IFB_FS7pdf.pdf

PDF 3 MB Posted

Attached to
FIRE STATION 7 - GO BOND - DESIGN-BID-BUILD
Solicitation number
FD57100030
Issued by
Maricopa County, Phoenix City, Arizona

About this file

This is an Invitation for Bids (IFB) document issued by the City of Phoenix for the construction of Fire Station No. 7, a two-story facility approximately 18,000 gross square feet located at 8907 N. 3rd Street. The project is a Design-Bid-Build delivery method with OpenGov Project ID FD57100030. The fire station will include four apparatus bays, a minimum of 16 dormitories, kitchen, dining, day room, restrooms, exercise space, whole station generator, above-ground diesel fuel island, and site development including parking, hardscape, landscape, and irrigation. A pre-bid meeting is scheduled for 1:00 pm on Tuesday, September 29, 2026, at Phoenix City Hall, Room 5 West, and via Microsoft Teams. The Invitation for Bids packet will be available for download on Thursday, September 17, 2026, from the e-Procurement Portal at https://procurement.opengov.com/portal/phoenix. Sealed bids are due by 2:00 pm on Tuesday, October 13, 2026, at the Design and Construction Procurement Bid Box on the first floor of Phoenix City Hall, 200 W. Washington Street, Phoenix, Arizona 85003. Bids will be opened and read immediately following submission at 2:00 pm on the same date in Room 5 West of Phoenix City Hall. The contract will be awarded to the lowest responsive and responsible bidder, with the City reserving the right to reject all bids.

The project is funded through the 2023 General Obligation Bond Program (GO Bond). A Small Business Enterprise (SBE) subcontracting goal of 13 percent has been established for this project. Bidders must submit a bid bond or certified check equal to 10 percent of the total bid amount, executed by a surety company rated A- or better for the prior four quarters by A.M. Best Company. All bidders must be registered in the City's Vendor Management System and possess the appropriate Arizona Contractor's License and City of Phoenix Privilege License prior to bidding. The three lowest bidders will be required to submit additional documentation including a complete List of All Subcontractors and Suppliers within three calendar days of bid opening by 5:00 pm. Bidders must acknowledge all addenda on the bid proposal and comply with all applicable federal, state, and local laws, including immigration requirements, equal employment opportunity requirements, prevailing wage requirements, and heat safety mitigation requirements. The contract will require performance and labor and material bonds equal to 100 percent of the contract amount, comprehensive general liability insurance with minimum limits of $2,000,000 general aggregate, and builders' risk insurance equal to the initial contract amount plus additional coverage for subsequent change orders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STR DCM Standard MAG Boilerplate Rev. 2-26

TABLE OF CONTENTS

PROJECT TITLE:

PROJECT NO.:

SECTION I – Informative Page

(1) Call for Bids C.F.B. - 1 to 2

(2) Information for Bidders I.F.B. - 1 to 13

(3) Supplementary Conditions S.C. - 1 to 19

(4) Burrowing Owl / Migratory Birds ENV – 1 to 3

(5) Storm Water Pollution Prevention Plan S.W.P.P.P - 1 to 13

SECTION II - Submittals

(1) Bid Proposal P. - 1 to 2

(2) Proposal Submittal P.S. - 1

(3) Surety Bond S.B. - 1

(4) Small Business Enterprise Clause and Submittal Documents SBE 1 to 10

(5) Bidder’s Statement of Proposed SBE Utilization S.B.U. - 1

(6) Letter of Intent to Perform as a SBE Subcontractor/Supplier L.O.I.-1

(7) Letter of Intent to Perform as a Subcontractor/Supplier Instructions & Worksheet L.O.I.W-1

(8) List of Major Subcontractors and Suppliers L.O.S. - 1

(9) List of All Subcontractors and Suppliers L.O.S. - 2

(10) Bidder’s Disclosure Statement B.D.S.-1 to 4

(11) Affidavit of Identity A.O.I. - 1

SECTION III – Technical Specifications and Drawings Pages/Sheets

(1) Technical Specifications 639 pages

(2) Plan Sheets 218 pages

C.F.B. 1

CALL FOR BIDS

CITY OF PHOENIX

FIRE STATION 7 – GO BOND

DESIGN-BID-BUILD

OPENGOV ID. FD57100030

BIDS WILL BE DUE: TUESDAY, OCTOBER 13, 2026, AT 2:00 P.M.

SUBMITTED INTO THE DESIGN AND CONSTRUCTION PROCUREMENT BID BOX LOCATED

ON THE 1ST FLOOR LOBBY OF THE PHOENIX CITY HALL BUILDING, 200 W. WASHINGTON

STREET, PHOENIX, ARIZONA, 85003

BIDS WILL BE READ: TUESDAY, OCTOBER 13, 2026, AT 2:00 P.M.

ON 5TH FLOOR, ROOM 5 WEST

PHOENIX CITY HALL

200 W. WASHINGTON STREET

PHOENIX, AZ 85003-1611

*All times are local Phoenix time

Scope of Work

The City of Phoenix is seeking a qualified contractor to provide construction services for the project listed below.

Fire Station No. 7 is proposed to be a two-story fire station with approximately 18,000 gross square feet. It will have four apparatus bays and a minimum of 16 dormitories with all the standard fire station amenities including whole station generator and above-ground diesel fuel island. There will be the typical spaces associated with a fire station of this size – kitchen, dining, day room, individual restrooms, and exercise space. The scope of work will also include site development, parking, hardscape, landscape, irrigation, security lighting, and other elements as required. The architectural elements, landscape, and hardscape to be designed to match and blend with the surrounding community.

The project will require the design of the new Fire Station No. 7 on City of Phoenix owned property located at 8907 N.

3rd Street. The site is approximately 1.6 acres relatively square in shape and has some existing setbacks and easements that will affect the overall use and placement of buildings and driveways. This project will utilize 2023-General Obligation Bond Program (GO Bond) Funding.

A Small Business Enterprise goal of 13% has been established for this project.

Pre-Bid Meeting

A pre-bid meeting will be held at 1:00 pm on Tuesday, September 29, 2026, at 200 W. Washington Street, City Hall Conference Room 5 West ---- AND via Teams. At this meeting, staff will discuss the scope of work, general contract issues and respond to questions from the attendees. As City staff will not be available to respond to individual inquiries regarding the project scope outside of this pre-bid meeting, it is strongly recommended that interested firms send a representative to the pre-bid meeting.

Pre-Bid Teams Meeting Information:

Join: https://teams.microsoft.com/meet/281823862375695?p=Dj1KGto6FuaqwL4YVN

Meeting ID: 281 823 862 375 695

Passcode: Wj3bG2mt https://teams.microsoft.com/meet/281823862375695?p=Dj1KGto6FuaqwL4YVN

C.F.B. 2

Request For Bid Packet

On Thursday, September 17, 2026 the Invitation For Bids packet may be downloaded from the e-Procurement Portal at: https://procurement.opengov.com/portal/phoenix

Firms receiving a copy of the bid packet through any other means are strongly encouraged to download the bid packet from the City webpage.

Firms must be registered in e-Procurement https://procurement.opengov.com/portal/phoenix as a vendor.

General Information

The City reserves the right to award the contract to the lowest responsible responsive bidder or all bids will be rejected, as soon as practicable after the date of opening bids.

The City of Phoenix will provide reasonable accommodations for alternate formats of the bid packet by calling Anna York at

(602) 534-3691 or calling TTY 711. Requests will only be honored if made within the first week of the advertising period.

Please allow a minimum of seven calendar days for production.

Questions pertaining to process or contract issues should be submitted via the e-Procurement portal.

Ed Zuercher City Manager

Eric J. Froberg, PE City Engineer

Published: Arizona Business Gazette Date: August 20, 2026 Date: August 28, 2026 District: 3 https://procurement.opengov.com/portal/phoenix

PROPOSAL SUBMITTAL

I.F.B.-1

INFORMATION FOR BIDDERS

1. 102 BIDDING REQUIREMENTS AND CONDITIONS, Add the following to MAG and COP

Supplement to MAG Section 102 BIDDING REQUIREMENTS AND CONDITIONS:

INFORMATION FOR BIDDERS

A. QUESTIONS ON PLANS AND SPECIFICATIONS

Neither the Engineer nor the City of Phoenix will be held responsible for any oral instructions.

Any changes to the plans and specifications will be in the form of an addendum. All Addenda will be posted online within the project folder at the following website:

For additional information prior to submitting your bid, contact:

Plans, Technical/Special Provisions, Proposal or Specifications:

NAME: Anna York, Design and Construction Procurement All questions must be submitted through OpenGov.

SBE Utilization contact:

Equal Opportunity Department: (602) 262-6790

All questions regarding the plans and specifications must be received (in writing) at a minimum seven calendar days prior to bid opening. Questions received after that time may not be given any consideration.

B. REQUEST FOR SUBSTITUTIONS

Paragraph A, B, and C of MAG Section 106.4 are deleted and the following paragraphs substituted:

1. The Engineer will consider written request(s), by a prime bidder only, for substitution(s) which is/are considered equivalent to the item(s) specified in the Contract documents. The written request will be considered only if it is received at least twelve calendar days prior to the established bid date. Notification of acceptable substitutions will be made by addendum issued no fewer than seven calendar days prior to the established bid date. (A.R.S. 34-104)

2. The prime bidder, at his own expense, will furnish the necessary data of substitution and validate that the physical, chemical, and operational qualities of each substitute item is such that this item will fulfill the originally specified required function.

3. The substitution, if approved, will be authorized by a written addendum to the Contract documents and will be made available to all bidders. The bid date and the scheduled completion time will not be affected by any circumstances developing from this substitution.

4. The request will be submitted to Design and Construction Procurement, Attention Anna York, 6th Floor, Phoenix City Hall, 200 W. Washington Street, Phoenix, Arizona 85003-1611 or via email to anna.york@phoenix.gov.

C. BID BOND

Bidders must submit a properly completed proposal guarantee in the form of certified check, cashier's check, or surety bond provided, for an amount not less than 10 percent of the total

I.F.B.-2

STR DCM Standard MAG Boilerplate Rev. 2-26 amount bid included in the proposal as a guarantee that the contractor will enter into a contract to perform the proposal in accordance with the plans and specifications. Surety bonds submitted for this project will be provided by a company which has been rated “A- or better for the prior four quarters” by the A.M. Best Company. A bid will be deemed non-responsive if not accompanied by this guarantee.

The surety bond will be executed solely by a surety company or companies holding a certificate of authority to transact surety business in the State of Arizona, issued by the Director of the Department of Insurance pursuant to Title 20, Chapter 2, Article 1. The surety bond will not be executed by an individual surety or sureties even if the requirements of Section 7-101 are satisfied. The certified check, cashiers check, or surety bond will be returned to the contractors whose proposals are not accepted, and to the successful contractor upon the execution of a satisfactory bond and contract.

When providing a Surety Bond, failure to provide an "A- or better for the prior four quarters" bond will result in bid rejection.

