IFB Cost Estimate Worksheet Salisbury Natl Cem FY24.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78624B0009
About this file
This document includes a cost estimate worksheet and details of a related federal contract opportunity for bridge and historic repairs at the Salisbury National Cemetery. The cost estimate worksheet is a template for contractors to provide lump sum pricing for various construction divisions that may be required for the project, such as concrete, masonry, metals, and electrical work. The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs National Cemetery Administration seeking bids for mini minor project number 876-MM24-02 for bridge and historic repairs at the Salisbury National Cemetery. The solicitation number is 36C78624B0009 and bids are due on an unspecified date. Contractors should use the cost estimate worksheet to inform their pricing responses to the solicitation for the bridge and historic repair work at the cemetery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B0009 A0002.docx | DOCX document | |
| 876-MM24-02 Full Drawings - Salisbury Natl Cem.pdf | ||
| Virtual Bid Opening Salisbury National Cemetery.pdf | ||
| 36C78624B0009 A0001.docx | DOCX document | |
| 876-MM24-02 SOW.pdf | ||
| 36C78624B0009_1.docx | DOCX document | |
| Wage Determination Rowan County Salisbury NC.pdf | ||
| 876-MM24-02 Full Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number: 36C78624B0009 | PO NO. 876-MM24-02 |
| Project Name: Salibury Naional Cemetery |
| Division | CLIN1 | CLIN 2 | CLIN 3 | CLIN 4 | CLIN 5 | CLIN 6 | CLIN 7 | CLIN 8 | CLIN 9 | CLIN 10 | CLIN 11 | CLIN 12 | CLIN 13 | CLIN 14 | CLIN 15 | Total |
| Division 0 | ||||||||||||||||
| Special Sections | ||||||||||||||||
| Division 01 | ||||||||||||||||
| General Requirements | ||||||||||||||||
| Division 02 | ||||||||||||||||
| Existing Conditions | ||||||||||||||||
| Division 03 | ||||||||||||||||
| Concrete | ||||||||||||||||
| Division 04 | ||||||||||||||||
| Masonry | ||||||||||||||||
| Division 05 | ||||||||||||||||
| Metals | ||||||||||||||||
| Division 06 | ||||||||||||||||
| Wood, Plastic, and Composites | ||||||||||||||||
| Division 07 | ||||||||||||||||
| Thermal and Moisture Protection | ||||||||||||||||
| Division 08 | ||||||||||||||||
| Openings (Doors, Windows, etc...) | ||||||||||||||||
| Division 09 | ||||||||||||||||
| Finishes | ||||||||||||||||
| Division 10 | ||||||||||||||||
| Specialties | ||||||||||||||||
| Division 11 | ||||||||||||||||
| Equipment | ||||||||||||||||
| Division 12 | ||||||||||||||||
| Furnishings | ||||||||||||||||
| Division 13 | ||||||||||||||||
| Special Construction | ||||||||||||||||
| Division 14 | ||||||||||||||||
| Fire Suppression | ||||||||||||||||
| Division 22 | ||||||||||||||||
| Plumbing | ||||||||||||||||
| Division 23 | ||||||||||||||||
| Heat, Ventilating, and Air Conditioning | ||||||||||||||||
| Division 25 | ||||||||||||||||
| Integrated Automation | ||||||||||||||||
| Division 26 | ||||||||||||||||
| Electrical | ||||||||||||||||
| Division 27 | ||||||||||||||||
| Communications | ||||||||||||||||
| Division 28 | ||||||||||||||||
| Electronic Safety and Security | ||||||||||||||||
| Division 31 | ||||||||||||||||
| Earthwork | ||||||||||||||||
| Division 32 | ||||||||||||||||
| Exterior Improvements | ||||||||||||||||
| Division 33 | ||||||||||||||||
| Utilities | ||||||||||||||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $ $
File details come from the government source that posted it. Updated .