This Scope of Services document from Orange County, Florida details specifications for a hauling transfer trailers contract (Solicitation Y25-1037) requiring transportation services for waste transfer between two county facilities and the Orange County Landfill. The contractor shall provide on-demand hauling services seven days per week between 5:30 AM and 5:30 PM, excluding Thanksgiving and Christmas Day, with an estimated 25 to 180 trips per week. The contract involves four primary transportation routes: Porter Transfer Station to the landfill staging area (approximately 46 miles round trip), L.B. McLeod Transfer Station to the staging area (approximately 42 miles round trip), Porter Transfer Station to the landfill work face, and L.B. McLeod Transfer Station to the landfill work face (approximately 42 miles round trip). Work assignments are structured as full-day commitments lasting approximately 10 to 12 hours. The solicitation deadline is September 30, 2025, at 4:00 PM EST through the OpenGov e-Procurement Platform, with a non-mandatory pre-solicitation meeting on September 4, 2025, and a question submission deadline of September 9, 2025, at 5:00 PM EST. The contract is awarded on an all-or-none basis to the lowest responsive and responsible bidder for a five-year term with potential Consumers Price Index (CPI-U) escalations up to 4 percent annually after the initial year.
The contractor must maintain a minimum of two operational tractors equipped with hydraulic "wet kits" compatible with the county's aluminum Keith Walking Floor trailers and demonstrate the ability to respond to hauling requests within 48 hours. Historical average payload is approximately 20 tons per trailer with a maximum loaded weight of 80,000 pounds. All drivers must complete a county-designated safety course at no cost before commencing work and shall maintain detailed trip logs verified by transfer station supervisors. The contractor bears all transportation expenses, including tolls, and must comply with county safety and operating requirements. No minimum purchase quantity is guaranteed, and the county does not obligate any specific volume of services. Pricing is structured per trip with no specific budget range identified, though the scope indicates a substantial multi-year transportation services contract with significant operational revenue potential for the selected contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF SERVICES / SPECIFICATIONS
1. OVERVIEW
Historical average payload per trailer is approximately 20 tons. Actual payload will vary, with maximum total weight of loaded tractor and trailer not to exceed 80,000 pounds. Orange County
Solid Waste Division will supply the transfer trailers which are aluminum with walking floors.
2. HOURS OF OPERATION
The Contractor shall provide services between the hours of 5:30 A.M. to 5:30 P.M., Sunday through Saturday, on an on-demand basis, including holidays, or as directed by the County. The
Solid Waste Management Division is only closed on Thanksgiving Day and Christmas Day.
3. LOCATIONS
• Porter Transfer Station - 1326 Good Homes Road, Orlando FL 32818
• L.B McLeod Transfer Station - 5000 L.B. McLeod Road, Orlando FL 32811
• Landfill Trailer Staging Area – 5901 Young Pine Road, Orlando FL 32829, just past the landfill scale house (Staging Area)
• Landfill Class I Work Face – 5901 Young Pine Road, in Orlando FL 32829 within the operating landfill (Work Face)
4. REQUIREMENTS
A. When hauling is required, the estimated number of trips per week ranges from 25 to 180.
The possible number of trips per day can range from 1 to 30.
B. A minimum of 2 tractors are needed for this operation.
C. The Contractor’s driver shall receive a log sheet from the Transfer Station supervisor on duty to log all trips in addition to any Contractor required documentation. At the completion of each day the driver shall turn in the log sheet to the Transfer Station supervisor for confirmation of all trips.
D. List of personnel contemplated to perform the work
E. Each driver shall complete a County designated safety course (approximately 15 minutes) delivered by the County or its designee, at no cost to the Contractor. The course shall be completed prior to commencing work.
F. The Contractor shall have the ability to respond within forty-eight (48) hours of hauling requests.
G. All Contractor road-tractors shall have operational hydraulic “wet kits” capable of operating the County’s Keith Walking Floor live bottom trailers. The trucks shall be equipped with a high pressure line and return line.
H. The driver shall be instructed to weigh in and out on the County’s scales.
I. The Contractor shall abide by all site-specific safety and operating requirements.
J. Approximate mileage from Porter Transfer Station to the Landfill is 46 miles round trip.
Various routes can be taken including the East-West Expressway, which is the most direct route. The Contractor shall bear the cost of any tolls or transportation expenses incurred in the provision of services.
K. Approximate mileage from McLeod Transfer Station to the Landfill is 42 miles round trip.
Various routes can be taken including the East-West Expressway, which is the most direct route. The Contractor shall bear the cost of any tolls or transportation expenses incurred in the provision of services.
5. TRANSPORTATION ROUTES
Transportation routes (Routes) to be operated are detailed below. The described routes may be required to be operated in reverse order.
A. Route 1: Porter Transfer Station to Staging Area and Drop Trailer.
i. The Contractor shall arrive at Porter Transfer Station, enter the tunnel and wait to be loaded.
ii. The Contractor shall deliver the loaded trailer to the Orange County Landfill trailer staging area and drop the trailer.
iii. The Contractor shall pick-up a designated empty trailer.
iv. The Contractor shall return the empty trailer to Porter Transfer Station, enter the tunnel and wait to be loaded.
v. Work assignments for this Route shall be made on a full-day (approximately 10 to 12 hours).
B. Route 2: L.B. McLeod Trnsfer Station to Staging Area and Drop Trailer
i. The Contractor shall arrive at L.B. McLeod Transfer Station, enter the tunnel and wait to be loaded.
ii. The Contractor shall deliver the loaded trailer to the Orange County Landfill trailer staging area and drop the trailer.
iii. The Contractor shall pick-up a designated empty trailer.
iv. The Contractor shall return the empty trailer to L.B. McLeod Transfer Station, enter the tunnel and wait to be loaded
C. Route 3: Porter Transfer Station to Work Face and Unload Trailer
i. The Contractor shall arrive at Porter Transfer Station, enter the tunnel and wait to be loaded
ii. The Contractor shall deliver the loaded trailer to the Work Face.
iii. The Contractor shall discharge the load in a location as directed by the landfill spotter.
iv. The Contractor shall return the empty trailer to Porter Transfer Station, enter the tunnel and wait to be loaded.
D. Route 4: L.B. McLeod Transfer Station to Work Face and Unload Trailer
i. The Contractor shall arrive at L.B. McLeod Transfer Station, enter the tunnel and wait to be loaded.
ii. The Contractor shall deliver the loaded trailer to the Work Face.
iii. The Contractor shall discharge the load in a location as directed by the landfill spotter.
iv. The Contractor shall return the empty trailer to L.B. McLeod Transfer Station, enter the tunnel and wait to be loaded