IGM_ON_CALL_AIRPORT_ENGINEERING_AND_ARCHITECTURAL_SERVICES_(Addendum_#4_Revision).pdf
PDF 282 KB Posted
- Solicitation number
- 2025-RFQ-004
- Issued by
- Mohave County, Arizona
About this file
This document is a Request for Qualifications (RFQ) issued by the City of Kingman, Arizona, seeking engineering and architectural services for the Kingman Municipal Airport & Industrial Park (IGM). The RFQ #2025-RFQ-004 is soliciting statements of qualifications from professional firms capable of providing on-call airport engineering and architectural services. Responses are due by 12:00 pm Arizona time on April 7, 2025, with a non-mandatory site visit scheduled for March 18, 2025. The contract term will be five years from the execution date, with monthly contract terms and no requirement to renew for additional annual terms. The City anticipates selecting a firm by April 15, 2025, with contract award expected at the City Council Meeting on May 20, 2025.
The RFQ emphasizes qualifications-based selection, with evaluation criteria spanning 16 categories scored on a 0-5 point scale. Firms must provide registered Professional Engineers and Architects licensed in Arizona, with expertise in airport engineering, industrial park development, construction management, and related disciplines. Insurance requirements include commercial general liability ($1M per occurrence), professional liability ($1M), and workers' compensation. The selection process will consider factors such as project experience, personnel qualifications, firm reputation, understanding of project challenges, and ability to meet schedules and budgets. Preference will be given to Arizona-based firms, and respondents must comply with federal and local regulations, including Disadvantaged Business Enterprise (DBE) participation goals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Publication_Approved_and_Posted.pdf | ||
| IGM_DBE_Goal_Methodology_2025-2027.pdf | ||
| IGM_ACIP_FY2026-2030_Package-accepted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATION
CITY OF KINGMAN
Airport
2025-RFQ-004
IGM ON CALL AIRPORT ENGINEERING AND
ARCHITECTURAL SERVICES
ISSUE DATE: March 5, 2025
PROPOSAL DUE DATE: April 7, 2025, 12:00 pm (Arizona Time)
CONTACT PERSON:
Doug Breckenridge, Airport General Manager
(928) 565-1420 dbreckenridge@cityofkingman.gov
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/cityofkingman https://secure.procurenow.com/portal/%7bproject.government.code%7d
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 2
PLEASE NOTE: Bidder is responsible for obtaining any addenda and acknowledging it through the procurement portal.
CITY OF KINGMAN
I. INTRODUCTION
II. SCOPE OF SERVICES
III. RESPONSE INSTRUCTIONS AND REQUIREMENTS
IV. INSURANCE REQUIREMENTS
V. SELECTION PROCESS AND CONTRACT AWARD
VI. EVALUATION CRITERIA
VII. PREFERENCE IN PURCHASING
VIII. VENDOR QUESTIONNAIRE
Attachments:
A - IGM ACIP FY2026-2030 Package-accepted
B - IGM DBE Goal Methodology 2025-2027
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 4
1. INTRODUCTION
1.1. General Information
The City of Kingman, Arizona (City) is seeking a qualified firm to provide professional airport engineering and architectural services to the Kingman Municipal Airport (IGM) and Industrial Park
The City provides a full range of services including public safety, highways and streets, economic development, parks, golf, pools, recreation, water, wastewater, solid waste, airport, development services, and other administrative/support services. The City serves as the Mohave County, Arizona seat and has a population of more than 35,000. It employs 400+ full-time employees who provide services for 31 divisions. More detailed information on the City and its finances can be found in the City's Annual
Comprehensive Financial Report on the City's website at www.cityofkingman.gov.
1.2. Submittal Location and Details
Responses must be submitted electronically through the City's procurement portal at https://procurement.opengov.com/portal/cityofkingman no later than 12:00 pm, Arizona time, on Monday, April 7, 2025. Any response received after 12:00 pm, Arizona time, on Monday, April 7, 2025 will not be accepted.
Mailed, faxed, hand-delivered, and e-mailed Responses will not be accepted. Mailed Responses will be disposed of, unopened, and will not be returned to the Respondent.
The City anticipates selecting and notifying the selected firm by April 15 2025, 12:00 pm and requesting the award of the contract at the City Council Meeting on May 20, 2025. There is not an expressed or implied obligation for the City of Kingman to reimburse responding proposers for any expenses incurred in preparing proposals in response to this request.
During the evaluation process, the City of Kingman reserves the right, where it may serve in the City’s best interest, to request additional information or clarification from proposers. At the discretion of the City of
Kingman, each respondent submitting a response may be requested to attend interviews as part of the evaluation process.
The City of Kingman reserves the right to retain all responses submitted and to use any ideas in a response, regardless of whether that response is selected. Submission of a response indicates acceptance by the respondent of the conditions contained in this request for qualifications.
The objective of requesting this Statement of Qualifications is for the City of Kingman.
1.3. RFQ Schedule
The City anticipates the following general timeline of key events during the response evaluations and contract award period:
Post RFQ: March 5, 2025
Site Visit: March 18, 2025, 11:00am
7000 Flightline Drive, Kingman, Arizona 86401 http://www.cityofkingman.gov/ https://procurement.opengov.com/portal/cityofkingman
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 5
Questions from Respondents Due: March 21, 2025, 12:00pm
Last Day for an Addenda: March 27, 2025
Response Due Date: April 7, 2025, 12:00pm
Evaluate Proposals: April 14, 2025
Notice of Intent to Award: April 15, 2025
Contract negotiations: 4/15/2025-4/30/2025
Council Contract Award: May 20, 2025
1.4. Terms of Engagement
The term of this contract will be five (5) from the contract execution date with monthly contract terms thereafter and no requirement to renew for additional annual terms. The maximum overall contract term, including any optional renewals, cannot exceed five (5) years.
1.5. Non-Mandatory Site Visit
A Non-mandatory Site Visit will be held at 11:00 am Arizona time, on March 18, 2025, at 7000 Flightline
Drive, Kingman, Arizona.
1.6. Questions
Questions regarding this solicitation must be submitted online through the OpenGov portal. Questions must be received by no later than the date and time specified in the timeline included in this RFQ (Questions Due
From Proposers).
2. SCOPE OF SERVICES
2.1. Scope of Work
A. To provide the most effective methods in delivering services for Kingman Municipal Airport & Industrial Park (IGM), IGM is seeking Firm(s) with expertise in airport engineering/architectural professional services. Airport engineering/architectural services include, but may not be limited to, the ability to provide/prepare legal descriptions, right-of-ways, construction plans and specifications, grant preparation, project management, construction management, reports/submittals as required by federal, state and, local governmental agencies for the specific projects previously listed under Section I – Project Description, and within the Five Year Airport Capital Improvement Program, a copy of which is included as Attachment A.
1. In order to fulfill the requirements of IGM, the successful Firm(s) must be available on an as-needed basis to undertake various engineering/architectural related disciplines for design and construction management.
2. The successful Firm(s)(s) will be expected to: a) Demonstrate satisfactory performance on airport engineering design and construction administration projects; b) Possess the required permits and
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 6 registrations necessary to perform the work; c) Have the ability and flexibility to respond promptly to all work requests; d) Develop fiscally and operationally sound construction documents to the highest degree of professional engineering standards; and, e) Provide construction administration personnel and services to the highest degree of professional engineering standards.
3. The successful Firm(s) shall be experienced in all pertinent disciplines to provide airport engineering services necessary. Likewise, the successful Firm(s) is expected to be capable of performing airport engineering in accordance with all applicable FAA Advisory Circulars, as amended, and other applicable government agencies rules, regulations and guidance.
4. The successful Firm(s) shall be required to provide a registered Professional Engineer(s) for the specific disciplines necessary to complete each approved task. Said Professional Engineer(s) shall be licensed by the State of Arizona.
2.2. Scope of Services
1. The list of services below is meant to provide general information as to the needs of IGM and the scope of services desired from the selected Firm(s). The list is not meant to be all inclusive and is subject to change at the discretion of IGM.
2. Assist IGM staff and representatives in establishing project goals, objectives, means and parameters for the disciplines listed within this SOQ.
3. Prepare detailed plan(s) for accomplishing the disciplines, including a management plan, a schedule for accomplishing the disciplines, and a description of all deliverables pertaining to each of the tasks necessary to accomplish the disciplines.
4. Make field trips as required to review existing conditions, and to properly prepare design and construction documents.
5. Attend meetings, including design, pre-bid, pre-construction and construction, as scheduled by IGM, the FAA, or ADOT-MPD Aeronautics Group, and prepare and distribute Minutes of said meetings.
6. Prepare plans and specifications in such form as to comply with the latest applicable federal, state and local laws, building codes, ordinances, FAA Advisory Circulars, as amended, and other applicable rules, regulations and guidance.
7. Prepare design documents, construction documents, and other required drawings, as well as technical specifications describing the size, character, and quality of the entire project. Revise documents to the satisfaction of the IGM, federal, state and/or local agencies.
8. Provide technical direction, interpret the construction documents, and make recommendations regarding claims, disputes and other matters in question between the construction contractor(s) and IGM.
9. Prepare and submit itemized project cost estimates at the design and construction document phase.
10. Prepare addenda, interpret the construction documents, and prepare clarification documents.
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 7
11. Provide full/part time qualified construction managers during construction to assure that the progress of the work, the character, scope and detail of construction, the quantity and quality of materials and equipment, and the standard of workmanship conforms to the intent of the architect/engineer as expressed in the construction documents.
12. Analyze substitutions, test reports, materials, equipment, systems schedules, shop drawings, laboratory reports, samples, etc., and make recommendations to IGM.
13. Assist IGM in reviewing and approving all contractor documents, including, but not limited to, pay requests and certified payroll reports.
14. Participate in the final inspection of the project(s), compile the punch list, and advise IGM as to the acceptability of the work performed by the construction contractor(s).
15. Prepare and furnish final record drawings and specifications including such revisions that may have been made in the course of construction.
16. Preparation of DBE Plan/Goals and assist with monitoring DBE Participation (See Attachment B for DBE Goals).
2.3. Key Personnel
1. It is essential that the successful Firm(s) provide adequate experienced personnel, capable of and devoted to the successful accomplishment of disciplines to be performed under this Contract.
The successful Firm(s) must agree to and assign specific individuals to key positions of each approved project.
2. The successful Firm(s) must employ staff that includes professional engineers/architects licensed in the State of Arizona who shall be in direct control of approved projects.
3. The successful Firm(s) agrees that, once assigned to work under the Contract, key personnel shall not be removed or replaced without prior written notice to IGM. Prior written notice shall include the reason(s) for the removal or replacement of the key personnel.
4. If key personnel are not available for work under this Contract for a continuous period exceeding thirty calendar days, or are expected to devote substantially less effort to the work than initially anticipated, the successful Firm(s) shall immediately notify IGM, and shall, subject to concurrence of IGM, replace such personnel with personnel of substantially equal ability and qualifications.
3. RESPONSE INSTRUCTIONS AND REQUIREMENTS
3.1. Response Format
The City will follow the evaluation process and selection criteria described in this RFQ. In order to provide each Respondent an equal opportunity for consideration, adherence to a standardized response format is required. The format of each response must contain the following elements organized into separate chapters and sections, in an order determined by the Respondent:
A. Cover letter;
B. Sample contract with terms and conditions;
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 8
C. Detailed response to all requirements;
D. Description of the experience and knowledge base of the Proposer;
E. Proposer Signature Page;
F. Proposer Guarantees and Warranties;
G. References (a minimum of three (3) must be provided);
H. New Vendor Application;
I. IRS W-9 Form; and
J. Optional - Vendor EFT Form
All requested items must be included with the Response or it will be considered non- responsive and will be rejected. The City is not responsible for failure to locate, consider and evaluate qualification factors presented outside of this format.
Each respondent must demonstrate a clear understanding of the work to be performed and must provide detailed specific qualifications and prior working experience.
Unsigned responses will be considered non-responsive and will be rejected. Responses must be signed by a duly authorized representative of the responding firm. If a response is signed by an agent of the firm, a
Power of Attorney showing the authority of the agent to sign must be submitted with the response or the response will be rejected.
The City will not be liable for any cost incurred by Respondents in preparing and submitting responses.
Respondents may not collect response preparation charges from the City as a result of cancellation of this
RFQ.
In the case of error in the extension of prices in the response, the unit price will govern. No response shall be altered, amended or withdrawn after the specified RFQ closing date and time.
It is the responsibility of the Respondent to examine the entire request for qualifications package and seek clarification for any item, service or requirement that may not be clear.
It is the responsibility of the Respondent to check the Response for accuracy before submitting a response.
