RFI2utilitiesLEWJUNE16.pdf
PDF 24 KB Posted
- Attached to
- Underground Utilities Replacement Project at the United States Penitentiary (USP) Lewisburg, Pennsylvania
- Solicitation number
- IFBLEW-0015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResultsUndergroundUtLEWjune24.pdf | ||
| RFI4LEWjune19.pdf | ||
| RFI3LEWjune17.pdf | ||
| BOP30A3.pdf | ||
| RFI1.pdf | ||
| Minutes.pdf | ||
| WageRates.txt | TXT text file | |
| BOP30A2.pdf | ||
| BOP30A.pdf | ||
| Amend1LEW0015page2.pdf | ||
| CoverLetterLEWutilities.pdf | ||
| BOP1442.pdf | ||
| TOC.pdf | ||
| Specifications.pdf | ||
| WageRates.txt | TXT text file | |
| SolicitationDocumentApril13LEW.pdf | ||
| Drawings.pdf | ||
| New Compressed | — |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Information (RFI) 2
IFB LEW-0015
Replace Underground Utilities USP Lewisburg
1. Is the excavation for this project unclassified or will rock excavation be paid for?
ANSWER: The agency is not aware of any rock beds within the work areas. The contractor shall factor into their bid costs for excavation.
2. The scale on Sheet No. 4 is shown as 1 inch = 200 feet, however Sheet No. 4A which seems to be an enlargement of a portion of Sheet No. 4, also shows a scale of 1 inch = 200 feet.
What is the correct scale for these drawings as well as Sheet No.
4B thru 4D?
ANSWER: Please use sheet 4 for scaling purposes. Sheets 4A, 4B, 4C & 4D are blown up portions of the work and are not to scale noted on the drawings.
3. What are the limits of work for the storm, water and sanitary (particularly in the area of the penitentiary)?
ANSWER: All work inside the secure perimeter has been completed with the exception of connecting to the water main inside the wall.
4. In general, are water and sewer connections to be made inside or outside of the building structures?
ANSWER: Water and sewer connections are to made within 5 feet of the buildings.
5. Sheet No. 10 shows sewer connections to two different buildings. What size are the sewer connections?
ANSWER: 8"
6. What size are the sewer lateral connections in the Reservation Area?
ANSWER: 8"
7. In the Reservation Area, are the existing storm water inlets being replaced or are they to remain?
ANSWER: All storm related items are to be replaced
8. For fire hydrant assemblies, can megalugs be used in lieu of tie rods?
ANSWER: Yes
9. On Sheet 22, there is a detail for trench repair and a detail for full width road repair. Where does the full width road repair need to be made?
ANSWER: Any place where complete road repair is necessary due to utility replacement
10. In the Erosion Control Notes on Sheet No. 1, note #1 indicates the Contractor is to submit an E&S plan for approval.
To whom does the plan have to be submitted? Is there a permit in place for this project?
ANSWER: Project Rep, No
11. The inset on Sheet No. 5 indicates a portion of the existing line to be rehabilitated is 15" diameter. However, it is unclear based on this drawing and Sheet No. 13 how much of the existing 15" is being lined. Please clarify or provide additional drawings.
ANSWER: All of the 15" that runs parallel to the main drive
12. The note on the inset of Sheet No. 5 also indicates the manholes in the portion of pipe to be lined need to be rehabilitated. However there is no specification provided for manhole rehabilitation. Please provide additional information.
ANSWER: Refer to spec section 02612