IFB_2502301_Attachment_A_-_Lake_Robinhood_Storm_Improvements_Drawings.pdf

PDF 4 MB Posted

Attached to
Lake Robinhood Stormwater Improvement Project
Solicitation number
2502301
Issued by
Lake County, Florida

About this file

The document is a set of engineering and design plans for the Lake Robinhood Storm Improvements project for the City of Leesburg, Florida. The project involves detailed storm drainage infrastructure improvements across multiple areas, including Cambridge Drive, Lancaster Avenue, Nottingham Road, and Stafford Road. The plans include comprehensive mapping of existing infrastructure, proposed new stormwater management systems, and specific technical details for drainage improvements such as new gutter inlets, concrete endwalls, and pipe installations.

The technical specifications cover precise engineering requirements for storm drainage infrastructure, including pipe bursting specifications, concrete endwall designs for 15" to 30" pipes, and detailed construction notes. The plans are prepared by Keith B. Riddle Engineering and include multiple detailed sheets showing exact locations, elevations, and technical specifications for storm drainage improvements. The documentation provides extensive technical guidance for contractors, including materials specifications, installation methods, and specific construction requirements for various drainage system components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COL Lake Robinhood Storm Improvements C1.1.pdf

COL Lake Robinhood Storm Improvements C2.1
COL Lake Robinhood Storm Improvements C3.1
COL Lake Robinhood Storm Improvements C3.2
COL Lake Robinhood Storm Improvements C3.3
COL Lake Robinhood Storm Improvements C4.1
COL Lake Robinhood Storm Improvements C4.2
2022-07-12T10:02:27-0400
Keith E Riddle

File details come from the government source that posted it. Updated .