IFB_2502301_Attachment_B_-_Itemized_Price_Schedule.pdf

PDF 121 KB Posted

Attached to
Lake Robinhood Stormwater Improvement Project
Solicitation number
2502301
Issued by
Lake County, Florida

About this file

The document is an Itemized Price Schedule for the Lake Robinhood Improvement Project (IFB 2502301) issued by the City of Leesburg, Florida. The bid schedule outlines 15 line items for a stormwater system improvement project, including mobilization, general conditions, survey and as-builts, testing, payment and performance bond, tree removal, existing pipe demolition, concrete curbing, sidewalk installation, sodding, cleanup, storm inlet construction, storm pipe installation (15" and 24"), and concrete end walls. The project involves constructing seven new storm inlets and installing stormwater piping to convey street runoff to Lake Robinhood, with specific quantities detailed for each item such as 100 linear feet of concrete curbing, 2,000 square yards of sod, 610 linear feet of 15" storm pipe, and 99 linear feet of 24" storm pipe.

The pricing document includes a contingency line item set at 20% of the total project cost, with spaces for bidders to fill in unit prices for each line item and calculate the total project cost. The form requires bidders to provide their business name, contact person, email address, and an authorized signature. While specific pricing details are left blank, the document serves as a comprehensive breakdown of the project's components and expected quantities, allowing potential contractors to prepare detailed bids for the stormwater improvement work in the Lake Robinhood area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lake Robinhood Improvement Project

IFB 2502301

Itemized Price Schedule

Item # Description Quantity Unit Unit Price Total Price

1 MOBILIZATION 1 LS $

2 GENERAL CONDITIONS 1 LS $

3 SURVEY AND AS-BUILTS 1 LS $

4 TESTING 1 EA $

5 PAYMENT & PERFORMANCE BOND 1 LS $

6 TREE REMOVAL 1 LS $

7 EXISTING PIPE DEMO 1 LS $

8 CONCRETE CURBING AT NEW INLETS 100 LF $

9 5’ SIDEWALK 100 LF $

10 SOD 2,000 SY $

11 CLEANUP 1 LS $

12 TYPE “V” STORM INLET 7 EA $

13 15” STORM PIPE 610 LF $

14 24” STORM PIPE 99 LF $

15 CONCRETE END WALL 7 EA $

TOTAL

CONTINGENCY

CONTINGENCY @ 20% TOTAL

GRAND BID TOTAL (In Figures)

NAME OF BUSINESS: ________________________________________

CONTACT PERSON: _________________________________________

EMAIL ADDRESS: ___________________________________________

AUTHORIZED SIGNATURE: ____________________________________

THIS FORM MUST BE COMPLETED AND RETURN WITH THE PROPOSAL BID FORM

File details come from the government source that posted it. Updated .