3.2. Minimum Qualifications
Firms shall possess the qualifications and Arizona licenses as required by law, in addition to having extensive knowledge, expertise, and a minimum of five (5) years of experience.
3.3. Subcontractors
Respondent must include in their submittal a list of any subcontractors that will be utilized in the performance of the work awarded under this procurement. Respondent must describe the subcontractors qualifications in detail in their response.
3.4. Federal Funds
Firms shall provide proof that they are not currently debarred by the federal government by providing a screen print from the System for Award Management (www.sam.gov).
http://www.sam.gov/
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 9
3.5. Periods of Time
Periods of time, stated as a number of days, shall be calendar days unless otherwise specified.
3.6. Response Withdrawal
Any response may be withdrawn at any time prior to the specified date and time for RFQ closing. The City will not accept late responses, late requests for modifications, or late withdrawals. All responses shall be irrevocable for one hundred twenty (120) calendar days from the day of RFQ closing.
Delays in submitting your response will not be considered excusable to the time requirements contained within this RFQ.
3.7. Addenda
All addenda shall be issued no later than five (5) business days prior to the RFQ closing date.
It is the responsibility of the Respondent to ensure that they have received all Addendums. Solicitation
Addenda will be posted to the RFQ on the City's OpenGov procurement portal where the RFQ is posted.
Vendors that have registered at https://procurement.opengov.com/portal/cityofkingman and who also follow the City of Kingman will receive email notifications of addenda.
3.8. Copies
Respondents may obtain copies of current or past procurement documents through the procurement portal.
If a document is not available through the procurement portal, Respondents may request copies through the
City Clerk's office. The charge per copy is payable in advance. Please contact the City Clerk’s Office for a current per copy cost.
3.9. Late Delivery of Responses
Late responses will not be considered under any circumstances. Delays in submitting your response will not be considered excusable to the time requirements contained within this request for qualifications.
3.10. Extension of Time
Prior to response opening, the City shall have the authority to extend the deadline for submittal of responses when unforeseen circumstances arise.
3.11. Collusion
Upon evidence that collusion exists among Respondents, none of the responses of participants in such collusion will be considered. All involved responses shall be rejected. The Respondent will be required to complete, notarize and submit a "No-Collusion Affidavit" upon request by the City. Failure of the
Respondent to submit a properly executed affidavit upon request by the City shall be grounds for rejection of the response.
3.12. Rejection of Responses
The City reserves the right to waive technical defects, discrepancies and minor irregularities in a response.
The City reserves the right to re-seal any response that was opened prematurely; the City has determined this event as a minor irregularity. The Deputy City Manager/Finance Director shall be notified and shall log the event and place it in the procurement file.
https://procurement.opengov.com/portal/cityofkingman
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 10
The City reserves the right to award any alternatives set forth in the RFQ documents at its sole discretion.
Responses may be rejected if there are any alterations to the required forms, additions not called for, conditional responses, incomplete responses, or irregularities of any kind. The City reserves the right to reject any response not in compliance with the RFQ documents, or prescribed public response procedures and requirements. Written notice of rejection of all response shall be sent to all Respondents. ALL
UNSIGNED RESPONSES SHALL BE REJECTED.
3.13. Rejection of All Responses and Cancellation of Award
The City reserves the right to reject all responses or to cancel award of the contract at any time before execution of the contract by both parties if rejection of all responses or cancellation of the award is deemed to be in the City's best interest. In no event shall the City have any liability for the cancellation of award.
3.14. Conflicts of Interest
A. Notify. Prior to taking an action in connection with a City contract, every employee shall, in writing, notify the employee's supervisor, the City Attorney, and Purchasing Officer of any actual or potential conflict of interest of such employee. City employees shall comply with A.R.S. Title 38 regarding conflicts of interest in the purchasing of and contracting for goods, services, and construction for the City.
B. Review potential conflict of interest. Upon receiving notice of an actual or potential conflict of the interest, the City Attorney or designated representative shall review the purchasing procedures for compliance with applicable laws and regulations.
C. Determination of conflict of interest. If the City Attorney determines that an employee has an actual or potential conflict of interest in connection with a purchase, no contract shall be awarded without City
Council review and approval.
3.15. Reissuance of RFQ
The City reserves the right to re-issue a subsequent procurement for this service at any time if deemed to be in the best interest of the City.
3.16. Protest of Award
A protest of award must be physically delivered to the Purchasing Officer within seven (7) business days of the notice of award date. Our office is open Monday through Thursday from 7:00 am to 6:00pm (closed on holidays). Packages containing protests shall be marked as follows:
RFQ Award Protest, RFQ - 2025-RFQ-004
City of Kingman
Attn: Tina Moline
310 N. 4th Street
Kingman, AZ 86401
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 11
3.17. Vendor Registration
Prior to the execution of a Contract, the successful firm must properly fill out and complete a City Vendor
Application and IRS W-9 Form, and include the documents with the Response.
3.18. Licenses
Respondents will maintain, in current status, all Federal, State, and local licenses and permits required for the operation of the business.
Pursuant to the Kingman Municipal Code, Chapter 8, Article 1.5, Business Licenses, Vendors conducting business within the City of Kingman with a permanent or temporary physical business location within the city limits must apply for a business license and pay the applicable license fee, unless exempted under section 8-13. The full municipal code can be found on the City's website or at the following link:
https://www.codepublishing.com/AZ/Kingman/#!/Kingman08/Kingman08.html.
For details regarding how to submit an application, pay the license fee, etc., please visit our website at:
https://www.cityofkingman.gov/government/departments/city-clerk/business-licenses.
3.19. Disputes
In the event any doubt or differences of opinions exists as to the items or service to be furnished hereunder, or from evaluation and/or testing of substitutes, or the interpretation of the provisions of this procurement, the decision of the City of Kingman shall be final and binding upon all parties.
3.20. Confidentiality
A. All documents, reports, proposals, submittals, responses, or other materials submitted to the City by firms shall become the sole and exclusive property of the City and become a public record.
B. Responses shall be opened publicly at the time and place designated in the RFQ. The name of each
Respondent and such other relevant information as is specified by rule shall be publicly read and recorded.
The responses shall be open for public inspection after contract award, if any.
C. To the extent the Respondent designates, trade secrets or other proprietary data contained in the response documents shall remain confidential. The City of Kingman is subject to the Arizona Revised Statutes, Title
39, Chapter 1, relating to public records.
3.21. Transaction Privilege Tax (TPT)
The City is not exempt from Transaction Privilege Tax (TPT); Respondent must include tax in the pricing proposal, when applicable.
4. INSURANCE REQUIREMENTS
4.1. Required Insurance Policies
All insurance, with the exception of Workers Compensation and Professional Liability, must name the City as additional insured before a final contract can be executed. The City reserves the right to request a copy of the full policy for review. A copy of additional insured endorsement will be required prior to contract execution. Insurance must be primary and include a waiver of subrogation. Respondent agrees to obtain and maintain the following insurance coverage from insurers licensed to do business in the state of Arizona that have an "A.M. Best" rating of not less than "A-VII" with the following minimum insurance required:
https://www.codepublishing.com/AZ/Kingman/#!/Kingman08/Kingman08.html https://www.cityofkingman.gov/government/departments/city-clerk/business-licenses
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 12
4.2. Commercial General Liability
Policy must include Bodily Injury, Property Damage, Personal Injury and Broad Form Contractual Liability with coverage limits of not less than:
A. Each Occurrence: $1,000,000
B. General Aggregate: $2,000,000
4.3. Commerical Automobile Liability
$1,000,000 Commercial Auto (can be waived, depending on circumstances)
4.4. Worker's Compensation
Per Occurrence: statutory requirement
4.5. Other and Professional Liability
$1,000,000 - Applicable to design services (architects or engineers).
Pollution, where necessary.
Builders Risk (for new construction). Bid bonds may be required and if awarded, payment and performance bonds. All bonds must be verified before work can begin.
4.6. Minimum Limits
The City in no way warrants that the minimum limits contained herein are sufficient to protect the contractor from liabilities that might arise out of the performance of work under this contract/agreement. The contractor is free to purchase such additional insurance as may be determined necessary.
5. SELECTION PROCESS AND CONTRACT AWARD
5.1. Selection Process
A selection committee will evaluate the responses and score them in accordance with the evaluation criteria listed in Section 7 of this solicitation. Respondents will be ranked according to their combined scores.
The Engineering / Architectural firm will be selected through a qualifications-based selection process. The selection process shall be in accordance with Chapter 2 of FAA Advisory Circular No. 150/5100-14E, and
A.R.S. §34-603, Firms interested in providing services must submit a Statement of Qualifications (SOQ) that addresses the following issues:
Evaluation criteria will be rated on a scale of 1 to 5, with one being the lowest and five being the highest.
Section 6 will be considered during the evaluation process.
5.2. Interviews
The City may interview some or all of the firms at any point during the evaluation process. Information provided during the interview process will be taken into consideration in the evaluation process.
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 13
5.3. Other Information
Information that Evaluation Committee Members have regarding a specific responder, aside from what is provided in the response, may be taken into consideration during the evaluation process.
5.4. Special Conditions for Submitting a Response
Submission of a Response indicates acceptance by the firm of the conditions contained in this RFQ.
The contents of the Response and any clarifications distributed by the City shall become part of the contractual obligation and incorporated by reference into the ensuing contracts.
5.5. Notice of Intent to Award a Contract
The firm selected to move forward with contract negotiations will be notified in writing (either by email or other formal means), which serves as the Notice of Intent to Award, on April 15 2025, 12:00 pm. A Notice of Intent to Award does not create a contract. Contracts are not considered executed until formal award by the City Council and signature of the selected firm.
RFQ results will be posted on the City of Kingman's OpenGov portal.
5.6. Contract Negotiations
Within nine (9) days after the Notice of Intent to Award a Contract, Proposer shall submit all documents necessary for the successful execution of the contract, such as insurance or performance and payment bonds, if required.
Negotiations may be considered in person, in writing, or by telephone.
Terms, conditions, prices, methodology, or other features of the fee proposal may be subject to negotiation and subsequent revision. As part of the negotiation, the respondent may be required to submit supporting financial, pricing, and other data in order to allow a detailed evaluation of the feasibility, reasonableness, and acceptability of the fee proposal.
The mandatory requirements of the RFQ shall not be negotiable and shall remain unchanged unless the City determines that a change in such requirements is in the best interest of the City.
In the event the City is unable to negotiate terms it deems acceptable, the City may withdraw its selection and select another firm. It is anticipated that negotiations will be concluded and a contract for IGM ON
CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES will be presented for consideration and approval by the City Council on May 20, 2025.
Additionally, if the City and the Proposer are unable to agree on final contract terms by the end of the negotiation period (as set forth in the RFQ Scheduled included in this document) , the City may withdraw its selection and move forward with contract negotiations with another Proposer.
5.7. Commencement of Work
Proposer will not perform any billable work, provide any material or service under this contract until the
Proposer receives a purchase order, or is otherwise directed to do so in writing by the City of Kingman.
6. EVALUATION CRITERIA
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 14
No. Evaluation Criteria Scoring Method Weight (Points)
1. The consultant's ability to perform all or most of the proposed projects listed.
0-5 Points 5
(6.3% of Total)
2. The consultant's experience within the past five (5) years in airport projects comparable to the proposed projects.
0-5 Points 5 (6.3% of Total)
3. The consultant's experience within the past five (5) years in industrial park developments, including roads, water and sewer mains and storm water issues.
0-5 Points 5 (6.3% of Total)
4. Key personnel's professional background and experience.
0-5 Points 5
(6.3% of Total)
5. The firm's reputation for personal and professional integrity and competence.
0-5 Points 5
(6.3% of Total)
6. Location of corporate office and satellite office (if applicable) assigned to the proposed projects, including familiarity and proximity to the Kingman Airport & Industrial Park.
0-5 Points 5 (6.3% of Total)
7. Current workload. 0-5 Points 5 (6.3% of Total)
8. Quality of projects previously completed. 0-5 Points 5 (6.3% of Total)
9. Evidence that firm has established and implemented an Affirmative Action and
Disadvantaged Business Enterprise Outreach
Plan.
0-5 Points 5 (6.3% of Total)
10. Demonstrated ability to meet schedules and deadlines.
0-5 Points 5
(6.3% of Total)
11. Demonstrated ability to complete disciplines within budget parameters.
0-5 Points 5
(6.3% of Total)
12. Qualifications and experience of sub-consultants with whom the firm partners with on a regular basis.
0-5 Points 5 (6.3% of Total)
13. Demonstrated understanding of any challenges of the proposed projects or sponsors specific concerns.
0-5 Points 5 (6.3% of Total)
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 15
14. Demonstrated knowledge of FAA and ADOT-
MPD, Aeronautics Group regulations, policies and procedures, including grant procurements.
