The document is an Independent Cost Estimate (ICE) prepared by Collier County for a Hurricane Ian Repairs project involving Clam Pass Exterior Wall Painting. The project involves painting the exterior precast concrete walls of a parking lot, with a total estimated project cost of $74,696.00 and a date of estimate set for 09/26/25. The procurement will be funded by Federal/State Grant Programs and involves a lump sum (LS) painting project estimated at 20,297 square feet for the first coat and 40,594 square feet for the second coat.

The cost estimate breaks down the project into material and labor costs, with paint materials including Loxon (1 coat) and SuperPaint (2 coats). The material costs are calculated at $12,550.00, with a 10% markup of $1,255.00, bringing the total material cost to $13,805.00. Labor costs are estimated at $2.75 per square foot, totaling $60,891.00. The independent third-party estimate was developed by WSP USA, and the document was prepared by Bryan Vehovec. The total estimated project cost remains consistent at $74,696.00, which represents a comprehensive pricing strategy for the exterior wall painting project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLLIER COUNTY

For the Acquisition of Goods and Services Funded By Federal/State Grant Programs

Independent Cost Estimate PRUPOSE: In connection with every procurement action, except a micro-purchase, an Independent Cost Estimate (ICE) must be prepared in advance of receiving a quote, bid, or proposal. This is necessary because the ICE documentation:

• Ensures a clear basis for determining the benefits of the procurement;

• Provides essential procurement and financial planning information;

• Documents Federal compliance in a consistent manner; and,

• Provides a basis for the cost/price analysis.

Description of Procurement Date of Estimate

Total Estimated Price/Cost

Method: The above estimate is developed from: CHECK ALL THAT APPLY

Published catalogs or price lists (attach pertinent catalog of price list pages)

Recent prices for the same or similar item (identify contracts, purchase orders, sources, and additional helpful information (e.g. dates of award), and attach any pertinent documents

In-house Engineering or technical estimates (see details below or attach estimate).

Independent Third Party estimate developed by (attach estimate).

Other (specify):

Cost Estimate Details:

Cost of Standard Items

Product Cost ($/ea.)

Notes/Data Source Unit Freight Total

Cost of Services, Repairs, or Non-Standard Items Item / Task:

Materials Other Direct

Costs Labor

(rate, hours) Labor Class

Allocated Overhead SG&A Profit Total

PREPARED BY:

Name Date est. FY14 v. 3

Clam Pass Exterior Wall Painting

Summary Description Unit Qua ntity

Unit Price

Total Base Bid

Parking Lot Exterior Precast Concrete Wall Painting (see scope for specific details)

LS 1 $74,696.00

Total $74,696.00

Product Area to Cover (Sq Ft)

Assumed Coverage Rate (Sq Ft/Gal)

Gallons Needed (Rounded Up)

Assumed Cost (Per Gallon, At Cost)

Cost (At Cost)

Loxon (1 Coat) 20,297 250 82 gallons $60.00 $4,920.00 SuperPaint (2 Coats) 40,594 375 109 gallons $70.00 $7,630.00

Total Material Cost (At Cost) $12,550.00

Material Cost (At Cost): $12,550.00 Maximum Markup (10%): $12,550.00×0.10=$1,255.00 Total Material Cost (with Markup): $12,550.00+$1,255.00=$13,805.00

Total Service/Labor Cost ($2.75/sq ft) $60,891.00 Total Material Cost (with 10% Markup) Estimated Paint Cost + Markup $13,805.00 Total Estimated Project Cost $74,696.00

ADPA184.tmp
21-8101 Bid Schedule
ADPC69B.tmp
21-8101 Bid Schedule
ADPD6F6.tmp
21-8101 Bid Schedule
Date of Estimate: 09/26/25
Description of Procurement: Hurricane Ian Repairs - Clam Pass Exterior Wall Painting
Total Estimated PriceCost: 74696
Published catalogs or price lists attach pertinent catalog of price list pages: Off
Recent prices for the same or similar item identify contracts purchase orders sources and additional: Off
Inhouse Engineering or technical estimates see details below or attach estimate: Off
Independent Third Party estimate developed by: On
Third Party Name: WSP USA
Other specify: Off
Othertext:
ProductRow1: see attached
UnitRow1:
FreightRow1:
TotalRow1:
NotesData SourceRow1:
ProductRow2:
UnitRow2:
FreightRow2:
TotalRow2:
NotesData SourceRow2:
ProductRow3:
UnitRow3:
FreightRow3:
TotalRow3:
NotesData SourceRow3:
ProductRow4:
UnitRow4:
FreightRow4:
TotalRow4:
NotesData SourceRow4:
Item Task:
MaterialsRow1:
Text1:
Text5:
Text9:
Text13:
SGARow1:
ProfitRow1:
TotalRow1_2:
MaterialsRow2:
Text2:
Text6:
Text10:
Text14:
SGARow2:
ProfitRow2:
TotalRow2_2:
MaterialsRow3:
Text3:
Text7:
Text11:
Text15:
SGARow3:
ProfitRow3:
TotalRow3_2:
MaterialsRow4:
Text4:
Text8:
Text12:
Text16:
SGARow4:
ProfitRow4:
TotalRow4_2:
Name_6: Bryan Vehovec
Date_5: 09/26/25