The document is a comprehensive Bid Schedule (IFB 260105) for the Francisco Elias Esquer Park Dog Park & Water Harvesting project issued by the City of Tucson, Arizona. The project encompasses three primary construction components: dog park construction, bridge/walking path development, and lighting and electrical infrastructure. The bid schedule details multiple line items including landscape grading, water line installation, tree and shrub planting, irrigation systems, fencing, shade structures, and a prefabricated steel truss pedestrian bridge. The bid was issued on August 13, 2025, with a pre-submittal meeting scheduled for August 20, 2025, at 10:00 am via Microsoft Teams, and bid responses are due on September 18, 2025, at 2:00 pm local time. The contract duration is anticipated to be 270 consecutive calendar days from the Notice to Proceed, with liquidated damages of $1,290.00 per calendar day of delay.

The project involves federal funding potentially from the U.S. Department of Housing and Urban Development (HUD), introducing specific compliance requirements including Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE) set-aside provisions. Contractors must demonstrate good faith efforts in DBE participation and comply with federal regulations, including Section 3 provisions mandating that 25% of total labor hours be worked by Section 3 workers, with 5% specifically performed by Targeted Section 3 workers. The project budget is estimated between $1,000,000 and $5,000,000, and contractors are required to be certified through the Arizona Unified Certification Program (AZUCP). Additional requirements include submission of a Subcontractors List, DBE Commitment Form, bid bond, contractor responsibility form, and detailed project experience documentation, with compliance to prevailing wage standards and Davis-Bacon Act regulations.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Francisco Bid Schedule

Project Name:Francisco Elias Esquer Park Dog Park & Water Harvesting
IFB260105
ITEM NO.ITEM DESCRIPTIONUNITUNIT PRICEQUANTITYAMOUNT
2010001CLEARING AND GRUBBINGL SUM1$ -
2010002REMOVAL OF TREESEACH18$ -
2020001REMOVAL OF STRUCTURES AND OBSTRUCTIONSL SUM1$ -
2020100REMOVE CHAIN LINK FENCEL FT186$ -
2030401DRAINAGE EXCAVATION (DETENTION AND SWALES)C.Y.1,450$ -
5030775CATCH BASIN SPECIALEACH1$ -
5010007PIPES, CORRUGATED METAL, 18"L FT205$ -
5101401POTABLE WATER LINE - 1" PVCL FT415$ -
8020001LANDSCAPE GRADING (INCLUDING WATER HARVESTING)SY1,309$ -
8030031ROCK MULCH (3/8" SCREENED PEA GRAVEL)SY4,100$ -
8030105DECOMPOSED GRANITE (3" MINUS, DESERT PAVEMENT)SY1,580$ -
8030143DECORATIVE BOULDERS (3')EA10$ -
8030144DECORATIVE BOULDERS (6')EA2$ -
8050003SEEDING (CLASS II)SY1,580$ -
8060066TREE PROTECTION (FENCING) AND TRIMMINGL SUM1$ -
8061011TREE (36" BOX)EACH2$ -
8061066TREE (24" BOX)EACH46$ -
8061101TREE STAKING AND GUYING (2 STAKES PER TREE)EACH48$ -
8061296SHRUB (ONE GALLON)EACH472$ -
8061390DASYLIRION (FIVE GALLON)EACH3$ -
8061701BROWSER CAGESEACH475$ -
8070001LANDSCAPING ESTABLISHMENT (24 MONTHS)L SUM1$ -
8080011MISCELLANEOUS LANDSCAPE WORKFA
8080049EMITTER (ASSEMBLY)(MULTI-OUTLET)EACH128$ -
8080067CONNECTION TO IRRIGATION CONTROLLEREACH1$ -