0-5 Points 5 (6.3% of Total)
15. Demonstrated ability to provide qualified construction managers and inspectors for construction management.
0-5 Points 5 (6.3% of Total)
16. Degree of interest and knowledge exhibited of
Kingman Municipal Airport & Industrial
Park.
0-5 Points 5 (6.3% of Total)
7. PREFERENCE IN PURCHASING
2-349 PREFERENCE IN PURCHASING.
A. Resident bidders. When evaluating a bid, except for procurement of construction services, the applicable amount of the City’s transaction privilege taxes shall not be included when the City is evaluating an award to be made between a City of Kingman bidder and an Arizona based non-City of Kingman bidder. This section may be utilized for non-bid purchases as well.
B. Non-resident bidders; award of identical offers. When a department receives offers identical in price, fitness, availability, and quality, and chooses to award a contract, the department shall award the contract based on the following order of precedence:
1. The department shall award the contract to the offeror among those submitting identical offers that is offering goods and/or services that have been manufactured or produced in
Arizona.
2. If 2 or more offerors submit identical offers, and they offer goods and/or services manufactured or produced in Arizona, the department shall award the contract by drawing lots among the identical offers offering goods and/or services that have been manufactured or produced in Arizona. The department may request either in the solicitation document, following closing of the solicitation or at any other time deemed appropriate, any information needed to determine if the goods and/or services in the solicitation are manufactured or produced in Arizona. The offerors that submitted the identical offers subject to the drawing of lots shall be given notice and an opportunity to be present when the lots are drawn.
3. If the department receives identical offers, and none of the identical offers offer goods and/or services manufactured or produced in Arizona, and then the department shall award the contract by drawing lots among the identical offers. The offerors that submitted the identical offers subject to the drawing of lots shall be given notice and an opportunity to be present when the lots are drawn.
C. Determining if offers are identical. A department shall consider offers identical in price, fitness, availability, and quality as follows:
1. Bids received in response to an invitation to bid (IFB) or request for quotation are identical in price, fitness, availability, and quality if the bids are responsive and offer the goods and/or services described in the IFB or request for quotation at the same price.
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 16
2. Proposals received in response to a request for proposals (RFP) are identical in price, fitness, availability, and quality if they are responsive and achieve equal scores when scored in accordance with the evaluation criteria set forth in the RFP.
3. Evaluating each offeror’s performance of previous work history for the City.
D. Procedure for drawing lots. In any instance when this section calls for the drawing of lots, the department shall draw lots by a procedure that affords each offeror subject to the drawing a substantially equal probability of being selected, and that does not allow the person making the selection the opportunity to manipulate the drawing of lots to increase the probability of selecting 1 offeror over another.
If the solicitation is for the procurement of goods for less than $50,000, the offeror shall include a statement as to qualification for any preference in purchasing pursuant to CC 2-349.
8. VENDOR QUESTIONNAIRE
8.1. Response Package*
The Response package shall include at a minimum, in this order:
A. Cover Letter: Provide a cover letter that confirms the Respondent’s understanding of this RFQ, and provide an overview of the history and qualifications of the firm.
B. Sample Contract with Terms and Conditions
C. A detailed response to all requirements (as listed in Section 3. Response Instructions and
Requirements).
D. A sufficient description of the experience and knowledge base of the Respondent to show the
Respondent's capabilities should be included with the Response. At a minimum, the description of the experience and knowledge base of the Respondent should include:
1. A brief description of the history and mission of the Respondent, the length of time the
Respondent has been in business, a description of the Respondent’s organizational culture and a description of the Respondent’s customer make-up;
2. A statement of how long the Respondent has provided services similar to the Services requested herein;
3. A general description of the Respondent’s experience and background in providing services similar to the Services requested herein;
4. Any other relevant information about the experience and knowledge base of the Respondent which is deemed to be material; and,
5. Disclosure of any past or pending litigation.
*Response required
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 17
8.2. Respondent Signature Page*
Please download the below documents, complete, and upload.
• RESPONDENT_SIGNATURE_PAGE.pdf
*Response required
8.3. Respondent Guarantees and Warranties*
Please download the below documents, complete, and upload.
• RESPONDENT_GUARANTEES_AND_W...
*Response required
8.4. References*
Please download the below documents, complete, and upload. Proposers shall provide a minimum of three
(3) references.
• REFERENCES.pdf
*Response required
8.5. Respondent Addenda Confirmation*
Respondent hereby acknowledges it is the responsibility of the Respondent to ensure they have received all
Addendums and responses to questions. Solicitation Addenda will be posted to the RFQ on the City's
OpenGov procurement portal where the RFQ is posted. Vendors that have registered at https://procurement.opengov.com/portal/cityofkingman and who also follow the City of Kingman will receive email notifications of addenda.
All addenda shall be issued no later than five (5) business days prior to the RFQ closing date.
☐ Please confirm
*Response required
8.6. Please state the full name, title, and organization name of the person confirming the items in 9.5.* *Response required
8.7. New Vendor Application/Existing Vendor Verification Form* Please download the below documents, complete, and upload. If you are a new vendor, please complete the
New Vendor Application. If you are already a vendor with the City of Kingman, please complete the Vendor
Verification Form.
• New_Vendor_Application.pdf
• Vendor_Verification_Form.pdf
*Response required
8.8. (Optional) Vendor EFT Form Please download the below documents, complete, and upload.
https://government-project.s3.us-west-2.amazonaws.com/94315/fe2d2f5c-160b-4dd7-a767-396a6188f841_RESPONDENT_SIGNATURE_PAGE.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4GVQJY7WT%2F20250327%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250327T160245Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOD%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIGzMlGmFC44d%2F%2BJ%2BaMlcXtAA2LiR3yvOmKQRsISWNsfQAiEAzTVL8ZKmjXn0hqCI4u9fAJt1ivpIC0zkGwNW2xgYYSoqgwUISRACGgw4OTIzNjQ2ODc2NzIiDNPApRblz5%2BexwAcTirgBH671J5a0%2BU%2BvQYn%2FML%2FayLYMpzrcBUPnt%2FgOcH5CyPwYgkFXk5YGlRsskXiw92VqwXEmj2sJ4JvfsprgCTEhqQnioSKVx6t37UPq8XoDkr1JvuMMuz4%2BcPdZ7NnBgBOrBuGMO12mUqlHo53UVikYB7sSt516XhOJqpdE1bn7uTz3HdlzEPcCx9oL5tZ5aWnFTyn5zsdV%2FUfBOC7SeaRpvtMbZOV%2FEMo2h9MJv%2BSxa4eWAcCcjTweNo9lxok5uAeVZ2sjvR3onyxq2jERuS54Fmx6UHm1MKJLF0bWKtraf649izQehxLynUhX665fYtuW3SaDYm%2FTZ6iuOzIHUOLFyRevQAW3XNCFvQq7iwjBQji%2Bc%2FZbvZoaA6kmJ3leC54llQD20nCTWrhj0eLFpWjrlllvSEQtPfXZhIJO5n%2BcSLybKzy1lWSBZA23btmjJj4hXTOikSUw77%2FQDmpqptg04Of%2F99HkAih4OojuWA7dQu4MfsnsMKynbtO3GcX9tvOFkNBoT2W60O%2Bl5dihcCxmsm15lhhpJ73HlQBZA54SugWGcrHcjZr8FGwQJL%2B5HYFF1VqdVPy3vzlE2XkUzT%2FsjCvdln9qFSFHr3po8CrIXC5HqF33glRdCNPxHRyIDXlCwc3MhRZs4l9YE8m5H1FBWJqxwSLdBKkZ7XcdGqJSAXExd6mjrTX6dG3im6%2F26JERE57BV5RY%2B9YrXNDaZIJKoVrLiQXisctp6x6QqWo9rQqK7rOO00Zb2KIgKGuaslM9GyFhA34GqrIQRu5pBSmzk4WT1iQG121HCGs58xHiwdqMNvnlb8GOpsBYlGu%2BNb9Ctyx2xJZINvf5coWjEEGMgcrDr9Nz78GKeTbawtizjg%2BuT82VlNbbho3kYUAFACCPYxGUF9YcFaL1kcNv%2F2rmFB55iPu%2B8tJ7rfGUGD3nNFHENCLnIbIBgG%2BTMcXBxz3dUYdnPO2JqT6qVNKhXxJULOJmkZaAC7P%2FQxOdws3HC1gLh5I%2FG7mYBEILCFLtXbxZ7LKdpU%3D&X-Amz-Signature=6ff19b407ff53e9d64f4ad8986ac506bb981e19e0854b2c611a6efdf59d18eba&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22RESPONDENT_SIGNATURE_PAGE.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/94315/420b626c-5bad-422b-bbae-d74d86613077_RESPONDENT_GUARANTEES_AND_WARRANTIES.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4GVQJY7WT%2F20250327%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250327T160245Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOD%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIGzMlGmFC44d%2F%2BJ%2BaMlcXtAA2LiR3yvOmKQRsISWNsfQAiEAzTVL8ZKmjXn0hqCI4u9fAJt1ivpIC0zkGwNW2xgYYSoqgwUISRACGgw4OTIzNjQ2ODc2NzIiDNPApRblz5%2BexwAcTirgBH671J5a0%2BU%2BvQYn%2FML%2FayLYMpzrcBUPnt%2FgOcH5CyPwYgkFXk5YGlRsskXiw92VqwXEmj2sJ4JvfsprgCTEhqQnioSKVx6t37UPq8XoDkr1JvuMMuz4%2BcPdZ7NnBgBOrBuGMO12mUqlHo53UVikYB7sSt516XhOJqpdE1bn7uTz3HdlzEPcCx9oL5tZ5aWnFTyn5zsdV%2FUfBOC7SeaRpvtMbZOV%2FEMo2h9MJv%2BSxa4eWAcCcjTweNo9lxok5uAeVZ2sjvR3onyxq2jERuS54Fmx6UHm1MKJLF0bWKtraf649izQehxLynUhX665fYtuW3SaDYm%2FTZ6iuOzIHUOLFyRevQAW3XNCFvQq7iwjBQji%2Bc%2FZbvZoaA6kmJ3leC54llQD20nCTWrhj0eLFpWjrlllvSEQtPfXZhIJO5n%2BcSLybKzy1lWSBZA23btmjJj4hXTOikSUw77%2FQDmpqptg04Of%2F99HkAih4OojuWA7dQu4MfsnsMKynbtO3GcX9tvOFkNBoT2W60O%2Bl5dihcCxmsm15lhhpJ73HlQBZA54SugWGcrHcjZr8FGwQJL%2B5HYFF1VqdVPy3vzlE2XkUzT%2FsjCvdln9qFSFHr3po8CrIXC5HqF33glRdCNPxHRyIDXlCwc3MhRZs4l9YE8m5H1FBWJqxwSLdBKkZ7XcdGqJSAXExd6mjrTX6dG3im6%2F26JERE57BV5RY%2B9YrXNDaZIJKoVrLiQXisctp6x6QqWo9rQqK7rOO00Zb2KIgKGuaslM9GyFhA34GqrIQRu5pBSmzk4WT1iQG121HCGs58xHiwdqMNvnlb8GOpsBYlGu%2BNb9Ctyx2xJZINvf5coWjEEGMgcrDr9Nz78GKeTbawtizjg%2BuT82VlNbbho3kYUAFACCPYxGUF9YcFaL1kcNv%2F2rmFB55iPu%2B8tJ7rfGUGD3nNFHENCLnIbIBgG%2BTMcXBxz3dUYdnPO2JqT6qVNKhXxJULOJmkZaAC7P%2FQxOdws3HC1gLh5I%2FG7mYBEILCFLtXbxZ7LKdpU%3D&X-Amz-Signature=3225ceb37d9ef3532af8002f852d4c27e3336213e5c74a281b09d7db9ae3d5b1&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22RESPONDENT_GUARANTEES_AND_WARRANTIES.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/51213/6f3cafac-bfb3-4f53-8a6e-022827422ebf_REFERENCES.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4GVQJY7WT%2F20250327%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250327T160245Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOD%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIGzMlGmFC44d%2F%2BJ%2BaMlcXtAA2LiR3yvOmKQRsISWNsfQAiEAzTVL8ZKmjXn0hqCI4u9fAJt1ivpIC0zkGwNW2xgYYSoqgwUISRACGgw4OTIzNjQ2ODc2NzIiDNPApRblz5%2BexwAcTirgBH671J5a0%2BU%2BvQYn%2FML%2FayLYMpzrcBUPnt%2FgOcH5CyPwYgkFXk5YGlRsskXiw92VqwXEmj2sJ4JvfsprgCTEhqQnioSKVx6t37UPq8XoDkr1JvuMMuz4%2BcPdZ7NnBgBOrBuGMO12mUqlHo53UVikYB7sSt516XhOJqpdE1bn7uTz3HdlzEPcCx9oL5tZ5aWnFTyn5zsdV%2FUfBOC7SeaRpvtMbZOV%2FEMo2h9MJv%2BSxa4eWAcCcjTweNo9lxok5uAeVZ2sjvR3onyxq2jERuS54Fmx6UHm1MKJLF0bWKtraf649izQehxLynUhX665fYtuW3SaDYm%2FTZ6iuOzIHUOLFyRevQAW3XNCFvQq7iwjBQji%2Bc%2FZbvZoaA6kmJ3leC54llQD20nCTWrhj0eLFpWjrlllvSEQtPfXZhIJO5n%2BcSLybKzy1lWSBZA23btmjJj4hXTOikSUw77%2FQDmpqptg04Of%2F99HkAih4OojuWA7dQu4MfsnsMKynbtO3GcX9tvOFkNBoT2W60O%2Bl5dihcCxmsm15lhhpJ73HlQBZA54SugWGcrHcjZr8FGwQJL%2B5HYFF1VqdVPy3vzlE2XkUzT%2FsjCvdln9qFSFHr3po8CrIXC5HqF33glRdCNPxHRyIDXlCwc3MhRZs4l9YE8m5H1FBWJqxwSLdBKkZ7XcdGqJSAXExd6mjrTX6dG3im6%2F26JERE57BV5RY%2B9YrXNDaZIJKoVrLiQXisctp6x6QqWo9rQqK7rOO00Zb2KIgKGuaslM9GyFhA34GqrIQRu5pBSmzk4WT1iQG121HCGs58xHiwdqMNvnlb8GOpsBYlGu%2BNb9Ctyx2xJZINvf5coWjEEGMgcrDr9Nz78GKeTbawtizjg%2BuT82VlNbbho3kYUAFACCPYxGUF9YcFaL1kcNv%2F2rmFB55iPu%2B8tJ7rfGUGD3nNFHENCLnIbIBgG%2BTMcXBxz3dUYdnPO2JqT6qVNKhXxJULOJmkZaAC7P%2FQxOdws3HC1gLh5I%2FG7mYBEILCFLtXbxZ7LKdpU%3D&X-Amz-Signature=2a38d0c6901bf3c8afcae7c92868c8df61bce52bdeafce7081f0e792326faedd&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22REFERENCES.pdf%22&x-id=GetObject https://procurement.opengov.com/portal/cityofkingman https://government-project.s3.us-west-2.amazonaws.com/51213/a32e6d6f-42e2-46ea-a2c7-e6ed0a5807ca_New_Vendor_Application.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4GVQJY7WT%2F20250327%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250327T160245Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOD%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIGzMlGmFC44d%2F%2BJ%2BaMlcXtAA2LiR3yvOmKQRsISWNsfQAiEAzTVL8ZKmjXn0hqCI4u9fAJt1ivpIC0zkGwNW2xgYYSoqgwUISRACGgw4OTIzNjQ2ODc2NzIiDNPApRblz5%2BexwAcTirgBH671J5a0%2BU%2BvQYn%2FML%2FayLYMpzrcBUPnt%2FgOcH5CyPwYgkFXk5YGlRsskXiw92VqwXEmj2sJ4JvfsprgCTEhqQnioSKVx6t37UPq8XoDkr1JvuMMuz4%2BcPdZ7NnBgBOrBuGMO12mUqlHo53UVikYB7sSt516XhOJqpdE1bn7uTz3HdlzEPcCx9oL5tZ5aWnFTyn5zsdV%2FUfBOC7SeaRpvtMbZOV%2FEMo2h9MJv%2BSxa4eWAcCcjTweNo9lxok5uAeVZ2sjvR3onyxq2jERuS54Fmx6UHm1MKJLF0bWKtraf649izQehxLynUhX665fYtuW3SaDYm%2FTZ6iuOzIHUOLFyRevQAW3XNCFvQq7iwjBQji%2Bc%2FZbvZoaA6kmJ3leC54llQD20nCTWrhj0eLFpWjrlllvSEQtPfXZhIJO5n%2BcSLybKzy1lWSBZA23btmjJj4hXTOikSUw77%2FQDmpqptg04Of%2F99HkAih4OojuWA7dQu4MfsnsMKynbtO3GcX9tvOFkNBoT2W60O%2Bl5dihcCxmsm15lhhpJ73HlQBZA54SugWGcrHcjZr8FGwQJL%2B5HYFF1VqdVPy3vzlE2XkUzT%2FsjCvdln9qFSFHr3po8CrIXC5HqF33glRdCNPxHRyIDXlCwc3MhRZs4l9YE8m5H1FBWJqxwSLdBKkZ7XcdGqJSAXExd6mjrTX6dG3im6%2F26JERE57BV5RY%2B9YrXNDaZIJKoVrLiQXisctp6x6QqWo9rQqK7rOO00Zb2KIgKGuaslM9GyFhA34GqrIQRu5pBSmzk4WT1iQG121HCGs58xHiwdqMNvnlb8GOpsBYlGu%2BNb9Ctyx2xJZINvf5coWjEEGMgcrDr9Nz78GKeTbawtizjg%2BuT82VlNbbho3kYUAFACCPYxGUF9YcFaL1kcNv%2F2rmFB55iPu%2B8tJ7rfGUGD3nNFHENCLnIbIBgG%2BTMcXBxz3dUYdnPO2JqT6qVNKhXxJULOJmkZaAC7P%2FQxOdws3HC1gLh5I%2FG7mYBEILCFLtXbxZ7LKdpU%3D&X-Amz-Signature=09975c12801c4aa755f8a6ee21bf6e0639dc422ab74926fb1983bb97d9d4b0ff&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22New_Vendor_Application.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/94315/6bf7a134-e2d0-422a-9a07-a2bb9cbd50d5_Vendor_Verification_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4GVQJY7WT%2F20250327%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250327T160245Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOD%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIGzMlGmFC44d%2F%2BJ%2BaMlcXtAA2LiR3yvOmKQRsISWNsfQAiEAzTVL8ZKmjXn0hqCI4u9fAJt1ivpIC0zkGwNW2xgYYSoqgwUISRACGgw4OTIzNjQ2ODc2NzIiDNPApRblz5%2BexwAcTirgBH671J5a0%2BU%2BvQYn%2FML%2FayLYMpzrcBUPnt%2FgOcH5CyPwYgkFXk5YGlRsskXiw92VqwXEmj2sJ4JvfsprgCTEhqQnioSKVx6t37UPq8XoDkr1JvuMMuz4%2BcPdZ7NnBgBOrBuGMO12mUqlHo53UVikYB7sSt516XhOJqpdE1bn7uTz3HdlzEPcCx9oL5tZ5aWnFTyn5zsdV%2FUfBOC7SeaRpvtMbZOV%2FEMo2h9MJv%2BSxa4eWAcCcjTweNo9lxok5uAeVZ2sjvR3onyxq2jERuS54Fmx6UHm1MKJLF0bWKtraf649izQehxLynUhX665fYtuW3SaDYm%2FTZ6iuOzIHUOLFyRevQAW3XNCFvQq7iwjBQji%2Bc%2FZbvZoaA6kmJ3leC54llQD20nCTWrhj0eLFpWjrlllvSEQtPfXZhIJO5n%2BcSLybKzy1lWSBZA23btmjJj4hXTOikSUw77%2FQDmpqptg04Of%2F99HkAih4OojuWA7dQu4MfsnsMKynbtO3GcX9tvOFkNBoT2W60O%2Bl5dihcCxmsm15lhhpJ73HlQBZA54SugWGcrHcjZr8FGwQJL%2B5HYFF1VqdVPy3vzlE2XkUzT%2FsjCvdln9qFSFHr3po8CrIXC5HqF33glRdCNPxHRyIDXlCwc3MhRZs4l9YE8m5H1FBWJqxwSLdBKkZ7XcdGqJSAXExd6mjrTX6dG3im6%2F26JERE57BV5RY%2B9YrXNDaZIJKoVrLiQXisctp6x6QqWo9rQqK7rOO00Zb2KIgKGuaslM9GyFhA34GqrIQRu5pBSmzk4WT1iQG121HCGs58xHiwdqMNvnlb8GOpsBYlGu%2BNb9Ctyx2xJZINvf5coWjEEGMgcrDr9Nz78GKeTbawtizjg%2BuT82VlNbbho3kYUAFACCPYxGUF9YcFaL1kcNv%2F2rmFB55iPu%2B8tJ7rfGUGD3nNFHENCLnIbIBgG%2BTMcXBxz3dUYdnPO2JqT6qVNKhXxJULOJmkZaAC7P%2FQxOdws3HC1gLh5I%2FG7mYBEILCFLtXbxZ7LKdpU%3D&X-Amz-Signature=afb3cd90d7e16f06d4adeb7bb0cb0b66f1bb2d5c6267b01e9ed01eb435c887eb&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Vendor_Verification_Form.pdf%22&x-id=GetObject
Request for Qualification #2025-RFQ-004, IGM ON CALL AIRPORT ENGINEERING AND ARCHITECTURAL SERVICES 18
• Vendor_EFT_form,_FAQ_and_in...
8.9. W-9*
Please download the below documents, complete, and upload.
• W-9.pdf
*Response required
8.10. Please upload a copy of your City of Kingman business license (if applicable) https://government-project.s3.us-west-2.amazonaws.com/51213/1388aa37-0092-49d6-8148-2056c88be3ae_Vendor_EFT_form%2C_FAQ_and_instructions_3_PG.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4GVQJY7WT%2F20250327%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250327T160245Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOD%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIGzMlGmFC44d%2F%2BJ%2BaMlcXtAA2LiR3yvOmKQRsISWNsfQAiEAzTVL8ZKmjXn0hqCI4u9fAJt1ivpIC0zkGwNW2xgYYSoqgwUISRACGgw4OTIzNjQ2ODc2NzIiDNPApRblz5%2BexwAcTirgBH671J5a0%2BU%2BvQYn%2FML%2FayLYMpzrcBUPnt%2FgOcH5CyPwYgkFXk5YGlRsskXiw92VqwXEmj2sJ4JvfsprgCTEhqQnioSKVx6t37UPq8XoDkr1JvuMMuz4%2BcPdZ7NnBgBOrBuGMO12mUqlHo53UVikYB7sSt516XhOJqpdE1bn7uTz3HdlzEPcCx9oL5tZ5aWnFTyn5zsdV%2FUfBOC7SeaRpvtMbZOV%2FEMo2h9MJv%2BSxa4eWAcCcjTweNo9lxok5uAeVZ2sjvR3onyxq2jERuS54Fmx6UHm1MKJLF0bWKtraf649izQehxLynUhX665fYtuW3SaDYm%2FTZ6iuOzIHUOLFyRevQAW3XNCFvQq7iwjBQji%2Bc%2FZbvZoaA6kmJ3leC54llQD20nCTWrhj0eLFpWjrlllvSEQtPfXZhIJO5n%2BcSLybKzy1lWSBZA23btmjJj4hXTOikSUw77%2FQDmpqptg04Of%2F99HkAih4OojuWA7dQu4MfsnsMKynbtO3GcX9tvOFkNBoT2W60O%2Bl5dihcCxmsm15lhhpJ73HlQBZA54SugWGcrHcjZr8FGwQJL%2B5HYFF1VqdVPy3vzlE2XkUzT%2FsjCvdln9qFSFHr3po8CrIXC5HqF33glRdCNPxHRyIDXlCwc3MhRZs4l9YE8m5H1FBWJqxwSLdBKkZ7XcdGqJSAXExd6mjrTX6dG3im6%2F26JERE57BV5RY%2B9YrXNDaZIJKoVrLiQXisctp6x6QqWo9rQqK7rOO00Zb2KIgKGuaslM9GyFhA34GqrIQRu5pBSmzk4WT1iQG121HCGs58xHiwdqMNvnlb8GOpsBYlGu%2BNb9Ctyx2xJZINvf5coWjEEGMgcrDr9Nz78GKeTbawtizjg%2BuT82VlNbbho3kYUAFACCPYxGUF9YcFaL1kcNv%2F2rmFB55iPu%2B8tJ7rfGUGD3nNFHENCLnIbIBgG%2BTMcXBxz3dUYdnPO2JqT6qVNKhXxJULOJmkZaAC7P%2FQxOdws3HC1gLh5I%2FG7mYBEILCFLtXbxZ7LKdpU%3D&X-Amz-Signature=50dcdc80ab389172b80315643c94178c646daa4c87515244c36f433f75eeedaf&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Vendor_EFT_form%252C_FAQ_and_instructions_3_PG.pdf%22&x-id=GetObject…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .