IFB_260105_Francisco_Elias_Esquer_Bid_Schedule.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 260105
- Issued by
- Pima County, Tucson City, Arizona
About this file
The document is a comprehensive Bid Schedule (IFB 260105) for the Francisco Elias Esquer Park Dog Park & Water Harvesting project issued by the City of Tucson, Arizona. The project encompasses three primary construction components: dog park construction, bridge/walking path development, and lighting and electrical infrastructure. The bid schedule details multiple line items including landscape grading, water line installation, tree and shrub planting, irrigation systems, fencing, shade structures, and a prefabricated steel truss pedestrian bridge. The bid was issued on August 13, 2025, with a pre-submittal meeting scheduled for August 20, 2025, at 10:00 am via Microsoft Teams, and bid responses are due on September 18, 2025, at 2:00 pm local time. The contract duration is anticipated to be 270 consecutive calendar days from the Notice to Proceed, with liquidated damages of $1,290.00 per calendar day of delay.
The project involves federal funding potentially from the U.S. Department of Housing and Urban Development (HUD), introducing specific compliance requirements including Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE) set-aside provisions. Contractors must demonstrate good faith efforts in DBE participation and comply with federal regulations, including Section 3 provisions mandating that 25% of total labor hours be worked by Section 3 workers, with 5% specifically performed by Targeted Section 3 workers. The project budget is estimated between $1,000,000 and $5,000,000, and contractors are required to be certified through the Arizona Unified Certification Program (AZUCP). Additional requirements include submission of a Subcontractors List, DBE Commitment Form, bid bond, contractor responsibility form, and detailed project experience documentation, with compliance to prevailing wage standards and Davis-Bacon Act regulations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Francisco Bid Schedule
| Project Name: | Francisco Elias Esquer Park Dog Park & Water Harvesting | ||||
| IFB | 260105 | ||||
| ITEM NO. | ITEM DESCRIPTION | UNIT | UNIT PRICE | QUANTITY | AMOUNT |
| 2010001 | CLEARING AND GRUBBING | L SUM | 1 | $ - | |
| 2010002 | REMOVAL OF TREES | EACH | 18 | $ - | |
| 2020001 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | L SUM | 1 | $ - | |
| 2020100 | REMOVE CHAIN LINK FENCE | L FT | 186 | $ - | |
| 2030401 | DRAINAGE EXCAVATION (DETENTION AND SWALES) | C.Y. | 1,450 | $ - | |
| 5030775 | CATCH BASIN SPECIAL | EACH | 1 | $ - | |
| 5010007 | PIPES, CORRUGATED METAL, 18" | L FT | 205 | $ - | |
| 5101401 | POTABLE WATER LINE - 1" PVC | L FT | 415 | $ - | |
| 8020001 | LANDSCAPE GRADING (INCLUDING WATER HARVESTING) | SY | 1,309 | $ - | |
| 8030031 | ROCK MULCH (3/8" SCREENED PEA GRAVEL) | SY | 4,100 | $ - | |
| 8030105 | DECOMPOSED GRANITE (3" MINUS, DESERT PAVEMENT) | SY | 1,580 | $ - | |
| 8030143 | DECORATIVE BOULDERS (3') | EA | 10 | $ - | |
| 8030144 | DECORATIVE BOULDERS (6') | EA | 2 | $ - | |
| 8050003 | SEEDING (CLASS II) | SY | 1,580 | $ - | |
| 8060066 | TREE PROTECTION (FENCING) AND TRIMMING | L SUM | 1 | $ - | |
| 8061011 | TREE (36" BOX) | EACH | 2 | $ - | |
| 8061066 | TREE (24" BOX) | EACH | 46 | $ - | |
| 8061101 | TREE STAKING AND GUYING (2 STAKES PER TREE) | EACH | 48 | $ - | |
| 8061296 | SHRUB (ONE GALLON) | EACH | 472 | $ - | |
| 8061390 | DASYLIRION (FIVE GALLON) | EACH | 3 | $ - | |
| 8061701 | BROWSER CAGES | EACH | 475 | $ - | |
| 8070001 | LANDSCAPING ESTABLISHMENT (24 MONTHS) | L SUM | 1 | $ - | |
| 8080011 | MISCELLANEOUS LANDSCAPE WORK | FA | |||
| 8080049 | EMITTER (ASSEMBLY)(MULTI-OUTLET) | EACH | 128 | $ - | |
| 8080067 | CONNECTION TO IRRIGATION CONTROLLER | EACH | 1 | $ - | |
| 8080074 | EMITTER DISTRIBUTION TUBING (STAKING INCLUDED) | L SUM | 1 | $ - | |
| 8080084 | PRESSURE REGULATOR | EACH | 4 | $ - | |
| 8080090 | QUICK COUPLING VALVE | EACH | 2 | $ - | |
| 8080120 | FILTER ASSEMBLY | EACH | 4 | $ - | |
| 8080168 | CONTROL VALVE (REMOTE)(ELECTRIC)(1")(BATTERY OPERATED-PLASTIC) | EACH | 4 | $ - | |
| 8080245 | END CAP ASSEMBLY - W/ 10" DIA. CAN | EACH | 21 | $ - | |
| 8080301 | MAINLINE PIPE - SCH. 40 PVC - 1" SIZE | L FT | 261 | $ - | |
| 8080304 | PIPE (SLEEVE) PVC, SCHEDULE 40 (4") | L FT | 147 | $ - | |
| 8080305 | PIPE (SLEEVE) PVC, SCHEDULE 40 (6") | L FT | 104 | $ - | |
| 8080312 | LATERAL LINE PIPE - SCH. 40 PVC - 3/4" SIZE | L FT | 3,070 | $ - | |
| 8100001 | AZPDES/NPDES (ORIGINAL) | L SUM | 1 | $ - | |
| 8100002 | AZPDES SWPPP MODIFICATIONS | FA | |||
| 9010001 | MOBILIZATION | L SUM | 1 | $ - | |
| 9020201 | STEEL FENCE | L FT | 1,394 | $ - | |
| 9030102 | FENCE GATE (12') | EACH | 2 | $ - | |
| 9030103 | FENCE GATE (6') | EACH | 4 | $ - | |
| 9130001 | RIPRAP (DUMPED) | C.Y. | 54 | $ - | |
| 9130009 | RIPRAP (HAND PLACED) (GROUTED) | C.Y. | 16 | $ - | |
| 9140085 | TENSILE SHADE STRUCTURE (AND FOUNDATION) | EACH | 2 | $ - | |
| 9140156 | SEATWALL (MASONRY) | SF | 146 | $ - | |
| 9300202 | MISCELLANEOUS WORK (DRINKING FOUNTAIN W/PET FOUNTAIN) | EACH | 2 | $ - | |
| DOG PARK CONSTRUCTION TOTAL | $0.00 |
| ITEM NO. | ITEM DESCRIPTION | UNIT | UNIT PRICE | QUANTITY | AMOUNT |
| 2030502 | STRUCTURAL EXCAVATION | C.Y. | 131 | $ - | |
| 2030506 | STRUCTURE BACKFILL | C.Y. | 97 | $ - | |
| 5030084 | SIDEWALK SCUPPER TYPE 2 (3 CELL) | EACH | 2 | $ - | |
| 5030085 | SIDEWALK SCUPPER TYPE 2 (5 CELL) | EACH | 2 | $ - | |
| 5101522 | STEEL SLEEVE PIPE, 3" | L FT | 60 | $ - | |
