EPSE IV J-3 TO2 PWS.docx
DOCX document 48 KB Posted
- Attached to
- Enterprise Product Support Engineering (EPSE) IV
- Solicitation number
- ID05180026
- Issued by
-
GSA Federal Acquisition Service
About this file
J-3 TO2 PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EPSE_IV_RFP_-_Amendment_1.docx | DOCX document | |
| Questions_and_Answers_-_June_13.docx | DOCX document | |
| EPSE_IV_J-1_TO1_PWS_-_Amendment_1.docx | DOCX document | |
| EPSE IV J-1 TO1 PWS.docx | DOCX document | |
| EPSE IV J-4 TO2 QASP Attachment 1.docx | DOCX document | |
| EPSE IV J-2 TO1 QASP.docx | DOCX document | |
| EPSE IV J-4 TO2 QASP Attachment 2.xlsx | XLSX spreadsheet | |
| EPSE IV J-4 TO2 QASP.docx | DOCX document | |
| EPSE IV J-2 TO1 QASP Attachment2.xlsx | XLSX spreadsheet | |
| EPSE IV RFP - final.docx | DOCX document | |
| EPSE IV J-2 TO1 QASP Attachment 1.docx | DOCX document | |
| EPSE_IV_RFP_-_draft.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enterprise Product Support Engineering Initiatives IV
High Pulse Frequency Laser System Optimization Effort
IDIQ GSA ITSS ID05180026002
20 Mar 2018
TASK ORDER: 02
Air Force Life Cycle Management Center (AFLCMC) Product Support Engineering Division (EZP) Department of the Air Force Wright-Patterson Air Force Base (WPAFB), OH
POCs:
Program Manager (PM):
John Hedke, AFLCMC/EZP Phone: (937) 656-6873 E-mail: john.hedke@us.af.mil
Contractor Officer Representative (COR)/ Government Technical Point of Contact (TPOC):
Gregory Schwabacher, AFLCMC/EZPT Phone: (937) 656-7903 Fax: (937) 255-7791 E-mail: gregory.schwabacher.1@us.af.mil
General Services Administration (GSA) COR/PM:
Theresa Vollink Phone: (312) 279-8145 Fax: (312) 886-3827 E-mail: theresa.vollink@gsa.gov
| (X) New Task | ( ) Renewal | ( ) Revision |
| (X) T&M | ( ) Fixed Price | |
| (X) On-Site | (X) Off-Site |
1. BACKGROUND: The Air Force Life Cycle Management Center Product Support Engineering Division (AFLCMC/EZP) was established to ensure the United States Air Force (USAF) tackles product support engineering problems using an enterprise approach crossing multiple platforms and portfolios. AFLCMC/EZP’s primary customer base includes the Program Executive Offices (PEOs), System Program Offices (SPOs) – Chief Engineers, Air Force Sustainment Center (AFSC), Major Commands (MAJCOMs), as well as other center offices and headquarters. The USAF realizes that coordinated efforts progress faster and cost less in total and that moving in consistent pathways is critical to making the changes required to bend the cost curve and increase readiness.
As the USAF progresses towards a cost effective engineering mindset, opportunities to implement technologies across the USAF enterprise must be considered and evaluated to improve sustainment parts availability, reduce life cycle costs and increase weapon system readiness. AFLCMC/EZP is in the process of qualifying new materials and equipment and identifying a number of aircraft and ground support equipment parts that would benefit from application of emerging technology, equipment and processes. The focus is on identifying, qualifying and implementing the best opportunities to facilitate rapid infusion of technology across the USAF enterprise. Demonstration projects and qualification programs shall be accomplished in conjunction with this Task Order (TO 02). These efforts are focused on addressing needs across both the maintenance and sustainment (M&S) and reliability and maintainability (R&M) spectrums whose application could cross multiple weapon systems.
2. SCOPE OF WORK: The scope of this task is on efforts that will enhance quick, successful adoption of technologies within the USAF. Work under Task Order 02 will cross multiple PEOs and SPOs in an enterprise manner; the Contractor shall:
· Perform required taskings related to novel laser depaint optimization.
· Accomplish tasks in coordination with Airworthiness Bulletin (AWB)-1015, Airworthiness Process for Deploying New or Substitute Materials, Processes, and Product Forms, as required.
· Develop abstracts, presentations, newsletters, articles, posters showcasing technology efforts.
2.1. Objective: The overall objective of this Task Order is to accomplish technical and program management planning, coordination, testing, evaluations including cost benefit analysis, qualification and analysis, validation and verification, demonstration plans, process orders, to transition solutions; product and/or process focused, using the new or substitute materials, processes, and product form(s) using the Air Force airworthiness approach.
3. CONTRACTOR REQUIREMENTS: Each technical activity pre-screening/qualification/demonstration project shall be funded based on the availability of resources. To execute this Task Order, both technical and program management activities shall be required, and the Contractor shall apply common technical and program management requirements and techniques. In all cases, the Contractor shall perform the appropriate level of effort in accordance with the state of the technical activity (i.e., some projects may require in-house testing, demonstration, and validation support while others will require management of sub-tier suppliers whereby planning and requirements matching to ensure sub-contractor contract deliverables are the critical activities required). For this Task Order, the Contractor shall consider, as appropriate, program management requirements, environmental, energy and safety requirements/savings, readiness factors, return on investment, and sustainment/maintenance needs. The project shall have a project plan that includes project objectives, technical approach, program schedule, and transition plan. All efforts shall include a final report that includes all raw data, technical and non-technical, technical reports and analysis. In-process program reviews shall be conducted quarterly. Data included in the final report shall include raw data, notebooks, pictures, analysis, test plans, Design of Experiments, analytical data and test results, computer generated data and programs as well as any data that is used to determine technical and programmatic information and decisions. The Contractor, or their subcontractor, shall propose a program manager for the technical activity as well as subject matter experts, as required, to lead technical activities. The proposed program manager and all additional team members shall be identified and approved by EZP. Listed below are some of the major technical activities to be accomplished. Each activity/demonstration project must be considered a separate undertaking and deliverable if funded. Monthly reporting shall be conducted that includes status on technical performance, cost and schedule aspects as well as includes a detailed invoice for each sub-task. The Contractor shall also develop a parent-level program plan and integrated master schedule that outlines all technical activities, showing any interconnects between efforts as means to enhance efficiencies and effectiveness.
3.1 Novel laser depaint optimization: The Contractor shall identify the equipment manufacturer for a novel, high pulse frequency laser, scanner, and required sensors to demonstrate the technology. Various types of high pulse frequency lasers including nano and femto lasers and associated special scanners to maximize strip rates will be evaluated and potentially included in the laser qualification plan. The Contractor shall obtain approval from the Government prior to purchasing the equipment. The Contractor shall purchase and install the equipment, and propose a plan for optimization to depaint aerospace materials. The Contractor shall optimize by maximizing the coating removal rate while preventing negative effects on aerospace materials, to include composite substrates. Laser optimization shall focus on standard USAF aerospace metallic and composite substrates with standard gray topcoat/primer and gloss-white topcoat/primer coating systems. The Contractor shall take a spiral approach. The first year, the Contractor shall perform open-loop optimization testing. The second year, the Contractor shall develop a closed-loop system and perform screening testing. The Contractor shall develop and deliver a project plan for this effort. The project plan shall include the objective of the effort, the technical approach used, the optimization and screening test plans, and the planned program schedule. The Contractor shall obtain comment and approval of the plan from the Government before final delivery. The Contractor shall develop all required test plans and coordinate and obtain approval from EZP. The Contractor shall purchase and prepare all required coupons to support the test plans. The Contractor shall execute the approved test plans, document process parameters and analyze test results, and perform material testing in accordance with the test plans. The Contractor shall consolidate all test data, results, pictures, analysis, and recommendations into a final test report. Interim results and data shall be consolidated into interim test reports that will be delivered as required by EZP. The Contractor shall capture action items and minutes from various technical exchange meetings in support of this task order.
4. DELIVERABLES:
| Data Item # |
| PWS Section |
Data Item Title
Description
Due Date (in calendar days where appropriate)
| Status Report |
| Objectives, technical performance, cost, schedule, trips, include all sub-contractor data & reporting |
| Due with the monthly invoice submittal No Later Than (NLT) 10th day of the month |
| Funds and Man-Hour Expenditure Report |
| Breakdown costs identified in MSR with quick reference charts |
| Due with the monthly invoice submittal NLT 10th day of the month |
| Contract Funds Status Report (CFSR) |
| All efforts |
| Quarterly |
| 004 |
| 3 |
| Parent-level Program Plan and Integrated Master Schedule |
| Outlines all technical activities, shows interconnects between efforts as a means to enhance efficiencies and effectiveness |
| NLT 30 days after kickoff meeting, or as required by EZP |
| 005 |
| 3.1 |
| Laser and Scanner Market Research Final Report and Selection |
| Identifies potential technology solutions, risk, and maturity to allow for selection of equipment |
| NLT 30 days after kickoff meeting, or as required by EZP |
| 006 |
| 3.1 |
| Laser Optimization Project Plan & Approach with Integrated Master Schedule (IMS) |
| All efforts with quick reference charts; includes objective of the effort, technical approach, and planned program schedule |
| NLT 30 days after kickoff meeting, or as required by EZP |
| 007 |
| 3.1 |
| Laser Optimization Test Plan |
| Defines optimization methods to be used to evaluate the technology |
| As required by EZP |
| 008 |
| 3.1 |
| Laser Optimization Test Report |
| Consolidates all test data, results, pictures, analysis, and recommendations |
| As required by EZP |
| 009 |
| 3.1 |
| Laser Screening Test Plans |
| Defines screening methods to be used to evaluate the technology, to include material testing |
| As required by EZP |
| 010 |
| 3.1 |
| Laser Screening Test Report |
| Consolidates all test data, results, pictures, analysis, and recommendations |
| As required by EZP |
| 011 |
| 2 |
| AWB-1015 Documentation |
| Documentation required to maintain conformance to requirements of AWB-1015 CET process |
| As required by EZP |
| Invoices |
| All efforts |
| 25 days following the monthly financial report (Submitted to ITSS) |
| Quarterly Project Management Review Reports |
| Documents objectives, financial information, accomplishments and milestones |
| Quarterly or as required by EZP |
5. MEETING ATTENDANCE/TRAVEL: Travel to commercial vendor sites, test facilities and military installations is expected. Some international travel may also be required in support of technical evaluation efforts. The Contractor shall abide by all Air Force safety and conduct policies when conducting travel. The Contractor shall coordinate with AFLCMC to ensure the proper Government documentation is in place, such as CAC cards and/or clearances pending the type of efforts and programs the Contractor is asked to support. Throughout the period of performance, the Contractor shall coordinate all efforts directly with AFLCMC/EZP TPOC and COR; this includes any travel requests and the level of effort per month that shall be allocated to this support. The Contractor shall report all findings, recommendations, and efforts thru travel reports to EZP TPOC and COR, as appropriate. The AFLCMC/EZP technical points of contact for this effort shall be John Hedke, Jesse Holdaway, Michael C. Jones, and Greg Schwabacher. The Contractor shall participate in regular progress meetings and travel to events deemed necessary to provide support efforts described above. It is anticipated that travel to USAF sites includes, but is not limited to:
· Wright Patterson Air Force Base (AFB), Ohio
· Robins Air Force Base, Georgia
5.1. Kick-Off Meeting. Within 15 business days of award, the Contractor shall coordinate an Overall Task Order kickoff meeting, at which time all parties involved in the Task Order execution shall be represented and roles/responsibilities clearly outlined. During the kickoff meeting, the Contractor shall be prepared to discuss the Task Order at the parent level as well as details for each technical activity. In addition, individual technical activity area kick-off meetings shall occur for every funded area. The intent of the technical activity area kick-off meeting is to review the sub-task schedule, objectives of each technical activity area, and review roles and responsibilities of the players.
5.2. Meetings. The Contractor shall plan to participate in monthly and quarterly progress meetings, detailing the progress, issues, needs, and/or unforeseen items that occur. The Contractor shall be responsible for coordinating and scheduling all meetings; however, the government PM shall maintain approval authority for date, time, and location of all meetings. The Contractor shall prepare an agenda, briefing materials, brief project status and technical data, and coordinate in advance of any meeting for government PM approval. The government PM has authority to attend or not attend any scheduled meetings. The Contractor shall capture and track all action items, decisions, and minutes from all meetings and telecoms. A detailed review of each technical activity area shall be required.
6. GOVERNMENT FURNISHED EQUIPMENT: None
7. PLACE OF PERFORMANCE: Demonstration shall be performed at Contractor’s facilities and/or Air Force installations (e.g. WPAFB OH, Hill and Robins AFB GA).
8. SECURITY CLASSIFICATION: None
9. PERIOD OF PERFORMANCE: One (12 month) base year and one (12 month) option year.
10. SPECIAL INSTRUCTIONS: All terms listed in the base IDIQ PWS are applicable.