D. LIST OF MAJOR SUBCONTRACTORS AND SUPPLIERS & LIST OF ALL

SUBCONTRACTORS AND SUPPLIERS

A bid will be deemed non-responsive if not accompanied by a properly completed and signed L.O.S.-1 “List of Major Subcontractors and Suppliers” form.

To assist in eliminating the practice of bid shopping on City construction projects, the Bidder shall list all Major Subcontractors and Suppliers to whom the Bidder intends to contract with that are equal to or greater than 5% of the base bid. The list of Major Subcontractors and Suppliers will be provided on the L.O.S.-1 “List of Major Subcontractors” form. Failure to properly complete and sign this form will result in bid rejection. This form is due with the bid.

If substantial evidence exists that bid shopping occurred on this project, the Bidder will be ineligible to bid on City or City-affiliated construction projects for a period of one year.

The list of All Subcontractors and Suppliers shall be provided on the L.O.S.-2 “List of All Subcontractors and Suppliers” form. This form is due three calendar days after bid opening by 5:00 p.m. All bidders will be required to submit the L.O.S.-1 form. The three lowest bidders will be required to submit the L.O.S.-2 form. If the L.O.S.-2 form is not submitted by the post-bid deadline, the Bidder will still be required to submit the document prior to award. If the Bidder fails to submit the required L.O.S.-2 form by the post-bid deadline, the Bidder’s bid bond may be placed in jeopardy because the City may make a claim against the Bidder’s bid bond for the cost difference between the lowest responsive and responsible Bidder’s bid and the next lowest bid (and any additional costs involved in awarding the contract to the next lowest responsive and responsible bidder).

E. BID SUBMITTAL

The properly completed bid documents along with the ten percent bid guarantee will be submitted in a sealed envelope. The outside of the envelope will be marked as follows:

Bid of (Firm's Name, Address and Phone Number) For: Fire Station 7 – GO Bond City of Phoenix Project Number: FD57100030

Sealed bids will be submitted to the bid box located on the first floor of the Phoenix City Hall Building, 200 W. Washington Street, Phoenix, Arizona, 85003 prior to the time and date specified for bid opening.

I.F.B.-3

STR DCM Standard MAG Boilerplate Rev. 2-26

F. BID WITHDRAWALS

MAG Section 102-10, Withdrawal or Revision of Proposal, is hereby deleted and the following paragraph is submitted:

“No bidder may withdraw or revise a proposal after it has been deposited with the City except as provided in Phoenix City Code Chapter 2, Section 190.2. Proposals, read or unread, will not be returned to the bidders until after determination of award has been made.

G. ADDENDA

Acknowledge all addenda; a bid will be deemed non-responsive if all issued addenda for this project are not acknowledged in writing on Page P. -1.

The City of Phoenix will not be responsible for any oral responses or instructions made by any employees or officers of the City of Phoenix regarding bidding instructions, plans, drawings, specifications or contract documents. A verbal reply to an inquiry does not constitute a modification of the Invitation for Bid. Any changes to the plans, drawings and specifications will be in the form of an addendum.

It will be the responsibility of the prospective bidder to determine, prior to the submittal of its bid, if any addenda to the project have been issued by the Design and Construction Procurement. All addenda issued will be acknowledged by the bidder on Page P-1. All addenda (if any) will be available online within each project’s folder at the following website:

The contractors are responsible for ensuring they have all addenda for all projects they are submitting on. Prospective bidders are strongly encouraged to check the Solicitations website in order to ascertain if any addenda have been issued for the project.

H. BID SUBMITTAL CHECKLIST

All firms must be registered in the City’s Vendor Management System prior to submitting a bid. For new firms – the City will send an email to your firm with a vendor number within two days of submitting the request. The vendor number needs to be included on the cover of the bid proposal package/envelope. Information on how to register with the City is available at:

https://www.phoenix.gov/finance/vendorsreg

BID SUBMITTAL CHECKLIST

This checklist is provided to remind bidders of several of the required elements of the bid packages. It is not intended to be a comprehensive list of all the contract documents. Bidders are encouraged to review all of the Bid Instructions to determine compliance therein.

o Acknowledge all addenda? (Page P-1) o Completed all of the Bid Proposal forms? (Pages P-1 to P-2 and P.S.-1) o Included your Bid Bond (rated A- or better for the prior four quarters) or Guarantee

Cashier’s Check? (Page S.B.-1) o Completed SBE Utilization form or a fully documented waiver package? (Page S.B.U.-1) o Completed List of Major Subcontractors and Suppliers form? (Page L.O.S.-1)

I.F.B.-4 o Completed Letter of Intent to Perform as Subcontractor/Supplier (L.O.I-1)

PLEASE DO NOT SUBMIT THE ENTIRE SPECIFICATION BOOK WHEN SUBMITTING

YOUR BID. INCLUDE ONLY THE REQUIRED BIDDING DOCUMENTS.

POST-BID SUBMITTAL CHECKLIST

The three lowest bidders must submit completed contracts documents listed below, no later than three calendar days after bid opening by 5:00 p.m. The documents must be submitted to Design and Construction Procurement, 6th Floor, or can be sent by email to anna.york@phoenix.gov.

o Completed List of All Subcontractors and Suppliers form (L.O.S.-2) o Bidders Disclosure Statement? (Pages B.D.S.-1 to 4) o Submit Affidavit of Identity (if you are a sole proprietor) (Page A.O.I.-1)

PRIOR TO CONTRACT EXECUTION

o Contractor must provide proof of license required to perform the work.

o Verification of Experience Modification Rate (EMR) – the awarded company will be required to provide an EMR verification letter from the insurance company prior to contract execution.

