IFB_26038JG_Bid_Tabulation.pdf

PDF 265 KB Posted

Attached to
Simpson Rd Relocation Project-Tubular Steel Transmission Poles
Solicitation number
IFB 26-038-JG
Issued by
Florida

About this file

This is a Bid Tabulation document for Invitation for Bid (IFB) 26-038-JG issued by Kissimmee Utility Authority (KUA) in Florida for the Simpson Road Relocation Project. The solicitation sought tubular steel transmission poles for three custom transmission structures (Structure Numbers 26337, 26342, and 26339), each measuring 85 feet in overall length with specified pier embedment depths. Four bidders submitted responses by the June 30, 2026 bid closing deadline, with the public bid opening conducted virtually via Zoom. All poles were required to be tubular steel construction, with concrete pole alternatives explicitly rejected. Bidders were obligated to identify the transmission structure manufacturer, plant location, shipment method, and confirm delivery capability by June 1, 2027, or provide lead time in weeks. Addendum 1, issued June 16, 2026, clarified specifications and technical requirements, and all bidders were required to acknowledge receipt and incorporate the addendum into their bids.

Pricing was established on a fixed-price basis, with bidders required to submit unit prices and extended totals for each structure plus separate, firm or estimated freight pricing on FOB destination terms. All costs were inclusive of labor, supervision, planning, scheduling, overhead, profit, materials, supplies, equipment, tools, mobilization and demobilization, travel, handling, fuel, power, assessments, fees, tariffs, and taxes. The estimated contract value ranged from $250,000 to $500,000 under Service Tier B classification. The contract represented a one-time purchase with potential renewal periods at KUA's discretion and included provisions for potential FEMA reimbursement in the event of a federally declared disaster. Bidders were permitted to propose tariff adjustment mechanisms with documented caps on increases and refund provisions if tariffs declined. Award was designated for the lowest responsive and responsible bidder whose bid conformed to solicitation requirements and was most advantageous to KUA, considering price, quality, experience, financial capability, and other evaluation factors. The successful bidder was required to furnish a 100% performance bond within ten days of notification of bid acceptance.

View the file

Other files

File Type Posted
IFB_26038JG_Notice_of_Intent.pdf PDF
IFB_26038JG_Bid_Opening_Tabulation.pdf PDF
IFB_26038JG_Addendum_1.pdf PDF
IFB_26038JG_Exhibit_A_Pricing_Sheet.xlsx XLSX spreadsheet
IFB_26038JG_Simpson_Rd_Relocation_Project.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kissimmee Utility Authority

Finance & Administration 1701 W. Carroll Street Kissimmee, Florida 34741 Phone: (407) 933-9809

VENDOR NAME→ American Wire Group LLC Gresco Utility Supply

Superior Power Products

LLC/Distran TAPP Inc N/A N/A N/A

Structure Number 26337 -unit price $110,887.68 $103,370.00 $166,178.00 $77,682.00

Structure Number 26342 - unit price $110,895.48 $103,360.00 $86,434.00 $77,682.00

Structure Number 26339 - unit price $51,836.70 $51,200.00 $166,178.00 $47,554.00

Freight Total $21,697.20 $0.00 $15,927.00 $0.00

LEAD TIME (in weeks) ARO Did not reply-can deliver by 06/01/27

Did not reply-can deliver by 06/01/27 75 Weeks ARO 64 Weeks ARO

TOTAL $273,619.86 $257,930.00 $434,717.00 $202,918.00

OPENED BY:JENNIFER GRIEVES VERIFIED BY: LARRY WEBB

Solicitation Tabulation

Remarks: Offers from the vendors listed herein are the only offers received timely as of the above opening date and time. All other offers submitted in response to this solicitation, if any, are hereby rejected as late. Shaded or circled prices indicates apparent low bidder subject to evaluation and review before an intent to award is made.

Rules: All bids accepted by Kissimmee Utility Authority are subject to the Agencies terms and conditions and any and all additional terms and conditions submitted by the bidders are rejected and shall have no force and effect unless receiving prior consideration and approval of the Authority in the form of Addenda to this bid.

2:00 PM

06/30/26 Simpson Rd Relocation Project-Tubular Steel Transmission Poles IFB 26-038-JGSolicitation Number:

Solicitation Title Solicitation Opening Date:

Solicitation Opening Time

IFB 26-038-JG Bid Tabulation and Checklist.xlsx page 1 of 1

NOTE: TAPP was the apparent low bidder but was deemed nonresponsive due to exceptions to offer validity and liability requirements.

jgrieves Oval

Tabulation

File details come from the government source that posted it. Updated .