EPSE IV J-4 TO2 QASP Attachment 1.docx

DOCX document 34 KB Posted

Attached to
Enterprise Product Support Engineering (EPSE) IV
Solicitation number
ID05180026
Issued by

About this file

J-4 TO2 QASP Attachment 1

View the file

Other files

File Type Posted
Questions_and_Answers_-_June_13.docx DOCX document
EPSE_IV_J-1_TO1_PWS_-_Amendment_1.docx DOCX document
EPSE_IV_RFP_-_Amendment_1.docx DOCX document
EPSE IV J-1 TO1 PWS.docx DOCX document
EPSE IV J-3 TO2 PWS.docx DOCX document
EPSE IV J-4 TO2 QASP.docx DOCX document
EPSE IV J-2 TO1 QASP Attachment2.xlsx XLSX spreadsheet
EPSE IV RFP - final.docx DOCX document
EPSE IV J-2 TO1 QASP Attachment 1.docx DOCX document
EPSE IV J-2 TO1 QASP.docx DOCX document
EPSE IV J-4 TO2 QASP Attachment 2.xlsx XLSX spreadsheet
EPSE_IV_RFP_-_draft.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITSS Solicitation # ID05180026001 Robotic Paint Application System Effort QASP OEM Page 2 of 2

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

SURVEILLANCE OBJECTIVES, MEASURES, AND EXPECTATIONS

PERFORMANCE OBJECTIVE

The overall objective of this Task Order is to accomplish technical and program management planning, coordination, design, testing, evaluations including cost benefit analysis, qualification and analysis, validation and verification, demonstration plans, process orders, to transition solutions; product and/or process focused, using the new or substitute materials, processes, and product form(s) using the Air Force airworthiness approach.

PERFORMANCE MEASURES

Contractor performance will be evaluated using the following measures.

Completeness of Work: Using this measure, the Government will assess the degree to which the Contractor identifies, includes, addresses and/or performs all pertinent aspects of the work or all pertinent elements of delivered items, data, or services. Using this measure, the Government will also assess the degree to which the Contractor performs all stipulated or planned activities and captures the results of those activities in the various documents that are to be delivered.

Effectiveness: Using this measure, the Government will assess the degree to which the Contractor’s resources, methods, best practices, techniques, and/or tools are successful in meeting all goals and objectives established in the PWS. Effectiveness includes the Contractor’s ability to ensure that all team players perform as expected and that all efforts are appropriately coordinated to ensure that the work is performed as planned and prescribed in the PWS.

Format & Clarity: Using this measure, the Government will assess the design, flow, matrix, and/or layout used by the Contractor to present data (whether presented physically, orally, or electronically). This assessment will focus on the degree of clarity and logical organization with which the data is presented and whether or not the format facilitates easy review and use of the material. Using this measure, the Government will assess the degree to which material presented in documents (narrative, tables, diagrams, footnotes, photographs, etc.) are easy to understand by the intended audience.

Quality: Using this measure, the Government will assess the degree to which the work performed and items or documents delivered achieve a standard of excellence or adhere to rules established by a recognized authority as a standard of performance. For example, documents will be assessed to determine the degree to which they are technically sound and free of typographical, grammatical, mathematical, and conceptual errors. Using this measure, the Government will also evaluate the degree to which the required document(s) is suitable for assessing the impacts of all reasonable alternatives and how well the recommended system will meet its intended purpose. Using this measure, the Government will assess the level of professionalism exhibited by the Contractor staff in interactions with Government and other personnel in connection with work being performed under this task order.

Reliability: Using this measure, the Government will assess degree to which the Contractor furnished systems or services are or remain fully functional during the period of times specified in the task order. This assessment will include the degree to which the Contractor is able to produce continuous output or service support, minimizing down-time and service interruptions.

Timeliness: Using this measure, the Government will assess degree to which the Contractor meets or exceeds the delivery schedule.

Viability: Using this measure, the Government will assess the degree with which the Contractor’s recommendations apply to Government’s needs, solve the Government’s problems, are appropriate to the situation, or meet government’s requirements.

PERFORMANCE EXPECTATIONS AND EVALUATION

The COR or other Government representative responsible for evaluating Contractor performance shall provide their evaluation on the PERFORMANCE EVALUATION REPORT.