I. PERMITS

CITY RESPONSIBILITY – The City will be responsible for City of Phoenix review and permit(s) fees for building and demolition permits. The City will also pay review fees for grading and drainage, water, sewer, and landscaping. The City will also pay for utility design fees for permanent services.

CONTRACTOR RESPONSIBILITY – The Contractor will be responsible for all other permits and review fees not specifically listed above. The Contractor is responsible for the cost of water meters, water and sewer taps, fire lines and taps, and all water bills on the project meters until the project is accepted. Arrangements for construction water are the Contractor's responsibility.

The Contractor may elect to use a City fire hydrant for its source of construction water only if an existing water service connection is unavailable or inadequate. The Contractor will be required to comply with Phoenix City Code Section 37-13A.

The Contractor is specifically reminded of the need to obtain the necessary environmental permits or file the necessary environmental notices. Copies of these permits and notices must be provided to the City's Project Manager prior to starting the permitted activity. In the case of Fire Department permits, a copy of the application for permit will also be provided to the Project Manager. This provision does not constitute an assumption by the City of an obligation of any kind for violation of said permit or notice requirements.

J. CANCELLATION OF CONTRACT FOR CONFLICT OF INTEREST

All parties hereto acknowledge that this Agreement is subject to cancellation by the City of Phoenix pursuant to the provisions of Section 38-511, Arizona Revised Statutes.

K. CONTRACTOR'S LICENSE AND PRIVILEGE LICENSE AND CERTIFICATIONS

I.F.B.-5

STR DCM Standard MAG Boilerplate Rev. 2-26

Prior to bidding on this project, the bidder must possess the correct license to perform the work described in the plans and specifications. Prior to award of the contract, the successful bidder must provide to the Contract Procurement Section its Contractor’s License Classification and number, its City of Phoenix Privilege License number and Federal Tax Identification number.

Bidder will submit the Bidder’s Disclosure Statement as set forth in Pages B.D.S. - 1 to B.D.S. - 4 within three calendar days of bid opening by 5:00 p.m.

Unless provided otherwise in this solicitation, Bidder will be deemed non-responsive and the bid rejected if Bidder fails to possess the proper Contractor’s and Business Licenses at the time of bid or fails to submit a substantially completed Bidder’s Disclosure Statement as specified above.

L. TAX LIABILITIES; DISCLOSURE OF CONVICTIONS AND BREACH(S) OF CONTRACT

On or before the award of the contract for this project, the successful bidder will: (i) file all applicable tax returns and will make payment for all applicable State of Arizona and Maricopa County Transaction Taxes (ARS Sec. 41-1305) and City of Phoenix Privilege License Taxes (Phoenix City Code Sec.14-415); (ii) disclose any civil fines, penalties or any criminal convictions, other than for traffic related offenses, for violation of federal, state, county or city laws, rules or regulations including, but not limited to, environmental, OSHA, or labor compliance laws (collectively “Laws”) by Bidder, Bidder’s directors, managing members, responsible corporate officers or party who will be responsible for overseeing and administering this project (collectively “Bidder”); and (iii) disclose any material breach(s) of an agreement with the City of Phoenix, any termination for cause or any litigation involving the City of Phoenix occurring within the past three calendar years. Unless provided otherwise in this solicitation, the successful bidder will be deemed non-responsible and the bid rejected for any of the following: (i) Bidder’s civil or criminal conviction, other than for traffic related offenses, for a violation of Laws within the past three calendar years; (ii) liability or culpability resulting in payment of fines or penalties in the cumulative total amount of $100,000 or greater for a violation of “Laws” within the past three calendar years;

(iii) material breach of a City of Phoenix agreement, termination for cause or litigation with the City of Phoenix within the past three calendar years; and (iv) Bidder’s failure to disclose the information as required by this provision. Further, after award of contract, in addition to any other remedy, Bidder’s failure to remit proper taxes to the City of Phoenix may result in the City withholding payment pursuant to Phoenix City Charter Chapter XVIII, Section 14 until all delinquent taxes, interest, and penalties have been paid.

State and Local Transaction Privilege Taxes:

In accordance with applicable state and local law, transaction privilege taxes may be applicable to this transaction. The state and local transaction privilege (sales) tax burden is on the person who is conducting business in Arizona and the City of Phoenix. The legal liability to remit the tax is on the person conducting business in Arizona. Any failure by the Contractor to collect applicable taxes from the City will not relieve the Contractor from its obligation to remit taxes.

It is the responsibility of the Contractor to determine any applicable taxes. The City will review the price or offer submitted and will not deduct, add or alter pricing based on taxes.

If you have questions regarding tax liability, seek advice from a tax professional prior to submitting a bid. Once the bid is submitted, the Offer is valid for the time specified in this Solicitation, regardless of mistake or omission of tax liability.

If the City finds over payment of a project due to tax consideration that was not due, the Contractor will be liable to the City for that amount, and by contracting with the City agrees to remit any overpayments back to the City for miscalculations on taxes included in a bid price.

For purposes of A.R.S. 42-5075(P), this contract is subject to A.R.S. Title 34.

I.F.B.-6

STR DCM Standard MAG Boilerplate Rev. 2-26

Tax Indemnification:

Contractor will, and require the same of all subcontractors, pay all federal, state and local taxes applicable to its operation and any persons employed by the Contractor. Contractor will, and require the same of all subcontractors, hold the City harmless from any responsibility for taxes, damages and interest, if applicable, contributions required under federal, and/or state and local laws and regulations and any other costs including transaction privilege taxes, unemployment compensation insurance, Social Security and Worker’s Compensation.

