View the file

Other files

File Type Posted
BidResultsUndergroundUtLEWjune24.pdf PDF
RFI3LEWjune17.pdf PDF
RFI2utilitiesLEWJUNE16.pdf PDF
BOP30A3.pdf PDF
RFI1.pdf PDF
Minutes.pdf PDF
WageRates.txt TXT text file
BOP30A2.pdf PDF
BOP30A.pdf PDF
Amend1LEW0015page2.pdf PDF
CoverLetterLEWutilities.pdf PDF
BOP1442.pdf PDF
TOC.pdf PDF
Specifications.pdf PDF
WageRates.txt TXT text file
SolicitationDocumentApril13LEW.pdf PDF
Drawings.pdf PDF
New Compressed —
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request For Information (RFI) 4

IFB LEW-0015

Replace Underground Utilities USP Lewisburg

1. In RFI #2, question #11 is still unclear. The plans do not show any existing 15" running parallel to the main drive (it appears the plans do not extend down far enough). Please provide additional information as necessary to determine the quantity of 15" which is to be lined.

ANSWER: The 15" sewer line that is to be relined will terminate at an existing manhole on the property boundary line as shown on the drawing.

2. Questions regarding RFI #3: Item #7 indicates the laterals from SMH 24 to the ICC Facility and from Existing SMH 5 to the Camp Facility are to be replaced. However the drawings do not indicate that these lines are to replaced and it also appears there are intermittent manholes in these runs but it is not clear based on the drawings what the depth of the laterals and manholes should be. Please clarify if this indeed part of the scope and if it is, please provide profiles of these runs so that we can accurately prepare our bid.

ANSWER: The laterals from manhole 24 to the ICC and Manhole 5 to the camp are not part of this project.