IFB439_Beaver Creek PS_Appendix 1 - Plans for the Construction of the Beaver Creek Reservoir In-Reservoir Diffused Air-Destratif.pdf
PDF 3 MB Posted
- Solicitation number
- IFB-131135
- Issued by
- Albemarle County, Virginia
About this file
This file consists of construction plans and specifications prepared by Mobley Engineering, Inc. for the Rivanna Water and Sewer Authority regarding the design of an in-reservoir diffused air/destratification system for Beaver Creek Reservoir located at 4365 Beaver Creek Park, Charlottesville, Virginia 22901. The plans detail the construction of a diffused air/destratification (DA/D) system designed to operate at a destratification capacity of 4-70 SCFM or 700 kg/day of O2, assuming 45% OTE. The project includes approximately 1,145 linear feet of piping comprising a supply section (225 feet), a diffuser section (840 feet), and a sleeve section (80 feet). The system consists of HDPE piping with dual buoyancy and air supply lines, anchor systems to maintain proper alignment and depth, shoreline transition details, and diffuser termination components. The plans were issued for bidding as of March 2026 and include comprehensive technical drawings indexed across eight sheets (MEI-G01 through MEI-D04) with detailed specifications for materials, assembly procedures, pressure testing requirements, and installation protocols.
The specifications establish that the general contractor is responsible for all trenching, earthwork, utility location, and trench restoration, while Mobley Engineering, Inc. functions as the diffuser system subcontractor responsible for line diffuser installation. All HDPE piping must be cleaned and heat-fused to manufacturer specifications using hand-operated fusion equipment with manual fusion logs maintained throughout construction. The air supply piping requires pressure testing to 60 PSIG for one hour and buoyancy piping to 30 PSIG for one hour. The engineered anchor system is designed to maintain proper alignment and depths whether the DA/D pipes are sunk with water-displaced air supply and full buoyancy pipes, or floated with both air supply and buoyancy pipes displaced. As-built records must be submitted to the engineer prior to final project acceptance, with all necessary permits, licenses, and compliance with applicable laws and regulations the responsibility of the contractor and owner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6
B
C
D
DATE
SHEET
DWG
A
M ob le y
En g in ee ri n g
In c.
P
O B ox
N or ri s, T N
-0
P h
-0
C O
V E
R S
H E
E T
A N
D V
IC
IN
IT
Y
M A
P
DRAWN BY
SCALE
R E
V
IS
IO
N
S N
O
D
ES
C R
IP
TI
O
N D
A
TE
OF
DESIGN
MARCH 2026
MARK M
MILES M
NTS
MEI-G01
PLANS FOR THE CONSTRUCTION OF
THE BEAVER CREEK IN-RESERVOIR
DIFFUSED AIR / DESTRATIFICATION
SYSTEM
PROJECT LOCATION
4365 BEAVER CREEK PARK
CHARLOTTESVILLE, VA 22901
VICINITY MAP
1" = 1 MILE
1 8
PROJECT SITE
IS
S U
ED
F
O R B
ID
D
IN
G
BE
AV
ER
C
R
EE
K R
ES
ER
VO
IR
R
AW
W
AT
ER
P
U M
P
ST
AT
IO
N
AN
D
IN
TA
KE
C
D
DATE
SHEET
DWG
A
M ob le y
En g in ee ri n g
B ox
N or ri s, T N
-0
P h
-0
DRAWN BY
SCALE
R
EV
IS
IO
N S
N O
DE
SC
RI
PT
IO
N
DA
TE
OF
DESIGN
MARCH 2026
MARK M
KEN K
NTS
MEI-G02
D R
AW
IN
G
IN
D
EX
, N O
TE
S
AN
D
AB
BR
EV
IA
TI
O
N S
GENERAL NOTES
1. THE WORD "OWNER" HEREON SHALL MEAN THE RIVANNA WATER AND SEWER AUTHORITY.
2. THE WORD “ENGINEER” HEREON SHALL MEAN PROPERLY AUTHORIZED AGENTS ACTING SEVERALLY
WITH THE OWNER WITHIN THE SCOPE OF THE PARTICULAR DUTIES ENTRUSTED TO THEM.
3. THE WORD “CONTRACTOR” HEREON SHALL MEAN THE PERSON, FIRM OR CORPORATION WITH WHOM
A CONTRACT HAS BEEN MADE FOR THE PERFORMANCE OF THE GENERAL CONTRACTING WORK.
4. THE WORDS “MOBLEY ENGINEERING INC.” (MEI) HEREON SHALL MEAN THE PERSON, FIRM OR
CORPORATION WITH WHOM A SUBCONTRACT HAS BEEN MADE BY THE CONTRACTOR FOR THE
PERFORMANCE OF THE LINE DIFFUSER INSTALLATION OR ANY PART THEREOF COVERED BY THE JOB
SPECIFICATIONS AND THESE DRAWINGS.
5. MEI SHALL PERFORM ALL WORK SHOWN HEREON UNLESS OTHERWISE NOTED.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRENCHING AND EARTHWORK INCLUDING:
LOCATING EXISTING UTILITIES, LOCATING TRENCH LOCATIONS PER DRAWINGS, INSTALLING BEDDING, PLACING TRACING WIRE AS APPROPRIATE, AND RESTORING DISTURBED EARTH TO ORIGINAL
CONDITION.
7. THE CONTRACTOR AND MEI SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH ANY ADJACENT OR
NEARBY CONSTRUCTION WORK THAT MAY BE OCCURRING SIMULTANEOUSLY.
8. THE CONTRACTOR AND MEI SHALL PROVIDE A FINAL AS-BUILT RECORD TO THE ENGINEER AT THE CONCLUSION OF THE WORK. FINAL ACCEPTANCE OF THE WORK WILL NOT BE ISSUED PRIOR TO THE
SUBMITTAL OF “AS-BUILT” RECORDS TO THE ENGINEER.
9. EXCEPT AS OTHERWISE SPECIFIED HEREON, CONTRACTOR OR OWNER SHALL OBTAIN ALL NECESSARY PERMITS AND LICENSES FOR THE CONSTRUCTION OF THE PROJECT, SHALL PAY ALL FEES REQUIRED FOR
SUCH PERMITS AND LICENSES, AND SHALL COMPLY WITH ALL LAWS, ORDINANCES, RULES AND
REGULATIONS RELATING TO THE WORK AND THE PRESERVATION OF PUBLIC HEALTH AND SAFETY.
10. THE CONTRACTOR AND MEI SHALL PROVIDE THE ENGINEER WITH SUBMITTALS FOR ALL MATERIALS TO
BE USED ON PROJECT. SUBMITTALS SHALL BE PROVIDED IN ACCORDANCE WITH THE STANDARD
SPECIFICATIONS.
11. ALL PIPE DIAMETERS ARE NOMINAL ID.
12. ALL HDPE PIPING SHALL BE CLEANED BY FIRST REMOVING ANY LOOSE DEBRIS AND THEN PULLING A
CLEAN DAMP SWAB THROUGH THE ENTIRE LENGTH OF THE PIPE PRIOR TO HEAT FUSIONS.
13. ALL HDPE HEAT FUSIONS SHALL BE PERFORMED TO MANUFACTURER'S SPECS USING HAND OPERATED
FUSION EQUIPMENT. MANUAL FUSION LOGS SHALL BE KEPT IN LIEU OF DATA LOGGING EQUIPMENT.
14. ALL BUOYANCY AND AIR SUPPLY LINES SHALL BE PRESSURE TESTED TO A POINT JUST PRIOR TO THE
DIFFUSERS USING COMPRESSED AIR FROM THE COMPRESSOR BUILDING. PRESSURE TESTS SHALL BE
PREFORMED TO THE FOLLOWING SPECS:
14.1. AIR SUPPLY PIPING SHALL BE TESTED TO 60 PSIG FOR ONE HOUR.
14.2. BUOYANCY PIPING SHALL BE TESTED TO 30 PSIG FOR ONE HOUR.
2 8
BASIS OF DESIGN NOTES
1. MEI SHALL VERIFY THE CURRENT BATHYMETRY SURVEY OF BEAVER CREEK RESERVOIR IN THE AREAS NEAR OR ADJACENT TO THE LINE DIFFUSERS.
2. THE ENGINEERED ANCHOR SYSTEM IS DESIGNED TO MAINTAIN THE DIFFUSED AIR/DESTRATIFICATION SYSTEM (DA/D) PIPES AT THE DESIGNATED ALIGNMENT AND DEPTHS INDICATED IN THE DRAWINGS. THE VERTICAL ANCHOR SYSTEM SHALL BE SIZED TO 1) SINK THE DA/D SYSTEM PIPES WHEN WATER HAS BEEN DISPLACED FROM THE AIR SUPPLY PIPE AND THE BUOYANCY PIPE IS FULL OF WATER, AND 2) FLOAT THE DA/D SYSTEM PIPES WHEN
WATER HAS BEEN DISPLACED FROM BOTH THE AIR SUPPLY AND BUOYANCY PIPES.
3. THE DA/D IS DESIGNED WITH DESTRATIFICATION CAPACITY OF 4-70 SCFM OR 700 KG/DAY OF O2 (ASSUMING 45% OTE).
VIEW CALLOUTS
X
X-XX
X
X-XX
SECTION CALLOUT
CALLOUT DESIGNATION
LETTER OR NUMBER
SHEET REFERENCE WHERE
SECTION IS SHOWN
DETAIL/ENLARGED PLAN AREA
CALLOUTS
CALLOUT DESIGNATION
LETTER OR NUMBER
SHEET REFERENCE
WHERE SECTION IS
SHOWN
PATTERNS SECTION & DETAIL VIEW TITLES
EARTH OR GRADE
BEDROCK
GRANULAR FILL
(CRUSHED ROCK OR GRAVEL)
SAND
CONCRETE
RIP-RAP
01 1/8" = 1'-0"
DETAIL
X-XX
A 1/8" = 1'-0"
SECTION
X-XX
SHEET REFERENCE WHERE
DETAIL IS USED
SHEET REFERENCE WHERE
SECTION IS USED
BREAKS
PLAN, ELEVATION, AND
SECTION BREAKS
PIPE BREAK
ANNOTATION
1 SHEET KEYNOTE
EQUIPMENT MARK NUMBER
ABBREVIATIONS
AISI AMERICAN IRON AND STEEL INSTITUTE N NORTH
ANCH ANCHOR N/A NOT APPLICABLE
APWA AMERICAN PUBLIC WORKS ASSOCIATION NGVD NATIONAL GEODETIC VERTICAL DATUM
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS NO NUMBER
AVE AVENUE NPT NATIONAL PIPE THREAD
AWWA AMERICAN WATER WORKS ASSOCIATION NSF NATIONAL SANITATION FOUNDATION
NTS NOT TO SCALE
B BUOYANCY NW NORTH WEST
BF BLIND FLANGE
BLK BLOCK OD OUTSIDE DIAMETER
BM BENCHMARK
BYP BYPASS PE PLAIN END
PH POTHOLE
CA COMPRESSED AIR PI POINT OF INTERSECTION
CBL CABLE PL, P/L PROPERTY LINE
C/L /CL CENTER LINE POT POINT ON TANGENT
CFM CUBIC FEET PER MINUTE PP POWER POLE
CONC CONCRETE PS PUMP STATION
CONST CONSTRUCTION PSF POUNDS PER SQUARE FOOT
CONT. CONTINUED PSI POUNDS PER SQUARE INCH
CPLG COUPLING PSIG POUNDS PER SQUARE INCH IN GAUGE
CPRSR COMPRESSOR PT POINT OF TANGENCY
CY CUBIC YARDS PVMT PAVEMENT
DA/D DIFFUSED AIR / DESTRATIFICATION R RADIUS
DEG DEGREE R/W RIGHT-OF-WAY
DIA DIAMETER RD ROAD
DWG DRAWING RED REDUCER
DWGS DRAWINGS REINF REINFORCEMENT
RSD REGIONAL STANDARD DRAWINGS
E EAST OR ELECTRICAL RT RIGHT
EA EACH
EC EPOXY COATED S SOUTH, SLOPE OR SEWAGE
EL OR ELEV ELEVATION SCFM STANDARD CUBIC FEET PER MINUTE
ELL ELBOW SCH SCHEDULE
EQUIV EQUIVALENT SD STORM DRAIN
EQUIP EQUIPMENT SDR STANDARD DIMENSION RATIO
EVC END VERTICAL CURVE SE SOUTH EAST
EXIST EXISTING SHT SHEET
SIM SIMILAR
FC FLEXIBLE COUPLING SL SUPPLY LINE
FCA FLANGED COUPLING ADAPTER SLV SLEEVE
FF FINISHED FLOOR SOV SHUT OFF VALVE
FG FINISHED GRADE SPEC SPECIFICATION
FLG FLANGE SQ SQUARE
FM FLOW METER SST/SS STAINLESS STEEL
FPS FEET PER SECOND ST STREET
FPT FEMALE PIPE THREAD STA STATION
FT FEET STD STANDARD
FTG FOOTING STL STEEL
FV/FCV FLOW CONTROL VALVE
t THICKNESS
G GAS TA TOWER AERATION
GA GAGE OR GAUGE TB THRUST BLOCK
GEN CONTR GENERAL CONTRACTOR TBM TEMPORARY BENCH MARK
GOX GASEOUS OXYGEN TEL TELEPHONE
GR GRADE TOC TOP OF CONCRETE
TOW TOP OF WALL
HDPE HIGH DENSITY POLYETHYLENE TR TRENCH
TYP TYPICAL
ID INSIDE DIAMETER
IE INVERT ELEVATION UNO UNLESS NOTED OTHERWISE
IN INCH
VAL VALVE
LBS POUNDS VERT VERTICAL
LDI LINE DIFFUSER INSTALLER
LF LINEAR FEET W WEST
LOX LIQUID OXYGEN WB WESTERN BRANCH
LP LAKE PRINCE W/ WITH
LR LONG RADIUS WAS WATER AGENCY STANDARDS
WC WATER COLUMN
MAX MAXIMUM WSE WATER SURFACE ELEVATION
MDPE MEDIUM DENSITY POLYETHYLENE WSL WATER SURFACE LEVEL
MIN MINIMUM WSP WELDED STEEL PIPE
MPT MALE PIPE THREAD
IS
SU
ED
F
O R
BI
DD
IN
G
BE
AV
ER
C
R
EE
K R
ES
ER
VO
IR
R
AW
W
AT
ER
P
U M
P
ST
AT
IO
N
AN
D
IN
TA
KE
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
MEI-G01 COVER SHEET AND VICINITY MAP
MEI-G02 DRAWING INDEX NOTES AND ABBREVIATIONS
MEI-G03 MARK NUMBERS & PIPE SCHEDULE
MEI-L01 DIFFUSER SYSTEM PLAN
MEI-D01 SHORELINE DETAILS
MEI-D02 DIFFUSER OVERVIEW
MEI-D03 DIFFUSER DETAILS
MEI-D04 DIFFUSER TERMINATION AND ANCHOR DETAILS
GENERAL SITE NOTES
1. HORIZONTAL DATUM: VIRIGINIA STATE PLANE SOUTH ZONE NAD 83.
2. VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM OF 1988 (NGVD 88).
3. ALL DIMENSIONS AND ELEVATIONS ARE IN FEET.
4. DIFFUSER CONSTRUCTION AREA TO BE THE BEAVER CREEK RESERVOIR BARGE LAUNCH AREA.
5. DIFFUSER MATERIALS WILL BE TRANSPORTED TO AND STORED AT DIFFUSER CONSTRUCTION AREA.
6. DIFFUSER AND PIPING WILL BE CONSTRUCTED FROM THE SHORELINE AT THE DIFFUSER CONSTRUCTION AREA.
7. DIFFUSER AND PIPING WILL BE STORED ON RESERVOIR SURFACE AT DIFFUSER CONSTRUCTION AREA PRIOR TO FINAL INSTALLATION.
AutoCAD SHX Text
XXX
C
D
DATE
SHEET
DWG
A
M ob le y
En g in ee ri n g
B ox
N or ri s, T N
-0
P h
-0
DRAWN BY
SCALE
R
EV
IS
IO
N S
N O
D
ES
C R
IP
TI
O
N D
A
TE
OF
DESIGN
MARCH 2026
MARK M
KEN K
NTS
MEI-G03
M
AR
K N
U M
BE
R
S
PI
PE
S C
H
ED
U
LE
3 8
MARK NUMBER DESCRIPTIONS
PIPE SCHEDULE
BOUYANCY AIR SUPPLY LENGTH
SLEEVE 3'' IPS SDR 17 2'' IPS SDR 9 80'
SUPPLY 3'' IPS SDR 17 2'' IPS SDR 11 225'
DIFFUSER 3'' IPS SDR 17 2'' IPS SDR 11 840'
SLEEVE PIPE SCHEDULE
SLEEVE 8" IPS SDR 17
PIPE SCHEDULE
IS
S U
ED
F
O R B
ID
D
IN
G
BE
AV
ER
C
R
EE
K R
ES
ER
VO
IR
R
AW
W
AT
ER
P
U M
P
ST
AT
IO
N
AN
D
IN
TA
KE
D2
S1
S2
S3
D1
1 2 3 4 5 6
B
C
D
DATE
SHEET
DWG
A
IS
SU
ED
F
O R
B
ID
D
IN
G
M ob le y
En g in ee ri n g
B ox
N or ri s, T N
-0
P h
-0
D
IF
FU
SE
R S
YS
TE
M P
LA
N
DRAWN BY
SCALE
BE
AV
ER
C
R
EE
K R
ES
ER
VO
IR
R
AW
W
AT
ER
P
U M
P
ST
AT
IO
N
AN
D
IN
TA
KE
R
EV
IS
IO
N S
N O
D
AT
E
OF
DESIGN
MARCH 2026
MARK M
MILES M
1" = 50'
LEGEND
60' AERATION SECTION
SUPPLY SLEEVE
90' MIXING SECTION
TRENCH
DA/D DIFFUSER LAYOUT
DA/D DIFFUSER
PUMP STATION
INTAKE
MEI-L01
MEI-D01
MEI-D02
MEI-D02
MEI-D02
MEI-D02
Feet 0 100 200
AutoCAD SHX Text 42" rcp
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text W.E. = 538.8
AutoCAD SHX Text W.E. = 538.8
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL NOTES: HORIZONTAL DATUM: NAD83 VIRGINIA STATE PLANE SOUTH ZONE (US-FT) VERTICAL DATUM: NGVD88 NOTES: 1. GC-MEI INTERFACE POINT LOCATED AT 11438863.9'E, 3914440.2'N.GC-MEI INTERFACE POINT LOCATED AT 11438863.9'E, 3914440.2'N.
Normal Pool Elev. 537.8'
Sleeve Terminus Elev. 512.9'
M
EI
G
EN
ER
AL
C O
N
TR
AC
TO
R
1 2 3 4 5 6
B
C
D
DATE
SHEET
DWG
A
IS
S U
ED
F
O R B
ID
D
IN
G
M ob le y
En g in ee ri n g
B ox
N or ri s, T N
-0
P h
-0
SH
O
R
EL
IN
E
D
ET
AI
LS
DRAWN BY
SCALE
BE
AV
ER
C
R
EE
K R
ES
ER
VO
IR
R
AW
W
AT
ER
P
U M
P
ST
AT
IO
N
AN
D
IN
TA
KE
R
EV
IS
IO
N S
N O
D
ES
C R
IP
TI
O
N D
A
TE
OF
DESIGN
MARCH 2026
MARK M
MILES M
VARIES
MEI-D01
MEI-L01
SHORELINE TRANSITION
SCALE: 5/16" = 1'
A
MEI-D01
SLEEVE PIPE SECTION
SCALE: 4" = 1'
MEI-D01
SHORELINE INTERFACE
SCALE: 1" = 1'
A
2 3
BUOYANCY
AIR SUPPLY
AutoCAD SHX Text
15' TYP
AutoCAD SHX Text
SLEEVE LENGTH 80'
AutoCAD SHX Text 10'
AutoCAD SHX Text
12.5' TYP
AutoCAD SHX Text 1'-7"
AutoCAD SHX Text 6"
AutoCAD SHX Text 5"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'
NOTES: MARK NUMBER TABLE LOCATED ON SHEET MEI-G03 1. SUPPLY PIPE TO TRANSITION FROM SDR9 TO SDR11 IMMEDIATELY EXITING SLEEVE. SUPPLY PIPE TO TRANSITION FROM SDR9 TO SDR11 IMMEDIATELY EXITING SLEEVE. 2. TRENCH PIPE TO BE PROVIDED BY GEN CONTR: TRENCH PIPE TO BE PROVIDED BY GEN CONTR: SUPPLY: 1-1/2" SS BUOYANCY: 2" SS GEN CONTR TO TERMINATE TRENCH PIPE WITH: SUPPLY: 2" BUTT WELD SS TO POLY TRANSITION, 304 SS, SDR 9, PE4710 BUOYANCY: 3", BUTT WELD SS TO POLY TRANSITION, 304 SS, SDR 11, PE4710 3. SLEEVE PIPE TO BE SEALED WITH " THICK HDPE PLATE BEFORE BACKFILLED. SLEEVE PIPE TO BE SEALED WITH " THICK HDPE PLATE BEFORE BACKFILLED. 12" THICK HDPE PLATE BEFORE BACKFILLED. 4. MIN OF THREE ANCHORS AND 10' OF SLEEVE TO BE BURIED IN TRENCH. MIN OF THREE ANCHORS AND 10' OF SLEEVE TO BE BURIED IN TRENCH.
SUPPLY - 225'
B
C
D
DATE
SHEET
DWG
A
IS
S U
ED
F
O R B
ID
D
IN
G
M ob le y
En g in ee ri n g
B ox
N or ri s, T N
-0
P h
-0
D
IF
FU
SE
R O
VE
R
VI
EW
DRAWN BY
SCALE
BE
AV
ER
C
R
EE
K R
ES
ER
VO
IR
R
AW
W
AT
ER
P
U M
P
ST
AT
IO
N
AN
D
IN
TA
KE
R
EV
IS
IO
N S
N O
D
ES
C R
IP
TI
O
N D
A
TE
OF
DESIGN
MARCH 2026
MARK M
MILES M
VARIES
MEI-D02
MEI-L01
SUPPLY OVERVIEW
SCALE: 3/8" = 1'
MEI=L01
DIFFUSER - MIXING SECTION OVERVIEW
SCALE: 1/4" = 1'
MEI-L01
DIFFUSER - AERATION SECTION OVERVIEW
SCALE: 1/4" = 1'
MEI-L01
DIFFUSER TERMINATION OVERVIEW
SCALE: 1/4" = 1'
MEI-D04
MEI-D03
MEI-D03
MEI-D03
AutoCAD SHX Text 7'
AutoCAD SHX Text 15'
AutoCAD SHX Text 15'
AutoCAD SHX Text 22'-6"
AutoCAD SHX Text 7'
AutoCAD SHX Text 15'
AutoCAD SHX Text 22'-6"
AutoCAD SHX Text 15'
AutoCAD SHX Text 8'
AutoCAD SHX Text 15'
AutoCAD SHX Text 15'
AutoCAD SHX Text 15'
AutoCAD SHX Text 15'
AutoCAD SHX Text 15'
AutoCAD SHX Text 15'
AutoCAD SHX Text
DIFFUSER - MIXING SECTION 90' TYP
AutoCAD SHX Text 22'-6"
AutoCAD SHX Text 7'
AutoCAD SHX Text 15'
AutoCAD SHX Text 22'-6"
AutoCAD SHX Text 15'
AutoCAD SHX Text 8'
AutoCAD SHX Text 15'
AutoCAD SHX Text 15'
AutoCAD SHX Text
DIFFUSER - AERATION SECTION 60' TYP
AutoCAD SHX Text 3'
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text 10'
AutoCAD SHX Text 22'-6"
AutoCAD SHX Text 7'
AutoCAD SHX Text 15'
AutoCAD SHX Text 15'
AutoCAD SHX Text 15'
NOTES: MARK NUMBER TABLE LOCATED ON SHEET MEI-G03. 1. BEFORE DIFFUSER IS CONNECTED TO THE SUPPLY: BEFORE DIFFUSER IS CONNECTED TO THE SUPPLY: 1.1. AIR AND BUOYANCY SUPPLY PIPING TO BE CAPPED AND PRESSURE TESTED. AIR AND BUOYANCY SUPPLY PIPING TO BE CAPPED AND PRESSURE TESTED. 1.2. AIR PIPING TO BE BLOWN CLEAN (MAX FLOW FOR 5 MINUTES OR VISIBLY FREE OF ANY AIR PIPING TO BE BLOWN CLEAN (MAX FLOW FOR 5 MINUTES OR VISIBLY FREE OF ANY DEBRIS). 2. ANCHOR CABLES TO BEGIN ONE ANCHOR BEFORE DIFFUSER SECTION. ANCHOR CABLES TO BEGIN ONE ANCHOR BEFORE DIFFUSER SECTION. 3. SPACING BETWEEN BETWEEN AERATION AND MIXING SECTION ORIFICE TEES OF 1FT TYP.SPACING BETWEEN BETWEEN AERATION AND MIXING SECTION ORIFICE TEES OF 1FT TYP.
C
D
DATE
SHEET
DWG
A
IS
S U
ED
F
O R B
ID
D
IN
G
M ob le y
En g in ee ri n g
B ox
N or ri s, T N
-0
P h
-0
D
IF
FU
SE
R D
ET
AI
LS
DRAWN BY
SCALE
R
EV
IS
IO
N S
N O
D
ES
C R
IP
TI
O
N D
A
TE
OF
DESIGN
MARCH 2026
MARK M
MILES M
VARIES
MEI-D03
MEI-D02
SUPPLY ANCHOR DETAIL
SCALE: 4" = 1' B
MEI-D03
SUPPLY ANCHOR SECTION
SCALE: 4" = 1'
C
MEI-D03
DIFFUSER TEE SECTION - EXPLODED VIEW
SCALE: 6" = 1'
MEI-D02
DIFFUSER DETAIL
SCALE: 6" = 1' 9
MEI-D02
HOSE PLUG DETAIL
SCALE: 6" = 1'
D
MEI-D03
ANCHOR CONNECTION SECTION
SCALE: 6" = 1'
MEI-D04
C D
B
C
MEI-D03
DIFFUSER TEE SECTION
SCALE: 6" = 1'
BE
AV
ER
C
R
EE
K R
ES
ER
VO
IR
R
AW
W
AT
ER
P
U M
P
ST
AT
IO
N
AN
D
IN
TA
KE
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text 5"
AutoCAD SHX Text 2"
AutoCAD SHX Text 6"
AutoCAD SHX Text 5"
AutoCAD SHX Text 3 "12"
AutoCAD SHX Text 1'-3"
AutoCAD SHX Text
CUT STD. SADDLE AS SHOWN THEN TAP " FNPT34" FNPT
AutoCAD SHX Text
3" BLACK SDR17 OD = 3.500" ID = 3.063"
AutoCAD SHX Text
2" BLACK SDR11 OD = 2.475" ID = 1.917"
AutoCAD SHX Text
CABLE LENGTH 1'
AutoCAD SHX Text
3/8" EYE BOLT
AutoCAD SHX Text
SADDLES PLACED APPROX. 6" - 12" APART
AutoCAD SHX Text
65 LBS PRECAST ANCHOR
AutoCAD SHX Text
38" DIA. THRU HOLE
AutoCAD SHX Text
3" BLACK SDR17 OD = 3.500" ID = 3.063"
AutoCAD SHX Text
2" BLACK SDR11 OD = 2.475" ID = 1.917"
NOTES: MARK NUMBER TABLE LOCATED ON SHEET MEI-G03. 1. MIXING TEE ORIFICE SIZED FOR 11 SCFM PER SECTION (90'). MIXING TEE ORIFICE SIZED FOR 11 SCFM PER SECTION (90'). AERATION TEE ORIFICE SIZED FOR 0.7 SCFM PER SECTION (60').
SLOT THRU
B
C
D
DATE
SHEET
DWG
A
IS
S U
ED
F
O R B
ID
D
IN
G
M ob le y
En g in ee ri n g
B ox
N or ri s, T N
-0
P h
-0
D
IF
FU
SE
R T
ER
M
IN
AT
IO
N
A N
D A
N C
H O
R D
ET
AI
LS
DRAWN BY
SCALE
R
EV
IS
IO
N S
N O
D
ES
C R
IP
TI
O
N D
A
TE
OF
DESIGN
MARCH 2026
MARK M
MILES M
VARIES
MEI-D04
MEI-D02
DIFFUSER TERMINATION DETAIL
SCALE: 3/4" = 1'
MEI-D03
ANCHOR DETAIL
SCALE: 4" = 1' E
MEI-D04
ANCHOR SECTION
SCALE: 4" = 1'
F
MEI-D04
ANCHOR TOP VIEW
SCALE: 4" = 1'
MEI-D03
U BOLT DETAIL
SCALE: 4" = 1'
MEI-D04
EYE BOLT DETAIL
SCALE: 4" = 1'
F
E
BE
AV
ER
C
R
EE
K R
ES
ER
VO
IR
R
AW
W
AT
ER
P
U M
P
ST
AT
IO
N
AN
D
IN
TA
KE
AutoCAD SHX Text 3'
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text 10'
AutoCAD SHX Text 7'
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 1'-7"
AutoCAD SHX Text 6"
AutoCAD SHX Text 5 "12"
AutoCAD SHX Text 5"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1'-7"
AutoCAD SHX Text 3 "12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 5 "12"
AutoCAD SHX Text 1'-3"
AutoCAD SHX Text 10"
AutoCAD SHX Text 3 "12"
AutoCAD SHX Text 3 "78"
AutoCAD SHX Text 38"
AutoCAD SHX Text 1'-0 "12"
AutoCAD SHX Text 6 "14"
AutoCAD SHX Text 38"
AutoCAD SHX Text 6 "14"
AutoCAD SHX Text 8"
NOTES: MARK NUMBER TABLE LOCATED ON SHEET MEI-G03. 1. DIFFUSER TERMINATION BUOYANCY PIPE TO BE CAPPED WHILE PIPING IS ON RESERVOIR DIFFUSER TERMINATION BUOYANCY PIPE TO BE CAPPED WHILE PIPING IS ON RESERVOIR SURFACE TO PREVENT WATER FROM ENTERING BUOYANCY LINE. 2. PRIOR TO SYSTEM INSPECTION AND DEPLOYMENT, DIFFUSER TERMINATION BALL VALVE TO BE PRIOR TO SYSTEM INSPECTION AND DEPLOYMENT, DIFFUSER TERMINATION BALL VALVE TO BE OPENED AND SYSTEM RUN AT MAX FLOW TO PREVENT DEBRIS FROM ENTERING DIFFUSER ORIFICES. VALVE TO BE CLOSED AND REMAIN CLOSED FOR SYSTEM INSTALLATION AND OPERATION.
| Sheets and Views |
| MEI-G01 COVER SHEET VICINITY MAP & LOCATION MAP |
| MEI-G02 DRAWING INDEX NOTES AND ABBREVIATIONS |
| MEI-G03 MARK NUMBERS & PIPE SCHEDULE |
| MEI-L01 DIFFUSER LAYOUT |
| MEI-D01 SHORELINE DETAILS |
| SHORELINE TRANSITION |
| SLEEVE PIPE SECTION |
| SHORELINE INTERFACE |
| MEI-D02 DIFFUSER OVERVIEW |
| SUPPLY OVERVIEW |
| DIFFUSER SECTION 1 OVERVIEW |
| DIFFUSER SECTION 2 OVERVIEW |
| DIFFUSER SECTION 3 OVERVIEW |
| MEI-D03 DIFFUSER DETAILS |
| SUPPLY ANCHOR DETAIL |
| SUPPLY ANCHOR SECTION |
| DIFFUSER TEE SECTION |
| DIFFUSER DETAIL |
| HOSE PLUG DETAIL |
| ANCHOR CONNECTION SECTION |
| DIFFUSER TEE SECTION(2) |
| MEI-D04 DIFFUSER TERMINATION AND ANCHOR DETAILS |
| DIFFUSER TERMINATION DETAIL |
| ANCHOR DETAIL |
| ANCHOR SECTION |
| ANCHOR TOP VIEW |
| U BOLT DETAIL |
| EYE BOLT DETAIL |
File details come from the government source that posted it. Updated .