About this file
This is a Key Personnel Designation submittal for an Invitation for Bid (IFB 5000 MAS1008) issued by the City of Austin, Texas, for Flexible Base, Surface Rock, and 3x5-inch Rock materials. The document establishes the framework for identifying and maintaining key personnel throughout the contract term, with the City's Contract Administrator and Procurement Specialist identified as Maggie Stenz (512-974-3020, Margaret.Stenz@austintexas.gov). The submittal requires contractors to designate key personnel in the roles of Contract Manager and Single Point of Contact (SPOC), though specific contractor personnel names and contact information are not populated in the provided document.
The document stipulates that the same key personnel must remain assigned to the engagement throughout its term to ensure continuity and project consistency. Should replacement of any key personnel become necessary, the substitute must possess equivalent experience and competence for the project type. The contractor is obligated to promptly notify the City and obtain written approval for any personnel changes, with approval not to be unreasonably withheld. This requirement ensures the City maintains oversight of contractor staffing and maintains quality standards throughout the contract performance period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_5000_MAS1008_ATT_9_v1.docx | DOCX document | |
| IFB_5000_MAS1008_ADD_1_v1.docx | DOCX document | |
| IFB_5000_MAS1008_ATT_6_v1.docx | DOCX document | |
| IFB_5000_MAS1008_ATT_7_v1.docx | DOCX document | |
| IFB_5000_MAS1008_ATT_8_v1.docx | DOCX document | |
| IFB_5000_MAS1008_PAC1_v1.docx | DOCX document | |
| IFB_5000_MAS1008_ATT_1_v1.docx | DOCX document | |
| IFB_5000_MAS1008_ATT_3_v1.docx | DOCX document | |
| IFB_1100_CPG1006_PAC1_v1.docx | DOCX document | |
| IFB_5000_MAS1008_ATT_5_v1.docx | DOCX document | |
| IFB_5000_MAS1008_ATT_2_v1.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL – Key Personnel
Designation of Key Personnel. The City and the Contractor resolve to keep the same key personnel assigned to this engagement throughout its term. In the event that it becomes necessary for the Contractor to replace any key personnel, the replacement will be an individual having equivalent experience and competence in executing projects such as the one described herein. Additionally, the Contractor shall promptly notify the City and obtain approval for the replacement. Such approval shall not be unreasonably withheld. The Contractor’s and City’s key personnel are identified as follows:
| Role |
| Name |
| Phone |
Contractor Contract Manager
Contractor Single Point of Contact (SPOC)
| City Contract Administrator, Procurement Specialist |
| Maggie Stenz |
| 512-974-3020 |
| Margaret.Stenz@austintexas.gov |
| SUBMITTAL – Key Personnel IFB 5000 MAS1008 |
| Pg. 1 |
image1.png