8080074EMITTER DISTRIBUTION TUBING (STAKING INCLUDED)L SUM1$ -
8080084PRESSURE REGULATOREACH4$ -
8080090QUICK COUPLING VALVEEACH2$ -
8080120FILTER ASSEMBLYEACH4$ -
8080168CONTROL VALVE (REMOTE)(ELECTRIC)(1")(BATTERY OPERATED-PLASTIC)EACH4$ -
8080245END CAP ASSEMBLY - W/ 10" DIA. CANEACH21$ -
8080301MAINLINE PIPE - SCH. 40 PVC - 1" SIZEL FT261$ -
8080304PIPE (SLEEVE) PVC, SCHEDULE 40 (4")L FT147$ -
8080305PIPE (SLEEVE) PVC, SCHEDULE 40 (6")L FT104$ -
8080312LATERAL LINE PIPE - SCH. 40 PVC - 3/4" SIZEL FT3,070$ -
8100001AZPDES/NPDES (ORIGINAL)L SUM1$ -
8100002AZPDES SWPPP MODIFICATIONSFA
9010001MOBILIZATIONL SUM1$ -
9020201STEEL FENCEL FT1,394$ -
9030102FENCE GATE (12')EACH2$ -
9030103FENCE GATE (6')EACH4$ -
9130001RIPRAP (DUMPED)C.Y.54$ -
9130009RIPRAP (HAND PLACED) (GROUTED)C.Y.16$ -
9140085TENSILE SHADE STRUCTURE (AND FOUNDATION)EACH2$ -
9140156SEATWALL (MASONRY)SF146$ -
9300202MISCELLANEOUS WORK (DRINKING FOUNTAIN W/PET FOUNTAIN)EACH2$ -
DOG PARK CONSTRUCTION TOTAL$0.00
ITEM NO.ITEM DESCRIPTIONUNITUNIT PRICEQUANTITYAMOUNT
2030502STRUCTURAL EXCAVATIONC.Y.131$ -
2030506STRUCTURE BACKFILLC.Y.97$ -
5030084SIDEWALK SCUPPER TYPE 2 (3 CELL)EACH2$ -
5030085SIDEWALK SCUPPER TYPE 2 (5 CELL)EACH2$ -
5101522STEEL SLEEVE PIPE, 3"L FT60$ -
6010004STRUCTURAL CONCRETE (CLASS S) (F'C = 4,000)CU YD24$ -
6010903CONCRETE BRIDGE DECKSQ.FT.600$ -
6040502SPECIAL PEDESTRIAN RAILINGL FT26$ -
6047000PREFAB. STEEL TRUSS PED. BRIDGE (INCLUDING DESIGN)LS1$ -
6050001REINFORCING STEELLB.3,560$ -
9010001MOBILIZATIONL SUM1$ -
9080201CONCRETE SIDEWALKSF15,125$ -
9080202DECORATIVE SIDEWALKSF1,105$ -
9330001HANDRAIL PER PAG SD 105L FT319$ -
9340011POST BARRICADES (PC/COT STD DTL 107)EACH2$ -
9340012REMOVEABLE POST BARRICADE (PC/COT STD DTL 107)EACH2$ -
BRIDGE/WALKING PATH CONSTRUCTION TOTAL$0.00
ITEM NO.ITEM DESCRIPTIONUNITUNIT PRICEQUANTITYAMOUNT
7320001PARK LIGHTING & ELECTRICALL SUM1$ -
LIGHTING & ELECTRICAL CONSTRUCTION TOTAL$0.00
TOTAL BID AMOUNT$0.00
Dog Park Construction (Bid Alt #1: Decorative Elements)
ITEM NO.ITEM DESCRIPTIONUNITUNIT PRICEQUANTITYAMOUNT
9140085TENSILE SHADE STRUCTURE (AND FOUNDATION)EACH2$ -
9140156SEATWALL (MASONRY)SF146$ -
DOG PARK BID ALT #1 CONSTRUCTION TOTAL$0.00
Bridge/Walking Path Construction (Bid Alt #2: Additional Paving Areas)
ITEM NO.ITEM DESCRIPTIONUNITUNIT PRICEQUANTITYAMOUNT
5030084SIDEWALK SCUPPER TYPE 2 (3 CELL)EACH2$ -
5030085SIDEWALK SCUPPER TYPE 2 (5 CELL)EACH2$ -
9080201CONCRETE SIDEWALKSF13,214$ -
9080202EXPOSED AGGREGATE PAVINGSF563$ -
9340011POST BARRICADES (PC/COT STD DTL 107)EACH2$ -
9340012REMOVEABLE POST BARRICADE (PC/COT STD DTL 107)EACH2$ -
9330001HANDRAIL PER PAG SD 105L FT112$ -
BRIDGE/WALKING PATH BID ALT #2 CONSTRUCTION TOTAL$0.00
Dog Park Construction (Bid Alt #3: Additional Landscape)
ITEM NO.ITEM DESCRIPTIONUNITUNIT PRICEQUANTITYAMOUNT
8030143DECORATIVE BOULDERS (3')EA10$ -
8030144DECORATIVE BOULDERS (6')EA2$ -
8061296SHRUB (ONE GALLON)EACH472$ -
8061390DASYLIRION (FIVE GALLON)EACH3$ -
8061701BROWSER CAGESEACH475$ -
8070001LANDSCAPING ESTABLISHMENT (24 MONTHS)L SUM1$ -
8080049EMITTER (ASSEMBLY(MULTI-OUTLET)EACH80$ -
8080245END CAP ASSEMBLY - W/ 10" DIA. CANEACH12$ -
8080312LATERAL LINE PIPE - SCH. 40 PVC - 3/4" SIZEL FT1,614$ -
DOG PARK BID ALT #3 CONSTRUCTION TOTAL$0.00