Tax Responsibility Qualification:

Contractor may be required to establish, to the satisfaction of City, that all fees and taxes due to the City or the State of Arizona for any License or Transaction Privilege taxes, Use Taxes or similar excise taxes, are currently paid (except for matters under legal protest).

Contractor agrees to a waiver of the confidentiality provisions contained in the City Finance Code and any similar confidentiality provisions contained in Arizona statutes relative to State Transaction Privilege Taxes or Use Taxes.

Contractor agrees to provide written authorization to the City Finance Department and to the Arizona State Department of Revenue to release tax information relative to Arizona Transaction Privilege Taxes or Arizona Use Taxes to assist the Department in evaluating Contractor’s qualifications for and compliance with contract for duration of the term of contract.

M. STANDARD SPECIFICATIONS AND DETAILS

Except as otherwise required in these specifications, bid preparation and construction of this project will be in accordance with all applicable Maricopa Association of Governments' (MAG) Uniform Standard Specifications and Uniform Standard Details, latest revision, and the City of Phoenix Supplements to the MAG Uniform Standard Specifications and Details, latest revision.

N. PRECEDENCE OF CONTRACT DOCUMENTS

In case of a discrepancy or conflict, the precedence of contract documents is as follows:

1. Change Orders or Supplemental Agreements

2. Addenda

3. Contract Specifications/Special Provisions/Technical Provisions

4. The Plans

5. COP Supplement to MAG Standard Specifications and Details, latest revision

6. MAG Standard Specifications and Details, latest revision

The precedence of any Addenda falls within the category of which it represents.

O. CONFIDENTIALITY OF PLANS & SPECIFICATIONS

Any plans generated for this project must include the following statement in the Title Block on every page: “Per City of Phoenix City Code Chapter 2, Section 2-28, these plans are for official use only and may not be shared with others except as required to fulfill the obligations of Contractor’s contract with the City of Phoenix.”

P. AUDIT AND RECORDS

Records of the Contractor's direct personnel payroll, bond expenses, and reimbursable expenses pertaining to this Project, and records of accounts between the City and Contractor will be kept on the basis of generally accepted accounting principles and must be made available to the City and its auditors for up to five years following Final Acceptance of the Project.

I.F.B.-7

The City, its authorized representative, and/or any federal agency, reserves the right to audit the Contractor's records to verify the accuracy and appropriateness of all cost and pricing data, including data used to negotiate the Contract and any change orders.

The City reserves the right to decrease Contract price and/or payments made on this Contract and/or request reimbursement from the Contractor following final contract payment on this Contract if, upon audit of the Contractor's records, the audit discloses the Contractor has provided false, misleading, or inaccurate cost and pricing data.

The Contractor will include a similar provision in all of its Agreements with subcontractors and suppliers providing services or supplying materials under the Contract Documents to ensure that the City, its authorized representative, and/or the appropriate federal agency has access to the Subcontractor’s and Supplier’s records to verify the accuracy of all cost and pricing data.

The City reserves the right to decrease the Contract price and/or payments made on this Contract and/or request reimbursement from the Contractor following final contract payment on this Contract if the above provision is not included in the Subcontractor’s and Supplier’s contracts, and one or more Subcontractors or Suppliers refuse to allow the City to audit their records to verify the accuracy and appropriateness of cost and pricing data.

If, following an audit of this Contract, the audit discloses the Contractor has provided false, misleading or inaccurate cost and pricing data, and the cost discrepancies exceed 1% of the total Contract billings, the Contractor will be liable for reimbursement of the reasonable, actual cost of the audit.

Q. IMMIGRATION REFORM AND CONTROL ACT

Compliance with Federal Laws Required. Contractor understands and acknowledges the applicability of the Immigration Reform and Control Act of 1986 and the Drug Free Workplace Act to it. Contractor agrees to comply with these Federal Laws in performing under this Agreement and to permit City inspection of its personnel records to verify such compliance.

R. LEGAL WORKER REQUIREMENTS

The City of Phoenix is prohibited by A.R.S. § 41-4401 from awarding a contract to any contractor who fails, or whose subcontractors fail, to comply with A.R.S. § 23-214(A). Therefore, Contractor agrees that:

1. Contractor and each subcontractor it uses warrants their compliance with all federal immigration laws and regulations that relate to their employees and their compliance with § 23-214, subsection A.

2. A breach of a warranty under paragraph 1 will be deemed a material breach of the contract that is subject to penalties up to and including termination of the contract.

3. The City of Phoenix retains the legal right to inspect the papers of any Contractor or subcontractor employee who works on the contract to ensure that the Contractor or subcontractor is complying with the warranty under paragraph 1.

S. CONTRACTOR AND SUBCONTRACTOR WORKER BACKGROUND SCREENING

Contractor agrees that all Contractor’s and subcontractors’ workers (collectively “Contract Worker(s))” pursuant to this Agreement will be subject to background and security checks and screening (collectively “Background Screening”) at Contractor’s sole cost and expense, unless otherwise provided for in the scope of work. Contractor’s background screening will comply with

I.F.B.-8

STR DCM Standard MAG Boilerplate Rev. 2-26 all applicable laws, rules and regulations. Contractor further agrees that the background screening is necessary to preserve and protect the public health, safety and welfare. The City requires a completed Contract Worker Badge/Key/Intrusion Detection Responsibilities Agreement for each Contract Worker who requires a badge or key.

Background Screening Risk Level: The City has established two levels of risk: Standard and Maximum risk. The current risk level and background screening required is NOT APPLIABLE TO THIS PROJECT. If the scope of work changes, the City may amend the level of risk, which could require the Contractor to incur additional contract costs to obtain background screens or badges.

Terms of This Section Applicable to all Contractor’s Contracts and Subcontracts:

Contractor will include Contract Worker background screening in all contracts and subcontracts for services furnished under this agreement.

Materiality of Background Screening Requirements; Indemnity: The background screening requirements are material to City’s entry into this agreement and any breach of these provisions will be deemed a material breach of this contract. In addition to the indemnity provisions set forth in this agreement, Contractor will defend, indemnify and hold harmless the City for all claims arising out of this background screening section including, but not limited to, the disqualifications of a Contract Worker by Contractor. The background screening requirements are the minimum requirements for the Agreement. The City in no way warrants that these minimum requirements are sufficient to protect Contractor from any liabilities that may arise out of the Contractor’s services under this Agreement or Contractor’s failure to comply with this section. Therefore, Contractor and its Contract Workers will take any reasonable, prudent and necessary measures to preserve and protect public health, safety and welfare when providing services under this Agreement.

Continuing Duty; Audit: Contractor’s obligations and requirements will continue throughout the entire term of this Agreement. Contractor will maintain all records and documents related to all background screenings and the City reserves the right to audit Contractor’s records.

T. LAWFUL PRESENCE REQUIREMENT

Pursuant to A.R.S. §§ 1-501 and 1-502, the City of Phoenix is prohibited from awarding a contract to any natural person who cannot establish that such person is lawfully present in the United States. To establish lawful presence, a person must produce qualifying identification and sign a City-provided affidavit affirming that the identification provided is genuine. This requirement will be imposed at the time of contract award. This requirement does not apply to business organizations such as corporations, partnerships or limited liability companies.

U. LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED)

If practical, the contractor will provide an easily accessible area to serve the construction site that is dedicated to the separation, collection and storage of materials for recycling including (at a minimum) paper, glass, plastics, metals, and designate an area specifically for construction and demolition waste recycling. The contractor must provide documentation that the materials have been taken to a Maricopa County approved recycling facility.

V. CITY OF PHOENIX EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENT

1. In order to do business with the City, Contractor must comply with Phoenix City Code, 1969, Chapter 18, Article V, as amended, Equal Employment Opportunity Requirements.

Contractor will direct any questions in regard to these requirements to the Equal Opportunity Department, (602) 262-6790.

I.F.B.-9

2. Any Contractor in performing under this contract will not discriminate against any worker, employee or applicant, or any member of the public, because of race, color, religion, sex, national origin, age, or disability nor otherwise commit an unfair employment practice. The Contractor will ensure that applicants are employed, and employees are dealt with during employment without regard to their race, color, religion, sex, national origin, age, or disability and will adhere to a policy to pay equal compensation to men and women who perform jobs that require substantially equal skill, effort, and responsibility, and that are performed within the same establishment under similar working conditions. Such action will include but not be limited to the following: Employment, promotion, demotion or transfer, recruitment or recruitment advertising, layoff or termination; rates of pay or other forms of compensation;

and selection for training; including apprenticeship. The Contractor further agrees that this clause will be incorporated in all subcontracts with all labor organizations furnishing skilled, unskilled and union labor, or who may perform any such labor or services in connection with this contract.

If the Contractor employs more than thirty-five employees, the following language will apply as the last paragraph to the clause above:

The Contractor further agrees not to discriminate against any worker, employee or applicant, or any member of the public, because of sexual orientation or gender identity or expression and will ensure that applicants are employed, and employees are dealt with during employment without regard to their sexual orientation or gender identity or expression.

3. Documentation. Contractor may be required to provide additional documentation to the Equal

Opportunity Department affirming that a nondiscriminatory policy is being utilized.

4. Monitoring. The Equal Opportunity Department will monitor the employment policies and practices of suppliers and lessees subject to this article as deemed necessary. The Equal Opportunity Department is authorized to conduct on-site compliance reviews of selected firms, which may include an audit of personnel and payroll records, if necessary.

W. PROTEST PROCEDURES

Any bidder who has any objections to the awarding of a contract to any bidder by the City of Phoenix, pursuant to competitive bidding procedures, will comply with Phoenix City Code Chapter 2, Section 188.” A copy of the Protest Policy is also available online at:

https://www.phoenix.gov/streets/procurement-opportunities

X. DATA CONFIDENTIALITY

As used in the Contract, “data” means all information, whether written or verbal, including plans, photographs, studies, investigations, audits, analyses, samples, reports, calculations, internal memos, meeting minutes, data field notes, work product, proposals, correspondence and any other similar documents or information prepared by, obtained by, or transmitted to the Contractor or its subcontractors in the performance of this Contract.

The parties agree that all data, regardless of form, including originals, images, and reproductions, prepared by, obtained by, or transmitted to the Contractor or its subcontractors in connection with the Contractor’s or its subcontractor’s performance of this Contract is confidential and proprietary information belonging to the City.

Except as specifically provided in this Contract, the Contractor or its subcontractors will not divulge data to any third party without prior written consent of the City. The Contractor or its subcontractors will not use the data for any purposes except to perform the services required

I.F.B.-10

STR DCM Standard MAG Boilerplate Rev. 2-26 under this Contract. These prohibitions will not apply to the following data provided the Contractor or its subcontractors have first given the required notice to the City:

A. Data which was known to the Contractor or its subcontractors prior to its performance under this Contract unless such data was acquired in connection with work performed for the City;

B. Data which was acquired by the Contractor or its subcontractors in its performance under this Contract and which was disclosed to the Contractor or its subcontractors by a third party, who to the best of the Contractor’s or its subcontractor’s knowledge and belief, had the legal right to make such disclosure and the Contractor or its subcontractors are not otherwise required to hold such data in confidence; or

C. Data which is required to be disclosed by virtue of law, regulation, or court order, to which the Contractor or its subcontractors are subject.

