IGM_ACIP_FY2026-2030_Package-accepted.pdf
PDF 663 KB Posted
- Solicitation number
- 2025-RFQ-004
- Issued by
- Mohave County, Arizona
About this file
The document is a Five-Year Capital Improvement Program (CIP) Project Request Data Sheet from the Federal Aviation Administration and Arizona Department of Transportation for the Kingman Airport, detailing planned infrastructure improvements from fiscal years 2026 to 2030. The projects include multiple critical airport infrastructure enhancements such as apron reconstructions, runway and taxiway rehabilitations, lighting upgrades, guidance signage replacements, and navigation aid installations. Specific projects include corner apron reconstruction, runway lighting replacements for Runways 3-21 and 17-35, taxiway Delta and Taxiway A rehabilitation, and security access control system upgrades. The projects are mapped out with detailed project identifiers, total project amounts ranging from $40,000 to $5,220,000, and are categorized under federal, state, and local funding sources.
The project request data sheets indicate that most projects are categorized as Categorical Exclusion (CatEx) for environmental review, and are mapped on the airport's approved Airport Layout Plan (ALP). Funding appears to be a combination of federal, state, and local sources, with some projects specifically noting Bipartisan Infrastructure Law (BIL) funding. The projects are strategically planned to address infrastructure aging, maintenance challenges, and safety improvements, with many justifications citing pavement condition indices, equipment beyond useful life, and the need to upgrade to modern LED technologies. The comprehensive five-year plan demonstrates a systematic approach to airport infrastructure maintenance and modernization, with projects designed to preserve existing investments and enhance overall airport safety and operational efficiency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Aviation Administration and Arizona Department of Transportation
Five-Year Capital Improvement Program
Project Request Data Sheet
Airport Name: Sponsor Signature:
(Required)
10/16/2024 10:03:18AMDate:
Fiscal
Year
Project ComponentProject Total AmountProject
Category
Project
Map
Identifier
Kingman Airport
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2026 $200,000 Apron:Rehabilitate Apron - Reconstruction
The apron area between the South Ramp and the Dross Site is in desperate need of reconstruction. PCI of 0 (2022 inspection). Severe alligator cracking and raveling.
Design Corner Apron Reconstruction (approximately 35,000 SY)
(BIL Funding) Y
N
CatEx
N
2026-2 Federal, State, and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2026 $480,000 Runway MIRL/HIRL, Install
This project would replace Runway 3-21 edge lighting, regulator & controls. The existing airfield lighting is beyond useful life, getting difficult to maintain & in need of an upgrade to LED.
Construct Replace Runway Lighting - Phase 1 (Runway 3-21) Y
Y
CatEx
N
2026-3a State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2026 $160,000 Guidance Signage, Install (New)
This project would replace Runway 3-21 Distance Remaining Signs. The existing airfield signage is beyond useful life, getting difficult to maintain & in need of an upgrade to LED.
Construct Replace Airfield Guidance Signs - Phase 1 (Runway 3-21 Distance
Remaining Signs) Y
Y
CatEx
N
2026-3b State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2026 $5,220,000 Taxiways:Rehabilitate Taxiway - Reconstruct
Twy D is constructed of asphaltic concrete pavement & is beyond its useful life
(PCI of 44 - estimated to be 41 in 2025) & needs to be reconstructed. This project will bring the Twy connectors up to standard geometry & increase overall safety.
Construct Reconstruction of Taxiway Delta (6,830 ft x 75 ft) and Connector
Taxiways (4) (400 ft x 53 ft each). Delta is the primary Taxiway for Runway 3-21.
Y
N
CatEx
N
2026-1 Federal, State, and
Local
1of 5 dbreckenridge Stamp
Project Request Data Sheet
Airport Name: Sponsor Signature:
(Required)
10/16/2024 10:03:18AMDate:
Fiscal
Year
Project ComponentProject Total AmountProject
Category
Project
Map
Identifier
Kingman Airport
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2027 $250,000 Apron:Rehabilitate Apron - Reconstruction
Pavement preservation for airport apron. PCI is 57 - 63. PMMP indicates that a mill and overlay is needed now to preserve and extend the life of this investment.
Design Transient Apron Mill and Overlay (approximately 132,000 SY).
City to pre-fund design and request reimbursement through construction grant Y
N
CatEx
N
2027-2 Federal, State, and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2027 $450,000 Runway MIRL/HIRL, Install
This project would replace Runway 17-35 edge lighting, regulator & controls.
The existing airfield lighting is beyond useful life, getting difficult to maintain & in need of an upgrade to LED.
Construct Replace Runway Lighting - Phase 2 (Runway 17-35) Y
Y
CatEx
N
2027-3a State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2027 $380,000 Guidance Signage, Install (New)
This project would replace airfield signs, regulators & controls. The existing airfield signage is beyond useful life, getting difficult to maintain & in need of an upgrade to LED.
Construct Replace Airfield Guidance Signs - Phase 2 (Taxiways A and C, and
Runway 17-35) Y
Y
CatEx
N
2027-3c State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2027 $120,000 Runway Vertical/Visual Guidance System, Install/Upgrade
Runway 17-35 currently does not have runway end identification lights (REILs).
This project would install REILs on each end of Runway 17-35.
Construct Airfield NAVAIDS - Implement REILs on Runway 17-35 Y
N
CatEx
N
2027-3d State and
Local
2of 5
Project Request Data Sheet
Airport Name: Sponsor Signature:
(Required)
10/16/2024 10:03:18AMDate:
Fiscal
Year
Project ComponentProject Total AmountProject
Category
Project
Map
Identifier
Kingman Airport
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2027 $1,250,000 Equipment:Acquire Security Equipment/Install Fencing [Required By Part 107] - Safety/Security
The existing system is a cipher code system that is not networked and is significantly less secure than a networked and monitored system. Also improve all access gates to meet current security standards.
Design and Construct Upgrade Airfield Access Control System and Gate
Improvements. Install an integrated and networked access control system for all airfield access gates.
Y
N
CatEx
N
2027-1 Federal, State, and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2027 $550,000 Taxiway Lighting, Install (New)
This project would replace taxiway edge lighting, regulators & controls. The existing airfield lighting is beyond useful life, getting difficult to maintain & in need of an upgrade to LED.
Construct Replace Taxiway Lighting (Taxiways A and C) Y
N
CatEx
N
2027-3b State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2028 $4,800,000 Apron:Rehabilitate Apron - Reconstruction
Pavement preservation for airport apron. PCI is 57 - 63. PMMP indicates that a mill and overlay is needed now to preserve and extend the life of this investment.
Construct Transient Apron Mill and Overlay (approximately 132,000 SY) Y
N
CatEx
N
2028-1 Federal, State, and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2028 $200,000 Taxiways:Rehabilitate Taxiway - Reconstruct
Taxiway A is in need of rehabilitation and the geometry needs to be revised per the ALP (PCI 52 - estimated to be 44 in 2028).
Design Taxiway A Rehabilitation and Geometry Update (2,300 ft x 75 ft) Y
N
CatEx
N
2028-2 Federal, State, and
Local
3of 5
Project Request Data Sheet
Airport Name: Sponsor Signature:
(Required)
10/16/2024 10:03:18AMDate:
Fiscal
Year
Project ComponentProject Total AmountProject
Category
Project
Map
Identifier
Kingman Airport
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2028 $2,200,000 Apron, Rehabilitate
The apron area between the South Ramp and the Dross Site is in desperate need of reconstruction. PCI of 0 (2022 inspection). Severe alligator cracking and raveling.
Construct Corner Apron Reconstruction - Phase 1 (approximately 17,500 SY) Y
Y
CatEx
N
2028-3 State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2029 $2,000,000 Taxiways:Rehabilitate Taxiway - Reconstruct
Taxiway A is in need of rehabilitation and the geometry needs to be revised per the ALP (PCI 52 - estimated to be 44 in 2028).
Construct Taxiway A Rehabilitation and Geometry Update (2,300 ft x 75 ft) Y
N
CatEx
N
2029-1 Federal, State, and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2029 $2,200,000 Apron, Rehabilitate
The apron area between the South Ramp and the Dross Site is in desperate need of reconstruction. PCI of 0 (2022 inspection). Severe alligator cracking and raveling.
Construct Corner Apron Reconstruction - Phase 2 (approximately 17,500 SY) Y
Y
CatEx
N
2029-2 State and
Local
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2030 $40,000 Runways:Install Runway <Vertical/Visual> Guidance System [PAPI/VASI/REIL/ALS/etc.] - Standards
The runway REILs are beyond useable service life, are getting harder to maintain and are in need of replacement.
Design REILs, replace incandescent with LED.
Y
N
CatEx
N
2030-1 Federal, State, and
Local
4of 5
Project Request Data Sheet
Airport Name: Sponsor Signature:
(Required)
10/16/2024 10:03:18AMDate:
Fiscal
Year
Project ComponentProject Total AmountProject
Category
Project
Map
Identifier
Kingman Airport
Project shown on approved ALP?
Phase Project?
FSL Pavement Maintenance Prj.?
Environmental Review Status?
Description:
Justification:
2030 $140,000 Taxiway, Construct (New)
A dedicated runup area is needed for the larger jet aircraft which frequently perform runup operations on Taxiway C in the vicinity of Runway 17. This will improve safety and eliminate issues with FOD and dust
Design Large Aircraft Engine Testing Area with Blast Fence (approximately 4,000
SY), to include ALP Update Y
N
CatEx
N
2030-2 State and
Local
5of 5
LEGEND
PREPARED: (FY )9/2023 2026
P
M
S e p r b e h m
F
P r o j e c t K
K i n g m a n
A i r p o r t
A
Z K
C I P s K i n g m
I P
Y
I G
M
A
C
M p s
F
Y r e v d w g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
DESIGN CORNER APRON RECONSTRUCTION
(APPROX. 35,000 SY)
3a
CONSTRUCT REPLACE RUNWAY LIGHTING - PHASE 1
(RUNWAY 3-21)
3b
CONSTRUCT REPLACE AIRFIELD GUIDANCE SIGNS - PHASE 1
(RUNWAY 3-21 DISTANCE REMAINING SIGNS)
3a
CONSTRUCT RECONSTRUCTION OF TAXIWAY DELTA
(6,830' X 75') AND CONNECTOR TAXIWAYS (4) (400' X 53' EA)
3b
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
AutoCAD SHX Text
PAPI-4
PREPARED: (FY )6/2024 2027
A
M
S e
P r o j e c t K i n g m r p o r t
A
Z K
I P s K i n g m
I G
M
A
C p s
F
Y r e v d w g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
DESIGN TRANSIENT APRON MILL AND OVERLAY
(APPROX 132,000 SY)
3b
CONSTRUCT REPLACE TAXIWAY LIGHTING
(TAXIWAYS A AND C)
3a
CONSTRUCT REPLACE RUNWAY LIGHTING - PHASE 2
(RUNWAY 17-35)
3c
CONSTRUCT REPLACE AIRFIELD GUIDANCE SIGNS-PHASE 2
(TAXIWAYS A AND C, AND RUNWAY 17-35)
3b
3b
3a
3c
(TYP)
3c
(TYP)
3b
DESIGN AND CONSTRUCT UPGRADE AIRFIELD ACCESS
CONTROL SYSTEM AND GATE IMPROVEMENTS
3d
3d
3d
CONSTRUCT AIRFIELD NAVAIDS - INSTALL REILS ON
RUNWAY 17-35
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
PREPARED: (FY )6/2024 2028
P
M
S e
P r o j e c t K i n g m r p o r t
A
Z K
I P s K i n g m
I G
M
A
C p s
F
Y r e v d w g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
DESIGN TW A REHABILITATION AND GEOMETRY UPDATE
(2,300' x 75')
CONSTRUCT CORNER APRON RECONSTRUCTION
PHASE 1 (APPROX. 17,500 SY)
CONSTRUCT TRANSIENT APRON MILL AND OVERLAY
(APPROX 132,000 SY)
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
PREPARED: (FY )6/2023 2029
P
M
S e
P r o j e c t K i n g m r p o r t
A
Z K
I P s K i n g m
I G
M
A
C p s
F
Y r e v d w g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
CONSTRUCT CORNER APRON RECONSTRUCTION
PHASE 2 (APPROX. 17,500 SY)
CONSTRUCT TW A REHABILITATION AND GEOMETRY
UPDATE (2,300' x 75')
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
PREPARED: (FY )6/2024 2030
P
M
S e
P r o j e c t K i n g m r p o r t
A
Z K
I P s K i n g m
I G
M
A
C p s
F
Y r e v d w g
AIRPORT CAPITAL IMPROVEMENT PROGRAM
ACIP FY 20
KINGMAN AIRPORT
N.T.S.
DESIGN REIL'S, REPLACE INCANDESCENT WITH LED.
DESIGN LARGE AIRCRAFT ENGINE TESTING AREA
WITH BLAST FENCE & ALP UPDATE (4,000 SY')
AutoCAD SHX Text
PAPI-4
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
APRON AREA
AutoCAD SHX Text
FLIGHTLINE DRIVE
AutoCAD SHX Text
BRUCE DR.
AutoCAD SHX Text
OLYMPIC WAY
AutoCAD SHX Text
INTERSTATE WAY W.
AutoCAD SHX Text
SHIPPING LANE
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MOHAVE
AutoCAD SHX Text
AIRPORT DRIVE
AutoCAD SHX Text
SANTE FE DRIVE
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PAPI-2
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'A'
AutoCAD SHX Text
TWY 'C'
AutoCAD SHX Text
TWY 'D'
AutoCAD SHX Text
TWY 'C1'
AutoCAD SHX Text
TWY 'B'
AutoCAD SHX Text
TWY 'D4'
AutoCAD SHX Text
TWY 'D3'
AutoCAD SHX Text
TWY 'D2'
AutoCAD SHX Text
TWY 'D1'
File details come from the government source that posted it. Updated .