IFB_2502301_Attachment_B_-_Itemized_Price_Schedule.pdf

PDF 121 KB Posted

Attached to
Lake Robinhood Stormwater Improvement Project
Solicitation number
2502301
Issued by
Lake County, Florida

About this file

The document is an Itemized Price Schedule for the Lake Robinhood Improvement Project (IFB 2502301) for the City of Leesburg, established in 1857. The project involves multiple infrastructure improvements, including mobilization, general conditions, survey and as-builts, testing, and various construction elements. Specific work includes tree removal, existing pipe demolition, concrete curbing, sidewalk installation, sodding, storm inlet construction, and storm pipe installation. The project entails 7 Type "V" storm inlets, 610 linear feet of 15" storm pipe, 99 linear feet of 24" storm pipe, and 7 concrete end walls, with additional elements like 100 linear feet of concrete curbing and 2,000 square yards of sod.

The pricing schedule includes a contingency of 20% on the total project cost, with line items for each project component to be priced by the bidder. The document requires bidders to complete the form with their business name, contact person, email address, and an authorized signature. Bidders must return this form with their proposal bid form, indicating a competitive bidding process for the infrastructure improvement project. The city has structured the bid to allow detailed pricing for each project element, enabling a comprehensive and transparent procurement approach.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lake Robinhood Improvement Project

IFB 2502301

Itemized Price Schedule

Item # Description Quantity Unit Unit Price Total Price

1 MOBILIZATION 1 LS $

2 GENERAL CONDITIONS 1 LS $

3 SURVEY AND AS-BUILTS 1 LS $

4 TESTING 1 EA $

5 PAYMENT & PERFORMANCE BOND 1 LS $

6 TREE REMOVAL 1 LS $

7 EXISTING PIPE DEMO 1 LS $

8 CONCRETE CURBING AT NEW INLETS 100 LF $

9 5’ SIDEWALK 100 LF $

10 SOD 2,000 SY $

11 CLEANUP 1 LS $

12 TYPE “V” STORM INLET 7 EA $

13 15” STORM PIPE 610 LF $

14 24” STORM PIPE 99 LF $

15 CONCRETE END WALL 7 EA $

TOTAL

CONTINGENCY

CONTINGENCY @ 20% TOTAL

GRAND BID TOTAL (In Figures)

NAME OF BUSINESS: ________________________________________

CONTACT PERSON: _________________________________________

EMAIL ADDRESS: ___________________________________________

AUTHORIZED SIGNATURE: ____________________________________

THIS FORM MUST BE COMPLETED AND RETURN WITH THE PROPOSAL BID FORM