IFB_270146_Plans.pdf

PDF 186 MB Posted

Attached to
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation number
270146
Issued by
Pima County, Tucson City, Arizona

About this file

Summary of IFB_270146_Plans.pdf

This document consists of construction plans for the Silverbell Road Roadway Improvements project in Arizona, prepared for bidding purposes. The project encompasses roadway improvements across 3.27 miles, including 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The construction scope includes four lanes of roadway with medians, curbs, sidewalks, multi-use paths, traffic signals, street lighting, landscaping and irrigation systems, utility work, and drainage facilities. The plans document provides detailed engineering drawings and specifications necessary for contractors to prepare accurate bids and execute the project according to design standards.

The plans file serves as the technical foundation for the Invitation for Bid (IFB_270146) and establishes the baseline construction requirements and site conditions. Contractors referencing these plans must adhere to the specified design standards, materials, and construction methodologies outlined throughout the documentation. The comprehensive nature of the plans, which typically include grading plans, utility layouts, traffic control details, and drainage designs, enables qualified bidders to understand project complexity and submit competitive proposals based on consistent project scope definitions.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .