product installation.

4. Operation and Maintenance Manuals: Data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.

a. Organized, bound, and indexed in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, with pocket inside the covers to receive folded oversized sheets. Binder front and spine identified with title, Project name, and contents.

5. Warranties: Submitted within 15 days for areas of partial occupancy.

SUMMARY-4

©2026, Koch Covotsos Architects, PC. All rights reserved.

a. Organized and bound in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, with paper dividers. Binder front and spine identified with title, Project name, and name of Contractor.

6. Demonstration and Training: Owner's personnel instructed how to adjust, operate, and maintain systems, subsystems, and equipment not part of a system.

a. Advance Notice: seven days.

7. Final Cleaning: Each surface or unit cleaned to condition expected in an average commercial building cleaning and maintenance program.

8. Clean ducts, blowers, and coils for units operated without filters during construction

END OF SECTION 011000

SUMMARY-5

©2026, Koch Covotsos Architects, PC. All rights reserved.

SECTION 01600 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Provide products of same kind from a single source.

B. Deliver, store, and handle products according to manufacturer's written instructions, using means and methods that will prevent damage, deterioration, and loss, including theft.

1. Schedule delivery to minimize long-term storage and to prevent overcrowding construction spaces.

2. Deliver in manufacturer's original sealed packaging with labels and written instructions for handling, storing, protecting, and installing.

3. Inspect to ensure compliance with the Contract Documents and to ensure items are undamaged and properly protected.

4. Store heavy items in a manner that will not endanger supporting construction.

5. Store items subject to damage aboveground, under cover in a weathertight enclosure, with ventilation adequate to prevent condensation. Maintain temperature and humidity within range required.

PART 2 - PRODUCTS

2.1 PRODUCT OPTIONS

A. A. Provide items that comply with the Contract Documents, are undamaged, and are new at the time of installation.

B. 1. Provide products and equipment complete with accessories, trim, finish, and other devices and components needed for a complete installation and the intended use and effect.

C. Do not attach manufacturer's labels or trademarks, except for required nameplates, on surfaces exposed to view in occupied spaces or on the exterior.

D. Select products as follows:

1. Where these Specifications name only a single product or manufacturer, provide the item indicated. Substitutions may be permitted per the process below.

2. Where these Specifications name 2 or more products or manufacturers, provide 1 of the items indicated. Substitutions may be permitted per the process below.

3. Where products or manufacturers are specified by name, accompanied by the term "or equal," comply with provisions concerning "product substitutions" to obtain approval for use of an unnamed product or manufacturer.

SUMMARY-6

©2026, Koch Covotsos Architects, PC. All rights reserved.

4. Where these Specifications describe a product and list characteristics required , with or without naming a brand or trademark, provide a product that complies with the characteristics and other requirements.

5. Where these Specifications require compliance with performance requirements, provide products that comply and are recommended in writing by the manufacturer for the application. Substitutions may be permitted per the process below.

6. Where these Specifications require compliance with codes, regulations, or reference standards, select a product that complies with the codes, regulations, or reference standards.

E. Unless otherwise indicated, Architect will select color, pattern, and texture of any product from manufacturer's full range of options.

F. The following products will be furnished by Owner and shall be installed by

Contractor as part of the Work:

2.2 PRODUCT SUBSTITUTIONS

A. Reasonable and timely requests for substitutions will be considered. Substitutions without change to the contract sum may only be considered prior to bid.

B. A submitted bid without a substitution request communicates to the owner that the specified product is in the project scope.

C. Substitutions made after bidding will be approved at the discretion of the owner and architect, along with a submitted credit if the product costs less than the specified product.

D. Submit 1 electronic copies of each request for product substitution. Identify product to be replaced, provide complete documentation showing compliance of proposed substitution with all specified requirements, and include the following:

1. A full comparison with the specified product.

2. A list of changes to other Work required to accommodate the substitution.

3. Any proposed changes in the Contract Sum or Contract Time should the substitution be accepted.

E. Architect will review the proposed substitution and notify Contractor of its acceptance or rejection prior to the bid submission deadline.

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 01600

PROJECT SPECIFICATIONS DIVISION 02 – DEMOLITION

024120-1

©2024, Koch Covotsos Architects, PC. All rights reserved.

SECTION 024120 - SELECTED DEMOLITION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Removal of designated building construction, equipment, and fixtures.

2. Identification of utilities.

B. Related Sections:

1. Division 01 - Administrative, procedural, and temporary work requirements.

1.2 SUBMITTALS

A. Submittals for Review:

1. Shop Drawings: Indicate areas for demolition, removal sequence and location of salvageable items, and location and construction of temporary work.

1.3 REGULATORY REQUIREMENTS

A. Conform to applicable code for demolition work, safety of structure, and dust control.

B. Obtain required permits from authorities.

C. Notify affected utility companies before starting work and comply with their requirements.

D. Conform to applicable codes when hazardous or contaminated materials are discovered.

E. Do not close or obstruct exits.

F. Do not disable or disrupt building fire or life safety systems without 3 days prior written notice to Owner.

1.4 PROJECT CONDITIONS

A. Minimize interference with streets, walks, public right-of-ways, and adjacent facilities.

B. If hazardous materials are discovered, notify owners representative and await instructions.

C. If any of the following conditions are encountered, cease work immediately, notify owners representative await instructions:

1. Structure is in danger of movement or collapse.

2. Materials or conditions encountered differ from those designated in the Contract Documents.

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

3.1 PREPARATION

A. Erect temporary partitions, barricades, warning devices, and controls.

024120-2

B. Provide protective coverings, shoring, bracing, and supports for construction designated to remain.

C. Temporarily or permanently disconnect utilities as required.

3.2 DEMOLITION

A. Prior to execution, walk through space with owner and architect clearly marking which building elements are to be demolished. Costs associated with over demolishing areas intended to remain will be assigned to the general contractor.

B. Remove existing construction to extent indicated and as necessary to join new work to existing. Do not remove more than is necessary to allow for new construction.

C. Do not damage work designated to remain.

D. Minimize noise and spread of dirt and dust.

E. Assign work to trades skilled in procedures involved.

F. Plug ends of disconnected utilities with threaded or welded caps.

G. Protect and support active utilities designated to remain. Post warning signs showing location and type of utility and type of hazard.

H. Store items designated to remain property of Owner where directed by Owner

I. Remove and dispose of waste materials off site.

END OF SECTION

PROJECT SPECIFICATIONS DIVISION 05 – METALS

Issued for Construction KOCH COVOTSOS ARCHITECTS PC Revision No. 000

05 March 2020 055213-1

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

SECTION 055213 - PIPE AND TUBE RAILINGS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Steel pipe and tube railings.

B. Related Requirements:

1. Section 055119 "Metal Grating Stairs" for steel tube railings associated with stairs.

1.3 COORDINATION

A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' written recommendations to ensure that shop primers and topcoats are compatible with one another.

B. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry.

Deliver such items to Project site in time for installation.

C. Schedule installation so wall attachments are made only to completed walls. Do not support railings temporarily by any means that do not satisfy structural performance requirements.

1.4 ACTION SUBMITTALS

A. Product Data: For the following:

1. Manufacturer's product lines of mechanically connected railings.

2. Railing brackets.

3. Grout, anchoring cement, and paint products.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

C. Samples: For each type of exposed finish required.

05 March 2020 055213-2

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

1. Sections of each distinctly different linear railing member, including handrails, top rails, posts, and balusters.

2. Fittings and brackets.

3. Assembled Sample of railing system, made from full-size components, including top rail, post, handrail, and infill. Sample need not be full height.

a. Show method of connecting and finishing members at intersections.

D. Delegated-Design Submittal: For railings, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For testing agency.

B. Welding certificates.

C. Mill Certificates: Signed by manufacturers of stainless-steel products certifying that products furnished comply with requirements.

D. Paint Compatibility Certificates: From manufacturers of topcoats applied over shop primers certifying that shop primers are compatible with topcoats.

E. Product Test Reports: For pipe and tube railings, for tests performed by a qualified testing agency, according to ASTM E 894 and ASTM E 935.

F. Evaluation Reports: For post-installed anchors, from ICC-ES.

1.6 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel according to the following:

1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."

1.7 DELIVERY, STORAGE, AND HANDLING

A. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

1.8 FIELD CONDITIONS

A. Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication.

05 March 2020 055213-3

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Steel Pipe and Tube Railings:

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

a. ATR Technologies, Inc.

b. Blum, Julius & Co., Inc.

c. Braun, J. G., Company; The Wagner Companies.

d. CraneVeyor Corp.

e. Hollaender Manufacturing Company.

f. Kee Industrial Products, Inc.

g. Moultrie Manufacturing Company.

h. Sterling Dula Architectural Products, Inc.

i. Superior Aluminum Products, Inc.

j. Thompson Fabricating, LLC.

k. Tri Tech, Inc.

l. Tubular Specialties Manufacturing, Inc.

m. Tuttle Railing Systems.

n. Wagner, R & B, Inc.

o. As approved by Owner

2.2 PERFORMANCE REQUIREMENTS

A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000 "Quality Requirements," to design railings, including attachment to building construction.

B. Structural Performance: Railings, including attachment to building construction, shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated:

1. Handrails and Top Rails of Guards:

a. Uniform load of 50 lbf/ ft. (0.73 kN/m) applied in any direction.

b. Concentrated load of 200 lbf (0.89 kN) applied in any direction.

c. Uniform and concentrated loads need not be assumed to act concurrently.

