Addendum_1_-_2502301.pdf
PDF 379 KB Posted
- Attached to
- Lake Robinhood Stormwater Improvement Project
- Solicitation number
- 2502301
- Issued by
- Lake County, Florida
About this file
This document is an Addendum No. 1 for the Lake Robinhood Stormwater Improvement Project (IFB 2502301) issued by the City of Leesburg, Florida. The addendum provides clarifications and responses to bidder questions for a stormwater infrastructure project involving storm pipe installation, replacement of storm inlets, and associated civil works. The project includes 610 linear feet of 15" storm pipe, 99 linear feet of 24" storm pipe, 7 Type "V" storm inlets, concrete end walls, and related site work such as tree removal, sidewalk construction, and sodding. The engineer's estimate for the project is $204,309.60 as of 9/26/24, and bidders can participate with either a Certified General Contractor (CGC) or Certified Underground Utility and Excavation Contractor (CUC) license.
The addendum includes specific guidance on project execution, such as minimizing tree removal, requiring one-to-one tree replacement if removal is necessary, and mandating that contractors obtain resident permissions for property access. Contractors must include costs for pole holding at several intersection points and are advised that open-cut pipe replacement will only be used as a last resort. The itemized price schedule includes a 20% contingency, with line items covering mobilization, general conditions, testing, tree removal, pipe demolition, storm inlet installation, concrete work, and maintenance of traffic. Bidders are required to complete and return the revised Itemized Price Schedule dated 8/11/2025 with their proposal bid form.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: August 12, 2025 TO: All Interested Bidders and Other Interested Parties FROM: Hosea Goodwyn, Senior Buyer
The City makes the following changes, additions, deletions, information, and/or clarifications and now considers the addendum a part of the Invitation for Bid (IFB) Document. Bidders must acknowledge receipt of this addendum by indicating receipt in the space provided on the Proposal Bid Form. If the bidder has already submitted the Proposal Bid Form to the City’s Purchasing Division, the Bidder should revise their electronic submission to include this addendum. In any case, the submission of a bid is an acknowledgment of receipt of the addendum. The City will construe all bids received as though the Bidder has received and acknowledged the addendum.
Below is the City’s reply to RFIs (Request for Information – a/k/a bid inquiries or questions) submitted by interested parties by the posted deadline to submit RFIs.
Q1. What is the engineer's estimate for the project?
A1. $204,309.60 (As of 9/26/24)
Q2. Can a Certified Underground Utility Contractor participate in the bid?
A2. Yes. Section 6.5.1 (LICENSE AND CERTIFICATIONS Contractor License) has been updated to the language below.
Bidders must submit a copy of their current active State of Florida Certified General Contractor (CGC) license or Certified Underground Utility and Excavation Contractor (CUC) license. This license must be issued by the State of Florida Construction Industry Licensing Board in accordance with Florida Statutes, Chapter 489. Additionally, bidders must ensure they are licensed by any other federal, state, county, and municipal agencies that may have jurisdiction over the type of work performed under this contract.
Q3. While every effort will be made to minimize damage to asphalt, there will likely be some loss of asphalt when removing and replacing the curb inlets (or during pipe bursting) on this project. What spec should be used for replacement? Should this scope be included with the inlets?
A3. Please find city standards and details at https://www.leesburgflorida.gov/my_city/departments/pnz/css.php
Q4. So far, due to a lack of local labor because of the "low" project quantity of pipe bursting, it has been difficult to secure anyone to do the pipe bursting scope. Due to limited access and
IFB 2502301
Lake Robinhood Stormwater Improvement Project
Addendum No. 1 https://www.leesburgflorida.gov/my_city/departments/pnz/css.php large existing trees directly in line with the proposed storm runs, will open cut removal and replacement of storm pipe be acceptable?
If open cut is acceptable, removal and replacement of existing fencing and landscaping will be included. Should replacement of trees be included and to what extent?
A4. Open cut will only be used as a last resort. We want to preserve as much tree cover as possible. If trees must be removed, open cut is acceptable, but each tree removed must be replaced at a one-to-one ratio.
Q5. The pipe run at the Briarcliff Ave intersection is extremely close to a power pole and fiber communications box. Are we to include the cost of pole holding?
A5. Yes, include any pricing needed to complete the job.
Q6. The pipe run at the Stafford Ave intersection is extremely close to a power pole and fiber communications box. Are we to include the cost of pole holding?
A6. Yes, include any pricing needed to complete the job.
Q7. The pipe run at the Nottingham Road intersection is directly in front of a fiber communications box. Will this be relocated prior to our construction or during our construction?
A7. No, we do not have control over any fiber communications.
Q8. The pipe run at the Crest Avenue intersection is extremely close to a power pole. Are we to include the cost of pole holding?
A8. Yes, include any pricing needed to complete the job.
Q9. Regardless of method of construction access to some properties will be required due to clearing at the outfall at Lake Robinhood or for pits needed for pipe bursting. Will access need to be granted by the affected resident(s)?
A9. Yes, you will need to get permission from the residents affected.
The following document is hereby made part of the solicitation.
1. Revised Itemized Price Schedule – 8/11/2025.
ACKNOWLEDGMENT - Addendum #1
Company Name
Signature of Officer
Type/Print Officer's Name & Title
Lake Robinhood Improvement Project
IFB 2502301
Itemized Price Schedule – Revised 8/11/2025
Item # Description Quantity Unit Unit Price Total Price
1 MOBILIZATION 1 LS $
2 GENERAL CONDITIONS 1 LS $
3 SURVEY AND AS-BUILTS 1 LS $
4 TESTING 1 EA $
5 PAYMENT & PERFORMANCE BOND 1 LS $
6 TREE REMOVAL 1 LS $
7 EXISTING PIPE DEMO 1 LS $
8 CONCRETE CURBING AT NEW INLETS 100 LF $
9 5’ SIDEWALK 100 LF $
10 SOD 2,000 SY $
11 CLEANUP 1 LS $
12 TYPE “V” STORM INLET 7 EA $
13 15” STORM PIPE 610 LF $
14 24” STORM PIPE 99 LF $
15 CONCRETE END WALL 7 EA $
16 MAINTENANCE OF TRAFFIC 1 LS $
TOTAL
CONTINGENCY
CONTINGENCY @ 20% TOTAL
GRAND BID TOTAL (In Figures)
NAME OF BUSINESS: ________________________________________
CONTACT PERSON: _________________________________________
EMAIL ADDRESS: ___________________________________________
AUTHORIZED SIGNATURE: ____________________________________
THIS FORM MUST BE COMPLETED AND RETURN WITH THE PROPOSAL BID FORM
File details come from the government source that posted it. Updated .