ICE_Hurricane_Repairs_Clam_Pass_Exterior_Wall_Painting.pdf
PDF 210 KB Posted
- Solicitation number
- QQ-2026-076
- Issued by
- Collier County, Florida
About this file
The document is an Independent Cost Estimate (ICE) prepared by Collier County for a Hurricane Ian Repairs project involving Clam Pass Exterior Wall Painting. The project involves painting the exterior precast concrete walls of a parking lot, with a total estimated project cost of $74,696.00 and a date of estimate set for 09/26/25. The procurement will be funded by Federal/State Grant Programs and involves a lump sum (LS) painting project estimated at 20,297 square feet for the first coat and 40,594 square feet for the second coat.
The cost estimate breaks down the project into material and labor costs, with paint materials including Loxon (1 coat) and SuperPaint (2 coats). The material costs are calculated at $12,550.00, with a 10% markup of $1,255.00, bringing the total material cost to $13,805.00. Labor costs are estimated at $2.75 per square foot, totaling $60,891.00. The independent third-party estimate was developed by WSP USA, and the document was prepared by Bryan Vehovec. The total estimated project cost remains consistent at $74,696.00, which represents a comprehensive pricing strategy for the exterior wall painting project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLLIER COUNTY
For the Acquisition of Goods and Services Funded By Federal/State Grant Programs
Independent Cost Estimate PRUPOSE: In connection with every procurement action, except a micro-purchase, an Independent Cost Estimate (ICE) must be prepared in advance of receiving a quote, bid, or proposal. This is necessary because the ICE documentation:
• Ensures a clear basis for determining the benefits of the procurement;
• Provides essential procurement and financial planning information;
• Documents Federal compliance in a consistent manner; and,
• Provides a basis for the cost/price analysis.
Description of Procurement Date of Estimate
Total Estimated Price/Cost
Method: The above estimate is developed from: CHECK ALL THAT APPLY
Published catalogs or price lists (attach pertinent catalog of price list pages)
Recent prices for the same or similar item (identify contracts, purchase orders, sources, and additional helpful information (e.g. dates of award), and attach any pertinent documents
In-house Engineering or technical estimates (see details below or attach estimate).
Independent Third Party estimate developed by (attach estimate).
Other (specify):
Cost Estimate Details:
Cost of Standard Items
Product Cost ($/ea.)
Notes/Data Source Unit Freight Total
Cost of Services, Repairs, or Non-Standard Items Item / Task:
Materials Other Direct
Costs Labor
(rate, hours) Labor Class
Allocated Overhead SG&A Profit Total
PREPARED BY:
Name Date est. FY14 v. 3
Clam Pass Exterior Wall Painting
Summary Description Unit Qua ntity
Unit Price
Total Base Bid
Parking Lot Exterior Precast Concrete Wall Painting (see scope for specific details)
LS 1 $74,696.00
Total $74,696.00
Product Area to Cover (Sq Ft)
Assumed Coverage Rate (Sq Ft/Gal)
Gallons Needed (Rounded Up)
Assumed Cost (Per Gallon, At Cost)
Cost (At Cost)
Loxon (1 Coat) 20,297 250 82 gallons $60.00 $4,920.00 SuperPaint (2 Coats) 40,594 375 109 gallons $70.00 $7,630.00
Total Material Cost (At Cost) $12,550.00
Material Cost (At Cost): $12,550.00 Maximum Markup (10%): $12,550.00×0.10=$1,255.00 Total Material Cost (with Markup): $12,550.00+$1,255.00=$13,805.00
Total Service/Labor Cost ($2.75/sq ft) $60,891.00 Total Material Cost (with 10% Markup) Estimated Paint Cost + Markup $13,805.00 Total Estimated Project Cost $74,696.00
| ADPA184.tmp |
| 21-8101 Bid Schedule |
| ADPC69B.tmp |
| 21-8101 Bid Schedule |
| ADPD6F6.tmp |
| 21-8101 Bid Schedule |
| Date of Estimate: 09/26/25 |
| Description of Procurement: Hurricane Ian Repairs - Clam Pass Exterior Wall Painting |
| Total Estimated PriceCost: 74696 |
| Published catalogs or price lists attach pertinent catalog of price list pages: Off |
| Recent prices for the same or similar item identify contracts purchase orders sources and additional: Off |
| Inhouse Engineering or technical estimates see details below or attach estimate: Off |
| Independent Third Party estimate developed by: On |
| Third Party Name: WSP USA |
| Other specify: Off |
| Othertext: |
| ProductRow1: see attached |
| UnitRow1: |
| FreightRow1: |
| TotalRow1: |
| NotesData SourceRow1: |
| ProductRow2: |
| UnitRow2: |
| FreightRow2: |
| TotalRow2: |
| NotesData SourceRow2: |
| ProductRow3: |
| UnitRow3: |
| FreightRow3: |
| TotalRow3: |
| NotesData SourceRow3: |
| ProductRow4: |
| UnitRow4: |
| FreightRow4: |
| TotalRow4: |
| NotesData SourceRow4: |
| Item Task: |
| MaterialsRow1: |
| Text1: |
| Text5: |
| Text9: |
| Text13: |
| SGARow1: |
| ProfitRow1: |
| TotalRow1_2: |
| MaterialsRow2: |
| Text2: |
| Text6: |
| Text10: |
| Text14: |
| SGARow2: |
| ProfitRow2: |
| TotalRow2_2: |
| MaterialsRow3: |
| Text3: |
| Text7: |
| Text11: |
| Text15: |
| SGARow3: |
| ProfitRow3: |
| TotalRow3_2: |
| MaterialsRow4: |
| Text4: |
| Text8: |
| Text12: |
| Text16: |
| SGARow4: |
| ProfitRow4: |
| TotalRow4_2: |
| Name_6: Bryan Vehovec |
| Date_5: 09/26/25 |
File details come from the government source that posted it. Updated .