2. Infill of Guards:

a. Concentrated load of 50 lbf (0.22 kN) applied horizontally on an area of 1 sq.

ft. (0.093 sq. m).

b. Infill load and other loads need not be assumed to act concurrently.

05 March 2020 055213-4

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

C. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C, material surfaces)

2.3 METALS, GENERAL

A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes.

B. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as supported rails unless otherwise indicated.

1. Provide type of bracket with predrilled hole for exposed bolt anchorage and that provides 1-1/2-inch (38-mm) clearance from inside face of handrail to finished wall surface.

2.4 STEEL AND IRON

A. Tubing: ASTM A 500 (cold formed) or ASTM A 513.

1. Provide hot dipped galvanized and powder-coated finish for exterior installations and where indicated.

B. Plates, Shapes, and Bars: ASTM A 36/A 36M.

C. Cast Iron: Either gray iron, ASTM A 48/A 48M, or malleable iron, ASTM A 47/A 47M, unless otherwise indicated.

D. Woven-Wire Mesh: Intermediate-crimp, square pattern, 2-inch (50-mm) woven-wire mesh, made from 0.134-inch- (3.42-mm-) diameter wire complying with ASTM A 510

(ASTM A 510M).

2.5 FASTENERS

A. General: Provide the following:

1. Hot-Dip Galvanized Railings: Type 304 stainless-steel or hot-dip zinc-coated steel fasteners complying with ASTM A 153/A 153M or ASTM F 2329 for zinc coating.

2. Provide exposed fasteners with finish matching appearance, including color and texture, of railings.

B. Fasteners for Anchoring Railings to Other Construction: Select fasteners of type, grade, and class required to produce connections suitable for anchoring railings to other types of construction indicated and capable of withstanding design loads.

C. Fasteners for Interconnecting Railing Components:

05 March 2020 055213-5

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

1. Provide concealed fasteners for interconnecting railing components and for attaching them to other work, unless otherwise indicated.

2. Provide concealed fasteners for interconnecting railing components and for attaching them to other work, unless exposed fasteners are unavoidable or are the standard fastening method for railings indicated.

3. Provide Phillips flat-head machine screws for exposed fasteners unless otherwise indicated.

D. Post-Installed Anchors: Torque-controlled expansion anchors capable of sustaining, without failure, a load equal to 6 times the load imposed when installed in unit masonry and 4 times the load imposed when installed in concrete, as determined by testing according to ASTM E 488/E 488M, conducted by a qualified independent testing agency.

1. Material for Interior Locations: Carbon-steel components zinc-plated to comply with ASTM B 633 or ASTM F 1941 (ASTM F 1941M), Class Fe/Zn 5, unless otherwise indicated.

2. Material for Exterior Locations and Where Stainless Steel Is Indicated: Alloy Group 1 (A1) stainless-steel bolts, ASTM F 593 (ASTM F 738M), and nuts, ASTM F 594 (ASTM F 836M).

2.6 MISCELLANEOUS MATERIALS

A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.

B. Etching Cleaner for Galvanized Metal: Complying with MPI#25.

C. Galvanizing Repair Paint: High-zinc-dust-content paint complying with SSPC-Paint 20 and compatible with paints specified to be used over it.

D. Shop Primers: Provide primers that comply with Section 099113 "Exterior Painting”

E. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer complying with MPI#79 and compatible with topcoat.

1. Use primer containing pigments that make it easily distinguishable from zinc-rich primer.

F. Epoxy Zinc-Rich Primer: Complying with MPI#20 and compatible with topcoat.

G. Shop Primer for Galvanized Steel: Primer formulated for exterior use over zinc-coated metal and compatible with finish paint systems indicated.

H. Intermediate Coats and Topcoats: Provide products that comply with Section 099113 "Exterior Painting"

I. Epoxy Intermediate Coat: Complying with MPI #77 and compatible with primer and topcoat.

05 March 2020 055213-6

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

J. Polyurethane Topcoat: Complying with MPI #72 and compatible with undercoat.

K. Bituminous Paint: Cold-applied asphalt emulsion complying with

ASTM D 1187/D 1187M.

L. Non-shrink, Nonmetallic Grout: Factory-packaged, non-staining, noncorrosive, nongaseous grout complying with ASTM C 1107/C 1107M. Provide grout specifically recommended by manufacturer for interior and exterior applications.

M. Anchoring Cement: Factory-packaged, non-shrink, non-staining, hydraulic-controlled expansion cement formulation for mixing with water at Project site to create pourable anchoring, patching, and grouting compound.

1. Water-Resistant Product: At exterior locations provide formulation that is resistant to erosion from water exposure without needing protection by a sealer or waterproof coating and that is recommended by manufacturer for exterior use.

2.7 FABRICATION

A. General: Fabricate railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage, but not less than that required to support structural loads.

B. Shop assemble railings to greatest extent possible to minimize field splicing and assembly. Disassemble units only as necessary for shipping and handling limitations.

Clearly mark units for reassembly and coordinated installation. Use connections that maintain structural value of joined pieces.

C. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch (1 mm) unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.

D. Form work true to line and level with accurate angles and surfaces.

E. Fabricate connections that are exposed to weather in a manner that excludes water.

Provide weep holes where water may accumulate.

F. Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similar items.

G. Connections: Fabricate railings with welded connections unless otherwise indicated.

H. Welded Connections: Cope components at connections to provide close fit, or use fittings designed for this purpose. Weld all around at connections, including at fittings.

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove flux immediately.

05 March 2020 055213-7

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

4. At exposed connections, finish exposed surfaces smooth and blended so no roughness shows after finishing and welded surface matches contours of adjoining surfaces.

I. Form Changes in Direction as Follows:

1. As detailed.

2. By flush bends or by inserting prefabricated flush-elbow fittings.

3. By radius bends of radius indicated or by inserting prefabricated elbow fittings of radius indicated.

J. For changes in direction made by bending, use jigs to produce uniform curvature for each repetitive configuration required. Maintain cross section of member throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of components.

K. Close exposed ends of railing members with prefabricated end fittings.

L. Provide wall returns at ends of wall-mounted handrails unless otherwise indicated. Close ends of returns unless clearance between end of rail and wall is 1/4 inch (6 mm) or less.

M. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and anchors to interconnect railing members to other work unless otherwise indicated.

1. At brackets and fittings fastened to plaster or gypsum board partitions, provide crush-resistant fillers or other means to transfer loads through wall finishes to structural supports and prevent bracket or fitting rotation and crushing of substrate.

N. Provide inserts and other anchorage devices for connecting railings to concrete or masonry work. Fabricate anchorage devices capable of withstanding loads imposed by railings. Coordinate anchorage devices with supporting structure.

O. For railing posts set in concrete, provide steel sleeves not less than 6 inches (150 mm) long with inside dimensions not less than 1/2 inch (13 mm) greater than outside dimensions of post, with metal plate forming bottom closure.

P. For removable railing posts, fabricate slip-fit sockets from steel tube or pipe whose ID is sized for a close fit with posts; limit movement of post without lateral load, measured at top, to not more than one-fortieth of post height. Provide socket covers designed and fabricated to resist being dislodged.

1. Provide chain with eye, snap hook, and staple across gaps formed by removable railing sections at locations indicated. Fabricate from same metal as railings.

2. -

Q. Woven-Wire Mesh Infill Panels: Fabricate infill panels from woven-wire mesh crimped into 1-by-1/2-by-1/8-inch (25-by-13-by-3-mm) metal channel frames. Make wire mesh and frames from same metal as railings in which they are installed.

1. Orient wire mesh with as indicated on Drawings.

05 March 2020 055213-8

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

R. Toe Boards: Where indicated, provide toe boards at railings around openings and at edge of open-sided floors and platforms. Fabricate to dimensions and details indicated.

2.8 STEEL AND IRON FINISHES

A. Galvanized Railings:

1. Hot-dip galvanize exterior steel railings, including hardware, after fabrication.

2. Comply with ASTM A 123/A 123M for hot-dip galvanized railings.

3. Comply with ASTM A 153/A 153M for hot-dip galvanized hardware.

4. Do not quench or apply post galvanizing treatments that might interfere with paint adhesion.

5. Fill vent and drain holes that are exposed in the finished Work, unless indicated to remain as weep holes, by plugging with zinc solder and filing off smooth.

B. For galvanized railings, provide hot-dip galvanized fittings, brackets, fasteners, sleeves, and other ferrous components.

C. Finish shall be powder-coated. Follow manufacturer’s required preparation procedures of surfaces prior to this finish.

1. Color: As indicated on architectural drawings

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine plaster and gypsum board assemblies, where reinforced to receive anchors, to verify that locations of concealed reinforcements are clearly marked for Installer. Locate reinforcements and mark locations if not already done.

3.2 INSTALLATION, GENERAL

A. Fit exposed connections together to form tight, hairline joints.

B. Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in location, alignment, and elevation; measured from established lines and levels and free of rack.

1. Do not weld, cut, or abrade surfaces of railing components that are coated or finished after fabrication and that are intended for field connection by mechanical or other means without further cutting or fitting.

2. Set posts plumb within a tolerance of 1/16 inch in 3 feet (2 mm in 1 m).

3. Align rails so variations from level for horizontal members and variations from parallel with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet (6 mm in 3.5 m).

05 March 2020 055213-9

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

C. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials.

1. Coat, with a heavy coat of bituminous paint, concealed surfaces of aluminum that are in contact with grout, concrete, masonry, wood, or dissimilar metals.

D. Adjust railings before anchoring to ensure matching alignment at abutting joints.

E. Fastening to In-Place Construction: Use anchorage devices and fasteners where necessary for securing railings and for properly transferring loads to in-place construction.

3.3 RAILING CONNECTIONS

A. Non-welded Connections: Use mechanical or adhesive joints for permanently connecting railing components. Seal recessed holes of exposed locking screws using plastic cement filler colored to match finish of railings.

B. Welded Connections: Use fully welded joints for permanently connecting railing components. Comply with requirements for welded connections in "Fabrication" Article whether welding is performed in the shop or in the field.

C. Expansion Joints: Install expansion joints at locations indicated but not farther apart than required to accommodate thermal movement. Provide slip-joint internal sleeve extending 2 inches (50 mm) beyond joint on either side, fasten internal sleeve securely to one side, and locate joint within 6 inches (150 mm) of post.

3.4 ANCHORING POSTS

A. Use metal sleeves preset and anchored into concrete for installing posts. After posts are inserted into sleeves, fill annular space between post and sleeve with nonshrink, nonmetallic grout or anchoring cement, mixed and placed to comply with anchoring material manufacturer's written instructions.

B. Form or core-drill holes not less than 5 inches (125 mm) deep and 3/4 inch (20 mm) larger than OD of post for installing posts in concrete. Clean holes of loose material, insert posts, and fill annular space between post and concrete with nonshrink, nonmetallic grout or anchoring cement, mixed and placed to comply with anchoring material manufacturer's written instructions.

C. Cover anchorage joint with flange of same metal as post, welded to post after placing anchoring material

D. Leave anchorage joint exposed with 1/8-inch (3-mm) buildup, sloped away from post

E. Anchor posts to metal surfaces with oval flanges, angle type, or floor type as required by conditions, connected to posts and to metal supporting members as follows:

05 March 2020 055213-10

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

1. For aluminum pipe railings, attach posts using fittings designed and engineered for this purpose.

2. For steel pipe railings, weld flanges to post and bolt to metal supporting surfaces.

3.5 ATTACHING RAILINGS

A. Anchor railing ends at walls with round flanges anchored to wall construction and welded to railing ends

B. Anchor railing ends to metal surfaces with flanges bolted to metal surfaces and welded to railing ends

C. Attach railings to wall with wall brackets, Locate brackets as indicated or, if not indicated, at spacing required to support structural loads.

D. Secure wall brackets and railing end flanges to building construction as follows:

1. For concrete and solid masonry anchorage, use drilled-in expansion shields and hanger or lag bolts.

2. For steel-framed partitions, use self-tapping screws fastened to steel framing or to concealed steel reinforcements.

3. For steel-framed partitions, use toggle bolts installed through flanges of steel framing or through concealed steel reinforcements.

3.6 ADJUSTING AND CLEANING

A. Clean aluminum by washing thoroughly with clean water and soap and rinsing with clean water.

B. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop painting to comply with SSPC-PA 1 requirements for touching up shop-painted surfaces.

1. Apply by brush or spray to provide a minimum 2.0-mil (0.05-mm) dry film thickness.

C. Touchup Painting: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint are specified in Section 099113 "Exterior Painting"

D. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas, and repair galvanizing to comply with ASTM A 780/A 780M.

3.7 PROTECTION

A. Protect finishes of railings from damage during construction period with temporary protective coverings approved by railing manufacturer. Remove protective coverings at time of Substantial Completion.

05 March 2020 055213-11

©2023, KOCH COVOTSOS ARCHITECTS PC. All rights reserved.

END OF SECTION 055213

PROJECT SPECIFICATIONS DIVISION 08 – OPENINGS

Issued for Construction Koch Covotsos Architects PC Revision No. 000 081113-1

SECTION 081113 - HOLLOW METAL DOORS AND FRAMES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes hollow-metal work.

B. Related Requirements:

1. Section 081119 "Stainless-Steel Doors and Frames" for hollow-metal doors and frames manufactured from stainless steel.

2. Section 087100 "Door Hardware" for door hardware for hollow-metal doors.

1.3 DEFINITIONS

A. Minimum Thickness: Minimum thickness of base metal without coatings according to NAAMM-HMMA 803 or SDI A250.8.

1.4 COORDINATION

A. Coordinate anchorage installation for hollow-metal frames. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors. Deliver such items to Project site in time for installation.

1.5 PRE-INSTALLATION MEETINGS

A. Pre-installation Conference: Conduct conference at Project Site.

1.6 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include construction details, material descriptions, core descriptions, fire-resistance ratings, and finishes.

B. Sustainable Design Submittals:

081113-2

C. Shop Drawings: Include the following:

1. Elevations of each door type.

2. Details of doors, including vertical- and horizontal-edge details and metal thicknesses.

3. Frame details for each frame type, including dimensioned profiles and metal thicknesses.

4. Locations of reinforcement and preparations for hardware.

5. Details of each different wall opening condition.

6. Details of anchorages, joints, field splices, and connections.

7. Details of accessories.

8. Details of moldings, removable stops, and glazing.

9. Details of conduit and preparations for power, signal, and control systems.

D. Samples for Initial Selection: For units with factory-applied color finishes.

E. Samples for Verification:

1. For each type of exposed finish required, prepared on Samples of not less than 3 by 5 inches (75 by 127 mm).

2. For "Doors" and "Frames" subparagraphs below, prepare Samples approximately 12 by 12 inches (305 by 305 mm) to demonstrate compliance with requirements for quality of materials and construction:

a. Doors: Show vertical-edge, top, and bottom construction; core construction;

and hinge and other applied hardware reinforcement. Include separate section showing glazing if applicable.

b. Frames: Show profile, corner joint, floor and wall anchors, and silencers.

Include separate section showing fixed hollow-metal panels and glazing if applicable.

F. Schedule: Provide a schedule of hollow-metal work prepared by or under the supervision of supplier, using same reference numbers for details and openings as those on Drawings. Coordinate with final Door Hardware Schedule.

1.7 INFORMATIONAL SUBMITTALS

A. Product Test Reports: For each type of hollow-metal door and frame assembly, for tests performed by a qualified testing agency.

B. Oversize Construction Certification: For assemblies required to be fire rated and exceeding limitations of labeled assemblies.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver hollow-metal work palletized, packaged, or crated to provide protection during transit and Project-site storage. Do not use nonvented plastic.

081113-3

1. Provide additional protection to prevent damage to factory-finished units.

B. Deliver welded frames with two removable spreader bars across bottom of frames, tack welded to jambs and mullions.

C. Store hollow-metal work vertically under cover at Project site with head up. Place on minimum 4-inch- (102-mm-) high wood blocking. Provide minimum 1/4-inch (6-mm) space between each stacked door to permit air circulation.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Amweld International, LLC.

2. Apex Industries, Inc.

3. Ceco Door; ASSA ABLOY.

4. Commercial Door & Hardware Inc.

5. Concept Frames, Inc.

6. Curries Company; ASSA ABLOY.

7. Custom Metal Products.

8. Daybar Industries, Ltd.

9. DE LA FONTAINE.

10. Deansteel Manufacturing Company, Inc.

11. DKS Steel Door & Frame Systems, Inc.

12. Door Components, Inc.

13. Fleming Door Products Ltd.; Assa Abloy Group Company.

14. Gensteel Doors, Inc.

15. Greensteel Industries, Ltd.

16. HMF Express, LLC.

17. Hollow Metal Inc.

18. Hollow Metal Xpress.

19. J/R Metal Frames Manufacturing, Inc.

20. Karpen Steel Custom Doors & Frames.

21. L.I.F. Industries, Inc.

22. LaForce, Inc.

23. Megamet Industries, Inc.

24. Mesker Door Inc.

25. Michbi Doors Inc.

26. MPI Group, LLC (The).

B. Source Limitations: Obtain hollow-metal work from single source from single manufacturer.

081113-4

2.2 REGULATORY REQUIREMENTS

A. Fire-Rated Assemblies: Complying with NFPA 80 and listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction for fire-protection ratings indicated, based on testing at positive pressure according to NFPA 252 or UL 10C.

1. Smoke- and Draft-Control Assemblies: Provide an assembly with gaskets listed and labeled for smoke and draft control by a qualified testing agency acceptable to authorities having jurisdiction, based on testing according to UL 1784 and installed in compliance with NFPA 105.

B. Fire-Rated, Borrowed-Lite Assemblies: Complying with NFPA 80 and listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction for fire-protection ratings indicated, based on testing according to NFPA 257 or UL 9.

2.3 EXTERIOR HOLLOW-METAL DOORS AND FRAMES

A. Construct exterior doors and frames to comply with the standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified.

B. Heavy-Duty Doors and Frames: SDI A250.8, Level 2. At locations indicated in the Door and Frame Schedule.

1. Physical Performance: Level B according to SDI A250.4.

2. Doors:

a. Type: As indicated in the Door and Frame Schedule.

b. Thickness: 1-3/4 inches (44.5 mm.)

c. Face: Metallic-coated steel sheet, minimum thickness of 0.042 inch (1.0 mm), with minimum A40 (ZF120) coating.

d. Edge Construction: Model 1, Full Flush.

e. Core: Manufacturer's standard kraft-paper honeycomb, polystyrene, polyurethane, polyisocyanurate, mineral-board, or vertical steel-stiffener core at manufacturer's discretion.

f. Core: Kraft-paper honeycomb

1) Thermal-Rated Doors: Provide doors fabricated with thermal-resistance value (R-value) of not less than [2.1 deg F x h x sq. ft./Btu (0.370 K x sq. m/W)] when tested according to ASTM C 1363.

3. Frames:

a. Materials: Metallic-coated steel sheet, minimum thickness of 0.053 inch (1.3 mm), with minimum A40 (ZF120) coating.

b. Construction: Knocked down.

4. Exposed Finish: Factory finish

081113-5

C. Hollow-Metal Doors and Frames: NAAMM-HMMA 860. At locations indicated in the Door and Frame Schedule.

1. Physical Performance: Level A according to SDI A250.4.

2. Doors:

a. Type: As indicated in the Door and Frame Schedule.

b. Thickness: 1-3/4 inches (44.5 mm.)

c. Face: Metallic-coated steel sheet, minimum thickness of 0.042 inch (1.0 mm), with minimum G60 ((Z180) or)A60 (ZF180) coating.

d. Edge Construction: Continuously welded with no visible seam.

e. Core: Steel stiffened.

1) Thermal-Rated Doors: Provide doors fabricated with thermal-resistance value (R-value) of not less than 2.1 deg F x h x sq. ft./Btu (0.370 K x sq. m/W) when tested according to ASTM C 1363.

3. Frames:

a. Materials: Metallic-coated steel sheet, minimum thickness of 0.053 inch (1.3 mm), with minimum G60 ((Z180) or)A60 (ZF180) coating.

b. Construction: Knocked down.

4. Exposed Finish: Prime.

2.4 FRAME ANCHORS

A. Jamb Anchors:

1. Masonry Type: Adjustable strap-and-stirrup or T-shaped anchors to suit frame size, not less than 0.042 inch (1.0 mm) thick, with corrugated or perforated straps not less than 2 inches (51 mm) wide by 10 inches (254 mm) long; or wire anchors not less than 0.177 inch (4.5 mm) thick.

2. Stud-Wall Type: Designed to engage stud, welded to back of frames; not less than

0.042 inch (1.0 mm) thick.

3. Compression Type for Drywall Slip-on Frames: Adjustable compression anchors.

4. Post-installed Expansion Type for In-Place Concrete or Masonry: Minimum 3/8-inch- (9.5-mm-) diameter bolts with expansion shields or inserts. Provide pipe spacer from frame to wall, with throat reinforcement plate, welded to frame at each anchor location.

B. Floor Anchors: Formed from same material as frames, minimum thickness of 0.042 inch (1.0 mm), and as follows:

1. Monolithic Concrete Slabs: Clip-type anchors, with two holes to receive fasteners.

2. Separate Topping Concrete Slabs: Adjustable-type anchors with extension clips, allowing not less than 2-inch (51-mm) height adjustment. Terminate bottom of frames at finish floor surface.

081113-6

2.5 MATERIALS

A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B;

suitable for exposed applications.

B. Hot-Rolled Steel Sheet: ASTM A 1011/A 1011M, Commercial Steel (CS), Type B; free of scale, pitting, or surface defects; pickled and oiled.

C. Metallic-Coated Steel Sheet: ASTM A 653/A 653M, Commercial Steel (CS), Type B.

D. Frame Anchors: ASTM A 879/A 879M, Commercial Steel (CS), 04Z (12G) coating designation; mill phosphatized.

1. For anchors built into exterior walls, steel sheet complying with ASTM A 1008/A 1008M or ASTM A 1011/A 1011M, hot-dip galvanized according to ASTM A 153/A 153M, Class B.

E. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A 153/A 153M.

F. Power-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hollow-metal frames of type indicated.

G. Grout: ASTM C 476, except with a maximum slump of 4 inches (102 mm), as measured according to ASTM C 143/C 143M.

H. Mineral-Fiber Insulation: ASTM C 665, Type I (blankets without membrane facing);

consisting of fibers manufactured from slag or rock wool; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively; passing ASTM E 136 for combustion characteristics.

I. Glazing: Comply with requirements in Section 088000 "Glazing."

J. Bituminous Coating: Cold-applied asphalt mastic, compounded for 15-mil (0.4-mm) dry film thickness per coat. Provide inert-type noncorrosive compound free of asbestos fibers, sulfur components, and other deleterious impurities.

2.6 FABRICATION

A. Fabricate hollow-metal work to be rigid and free of defects, warp, or buckle. Accurately form metal to required sizes and profiles, with minimum radius for metal thickness.

Where practical, fit and assemble units in manufacturer's plant. To ensure proper assembly at Project site, clearly identify work that cannot be permanently factory assembled before shipment.

B. Hollow-Metal Doors:

1. Steel-Stiffened Door Cores: Provide minimum thickness 0.026 inch (0.66 mm), steel vertical stiffeners of same material as face sheets extending full-door height, 081113-7 with vertical webs spaced not more than 6 inches (152 mm) apart. Spot weld to face sheets no more than 5 inches (127 mm) o.c. Fill spaces between stiffeners with glass- or mineral-fiber insulation.

2. Fire Door Cores: As required to provide fire-protection ratings indicated.

3. Vertical Edges for Single-Acting Doors: Bevel edges 1/8 inch in 2 inches (3.2 mm in 51 mm)

4. Top Edge Closures: Close top edges of doors with flush closures of same material as face sheets.

5. Bottom Edge Closures: Close bottom edges of doors where required for attachment of weather stripping with end closures or channels of same material as face sheets.

6. Exterior Doors: Provide weep-hole openings in bottoms of exterior doors to permit moisture to escape. Seal joints in top edges of doors against water penetration.

7. Astragals: Provide overlapping astragal on one leaf of pairs of doors where required by NFPA 80 for fire-performance rating or where indicated. Extend minimum 3/4 inch (19 mm) beyond edge of door on which astragal is mounted or as required to comply with published listing of qualified testing agency.

8. Head Anchors: Two anchors per head for frames more than 42 inches (1067 mm) wide and mounted in metal-stud partitions.

9. Door Silencers: Except on weather-stripped frames, drill stops to receive door silencers as follows. Keep holes clear during construction.

a. Single-Door Frames: Drill stop in strike jamb to receive three door silencers.

b. Double-Door Frames: Drill stop in head jamb to receive two door silencers.

10. Terminated Stops: Terminate stops 6 inches (152 mm) above finish floor with a 90-degree angle cut, and close open end of stop with steel sheet closure. Cover opening in extension of frame with welded-steel filler plate, with welds ground smooth and flush with frame.

C. Fabricate concealed stiffeners and edge channels from either cold- or hot-rolled steel sheet.

D. Hardware Preparation: Factory prepare hollow-metal work to receive templated mortised hardware; include cutouts, reinforcement, mortising, drilling, and tapping according to SDI A250.6, the Door Hardware Schedule, and templates.

1. Reinforce doors and frames to receive nontemplated, mortised, and surface-mounted door hardware.

2. Comply with applicable requirements in SDI A250.6 and BHMA A156.115 for preparation of hollow-metal work for hardware.

E. Stops and Moldings: Provide stops and moldings around glazed lites and louvers where indicated. Form corners of stops and moldings with buttered hairline joints.

1. Single Glazed Lites: Provide fixed stops and moldings welded on secure side of hollow-metal work.

2. Multiple Glazed Lites: Provide fixed and removable stops and moldings so that each glazed lite is capable of being removed independently.

081113-8

3. Provide fixed frame moldings on outside of exterior and on secure side of interior doors and frames.

4. Provide loose stops and moldings on inside of hollow-metal work.

5. Coordinate rabbet width between fixed and removable stops with glazing and installation types indicated.

2.7 STEEL FINISHES

A. Prime Finish: Clean, pretreat, and apply manufacturer's standard primer.

1. Shop Primer: Manufacturer's standard, fast-curing, lead- and chromate-free primer complying with SDI A250.10; recommended by primer manufacturer for substrate;

compatible with substrate and field-applied coatings despite prolonged exposure.

B. Factory Finish: Clean, pretreat, and apply manufacturer's standard two-coat, baked-on finish consisting of prime coat and thermosetting topcoat, complying with SDI A250.3.

1. Color and Gloss: As selected by Architect from manufacturer's full range

2.8 ACCESSORIES

A. Grout Guards: Formed from same material as frames, not less than 0.016 inch (0.4 mm) thick.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Examine roughing-in for embedded and built-in anchors to verify actual locations before frame installation.

C. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish by grinding, filling, and dressing, as required to make repaired area smooth, flush, and invisible on exposed faces.

081113-9

B. Drill and tap doors and frames to receive nontemplated, mortised, and surface-mounted door hardware.

3.3 INSTALLATION

A. General: Install hollow-metal work plumb, rigid, properly aligned, and securely fastened in place. Comply with Drawings and manufacturer's written instructions.

B. Hollow-Metal Frames: Install hollow-metal frames for doors, transoms, sidelites, borrowed lites, and other openings, of size and profile indicated. Comply with SDI A250.11 or NAAMM-HMMA 840 as required by standards specified.

1. Set frames accurately in position; plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces, leaving surfaces smooth and undamaged.

a. At fire-rated openings, install frames according to NFPA 80.

b. Where frames are fabricated in sections because of shipping or handling limitations, field splice at approved locations by welding face joint continuously; grind, fill, dress, and make splice smooth, flush, and invisible on exposed faces.

c. Install frames with removable stops located on secure side of opening.

d.…