IFB Drawings Part 4b.pdf

PDF 1 MB Posted

Attached to
751/17146. TAP; Mackinac Island - Comfort Station Replacement
Solicitation number
RFQ 171 190000000573 3
Issued by
Lake County, Mcbride Village, Michigan

About this file

Summary

These are electrical design and construction drawings for the Department of Technology, Management and Budget, State of Michigan, for a new Comfort Station building at the DNR/Mackinac Island State Harbor on Mackinac Island, Michigan (Project Number 2018060, Contract Number Y18395). The drawings were issued for bids on June 26, 2019. The project involves complete electrical systems installation including lighting plans, power distribution, emergency lighting, and related systems for the comfort station facility. The drawings specify lighting fixture types (LED cove lights and recessed downlights), control systems including wireless relay switches and occupancy sensors, receptacle installations with specific mounting heights and grounding requirements, and electrical panel configurations. Key electrical loads include two 40.5 kilowatt hot water heaters, a sewage ejector pump rated at 3.0 kilowatts, lighting at 1.3 kilowatts, and receptacles at 18.36 kilowatts, for a total calculated load of 103.66 kilowatts at 240 volts single-phase, requiring 432 amps.

The electrical specifications establish stringent wiring standards requiring dedicated neutral conductors and equipment grounding conductors throughout; prohibition of shared neutrals and raceway bonding paths; installation of all power wiring in conduit; and use of tamper-resistant receptacles at minimum 16 inches above finished floor. Emergency lighting and exit lights must operate 24/7. Lighting controls include occupancy sensors for gang toilets, combined occupancy and photo sensors maintaining 25 foot-candles during occupied periods and 5 foot-candles during unoccupied periods in the lobby, and wireless control systems for multiple lighting circuits. The design was prepared by WTA Architecture, located in Saginaw, Michigan, and was last updated on July 9, 2019.

View the file

Other files

File Type Posted
IFB Drawings Part 4a.pdf PDF
IFB Drawings Part 2.pdf PDF
IFB Specifications Part 2.pdf PDF
Advertisement 17146.pdf PDF
Addendum 1 17146.pdf PDF
IFB Drawings Part 3b.pdf PDF
IFB Drawings Part 3a.pdf PDF
IFB Specifications Part 3.pdf PDF
IFB Drawings Part 1.pdf PDF
IFB Specifications Part 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NUMBERPROJECT NUMBER

PROJECT DATE

CHECKED BY

SHEET TITLE

COPYRIGHT 2017

C

Saginaw, Michigan 48607

989 752 8107

100 S Jefferson Ave, Suite 601

WTAARCH.COM

ARCHITE SCT

DATENO. REVISION

53250

INDEX NO.

751/17146.TAP

FILE NO.

P

L

U

R

I B U

E

S

U

N

U

M

C

I

R

C

U M S

P

I

C

E

S

I

Q

U

ER

EI S

PENI NSUL AM

A M

O

E

N

A

M

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

ROBERT C. HALL, RA, NCARB, DIRECTOR

FACILITIES AND BUSINESS SERVICES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

Y18395

CONTRACT NO.

7/9/19ISSUE FOR BIDS

PROJECT TITLE

NEW BUILDING FOR:

DNR/ MACKINAC ISLAND

STATE HARBOR

MACKINAC ISLAND, MICHIGAN

2018060

JUNE 26, 2019

COMFORT STATION

LIGHTING PLAN

EAB

E1.1

LIGHTING PLAN

1/4"=1'-0"

NORTH

B B

B

C C

C C

C C

C C

C C

BB

B

BB

B

B

B

A18

A24

B

B

B

B

S

D D

D

S

M

S

M

D

S

M

E

E

EM

EM

EM

EM

EM

EM

EM

EM

EM

EM

EM

S

M

S

M

S

M

S

M

S

M

LIGHTING WIRING METHODS

1. EXIT LIGHTS SHALL OPERATE 24-7.

2. ALL LIGHTING CIRCUITS SHALL BE INSTALLED IN CONDUIT.

3. MC CABLE IS ACCEPTABLE AS A FINAL WIRING CONNECTION LESS THAN

6' IN LENGTH, TO RECESSED LIGHTING INSTALLED IN ACCESSIBLE

CEILINGS.

4. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH NEW

LIGHTING CIRCUIT. SHARED NEUTRALS ARE NOT PERMITTED FOR THIS

PROJECT.

5. PROVIDE AN EQUIPMENT GROUNDING CONDUCTOR FOR NEW LIGHTING

CIRCUITS. THE USE OF THE RACEWAY FOR A GROUNDING PATH IS NOT

ACCEPTABLE FOR THIS PROJECT.

D2

D2

B

B

B

B

D D D

DD D

D

D

F

F

F

F

A-34

A-34

A-34

A-34

A-34

S

A-34

A-34

S

A-32

S

A-30

EM

EM

A-33

A-30

A-34

S

K

A-30

B-3

A-33

LIGHTING WIRING METHODS

1. MOUNT ALL "EM" FIXTURES ABOVE THE DOORS AND AT A UNIFORM

HEIGHT, WIRED FROM THE LOCAL LIGHTING CIRCUIT AHEAD OF ANY

SWITCHING.

2. LOBBY LIGHTS SHALL BE CONTROLLED ON/OFF BY THE LOCAL

OCCUPANCY SENSOR AND DIMMED BY PHOTO SENSOR TO MAINTAIN

25fc. DURING OCCUPIED TIMES AND 5FC DURING UNOCCUPIED TIMES

AND 5fc DURING UNOCCUPIED TIMES.

3. GANG TOILETS SHALL BE CONTROLLED ON/OFF BY CEILING MOUNTED

OCCUPANCY SENSORS.

KEYED NOTES

EC SHALL INSTALL THE INDIRECT LINER LIGHTS ABOVE IN THE COVE. ANGLE

FIXTURES TO GRAZE THE WOOD SLOPE CEILING EVENLY.

EC SHALL MOUNT THE EMERGENCY REMOTE HEAD IN THE CORNER

MOUNTED AT THE SOFFIT TO HIDE THE REMOTE HEAD AS BEST AS

POSSIBLE.

WALL MOUNT TYPE "D" FIXTURES HERE ABOVE THE MIRROR.

FURNISH AND INSTALL A "WSP" FOR EACH CONTROLLED CIRCUIT.

PNL A

MDP

PNL

B

UPPER LIGHTING PLAN

1/4"=1'-0"

NORTH

WAC

WSP

WSP

WSP

WSP

F

F

A-28

A-28

ER

A-28

WSP

WSP

WIRELESS LIGHTING CONTROLS SCHEMATIC

WSP

WSP

WSP

WSP

WSP

WSP

WAC

A-22

A-22

A-33

A-28

A-30

A-32

A-34

A-33

A-28

A-30

A-32

A-34

CIRCUIT

IN

CIRCUIT

OUT

S

S

S

S

A-28

A-30

A-32

A-34

SHOWER HALLWAY LIGHTS

LOBBY LIGHTS

WOMENS LIGHTS

MENS LIGHTS

EXTERIOR LIGHTS

EXHAUST FAN

CKT B-3

F

W

T M

A

M a c k i n a c

I s l a n d

H r b o r

C o m f o r t

S t a t i o n

E

E

L

I G

H T

I N

G d w g

M o d e l

A

M d t h o r n h i l l

CHECKED BY

SHEET TITLE

COPYRIGHT 2017

C

Saginaw, Michigan 48607

989 752 8107

100 S Jefferson Ave, Suite 601

WTAARCH.COM

ARCHITE SCT

DATENO. REVISION

53250

INDEX NO.

751/17146.TAP

FILE NO.

P

L

U

R

I B U

E

S

U

N

U

M

C

I

R

C

U M S

P

I

C

E

S

I

Q

U

ER

EI S

PENI NSUL AM

A M

O

E

N

A

M

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

ROBERT C. HALL, RA, NCARB, DIRECTOR

FACILITIES AND BUSINESS SERVICES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

Y18395

CONTRACT NO.

7/9/19ISSUE FOR BIDS

PROJECT TITLE

NEW BUILDING FOR:

DNR/ MACKINAC ISLAND

STATE HARBOR

MACKINAC ISLAND, MICHIGAN

2018060

JUNE 26, 2019

COMFORT STATION

POWER AND SYSTEMS PLAN

EAB

E1.2

POWER AND SYSTEMS PLAN

1/4"=1'-0"

NORTH

WR

GFI

48"

GFI

WR

GFI

WR

GFI

48"

GFI

48"

GFI

GFI

GFI

GFI

GFI

48"

GFI

WR

GFI

GFI

48"

GFI

PNL

A

MDP

WAC

EF

EX

T

EX

T

EX. CABINET

M

M

GENERAL NOTES

1. ALL RECEPTACLES SHALL BE TAMPER RESISTANT LISTED.

30A

DISC

HD

HD

HD

HD

HD

TO

MDP

TO

MDP

TO

MDP

TO

PNL A

A-6

A-6

A-4

A-5

A-2 A-7

B-11

B-13

B-17

B-19

B-15

B-16

B-29

B-14

B-27 B-25 B-23

A-7 A-7

A-24

A-8

A-2

A-1

A-14

A-3

HD

A-2

B-28

B-26

B-24

B-22

B-18

B-20

B-30

B-16

B-16

V

Ø

N

E

M

A

R

B-16

JB

B-1

TELEPHONE

RACEWAY

B-14

48"

GFI

48"

GFI

48"

GFI

48"

GFI

WSP

WSP

WSP

WSP

48"

GFI

48"

GFI

48"

GFI

WASHER

DRYER

NEMA

10-30R

POWER & SYSTEMS WIRING METHODS

1. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH RECEPTACLE

CIRCUIT. SHARED NEUTRALS ARE NOT PERMITTED.

2. PROVIDE EQUIPMENT GROUNDING CONDUCTOR FOR EACH

RECEPTACLE. PROVIDE A #12 MINIMUM GROUNDING CONDUCTOR IN

EACH RACEWAY. THE USE OF METAL CONDUIT OR RACEWAY FOR A

BOND PATH IS NOT ACCEPTABLE FOR THIS PROJECT.

3. ALL POWER WIRING SHALL BE INSTALLED IN CONDUIT.

4. ALL NEW RECEPTACLES SHALL BE MOUNTED AT A MINIMUM OF 16" TO

THE BOTTOM OF BOX ABOVE THE FINISHED FLOOR, UNLESS NOTED

OTHERWISE. 18" IS ONLY AN ACCEPTABLE MOUNTING HEIGHT PENDING

FOR MASONRY COARSE LINE INSTALLATION. COORDINATE ALL DEVICE

HEIGHTS WITH ARCHITECT.

5. ELECTRICAL TRADES SHALL CONFIRM RECEPTACLE LOCATION WITH

THE OWNER PRIOR TO INSTALLATION OF ALL ROUGH-INS.

6. GENERAL PURPOSE DUPLEX RECEPTACLES SHALL BE WHITE, GRAY OR

IVORY AS ADVISED BY THE ARCHITECT.

7. ALL BRANCH DEVICES SHALL USE A 4" SQUARE STEEL BOX WITH A

SINGLE GANG TRIM RING FOR INTERIOR GYPSUM BOARD WALLS.

MASONRY BOXES ARE ACCEPTABLE FOR MASONRY WALL

INSTALLATION. NON-METALLIC BOXES ARE NOT ACCEPTABLE FOR THIS

PROJECT.

8. MC CABLE IS ONLY ACCEPTABLE FOR FINAL LIGHT FIXTURE

CONNECTIONS ABOVE THE LAY-IN CEILING ON THIS PROJECT, UNLESS

SPECIFICALLY NOTED.

9. NO SURFACE CONDUIT IS ALLOWED BELOW THE CEILING.

KEYED NOTES

REINSTALL SAVED PANELS HERE AS SHOWN. MAINTAIN 3' CLEARANCE IN

FRONT OF ALL PANELS TO MEET CODE.

EC SHALL PROVIDE A JUNCTION BOX WITH A 1" CONDUIT STUBBED OUT OF

THE BUILDING TO GREEN SPACE FOR USE FOR A TELEPHONE LINE. PROVIDE

A PULL STRING WITHIN RACEWAY.

EC SHALL INSTALL WIRELESS RELAY SWITCH PACK TO CONTROL THE

EXHAUST FAN. EXHAUST FAN SHALL OPERATE DURING OCCUPANT TIMES

AND UP TO 30 MINUTES PAST OCCUPANTS. UTILIZE LIGHTING SENSORS FOR

OCCUPANCY.

EC SHALL MOUNT/INSTALL THE MECHANICAL FURNISHED SEWAGE PUMP

CONTROLLER. WIRE POWER TO THE CONTROLLER AND MAKE ALL

CONNECTIONS AS REQUIRED FROM THE PUMPS UP TO THE CONTROLLER.

PNL

B

A-10,12

B-5

SE-1

WH-1

WH-2

SE CONTROLLER

4'x4'X1/2" PLYWOOD

BACKBOARD

WP

NEMA

6-20R

A-9,11

F

W

T M

A c k i n a c

I s l a r b o r

C o m f o r t

S t a t i o n

E

E

P

S d w g

M o d e l

A

M d t h o r n h i l l

CHECKED BY

SHEET TITLE

COPYRIGHT 2017

C

Saginaw, Michigan 48607

989 752 8107

100 S Jefferson Ave, Suite 601

WTAARCH.COM

ARCHITE SCT

DATENO. REVISION

53250

INDEX NO.

751/17146.TAP

FILE NO.

P

L

U

R

I B U

E

S

U

N

U

M

C

I

R

C

U M S

P

I

C

E

S

I

Q

U

ER

EI S

PENI NSUL AM

A M

O

E

N

A

M

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

ROBERT C. HALL, RA, NCARB, DIRECTOR

FACILITIES AND BUSINESS SERVICES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

Y18395

CONTRACT NO.

7/9/19ISSUE FOR BIDS

PROJECT TITLE

NEW BUILDING FOR:

DNR/ MACKINAC ISLAND

STATE HARBOR

MACKINAC ISLAND, MICHIGAN

2018060

JUNE 26, 2019

COMFORT STATION

RISER DIAGRAM,

SCHEDULES AND SYMBOLS

EAB

E2.1

WEATHER PROOF RECEPTACLE COVER

(INSTALL ON ALL EXTERIOR RECEPTACLES)

SURFACE CAST METAL HEAVY DUTY DUPLEX RECEPTACLE COVER. RATED

FOR IN USE, GASKETED. WITH LOCKABLE HASP.

INTERMATIC #WP1010MX SERIES OR EQUAL.

ELECTRICAL SYMBOLS

LINEAR FIXTURE

DOWNLIGHT OR SURFACE FIXTURE

RECESSED EMERGENCY LIGHT

EXIT/EMERGENCY LIGHT

WIRELESS PUSH "ON/OFF STATION, WAVELINX #W1L-W

MOTION SENSOR SWITCH WALL BOX INFRARED TYPE

NON-FUSED DISCONNECT SWITCH

DUPLEX RECEPTACLE

SINGLE PHASE MOTOR

PANEL BOARD

OCCUPANCY/PHOTO, WAVELINX #CWPD-1500

ELECTRICAL CRITICAL BRANCH

GROUND FAULT INTERRUPTER

WEATHER RESISTANT

SPECIAL RECEPTACLE NEMA 6-20R

WAVELINE AREA CONTROLLER #WAC-120

WAVELINX RELAY SWITCH PACK #MSP-MV010

WEATHER PROOF

WIRELESS

S

M

WR

GFI

EC

MDP PANEL SCHEDULE

600 AMP MCB 120/ 240 VOLT 1Ø, SQUARE D HCM I-LINE

1. PANEL A 150/2P CB

2. PANEL B 150/2P CB

3. HOT WATER HTR 40.5 KW 175/2P CB

4. HOT WATER HTR 40.5 KW 175/2P CB

5. SPARE 225/2P CB

6. SEWAGE EJECTOR 30A/2PCB

KEYED NOTES

EXISTING ELECTRICAL PANEL SALVAGED FROM THE EXISTING BUILDING AND

REINSTALLED FOR USE IN NEW COMFORT STATION.

NEW BREAKER FURNISHED AND INSTALLED BY CONTRACTOR FOR THE NEW

HOT WATER HEATER.

EC SHALL PROVIDE A BREAKER LOCK ON THIS BREAKER.

PROVIDE A NEW BREAKER FOR THE LOAD AS SHOWN.

PANEL

B

PANEL

A

TO MDP TO MDP

1 1

RISER DIAGRAM

E

M

EX CT SPLICE

CABINET

ELECTRICAL ROOM

EX UTILITY

TRANSFORMER

600A MCB

1 2

TO MDP TO MDP

WH-1 WH-2

LIGHTING FIXTURE SCHEDULE

A18 18' OF LED COVE LIGHT. 9 WATTS/FT, 109 LUMENS PER FOOT, 3500°K,

120 VOLT, 0-10 VOLT DIMMING, HALF DOME LENS + ASYMMETRIC WALL

WASH, ADJUSTABLE ALUMINUM BRACKET.

TEMPO #C6-ASY-O-UNV-9-35-LG-18'

A24 SAME AS TYPE "A18" EXCEPT 24'.

C 4" ROUND RECESSED LED DOWNLIGHT. 2000 LUMEN, 80 CRI, 3500°K,

WIDE DISTRIBUTION, 120 VOLT, NON CONDUCTIVE SHOWER TRIM,

WHITE MATTE FINISH, 0-10 VOLT DIMMING.

MDP

TO

PANEL A

EF-1

30A

1 HP

TO

MDP

SE-1

(3)#10

(1)#10 GND

3/4"C

(2)#10

(1)#10 GND

3/4"C

(2)#2/0, (1)#6 GND

2"C

(2)#2/0, (1)#6 GND

2"C

(3)#1/0

(1)#2/0 GND

3"C ( 2 SETS)

(3)#350

(1)#2/0 GND

3"C ( 2 SETS)

#2/0

#2/0

BUILDING

FND GND

(2) #3/4"x10'

GND RODS

S

WAC

WSP

LOAD SUMMARY

LIGHTING 1.3 KW

RECEPTACLE 18.36 KW

HVAC/MECHANICAL

1. WH-1 40.5 KW

2. WH-2 40.5 KW

3. SEWAGE EJECTOR 3.0 KW

TOTAL = 103.66 KW @ 240V, 1Ø = 432 AMPS

(2)#10

(1)#10 GND

3/4"C (3)#10

(1)#10 GND

3/4"C

SE-1 CONTROLLER

WATER

SERVICE

WM

WP

F

W

T M

A c k i n a c

I s l a r b o r

C o m f o r t

S t a t i o n

E

E

R

I S

E R

A

N D

S

C H

E D

U L

E S d w g

M o d e l

A

M d t h o r n h i l l

CHECKED BY

SHEET TITLE

COPYRIGHT 2017

C

Saginaw, Michigan 48607

989 752 8107

100 S Jefferson Ave, Suite 601

WTAARCH.COM

ARCHITE SCT

DATENO. REVISION

53250

INDEX NO.

751/17146.TAP

FILE NO.

P

L

U

R

I B U

E

S

U

N

U

M

C

I

R

C

U M S

P

I

C

E

S

I

Q

U

ER

EI S

PENI NSUL AM

A M

O

E

N

A

M

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

ROBERT C. HALL, RA, NCARB, DIRECTOR

FACILITIES AND BUSINESS SERVICES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

Y18395

CONTRACT NO.

7/9/19ISSUE FOR BIDS

PROJECT TITLE

NEW BUILDING FOR:

DNR/ MACKINAC ISLAND

STATE HARBOR

MACKINAC ISLAND, MICHIGAN

2018060

JUNE 26, 2019

COMFORT STATION

EMERGENCY LIGHTING

POINT BY POINT

EAB

E2.2

EMERGENCY LIGHTING POINT BY POINT

1/4"=1'-0"