| 6010004 | STRUCTURAL CONCRETE (CLASS S) (F'C = 4,000) | CU YD | 24 | $ - | |
| 6010903 | CONCRETE BRIDGE DECK | SQ.FT. | 600 | $ - | |
| 6040502 | SPECIAL PEDESTRIAN RAILING | L FT | 26 | $ - | |
| 6047000 | PREFAB. STEEL TRUSS PED. BRIDGE (INCLUDING DESIGN) | LS | 1 | $ - | |
| 6050001 | REINFORCING STEEL | LB. | 3,560 | $ - | |
| 9010001 | MOBILIZATION | L SUM | 1 | $ - | |
| 9080201 | CONCRETE SIDEWALK | SF | 15,125 | $ - | |
| 9080202 | DECORATIVE SIDEWALK | SF | 1,105 | $ - | |
| 9330001 | HANDRAIL PER PAG SD 105 | L FT | 319 | $ - | |
| 9340011 | POST BARRICADES (PC/COT STD DTL 107) | EACH | 2 | $ - | |
| 9340012 | REMOVEABLE POST BARRICADE (PC/COT STD DTL 107) | EACH | 2 | $ - | |
| BRIDGE/WALKING PATH CONSTRUCTION TOTAL | $0.00 | ||||
| ITEM NO. | ITEM DESCRIPTION | UNIT | UNIT PRICE | QUANTITY | AMOUNT |
| 7320001 | PARK LIGHTING & ELECTRICAL | L SUM | 1 | $ - | |
| LIGHTING & ELECTRICAL CONSTRUCTION TOTAL | $0.00 |
| TOTAL BID AMOUNT | $0.00 | ||||
| Dog Park Construction (Bid Alt #1: Decorative Elements) | |||||
| ITEM NO. | ITEM DESCRIPTION | UNIT | UNIT PRICE | QUANTITY | AMOUNT |
| 9140085 | TENSILE SHADE STRUCTURE (AND FOUNDATION) | EACH | 2 | $ - | |
| 9140156 | SEATWALL (MASONRY) | SF | 146 | $ - | |
| DOG PARK BID ALT #1 CONSTRUCTION TOTAL | $0.00 | ||||
| Bridge/Walking Path Construction (Bid Alt #2: Additional Paving Areas) | |||||
| ITEM NO. | ITEM DESCRIPTION | UNIT | UNIT PRICE | QUANTITY | AMOUNT |
| 5030084 | SIDEWALK SCUPPER TYPE 2 (3 CELL) | EACH | 2 | $ - | |
| 5030085 | SIDEWALK SCUPPER TYPE 2 (5 CELL) | EACH | 2 | $ - | |
| 9080201 | CONCRETE SIDEWALK | SF | 13,214 | $ - | |
| 9080202 | EXPOSED AGGREGATE PAVING | SF | 563 | $ - | |
| 9340011 | POST BARRICADES (PC/COT STD DTL 107) | EACH | 2 | $ - | |
| 9340012 | REMOVEABLE POST BARRICADE (PC/COT STD DTL 107) | EACH | 2 | $ - | |
| 9330001 | HANDRAIL PER PAG SD 105 | L FT | 112 | $ - | |
| BRIDGE/WALKING PATH BID ALT #2 CONSTRUCTION TOTAL | $0.00 |
| Dog Park Construction (Bid Alt #3: Additional Landscape) | |||||
| ITEM NO. | ITEM DESCRIPTION | UNIT | UNIT PRICE | QUANTITY | AMOUNT |
| 8030143 | DECORATIVE BOULDERS (3') | EA | 10 | $ - | |
| 8030144 | DECORATIVE BOULDERS (6') | EA | 2 | $ - | |
| 8061296 | SHRUB (ONE GALLON) | EACH | 472 | $ - | |
| 8061390 | DASYLIRION (FIVE GALLON) | EACH | 3 | $ - | |
| 8061701 | BROWSER CAGES | EACH | 475 | $ - | |
| 8070001 | LANDSCAPING ESTABLISHMENT (24 MONTHS) | L SUM | 1 | $ - | |
| 8080049 | EMITTER (ASSEMBLY(MULTI-OUTLET) | EACH | 80 | $ - | |
| 8080245 | END CAP ASSEMBLY - W/ 10" DIA. CAN | EACH | 12 | $ - | |
| 8080312 | LATERAL LINE PIPE - SCH. 40 PVC - 3/4" SIZE | L FT | 1,614 | $ - | |
| DOG PARK BID ALT #3 CONSTRUCTION TOTAL | $0.00 |
File details come from the government source that posted it. Updated .