ADD-001.pdf
PDF 294 KB Posted
- Solicitation number
- DQ1 AAHA 2027000145 3
- Issued by
- Denver County, Denver City, Colorado
About this file
This is an Addendum 01 issued by Koch Covotsos Architects PC on October 30, 2026, for the Capitol Garage Entrance remodel project located at 5035 Oakland Street, Denver, Colorado, on behalf of the State of Colorado Capital Complex. The addendum provides clarification and direction to bidding contractors regarding project scope and requirements. Key requirements include removal and disposal of the existing roll-up door curtain, rails, and conduit while salvaging electrical components such as the motor, controls, disconnect, and limit switches. The glass selected for the new entrance must match the tinted glass in the adjacent work area. Contractors must have been present at the bidders' conference, as indicated by the attached sign-in sheet, to be eligible to bid on this project. Questions regarding the scope are due by 10:00 AM on Monday, November 2, 2026, to allow time for coordination with curtain wall installers.
The addendum specifies detailed security system requirements, including the purchase and installation of card reader components compliant with the Hirsch security system standard, with Beacon identified as the preferred vendor. The general contractor must install conduit from the door entry point to the Hirsch M8 security panel in the demark area, utilizing existing pathways where possible without cutting or drilling into the existing precast structure without a structural engineer's letter. Additional specifications include installation of a Von Duprin motorized latch retraction rim exit device with integrated REX switch, power transfer hinge, and power supply, along with conduit runs to the Scramble Pad box, power transfer hinge, and door header for the position switch. The contractor must maintain a secure job site twenty-four hours per day by creating barricades at the open construction area daily. The existing handrail is to be salvaged and reused. No pricing terms, set-asides, or funding information is provided in this addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IH-25043 CDs.pdf | ||
| IH-25043 DQ.pdf | ||
| IH-25043 Specifications.pdf | ||
| ADD-002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 01 Architect’s ADDENDUM Date of Issuance: 10-30-26 Owner Owner’s Rep Architect Contractor Consultant Field Project:
Capitol Garage Entrance
5035 Oakland Street Denver, CO 802
Description:
From Architect:
Koch Covotsos Architects PC 1499 Blake St, #3L Denver, CO 80202
To Bidding Contractors:
Owner:
State of Colorado Capital Complex
1. See enclosed Sign in Sheet. Only contractors who were present at this meeting are allowed to bid on this project.
2. Question: Will the State want to salvage the existing roll up door?
a. Please include scope to remove and dispose of the curtain, rails, conduit.
b. Salvage the electrical components (motor, controls, disconnect, limit switches)
3. What is the color of the glass
a. The glass shall match the tinted glass directly adjacent to the work area
4. What is the scope for door security
a. The GC shall include purchase and install of all card reader parts and smarts that comply with the Hirsch security system standard at the Capitol Complex.
b. Beacon is our preferred vendor of Hirsch products, contact Mike Young at 303-641-6652
c. GC shall include a ¾” conduit to be installed from the door point of entry to the Hirsch
M8 security panel LBP#4 located in the demark area.
d. Routing of the conduit may use existing pathways which are currently bird protected. The existing precast Ts have sleeve locations so that the GC should not cut or drill into the existing structure without a structural engineer’s letter.
e. Install a Von Duprin RXQEL98 motorized latch retraction rim exit device with an integrated REX switch, a power transfer hinge, and a Von Duprin PS902-2RS power supply
f. Install any addition conduit runs from the door power supply to the
i. Scramble Pad box
ii. Power transfer hinge at the door
iii. Door header for the door position switch
5. GCs shall create a barricade at the open construction every day at the end of construction to maintain a secure job site 24/7
6. What do we do with the handrail?
a. Salvage and reuse
7. Questions are due by 10am Monday 11-2-26 to allow additional time for coordination with curtain wall installers.
Attachments: Sign In Sheet
Issued by the Architect
Michael E Koch, AIA