NORTH

7.9 14.9

13.8 18.1

14.1

13.57.3

19.5

7.9 14.9

13.8 18.1

14.1

13.57.3

19.5

8.1

11.1

16.1

14.2 10.8

14.6

6.7

20.4

5.3

5.7

6.1

11.4

13.0

7.9

16.9 13.1

15.0

7.7

9.0

3.4

19.6

4.4

6.7

7.1

6.4

12.1

14.5

7.3

16.8

6.1

12.2 4.3

4.1

20.7

2.1

3.4

4.4

3.6

7.3

10.3

5.2

11.4

14.8

11.4

7.2

5.9

6.8

8.1

9.3

7.6

4.1

2.3

5.3

11.7

14.8

11.7

7.9

7.8

11.3

12.1

13.0

10.2

6.1

2.9

3.9

7.5

10.5

9.6

7.5

8.3

12.2

12.1

9.8

8.5

5.7

3.2

1.4

3.4

6.2

6.8

8.8

8.5

6.3

5.6

4.5

3.3

5.8

5.2

5.5

5.8

5.5

4.9

4.9

4.9

4.5

10.0

8.0

4.7

4.2

4.2

5.2

6.6

7.8

7.5

14.7

10.7

5.0

3.4

3.7

6.4

9.8

12.8

11.6

9.6

14.4

13.3

8.3

4.3

2.8

3.3

6.3

11.8

14.1

8.0

3.4

4.9

6.9

6.8

4.7

2.7

2.1

2.4

4.3

8.3

10.7

9.4

5.5

2.5

1.3

2.1

3.4

4.4

3.8

2.6

1.7

1.2

16.1

6.2

8.2

7.2

5.7

12.8

17.4

13.0

6.4

14.0

13.6

0.5

18.8

4.9

5.6

4.5

2.6

11.0

13.7

9.7

4.6

15.2

14.3

6.0

11.5

0.620.2

0.5

0.6

0.6

0.7

0.6

0.7

1.0

1.3

1.5

1.4

1.2

2.0

3.3

3.7

3.1

1.9

4.3

8.1

8.3

5.8

2.6

5.8

9.7

9.3

6.3

1.7

4.3

6.1

6.2

5.5

4.1

3.5

7.1

9.3

5.9

3.6

2.5

4.7

10.8

14.3

6.9

6.2

3.9

4.2

8.8

13.5

10.1

5.7

3.2

5.8

9.5

2.7

10.0

7.8

2.0

1.6

1.8

1.5

11.2

10.6

9.3

9.8

0.4

0.4

0.4

0.4

15.2

0.9

0.9

0.9

1.1

1.4

1.7

1.5

1.5

2.5

3.5

2.9

2.0

4.2

6.5

6.1

2.1

4.8

9.1

9.7

1.9

3.8

7.5

7.9

1.9

3.0

4.5

4.5

2.6

4.4

5.8

4.7

3.6

7.9

11.6

18.9

11.5

2.7

1.4

1.0

4.7

13.4

18.4

10.4

2.7

1.5

1.0

6.7

13.8

13.5

12.6

6.7

2.4

1.5

1.0

5.3

10.4

10.3

2.1

1.6

1.4

1.3

0.9

3.3

4.4

5.8

0.8

20.1

0.6

1.1

1.1

0.6

0.5

1.3

2.5

2.4

1.5

0.5

1.3

2.5

2.0

0.4

0.8

1.4

1.8

1.3

0.5

0.6

0.7

0.6

0.3 0.3

3.0

Statistics

Description Symbol Avg Max Min Max/Min Avg/Min

B.F. Shower 9.4 fc 20.7 fc 4.1 fc 5.0:1 2.3:1

B.F. Shower 10.3 fc 19.6 fc 3.4 fc 5.8:1 3.0:1

Exit 1.2 fc 3.0 fc 0.3 fc 10.0:1 4.0:1

Lobby 6.9 fc 16.1 fc 1.2 fc 13.4:1 5.8:1

Restroom Mens 5.0 fc 15.2 fc 0.4 fc 38.0:1 12.5:1

Restroom

Womens

5.3 fc 20.1 fc 0.8 fc 25.1:1 6.6:1

Shower 13.6 fc 19.5 fc 7.3 fc 2.7:1 1.9:1

Shower 13.6 fc 19.5 fc 7.3 fc 2.7:1 1.9:1

Shower 12.8 fc 20.4 fc 6.7 fc 3.0:1 1.9:1

Toilet Rm 10.3 fc 18.8 fc 0.5 fc 37.6:1 20.6:1

Toilet Rm 8.9 fc 20.2 fc 0.6 fc 33.7:1 14.8:1

F

W

T M

A c k i n a c

I s l a r b o r

C o m f o r t

S t a t i o n

E

E

E

E

R G

E N

C Y

P

T

B

Y

P

T d w g

M o d e l

A

M d t h o r n h i l l

File details come from the government source that posted it. Updated .