IFB Contractor Cost Estimate Worksheet Saratoga Nalt Cem FY-23.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C78623B0005
About this file
This document contains an invitation for bid (IFB) from the Department of Veterans Affairs National Cemetery Administration for irrigation system upgrades at the Gerald B. H. Solomon Saratoga National Cemetery in Saratoga County, New York. Contractors are required to furnish all labor, materials, equipment, and supervision to perform the work described in the statement of work, specifications, and drawings. The project involves upgrading the cemetery's irrigation system and has a project number of 917-MM23-01. Bidders must complete the provided cost estimate worksheet listing lump sum pricing for various construction divisions involved in the project, including options, bonds, overhead, and profit to arrive at a grand total. The solicitation number for the IFB is 36C78623B0005.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number | IFB NO. 36C78623B0005 | Gerald B.H. Solomon, Saratoga National Cemetery |
| Project Name | Project No. 917-MM23-01 | Irrigation System Upgrades |
| Division | BASE CONTRACT BID | OPTION 01 (AAD ALT 01) | OPTION 01 (AAD ALT 02) | Total |
| Division 0+A7:A34D6A7:AA7:A46 | ||||
| Special Sections | ||||
| Division 01 | ||||
| General Requirements | ||||
| Division 02 | ||||
| Existing Conditions | ||||
| Division 03 | ||||
| Concrete | ||||
| Division 04 | ||||
| Masonry | ||||
| Division 05 | ||||
| Metals | ||||
| Division 06 | ||||
| Wood, Plastic, and Composites | ||||
| Division 07 | ||||
| Thermal and Moisture Protection | ||||
| Division 08 | ||||
| Openings (Doors, Windows, etc...) | ||||
| Division 09 | ||||
| Finishes | ||||
| Division 10 | ||||
| Specialties | ||||
| Division 11 | ||||
| Equipment | ||||
| Division 12 | ||||
| Furnishings | ||||
| Division 13 | ||||
| Special Construction | ||||
| Division 14 | ||||
| Fire Suppression | ||||
| Division 22 | ||||
| Plumbing | ||||
| Division 23 | ||||
| Heat, Ventilating, and Air Conditioning | ||||
| Division 25 | ||||
| Integrated Automation | ||||
| Division 26 | ||||
| Electrical | ||||
| Division 27 | ||||
| Communications | ||||
| Division 28 | ||||
| Electronic Safety and Security | ||||
| Division 31 | ||||
| Earthwork | ||||
| Division 32 | ||||
| Exterior Improvements | ||||
| Division 33 | ||||
| Utilities | ||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $ $