This is a comprehensive specification document for a new comfort station project on Mackinac Island, Michigan, prepared by MacMillan Associates Inc. for the Mackinac Island State Harbor Authority. The project involves construction of a complete public facility including plumbing systems, HVAC systems, electrical systems, site work, and landscaping. The specifications detail requirements for Division 22 (Plumbing), Division 23 (HVAC), Division 26-27 (Electrical), and site/landscape work. Key requirements include: domestic water piping (with PEX alternate option), sanitary and storm sewer systems, HVAC ductwork and equipment, interior and exterior luminaires, grounding and bonding systems, equipment connections, panelboards, wiring devices, conduit installation, excavation and grading, concrete sidewalk construction, and landscaping with one-year establishment guarantee. The mechanical trades contractor must have completed comparable installations in satisfactory operation for at least two years and maintain a developed service department. All work must comply with 2015 Michigan Building Code, 2017 National Electrical Code, and 2017 Michigan Electrical Code Rules Part 8, with final inspection approvals required from authorities having jurisdiction.
The specifications establish comprehensive quality assurance and regulatory compliance requirements including permits, inspections, testing, shop drawing submittals, equipment guarantees of one year from substantial completion, and detailed operation and maintenance manual requirements. All materials must be new and first-class quality with UL listings where applicable. The contractor bears responsibility for site examination, utility location verification through 811 call-outs, dewatering operations, site coordination with other trades, and protection of finished work until final acceptance. Electrical work requires arc flash hazard analysis studies per NFPA 70E, short-circuit coordination studies, and proper labeling of all equipment and conductors. The mechanical contractor must furnish testing and balancing reports, system completion checklists signed by installing contractors, record drawings with as-built conditions, and two bound copies of operation and maintenance manuals. All electrical connections must accommodate equipment furnished by mechanical and plumbing trades, with final power connections responsibility clearly delineated between trades.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB Drawings Part 4a.pdf | ||
| IFB Drawings Part 2.pdf | ||
| IFB Specifications Part 2.pdf | ||
| Advertisement 17146.pdf | ||
| Addendum 1 17146.pdf | ||
| IFB Drawings Part 4b.pdf | ||
| IFB Drawings Part 3b.pdf | ||
| IFB Drawings Part 3a.pdf | ||
| IFB Drawings Part 1.pdf | ||
| IFB Specifications Part 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING REQUIREMENTS 22 05 00-1
SECTION 22 05 00
PLUMBING REQUIREMENTS
PART 1 GENERAL
1.1 RELATED SPECIFICATIONS AND DOCUMENTS
A. Drawings and related specifications for this project including General and Sup-plementary Conditions, Division 1, General Requirements, Instructions to Bidders, Addenda's, etc. apply to and are considered a part of Division 22 - Mechanical Work.
B. Information in this division is intended to clarify or make additions to the requirements set forth in the General Conditions, Supplementary Conditions, and Division I of these specifications. Any conflict between this Division 22 and other sections or divisions of the specifications or drawings shall be brought to the attention of the Architect/Engineer in writing as a request for addendum prior to the bid opening.
C. Furnish all equipment, materials, articles, items, operations or methods listed, mentioned or scheduled on drawings, these specifications, manufacturer's installation instructions and include all labor, materials, equipment and incidentals necessary for their complete installation and operation.
D. All information contained in this section applies to all sections within Division 22 as if it was part of each section.
1.2 DRAWINGS AND SPECIFICATIONS
A. The drawings and these specifications are intended to supplement each other and any material or labor called for in one shall be furnished even if not specifically mentioned in both. Any material or labor which is neither shown on the drawings nor listed in this specification, but is normally incurred or required for completion of work shall be furnished. If there is a discrepancy between the drawings and specifications, the more stringent of the two shall be followed.
B. Drawings are diagrammatic and are intended to show approximate location and general arrangement of systems and equipment. No attempt has been made to show every ell, tee, etc. Drawings shall not be scaled for location of systems, equipment, etc. All dimensions whether given on drawings or scaled shall be verified in field and coordinated with all other trades and existing field conditions. Some plumbing, piping, equipment, etc. locations may require changes in location due to field conditions and coordination with other trades will be made with no additional cost to the Owner.
Failure to check will be no reason for additional compensation.
C. These drawings and the associated specifications are intended to provide complete furnishing, installation and operational plumbing systems as specified under Division 22 and as called for on the drawings. If these drawings and associated specifications have information omitted that would not allow a completely operational system as is the intent of the Engineer, the bidder shall notify the Engineer a minimum one week prior to the bid date to allow for addenda. Once bids have been received, the Contractor shall be responsible for material, labor, etc., to furnish and install a completely operational plumbing system as is the intent of these drawings and associated specification.
PLUMBING REQUIREMENTS 22 05 00-2
D. The installation of all systems, equipment, etc., is subject to clarification with submitted shop drawings and field coordination requirements. Equipment outlines shown on drawings or dimensioned on drawings are limiting dimensions. Any equipment that reduces the indicated clearances or exceeds specified or scheduled equipment dimensions shall not be used.
E. The Architect/Engineer and Owner reserve the right to make minor changes in the location of equipment, piping, ductwork, etc. at the time of rough-in without additional cost to the Owner.
F. The Mechanical Trades Contractor shall have completed for his portion of work, at least one installation of size and type comparable to this project and has been in satisfactory operation for at least two complete years. The Mechanical Trades Contractor shall also have a developed service department capable of negotiating service contracts with the Owner for systems herein specified.
1.3 AUTOCAD BACKGROUND FILES
A. The Contractor shall include in their bid any cost for requesting AutoCAD backgrounds for their use from the Architect or Engineer. The cost will be $150.00 for the first plan, and $50.00 for each additional plan that may be requested for AutoCAD use. A waiver of responsibility for the Architect and Engineer related to Contractor use of the CAD files shall be signed by the Contractor.
1.4 MANUFACTURER’S SPECIFICATIONS AND CAPACITIES
A. Some equipment, plumbing fixtures, materials, etc. that are scheduled on the drawings or listed in any addenda may not be specified in this specification. The manufacturer's specification and capacities shall be considered included and part of this specification whether it is specified in this specification or noted or scheduled on the drawings. The contractor shall remove and replace any "substituted" equipment or material, which has been installed or is on site, which in the opinion of the Architect/Engineer does not meet the scheduled equipment or materials, manufacturer's capacities or specification at no additional cost to the Owner.
1.5 DEFINITIONS
A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.
C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions.
D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in pipe shafts.
PLUMBING REQUIREMENTS 22 05 00-3
E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.
F. The following are industry abbreviations for plastic materials:
1. ABS: Acrylonitrile-butadiene-styrene plastic.
2. CPVC: Chlorinated polyvinyl chloride plastic.
3. PE: Polyethylene plastic.
4. PVC: Polyvinyl chloride plastic.
G. The following are industry abbreviations for rubber materials:
1. EPDM: Ethylene-propylene-diene terpolymer rubber.
2. NBR: Acrylonitrile-butadiene rubber.
1.6 LOCAL CONDITIONS
A. Before submitting proposals, each contractor shall examine these specifications and associated drawings, addenda, etc. and shall examine the site of the project. The bidder shall fully investigate the site of this project, investigate coordination of his work with all other trades and existing conditions and completely satisfy himself as to the conditions to which the work is to be performed before submitting his/her bid. No allowances or considerations will be given at a later date for alleged misunderstanding as to the requirements of the work, materials to be furnished, or conditions required by the nature of this project site and coordination by the neglect on the bidder's part to make such an examination and coordination.
B. Drawings show approximate location of existing services. The mechanical and electrical trades shall check with local utility companies or municipal agencies for exact location of services which they expect to encounter. The Mechanical Trades Contractor shall be responsible for hiring a company such as "Miss Dig" to stake out and locate all utilities in areas of excavation before commencing any work. The Mechanical Trades Contractor shall verify all elevations and locations of existing underground lines which are to be connected into or routed over or under. This verification shall be done prior to beginning work at this project.
1.7 QUALITY ASSURANCE
A. All work shall be performed in accordance with all local and state codes, laws and regulations applicable to the work for this project. The contractor shall be responsible for all permits and costs for inspections, etc., and for checking with each utility company supplying service to this project and shall determine from them all, any changes in boxes, meters, valves, service, etc., and shall include all cost for inspections, revisions to services, etc. in his bid as required by local agencies, utilities, etc. No extra payment will be made for such items after the contractor submits his bid.
B. In addition to all applicable Federal, State and local codes, the standards and codes listed below shall apply to all mechanical work. The reference to codes and standards shall be referenced to the latest edition or revision.
1. American Gas Association (AGA)
2. American National Standard Institute (ANSI)
PLUMBING REQUIREMENTS 22 05 00-4
3. American Society of Mechanical Engineers (ASME)
4. American Society for Testing materials (ASTM)
5. American Water Works Association (AWWA)
6. American Welding Society
7. ANSI code of Pressure Piping and Unified Pressure Vessels
8. Cast Iron Soil Pipe Institute
9. National Electrical Manufacturer's Association (NEMA)
10. Standards of the Hydraulic Institute
11. Underwriters' Laboratories (UL)
12. Williams-Steiger Occupational Safety & Health Act (OSHA)
C. In the event of conflict between drawings, codes, standards or specifications, the most stringent requirement shall apply
1.8 SUBMITTALS AND SHOP DRAWINGS
A. Submit electronic sets of complete shop drawings for all plumbing equipment and materials associated with Division 22 and associated drawings to the Architect/Engineer for review before fabrication of work or ordering of equipment. Shop drawings shall be submitted at the earliest possible time.
B. Shop drawings shall be first reviewed by the contractor. Inaccurate shop drawings shall be corrected by the contractor to meet specifications and schedules for this project. The contractor shall then initial the shop drawings as having been reviewed before submitting to the Architect/Engineer. Shop drawings shall have, in addition to the mechanical information, the electrical requirements for minimum circuit amperes and maximum fuse size ratings of the equipment.
C. Drawings which are rejected must be corrected and returned for Architect/Engineer review before ordering.
D. Furnish to the job site copies or prints of shop drawings that have been reviewed by the Engineer as soon as possible.
E. Include a copy of each shop drawing in the Operation and Maintenance Manual.
F. The checking and reviewing of shop drawings by the Architect/Engineer shall be construed as assisting the contractor and the Architect/Engineer's action does not relieve the contractor from the responsibility for errors or omissions which may exist thereon. The contractor shall be held responsible for errors or omissions that are discovered after approval process and must be made good by the contractor.
1.9 PERMITS, INSPECTIONS AND TESTS
A. The Mechanical Trades Contractor shall take out all permits and arrange for necessary inspections and shall pay all assessments, fees and costs, etc., and make all tests as required by applicable codes. At the completion of the project, the Mechanical Trades Contractor shall furnish certificates of inspection and approval and secure final occupancy permit. Record copies shall be included in the Operation and Maintenance manuals.
PLUMBING REQUIREMENTS 22 05 00-5
1.10 RECORD DRAWINGS
A. Maintain an up-to-date set of "record" drawings showing actual equipment, plumbing piping, etc. installation locations. Exact dimensions from column lines for all concealed work and tie-ins with elevations noted shall be included.
B. Include a set of reproducible drawings and a set of prints in each Operation and Maintenance Manual.
C. The Engineer reserves the right to request and be furnished any additional information he deems necessary to be shown on the record drawings.
1.11 OWNER'S INSTRUCTIONS
A. Upon completion of the project, the contractor shall be responsible for instructing the Owner's operating staff, in the presence of the Architect/Engineer's representative, in the proper operation and maintenance of the mechanical systems and equipment.
Include a statement signed by the Owner that instructions have been given for proper operation and maintenance of the mechanical systems and equipment.
1.12 GUARANTEES
A. Furnish a written guarantee, to the Architect/Engineer, that will make the contractor responsible at his own expense for any imperfections in material and/or workmanship which may develop under ordinary use within a period of one (1) year from final Owner's acceptance of the work.
B. Furnish all written guarantees from equipment and/or material manufacturers which shall include the operating and performance conditions and capabilities upon which they are based.
1.13 PORTABLE AND DETACHABLE PARTS
A. Retain all portable and detachable parts of installation such as keys, spare accessories, operating manuals, etc. include in the Operation and Maintenance Manual.
1.14 OPERATION AND MAINTENANCE MANUALS
A. Furnish to the Architect/Engineer two (2) copies of an approved bound (3 ring binder) book with tabs for sections covering each item of equipment. These notebooks shall include shop drawings, maintenance manuals, operating manuals and parts lists to instruct the Owner on proper operation and use as well as maintenance for each piece of equipment. These books shall also include contractors’, subcontractors’ and manufacturers' names, telephone numbers and addresses.
B. The manuals must be approved by the Architect/Engineer before final payment to the contractor. The Engineer reserves the right to request and be furnished any additional information that he deems necessary to be included in the manuals.
PLUMBING REQUIREMENTS 22 05 00-6
1.15 RESPONSIBILITIES FOR USE OF SUBSTITUTE MATERIALS
A. Contractor shall notify Architect/Engineer in writing at least ten (10) calendar days before bids are due for approval to use materials and/or equipment other than that which has been specified or scheduled. If substitute materials and/or equipment are approved and used, it will be this contractor's responsibility to guarantee that the items will function as the specified equipment or materials, will in no way alter the design of the structure or system, and will not require any additional mechanical work such as piping, plumbing, etc. Any additional cost required by substitute materials will be the responsibility of the contractor.
B. It will be the contractor's responsibility, at his own expense, to remove or replace any non-approved equipment or material or any approved equipment or materials not originally specified or scheduled if equipment and materials do not meet with the satisfaction of the Architect/Engineer.
C. It shall be the Contractor’s (Mechanical Trades) responsibility to coordinate and pay for any Electrical Contractor costs due to any changes in substitute materials and/or equipment’s power requirements, which differ from that shown on the design documents.
D. No consideration will be given to requests for substitute materials because of delivery problems unless the contractor can prove that orders were placed as soon as possible after contract was awarded and that delays were not caused by submittal of unscheduled or unspecified (substituted) materials to the Architect/Engineer.
1.16 COST BREAKDOWN AND EQUIPMENT LIST
A. The successful bidder shall be responsible for submitting a cost breakdown to the Architect/Engineer and Owner within ten (10) calendar days after date of request of the breakdown. During progress of the work, if changes occur which cause additional cost, the price on such items shall be broken down in accordance with the items listed in the breakdown.
B. The bidders shall be responsible for submitting a complete list of all equipment manufacturers, makes, models, etc. that will be used for this project with their proposal.
The equipment list shall be typed on the contractor’s letterhead and shall be signed by the authorized officer.
1.17 MATERIALS AND EQUIPMENT
A. Materials and equipment furnished under this project shall have a minimum warrantee of one (1) year. All materials and equipment shall be new, of first class quality and shall be furnished, delivered, erected, installed and finished in every detail and shall be so selected and arranged as to fit into the building space. All material or equipment that is not specified but necessary for this project shall be subject to the approval of the Architect/Engineer.
C. Any materials or equipment not specified or scheduled but similar to that which has had prior approval shall be listed as a substitution and noted on the proposal form as such.
PLUMBING REQUIREMENTS 22 05 00-7
D. The contractor shall include all miscellaneous materials and labor required to completely install and operate the plumbing systems as is intended by these drawings and specification.
1.18 SCHEDULE, COORDINATION AND INSTALLATION OF WORK
A. The contractor shall carry on work in such a manner as to meet the dates as scheduled by the General Contractor and shall work overtime at no expense to the Owner as required to comply with the schedule. This contractor shall schedule all work with Owner and Architect/Engineer and schedule shut down of systems with Owner.
B. Examine the site and all drawings and specifications and coordinate work with all other trades before commencing work for this project. Arrange work essentially as shown with the exact layout to be made on the job to suit actual conditions. Precise locations of equipment and materials shall be coordinated and shall be the responsibility of this contractor. Should any conflicts in location occur, and necessary deviations from drawings are required as determined by the Architect/Engineer, the contractor shall make necessary adjustments without additional cost to the Owner.
C. All equipment, plumbing piping, etc. shall be located and/or routed to allow for the most convenient access for servicing.
D. Arrange for necessary access doors, panels, etc. to allow servicing of equipment, piping, valves, etc. Perform any cutting and patching as required, made necessary by failure to make proper arrangements.
E. Indicated equipment connections, sizes and locations shall be verified and connected according to manufacturer's shop drawings and installation instructions. Thoroughly investigate the space provided for equipment and connections before ordering equipment. All equipment shall be selected to fit into the space allowed, including connections with adequate space allowed for operation and maintenance.
F. All work shall be installed in a neat and workmanlike manner, using skilled personnel thoroughly qualified in the trade or duties that they are to perform. Rough work will be rejected.
G. Coordinate all equipment deliveries and schedules to allow timely installation.
Contractor shall separate equipment into sections and reassemble in building if required by the installation at no extra cost to the Owner.
H. Furnish a superintendent approved by the Architect/Engineer to oversee and coordinate the work to be performed with all other trades.
I. Coordinate location of pipes, plumbing, etc. with other building components such as structural components (beams, joists, columns, etc.), electrical components (lighting, conduits, etc.) and architectural components (walls, ceilings, floors, pipe chases, roof, etc.).
J. Before starting work, Contractor shall verify that available space for proposed pipes, equipment etc. is adequate for the intended purpose and will result in a first class
PLUMBING REQUIREMENTS 22 05 00-8
installation. Regardless of drawings, responsibility for first class operating systems rests with the Contractor.
K. Arrange for chases, slots, openings, etc. and other building components to allow for plumbing systems installation. Coordinate cutting and patching of these components to accommodate installation. This contractor shall be responsible for accurately locating for the general trades all chases, shafts, etc. and shall be responsible for all cutting and patching if these chases were not accurate or not coordinated in time with the general trades. Coordinate installation of all sleeves in walls, floors or other structural or architectural components.
L. Sequence, coordinate and integrate installation of equipment and materials for efficient work flow during the project. Particular attention should be spent on larger pieces of equipment.
M. Install equipment and materials with provisions for necessary access for service and maintenance. Allow space for removal of all parts that may require replacement or servicing.
N. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.
O. Coordinate requirements for access panels and doors for mechanical items requiring access that are concealed behind finished surfaces. When access panels are required, valves and equipment components requiring access shall be located to minimize the number of panels.
P. Examine the work as it progresses and alert the Architect/Engineer in writing of any instances or obstructions that will prevent this contractor from performing his/her work.
Q. The Mechanical Trade shall be responsible for all coordination of all site utilities, the gas company, etc. including coordination of all new and existing natural gas loads.
1.19 DELIVERY, STORAGE, AND HANDLING
A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.
B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.
C. Furnish and maintain a weatherproof storage facility on the site of adequate size to store miscellaneous equipment and/or materials to prevent exposure to the weather. Location of shed shall be determined by the Owner and Architect/Engineer. The Owner reserves the right to deny storage of materials or equipment in any existing or new buildings.
1.20 COOPERATION WITH ARCHITECT/ENGINEER AND OTHERS
A. Coordinate all aspects of the plumbing system installation with all other trades, existing conditions, etc.
PLUMBING REQUIREMENTS 22 05 00-9
B. If the bidder believes that changes in design are required to meet intended design capacities and operation or material and/or equipment is obviously omitted from these specifications and drawings, the bidder shall contact the Architect/Engineer in writing at least ten (10) days before bid date. The acceptance of a bid by the Owner shall be binding and shall indicate that the bidder does not require any changes in design nor additional costs in order to meet the design and performance of the mechanical system as indicated in these specifications and drawings.
1.21 WORK INVOLVING OTHER TRADES
A. Equipment or materials specified in Division 22 may have to be installed by other trades (such as electrical trades or architectural trades) due to code requirements or union jurisdictional requirements. Where this occurs, this contractor shall include all costs required by other trades to complete the work and hire the respective trade to perform this work.
1.22 PERFORMANCE DATA AND ACCESSIBILITY
A. All performance data specified in this specification or scheduled on drawings shall be considered actual performance of the equipment after installation. The supplier and installer shall be responsible for suitable allowances to adjust equipment to design capacities when actual operating and installation conditions differ from drawings.
B. All equipment and materials shall be installed to allow access for servicing and maintenance. Coordinate final location of such equipment and materials that are concealed with required access doors on panels. Allow ample space for replacement or servicing.
1.23 CUTTING AND PATCHING
A. Unless noted otherwise, the Mechanical Trades shall be responsible for all cutting, patching and associated work required under Division 22. This work shall be performed by trades normally performing this type of work except drilling of holes shall be done by the contractor requiring same. This includes replacing areas of cutting required by this work with proper reinforcing, termite shielding, materials, finishing, etc. to restore the areas to their original condition, and filling all openings around ducts, piping, etc. with approved fire retardant materials. Regardless, all drilling of holes shall be the responsibility of the Contractor requiring same.
B. If noted on drawings that the General Trades will be responsible for all cutting and patching, it will be the Mechanical Trades responsibility to notify all General Trades during bidding of all areas requiring cutting and patching. Regardless, all drilling of holes shall be the responsibility of the contractor requiring same.
1.24 WORK IN EXISTING BUILDINGS
A. Coordinate and schedule all work in existing building with Owner and Architect/Engineer. Systems shall be kept in operation at all times if at all possible. If a system shut-down is required, the contractor shall schedule with the Owner, the time and length of shut-down. A system shall not be shut down without written permission from the Owner.
PLUMBING REQUIREMENTS 22 05 00-10
B. All existing equipment, plumbing, piping, etc. that is to be removed shall remain the property of the Owner. The contractor shall remove and locate this material that remains the property of the Owner to a location determined by the Owner somewhere on site. If the Owner does not want to maintain possession of the removed material, the contractor shall be responsible for removing material from the site and disposing of this material as necessary to meet all codes and requirements and shall pay all costs as required for any disposal fees, inspections, permits, etc.
C. All existing piping, equipment, etc. whether shown on drawings or not that is to be removed and/or abandoned and does not remain property of the Owner shall be removed from site.
D. Any existing plumbing, piping, valves, mechanical equipment, etc. serving the existing building which are shown or not shown on drawings and are required for systems operation shall remain in use. If these systems require relocation to allow installation of new systems, the contractor shall be responsible for relocating to an Owner and Architect/Engineer approved location. The contractor shall pay all cost for this work and include such cost in his/her bid. (As specified previously, contractor shall be responsible for examining site and include all cost for work required to complete this project.)
E. When active services, etc. are encountered in this project, the contractor shall furnish and install bracing, support, etc. as required to protect and keep these services active.
(As specified previously, these drawings are diagrammatical. The contractor shall be responsible for verification of all existing services, piping, equipment, etc.).
1.25 ACCESS TO EQUIPMENT, VALVES, ETC.
A. Coordinate access panels with type of construction and furnish access panels in areas that are non-accessible. Access panels shall be furnished by this contractor and installed by the General Contractor. The access panels shall be all approved, UL labeled and fired rated and shall be located and sized to allow access to equipment, valves, etc.
B. Where access panels are required, valves, equipment etc. shall be located as to require the least number of access panels.
1.26 EQUIPMENT CONNECTIONS
A. Connections to equipment, plumbing fixtures, etc. shall be made in accordance with shop drawings, rough-in dimensions furnished by the manufacturer, codes, etc. and may vary with connections shown on drawings. The contractor shall be responsible for making connections and number of connectors as per shop drawings, codes, etc. at no additional cost to the Owner.
1.27 ELECTRICAL CONNECTIONS
A. The Electrical Trades shall be responsible for furnishing and installing all electrical equipment, wiring, etc. required for operation of mechanical equipment unless otherwise noted on the drawings. The Mechanical Trades shall furnish detailed information and wiring diagrams to the Electrical Trades for all equipment specified and/or scheduled for this project. In the event that the Mechanical Trades furnishes an "approved equal" or
PLUMBING REQUIREMENTS 22 05 00-11
"alternate" that require changes in the original electrical design, the Mechanical Trades shall pay all costs to the Electrical Trades as required to make satisfactory adjustments.
All electrical work shall be done in accordance with the latest edition of the National Electric Code.
1.28 MOTORS, MOTOR STARTERS AND DISCONNECTS
A. Unless otherwise noted on drawings, motors shall be of constant speed 1750 rpm, new NEMA Design B, 40ºC rise, horse power rated, open drip-proof except TEFC in dirty atmosphere, induction type motor with service factor of 1.15 and be of sufficient capacity to continuously operate the apparatus to which it is connected under all conditions of operation without exceeding nameplate ratings.
B. Motors shall be premium efficiency as calculated using IEEE test method 112B.
C. Motors ½ Hp. or larger shall be three phase; motors under ½ Hp. shall be 115 volt, 60 cycle, single phase. Before ordering the motors, the contractor shall verify correct motor voltage with the Electrical Trades and field conditions.
D. The Mechanical Trades shall furnish, for equipment under Division 22, all special switches, disconnects, starters, alternators, etc. as specified or scheduled to be factory furnished and/or factory installed with the equipment including wiring diagrams, etc.
whether it is to be factory installed or field wired. All other motor starters, disconnects, etc. not noted as factory furnished shall be furnished and installed by the Electrical Trades.
E. Starters that are to be factory furnished with equipment shall be of the combination type and shall be as specified under Electrical Trades Division. Furnish overload protection for each phase.
F. All wiring methods and materials shall meet NEMA, National Electric Code and State of Michigan Code requirements.
G. All displays on control panels shall be on face of the panels.
1.29 EXCAVATION AND BACKFILLING
A. Furnish all excavation, backfilling and removal of excess dirt to accomplish installation of Division 22 mechanical work unless otherwise noted on drawings.
B. All excavation shall be by open cut from the surface. Contractor shall determine whether excavation shall be by machine or by hand except where existing utilities may be located where excavation shall be by hand. Contractor shall be responsible for all damage to existing facilities and services. Excavation shall be to a depth of at least 6" to allow granular bedding below pipe or duct.
C. If for any reason the work is suspended, the contractor shall properly protect the excavation and leave the areas unobstructed.
D. Trench width shall allow sufficient width at centerline of pipe to allow at all times a first class construction/installation method but in no case should be less than 12" larger than the nominal pipe or duct size. This shall especially be true in areas that joints must be
PLUMBING REQUIREMENTS 22 05 00-12
connected. Joint holes may have to be made with overhanging sides to make installation safe for workmen.
E. The excavation shall be at all times finished and backfilled to the required grade after completion and approval of work. Not more than 100 feet of trench shall be excavated and open unless written approval is given by the Architect/Engineer.
F. The subgrade shall be 4" to 6" below the pipe of granular bedding graded and tamped by hand or mechanical means to the exact elevation required at the bottom of the pipe.
Granular materials shall be approved fine aggregate meeting MDOT #2NS specifications. This material shall pass a ½" sieve but will be retained on a #4 sieve. If poor soil conditions exist which will not give proper support to the pipe, duct or structure, furnish granular fill as required to remedy this situation and give proper support.
G. Furnish and install properly sloped sheet piled, shored and braced in areas that the soil requires this to maintain a proper excavation and prevent any movement of earth which could in any way damage the work under construction. When removing the sheeting and bracing, special care should be taken to prevent any caving of the sides of the excavation and injury to the completed work or adjacent property.
H. Take all necessary action to keep trenches and other excavation areas free from water at all times. Use such methods as pumping, ditching, well pointing, etc. to prevent water in trench or excavation. Dewatering of trench shall have constant supervision.
I. Backfill excavation and trenches with approved granular material around sides of pipe and at least 12 inches above the top of the pipe laid not more than in 6 inch layers that are thoroughly tamped to 95% of its maximum density. There shall be no backfilling by any mechanical means until the granular material has been firmly tamped around the entire pipe to 12 inches above the pipe. All material used for backfilling shall be approved by the Architect/Engineer. Wherever trenching crosses walks or roadways or isolated inside of building, backfill top 6'-0" of trench with sand or bank run gravel in layers not to exceed 6 inches in depth and carefully compact by hand or machine. Do not backfill with frozen materials.
J. No piping shall be covered until it has been tested, inspected and approved. Upon completion of backfilling, grade shall be restored in indicated elevation and left in reasonable condition for finish grade by others unless otherwise noted on drawings.
K. Before final acceptance of work, all disturbed streets, drives, curbs, walks, parking areas, etc. shall be paved, graveled or other to as near their original condition as possible. All unused excavated material shall be removed from site if directed by the Architect/Engineer.
1.30 BASES AND SUPPORTS
A. This contractor shall be responsible for furnishing all equipment pads and supports for equipment and materials required by Division 22 unless otherwise noted on drawings.
B. All floor mounted mechanical equipment shall have a reinforced concrete pad furnished unless otherwise noted on drawings. The concrete pads shall be tied to the building floor with expansion bolts located maximum of 4’-0” on centers with a minimum of four
(4) bolts, set before pouring and concealed within the pad. The Mechanical Trades shall
PLUMBING REQUIREMENTS 22 05 00-13
verify exact pad or support size with the equipment manufacturer and shall size pad with adequate area to allow sufficient room for equipment mounting hardware, etc. Concrete pads shall have a 45 degree bevel at the top edge. The contractor shall verify exact location of concrete pads.
C. Furnish all steel, hanging material, rods, etc. for suspending equipment off floor unless otherwise noted on drawings for equipment to be furnished under Division 22. This includes all structural steel for supporting between beams.
D. All support structure shall be of strength to safely withstand all stresses and loads to which they will be subjected and shall distribute load properly over the building area.
Supports shall be designed to avoid undue strain to equipment and to avoid interference with piping, pipe connections, service and maintenance clearances, etc.
E. Where equipment is to be floor mounted and requires legs, this contractor shall furnish and install structural steel members or steel pipe and fittings for legs. Fasten and brace to equipment and furnish flange at base to allow bolting to floor.
F. Where equipment is to be ceiling or wall mounted, furnish necessary platform, structural steel, hardware, etc. as is most suitable for support of this equipment.
G. All supports shall be approved by the Architect/Engineer.
H. All piping, plumbing, etc. shall be suspended from structural steel members utilizing rods and approved hanger devices. Do not use metal deck for support. Beam clamps such as the Grinnell Fig. 260 or approved equal shall be used. Sheet metal “straps” shall not be used in place of rods.
I. The mechanical trades shall be responsible for furnishing and setting in place all mechanical equipment, roof curbs and plumbing, piping roof curbs. The general trade shall be responsible for the roof work and associated flashing. The mechanical trade shall furnish and install treated wood base blocking as required to level curb and to match roof insulation thickness. Curb shall be as specified, or if not specified should be similar to Pate or Thy-curb with heavy gauge galvanized steel, insulated and with wood nailer. Height of curb scheduled or specified shall be height required to top of curb above finished roof. If height is not specified or noted, a minimum 12” high above finished roof will be required. (pipe support units shall be at height required).
1.31 SLEEVES, PLATES AND COLLARS
A. Furnish all sleeves, plates and collars for plumbing piping, etc. passing through walls, floor ceilings, foundations, etc. Coordinate with the General Contractor the exact location and size of required openings. No pipe shall pass through a wall, floor ceiling, etc. without a sleeve. This contractor shall be responsible for sleeve locations and securing sleeves before concrete is formed.
B. Sleeves for steel pipe shall be standard weight black steel pipe. For walls, foundations and ceilings, sleeve shall be kept flush with finished surfaces. For floors, the sleeve shall be set flush with bottom of concrete construction and be extended up ¼" above concrete floor. Sleeves shall be set in place before construction of walls, floors, ceilings, etc.
PLUMBING REQUIREMENTS 22 05 00-14
C. Sleeves for copper pipe shall be type "M" hard copper tubing installed typical to that of steel pipe sleeves.
D. Sleeves for piping shall be sized to allow insulation to run continuous through sleeve whenever possible and to allow not less than ¼" all around bare pipe or insulation.
E. Where insulated piping passes through walls or floor sleeves, furnish 22 gauge galvanized band around insulation of same length as the sleeve length. Band shall fit snugly over insulation and be held in place by steel metal collars all around insulation to cover openings.
F. All penetration voids shall be sealed smoke tight with non-combustible materials similar to 3M or Hilti firestop systems to maintain the integrity of the fire rated structure. In a non-rated assembly, seal all voids with non-hardening sealant.
G. Where bare piping 2" and smaller pass through wall or floors, furnish polished chrome plated brass escutcheons, split type. Bare piping 2½" and larger that pass through walls or floor, furnish 22 gauge galvanized steel metal collars so as to cover opening.
H. Where piping penetrates an outside wall, below grade, utilize a mechanical sleeve, similar to Link-Seal, with stainless steel nuts and bolts on fasteners.
1.32 RIGGING AND HOISTING
A. Perform all required rigging, hoisting, transportation, moving, etc. of all equipment, materials, etc. to be furnished and/or installed under Division 22 whether furnished by this contractor or by the Owner or other trades.
1.33 STORAGE FACILITY
A. Furnish and maintain a weatherproof storage facility on the site of adequate size to store miscellaneous equipment and/or materials to prevent exposure to the weather. Location of shed shall be determined by the Owner and Architect/Engineer. The Owner reserves the right to deny storage of materials or equipment in any existing or new buildings.
1.34 PROTECTION FROM DAMAGE
A. The contractor shall be responsible for all materials, equipment, etc. and all work installed by himself and shall protect it from damage until final acceptance of this project by the Owner.
B. Furnish all coverings and protection from dirt, dust, rain, storm, heat, traffic, wear, etc.
and all possible injury including that by other workmen. Any equipment, workmanship, materials, etc. damaged prior to final acceptance by the Owner of this project shall be properly repaired at no expense to the Owner.
C. Protect all plumbing fixtures and other equipment from damage by covering or coating.
Any dented, scratched, rusted or marred surface finishes will not be accepted.
D. Protect all equipment, materials, etc. from freezing.
PLUMBING REQUIREMENTS 22 05 00-15
1.35 COMMON PIPE MATERIALS AND INSTALLATION INSTRUCTIONS
A. Refer to individual Division 22 piping Sections for pipe, tube, and fitting materials and joining methods.
B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.
C. Refer to individual Division 22 piping Sections for special joining materials not listed below.
1. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.
a. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch (3.2-mm) maximum thickness unless thickness or specific material is indicated.
1) Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.
2) Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.
b. AWWA C110, rubber, flat face, 1/8 inch thick, unless otherwise indicated;
and full-face or ring type, unless otherwise indicated.
2. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.
3. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.
4. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813.
5. Brazing Filler Metals: AWS A5.8, BCuP Series, copper-phosphorus alloys for general-duty brazing, unless otherwise indicated; and AWS A5.8, BAg1, silver alloy for refrigerant piping, unless otherwise indicated.
6. Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
7. Solvent Cements for Joining Plastic Piping:
a. ABS Piping: ASTM D 2235.
b. CPVC Piping: ASTM F 493.
c. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656.
d. PVC to ABS Piping Transition: ASTM D 3138.
8. Fiberglass Pipe Adhesive: As furnished or recommended by pipe manufacturer.
1.36 PIPE HANGERS AND SUPPORTS
A. Hangers and saddles shall be Modern Pipe Support Corp., Grinnel/Anvil, Autogrip, or M- CO. Inserts shall be of the type to receive a machine bolt head or nut after installation, permit horizontal adjustment, and shall be flush with the surface. For copper pipe with steel hangers, clean and wrap pipe with two layers of plastic insulating tape at point of
PLUMBING REQUIREMENTS 22 05 00-16
contact. Roller supports shall be adjustable type with insulated standoff. Rods shall be used for suspended installation. Sheet metal “straps” shall not be used in place of rods.
B. Hangers for piping with vapor barrier sealed insulation shall be multipurpose pipe saddles fitting over the insulation. Wire or perforated strap iron will not be permitted for pipe supports. Do not support hangers from roof deck. Furnish and install all support steel as required to suspend from structural steel joist or beams. Hangers shall be clevis or split ring type with vertical adjustment and beam clamp similar to Grinnell/Anvil Fig. 260, with maximum spacing per ASHRAE Standards:
Pipe Size Steel Pipe Copper Pipe PVC Pipe Rod Size
½ to ¾ inch 6 feet 5 feet 4 feet 3/8” 1 inch 7 feet 5 feet 4 feet 3/8” 1 ¼ inch 7 feet 7 feet 4 feet 3/8” 1½ inch 7 feet 7 feet 4 feet 1/2” 2 inch 10 feet 8 feet 4 feet 1/2" 2½ inch 11 feet 9 feet 4 feet 5/8” 3 inch 11 feet 9 feet 4 feet 5/8” 3 ½ inch 13 feet 11 feet 4 feet 5/8” 4 inch 14 feet 12 feet 4 feet 3/4” 5 inch 14 feet 12 feet 4 feet 3/4" 6 inch 14 feet -- 4 feet 3/4" 8 inch 16 feet -- 4 feet 7/8“ 10 inch 16 feet -- 4 feet 7/8” 12 inch 20 feet -- 4 feet 1”
C. Conform to ASME B31.9, ASTM F708, MSS SP58, MSS SP69 and MSS SP89.
D. Hangers for Pipe Sizes ½ to 1½ Inch: Malleable iron, adjustable swivel, split ring.
E. Hangers for Pipe Sizes 2 Inches and Over: Carbon steel, adjustable, clevis.
F. Hangers for Hot Pipe Sizes thru 4 Inches: Carbon steel, adjustable, clevis.
G. Hangers for Hot Pipe Sizes 5 Inches and Over: Adjustable steel yoke, cast iron roll, double hanger.
H. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods.
I. Wall Support for Pipe Sizes up thru 3 Inches: Cast iron hook.
J. Wall Support for Pipe Sizes 4 Inches and Over: Welded steel bracket and wrought steel clamp.
K. Vertical Support: Steel riser unistrut clamps at high, mid, and low locations.
L. Floor Support for Cold Pipe all sizes and Hot Pipe Sizes up thru 4 Inches: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.
M. Copper Pipe Support: Carbon steel ring, adjustable, copper plated.
PLUMBING REQUIREMENTS 22 05 00-17
N. Hanger Rods: Mild steel threaded both ends, threaded one end, or continuous threaded.
O. Inserts: Malleable iron case of steel shell and expander plug for threaded connection with lateral adjustments, top slot for reinforcing rods, lugs for attaching to forms, size inserts to suit threaded hanger rods.
1.37 PLUMBING, PIPING, AND EQUIPMENT SUPPORT
A. Attachments of mechanical equipment to structural members are the responsibility of the installing trade. Structural members shall not be field cut, welded or otherwise modified without approval of the Architect/Engineer. Attachment to steel joist shall be made at panel points. When routing piping or ductwork perpendicular to joist, a support shall be provided at every steel joist; when parallel to joist, a support shall be provided at no more than 6’ on centers or two panel bays. Structural members shall not be overloaded as a result of attachments. Attachment/equipment loading for all trades resulting in total load greater than an equivalent uniform 5 psf for any member shall be submitted to the Architect/Engineer for review. Mechanical Trades may contact the project Structural Engineer as required for panel point location assistance and welder certification requirements. Electrical Trades are still responsible for design, layout, and fabrication and installation of electrical supports and support attachment methods.
Mechanical Trades shall submit attachment methods to the Structural Engineer for review.
B. Install products in accordance with manufacturer's instructions.
C. Do not fasten supports to pipes, ducts, mechanical equipment, and conduit.
D. Do not use spring steel clips and clamps.
E. Do not use powder-actuated anchors.
F. Do not drill or cut structural members without permission from Architect/Engineer.
G. Fabricate supports from structural steel or steel channel. Rigidly weld members or use hexagon head bolts to present neat appearance with adequate strength and rigidity.
Use spring lock washers under all nuts.
1.38 PIPING SYSTEMS SHUT OFF VALVES
A. Shut off valves shall be installed at all branch lines off main piping, or where mains divide/separate to serve different areas, to allow isolation of all branch piping and systems they serve such as toilet rooms, areas or wings of the building, etc.
1.39 CLEANING AND FINISHING
A. During construction period, remove all debris, rubbish, tools, equipment, unused materials, etc. as required or requested by the Architect/Engineer. All cost for cleanup and removal will be the responsibility of the contractor.
PLUMBING REQUIREMENTS 22 05 00-18
B. Upon completion of the project and before final acceptance by the Owner, the entire installation shall be thoroughly cleaned, all rubbish and unused material removed to the satisfaction of the Architect/Engineer. All dust and dirt shall be removed from all equipment, piping, ductwork, etc.
C. Thoroughly clean all floor drains, cleanouts, and plumbing fixtures. Clean all trays and strainers.
D. Finish paint all equipment, materials, piping, etc. as noted on drawings or listed in this specification. Match Owner's existing color scheme. Any Division 22 equipment which has been scratched or damaged shall be finished equal to the original finish.
1.40 EQUIPMENT/SYSTEMS START-UP
A. Furnish and schedule manufacturer’s start-up service for all equipment and systems.
These start-up services shall be performed in the presence of, and to the satisfaction of the Owner and Architect/Engineer.
1.41 EQUIPMENT/SYSTEMS SIGN-OFF
A. The Mechanical Trades shall furnish written sign-offs on all systems stating that the equipment and systems have been checked, tested, started and that their operation has been verified correct through the entire range of operation that can be expected through the seasons.
1.42 SUBSTANTIAL COMPLETION
A. Contractor shall submit a letter to the Architect/Engineer advising that all work has been completed in accordance with plans and specifications and the project is ready for a final walk-thru.
END OF SECTION
MAI 2018-1523
PLUMBING SYSTEMS TESTING, CLEANING, WATER TREATMENT & STARTUP 22 05 10-1
SECTION 22 05 10
PLUMBING SYSTEMS TESTING, CLEANING, WATER TREATMENT & STARTUP
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Testing of piping systems.
B. Cleaning of piping systems.
C. Chemical treatment.
D. Substantial completion check list and sign-off forms.
1.2 RELATED SECTIONS
A. All drawings and specification sections apply to work in this section. Furnish all items, articles, materials, equipment, operations or methods that are mentioned, listed or scheduled on drawings or are in this specification including all labor, equipment, materials and miscellaneous incidentals necessary and/or required for the completion of this project. The work covered under this section of the specifications is in no way complete within itself, but is supplementary to the entire specification and drawings.
1.3 SCOPE OF WORK
A. The work covered by this specification consists of…