In the event the Contractor or its subcontractors are required or requested to disclose data to a third party, or any other information to which the Contractor or its subcontractors became privy as a result of any other contract with the City, the Contractor will first notify the City as set forth in this section of the request or demand for the data. The Contractor or its subcontractors will give the City sufficient facts so that the City can be given an opportunity to first give its consent or take such action that the City may deem appropriate to protect such data or other information from disclosure.

The Contractor, unless prohibited by law, within ten calendar days after completion of services for a third party on real or personal property owned or leased by the City, the Contractor or its subcontractors will promptly deliver, as set forth in this section, a copy of all data to the City. All data will continue to be subject to the confidentiality agreements of this Contract.

The Contractor or its subcontractors assume all liability for maintaining the confidentiality of the data in its possession and agrees to compensate the City if any of the provisions of this section are violated by the Contractor, its employees, agents or subcontractors. Solely for the purposes of seeking injunctive relief, it is agreed that a breach of this section will be deemed to cause irreparable harm that justifies injunctive relief in court. Contractor agrees that the requirements of this Section will be incorporated into all subcontracts entered into by Contractor. A violation of this Section may result in immediate termination of this Contract without notice.

Personal Identifying Information-Data Security Personal identifying information, financial account information, or restricted City information, whether electronic format or hard copy, must be secured and protected at all times. At a minimum, Contractor must encrypt and/or password protects electronic files. This includes data saved to laptop computers, computerized devices or removable storage devices.

When personal identifying information, financial account information, or restricted City information, regardless of its format, is no longer necessary, the information must be redacted or destroyed through appropriate and secure methods that ensure the information cannot be viewed, accessed, or reconstructed.

In the event that data collected or obtained by Contractor or its subcontractors in connection with this Contract is believed to have been compromised, Contractor or its subcontractors will immediately notify the Project Manager and City Engineer. Contractor agrees to reimburse the City for any costs incurred by the City to investigate potential breaches of this data and, where applicable, the cost of notifying individuals who may be impacted by the breach.

Contractor agrees that the requirements of this Section will be incorporated into all subcontracts entered into by Contractor. It is further agreed that a violation of this Section will be deemed to cause irreparable harm that justifies injunctive relief in court. A violation of this Section may result in immediate termination of this Contract without notice.

I.F.B.-11

The obligations of Contractor or its subcontractors under this Section will survive the termination of this Contract.

Y. PROJECT MANAGEMENT INFORMATION SYSTEM (UNIFIER)

The Street Transportation Department’s Design and Construction Management (DCM) Division Project Manager may determine that use of UNIFIER will be required during this contract. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the DCM Project Manager.

1. The contractor will be required to maintain all project records in electronic format. The City provides an Application Service Provider (ASP) web-based project management database which the contractor will be required to utilize in the fulfillment of the contract requirements.

Although this electronic platform does not fulfill this requirement in its entirety, the contractor will be required to utilize this platform as the basis for this work.

2. The contractor can expect to use this ASP to process all primary level tri-partite contract documents related to the design or construction phase of the Project including but not limited to: requests for interpretation/information, potential Change Orders, construction meeting minutes, Submittals, Design Professional’s supplemental instructions, and Payment Requests.

3. The contractor will be required to process information into electronic digital form. To fulfill this requirement, the contractor will provide all necessary equipment to perform the functions necessary to generate, convert, store, maintain, connect to web-based ASP and transfer electronic data.

4. The contractor will provide a computerized networked office platform with broadband internet connectivity. Wired or wireless is acceptable. This platform will function well in a web-based environment utilizing an internet browser compatible with the City’s UNIFIER ASP system.

UNIFIER training will be provided through the City of Phoenix. Contact information will be provided to the firms under contract, to establish the set up with a log-in and password.

Z. PROJECT STAFFING

Key Personnel: Before starting work, Contractor must submit detailed résumés of key personnel involved in that work for City’s approval (which City will not unreasonably withhold). If Contractor later desires to change key personnel involved in that work, Contractor must submit detailed résumés of the new personnel for City’s approval (which City will not unreasonably withhold).

Qualified Staff: Contractor must maintain an adequate and competent staff of qualified persons—as City may determine in its sole discretion—during performance of this Master Agreement. If City in its sole discretion determines that any of Contractor’s staff is objectionable, Contractor must take prompt corrective action or replace that staff with new personnel, subject to City’s approval.

Third-Party Employment Brokers: Contractor and Subcontractors will not utilize a third-party labor broker for any construction worker under this Agreement. The Contractor and Subcontractors must be the employers of record for its construction staff under this Agreement.

AA. NO ISRAEL BOYCOTT

I.F.B.-12

STR DCM Standard MAG Boilerplate Rev. 2-26

If this Contract is valued at $100,000 or more and requires Contractor (a company engaging in for-profit activity and having ten or more full-time employees) to acquire or dispose of services, supplies, information technology, or construction, then Contractor must certify and agree that it does not and will not boycott goods or services from Israel, pursuant to Title 35, Chapter 2, Article 9 of the Arizona Revised Statutes. Provided that these statutory requirements are applicable, Contractor by entering this Contract now certifies that it is not currently engaged in, and agrees for the duration of the Contract to not engage in, a boycott of goods or services from Israel.

BB. NO FORCED LABOR OF ETHNIC UYGHURS

If this Contract requires Contractor (a company engaging in for-profit activity and having ten or more full-time employees) to acquire or dispose of services, supplies, information technology, goods, or construction, then pursuant to Title 35, Chapter 2, Article 10 of the Arizona Revised Statutes Contractor must certify and agree that it and any contractors, subcontractors, or suppliers it utilizes do not and will not use the forced labor of ethnic Uyghurs in the People’s Republic of China or any goods or services produced by such forced labor. Provided these statutory requirements are applicable, Contractor, by entering this Contract, now certifies it is not currently engaged in, and agrees for the duration of the Contract to not engage in, (a) the use of forced labor of ethnic Uyghurs in the People’s Republic of China; (b) the use of any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China; or (c) the use of any contractors, subcontractors, or suppliers that use the forced labor or any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China.

CC. COMPLIANCE WITH LAWS

Contractor must comply with all existing and subsequently enacted federal, state and local laws, ordinances and codes, all applicable ADA requirements, regulations that are, or become applicable to this Agreement, and be in general conformance with PROWAG guidance. If a subsequently enacted law imposes substantial additional costs on Contractor, a request for an amendment may be submitted pursuant to this Agreement. Contractor is also required to certify its compliance with all applicable laws and Contractor must pass along these requirements to its Subcontractors. If any of Contractor’s certifications is found to be false, the City may terminate this Agreement or impose other remedies due to the false certification.

DD. HEAT MITIGATION

Per Phoenix City Code Chapter 18, Article XI, Sections 18-413(A) and 18-415, any Contractor whose employees and contract workers perform work in an outdoor environment under this contract must keep on file a written heat safety plan. The City may request a copy of this plan and documentation of all heat safety and mitigation efforts currently implemented to prevent heat-related illnesses and injuries in the workplace. The plan must also be posted in English and Spanish on a bulletin board in a breakroom where it is accessible to employees. If a Contractor does not have a breakroom, the heat safety plan must be physically placed in a conspicuous location in the workplace where notices to employees are customarily posted. The heat safety plan must also include a contact number of the contractor that all employees and contract workers can call if they need to inquire or report any heat safety issues and contain language that the Contractor will not retaliate against any employee or contract worker who reports an alleged heat safety violation or who otherwise avails themselves of the protections provided in this article. At a minimum, the heat safety and mitigation plan and documentation required under this provision shall include each of the following as it relates to heat safety and mitigation:

1. Availability of sanitized cool drink water free of charge at locations that are accessible to all employees and contract workers.

2. Ability to take regular and necessary breaks as needed and additional breaks for hydration.

I.F.B.-13

STR DCM Standard MAG Boilerplate Rev. 2-26

3. Access to shaded areas and/or air conditioning.

4. Access to air conditioning in vehicles with enclosed cabs. Beginning on April 1, 2026, all contractors shall regularly monitor vehicles to ensure all vehicles with enclosed cabs have properly functioning air conditioning per the manufacturer specifications. The heat safety and mitigation plan shall include how the contractor shall monitor vehicle air conditioning to comply with this subsection.

5. Effective acclimatization practices to promote the physiological adaptations of employees or contract workers newly assigned or reassigned to work in an outside environment.

6. Conduct training and make it available and understandable to all employees and contract workers on heat illness and injury that focuses on the environmental and personal risk factors, prevention, how to recognize and report signs and symptoms of heat illness and injury, how to administer appropriate first aid measures and how to report heat illness and injury to emergency medical personnel.

The Contractor further agrees that this clause will be incorporated in all subcontracts with subconsultants, sublicensees or sublessees who may perform labor or services in connection with this contract. Additionally, the Contractor agrees to require all subcontractors, sublicensees or sublessees to include this clause in all contracts with any third party who is contracted to perform labor or services in connection with this contract. It is the obligation of the Contractor to ensure compliance by its subcontractors.

******REMAINDER OF PAGE LEFT INTENTIALLY BLANK*******

S.C. - 1

SUPPLEMENTARY CONDITIONS

1. 103 AWARD AND EXECUTION OF CONTRACT, Add the following to Subsection 103.3 AWARD OF

CONTRACT:

Contract award will be made to a responsive and responsible bidder based on the low total base bid or on the low combination of the total base bid and any selected alternate(s), whichever is in the best interest of the City.

If unit pricing is required in the proposal, the extensions and additions will be verified to assure correctness.

Award will be based on the revised total if any errors are found. Additionally, the Contractor will meet the minimum SBE subcontracting goal set for this contract or have been granted a full or partial waiver of the goal.

The City expressly reserves the right to cancel this agreement without recourse or prejudice to Contractor until all parties have executed the agreement in full.

Any bidder that currently contracts with the City must be in good standing for its proposal to be considered responsive. For the purpose of this Invitation to Bid, good standing means compliance with all contractual provisions, including payment of financial obligations.

2. 103 AWARD AND EXECUTION OF CONTRACT, Add the following to Subsection 103.3 AWARD OF

CONTRACT

EARLY PROCUREMENT OF LONG LEAD MATERIALS

Within 30 days of contract execution and prior to scheduling of a Pre-construction conference meeting, the Contractor may request early procurement of long lead materials. The Contractor’s request shall be accompanied by comprehensive justification documents for review; this will include but is not limited to letters from material manufacturers or suppliers, and a project schedule showing the impact and incorporation of long lead items into the project to support the early procurement request. The request shall also outline the expected commencement of construction. The Engineer will evaluate the Contractor's early procurement request and practicable start of construction. Upon review of the request, the Engineer may issue a Notice of Intent or Limited Notice to Proceed based on the agreed upon date in the schedule.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .