This document is a Questions and Answers (Q&A) file for a federal contract opportunity for Alaska Commuter Passenger Services (Solicitation Number HTC71125RC001). The document contains 32 questions and answers dated 3/27/2025 and 3/31/2025, primarily addressing operational details for a charter aviation services contract with the Department of Defense United States Transportation Command. Key details include requirements for a Gulfstream-IV aircraft, crew availability 7 days a week/365 days a year, flight operations primarily on Monday, Wednesday, and Friday, with approximately 1,090 flight hours annually at Joint Base Elmendorf-Richardson (JBER) and Eareckson Air Force Station (EAFS) in Alaska.

Critical contract specifications include crew mobilization by October 2025, DoD CARB approval required for carriers, no guaranteed monthly flight hours, no aircraft hangar space available at locations, contractors must provide their own ground equipment and tow bars, and flights are not exempt from Federal Excise Tax. The contract is a re-compete of a previous task order (HTC71124FC004), with past performance questionnaires due by the RFP submission deadline of 14 April 2025. Contractors must be prepared to provide all necessary personnel and equipment to meet the Performance Work Statement (PWS) requirements, with flight hours paid only for actual missions flown.

View the file

Other files for this federal contract opportunity

Other files attached to Alaska Commuter Passenger Services, newest first.
File Type Posted
Atch 3 - Alaska Pricing Table Amend 0009.xlsx XLSX spreadsheet
HTC71125RC001 Amendment 0009.pdf PDF
HTC71125RC001 Q_A Round 5.pdf PDF
HTC71125RC001 Amendment 0008.pdf PDF
HTC71125RC001 Amendment 0007.pdf PDF
Atch 3 - Alaska Pricing Table Amend 0007.xlsx XLSX spreadsheet
HTC71125RC001 Amendment 0006.pdf PDF
HTC71125RC001 Q_A Round 4.pdf PDF
HTC71125RC001 Q_A Round 3.pdf PDF
HTC71125RC001 Amendment 0005.pdf PDF
HTC71125RC001 Amendment 0004.pdf PDF
Atch 1 - Alaska Pax HTC71125RC001 PWS Amend 0004.pdf PDF
HTC71125RC001 Amendment 0003.pdf PDF
Atch 4 - Past Performance Questionnaire-Amd 0003.docx DOCX document
Atch 9 - 12 Month Experience.xlsx XLSX spreadsheet
Atch 1 - Alaska Pax HTC71125RC001 PWS Amend 0003.pdf PDF
Atch 4 - Past Performance Questionnaire-Amd 0002.docx DOCX document
Atch 1 - Alaska Pax HTC71125RC001 PWS Amd 0002.pdf PDF
HTC71125RC001 Amendment 0002.pdf PDF
Atch 4 - Past Performance Questionnaire-Amd 0001.docx DOCX document
Atach 1 - Alaska Pax HTC71125RC001 PWS Amd 0001.pdf PDF
HTC71125RC001 Q_A Round 1.pdf PDF
HTC71125RC001 Amendment 0001.pdf PDF
Atch 7 - 2015-5681 Rev 21 WD.pdf PDF
Atch 6 - Basic Eligibility.docx DOCX document
Atch 1 - Alaska Pax HTC71125RC001 PWS.pdf PDF
Atch 8 - 2015-5687 Rev 23 WD.pdf PDF
Atch 5 - RFP Offeror Information Sheet.docx DOCX document
Atch 3 - Alaska Pricing Table.xlsx XLSX spreadsheet
Atch 2 - Aircraft Identification Sheet.docx DOCX document
Atch 4 - Past Performance Questionnaire.docx DOCX document
RFP - HTC71125RC001.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Par. Ref Quick Reference Question Date Government Answer

12 Flight Hours or Block Hours? 3/27/2025 Flight Hours. See PWS Paragraph 3.5 for further details on flight hours.

13 Does standby require APU on or just crew on standby? 3/27/2025 No during stand by the aircraft will not be required to be powered on. See PWS paragraph 2.8.3. for stand by information.

14 PWS paragraph 2.8.5 What equipment is available to support a GIVSP? 3/27/2025

JBER and EAFS have equipment to support a Gulfstream-IV aircraft and other aircraft.

An APU cart is available on site. APU Cart is a A/M32A-60 Gas Turbine Generator.

Aircraft Ground Equipment: (Depending on availability and mission priority the following equipment may be provided)

1. B1 Aircraft Mx Stand

2. B4 Aircraft Mx Stand

3. B5 Aircraft Mx Stand

4. -86 Diesel Generator

5. -86 Diesel Generator

6. FL1D Flood Light Set

7. FL1D Flood Light Set

8. MC1A High Pressure Compressor

9. NGH Ground Heater

10. NGH Ground Heater

11. -8 Generator Load Bank

12. MC2A Low Pressure Compressor

13. -60 Turbine Generator

14. -60 Turbine Generator

15. -60 Turbine Generator

16. 28-1050TR 28VDC Transformer Rectifier

15 PWS paragraph 5.1. 5.1 confirming Eareckson AFB not Eielson? 3/27/2025 Yes, Eareckson AFB (ICAO: PASY, IATA SYA) NOT Eielson or airport code SYA.

16 PWS paragraph 2.8.6.c

2.8.6 C, Are there additional frequencies that may not be covered with our HF system? Is military HF different than civilian HF? 3/27/2025 We do not have a list of frequencies at this time. The frequencies will be provided at time of contract award.

17 PWS paragraph 3.2

Says crew must be available 24/7/365 or just scheduled Mon, Wed, Friday? What type of standby is crew expected to be on during scheduled days off (do we need 4 crew members?) 3/27/2025

Crew members must be available for operations 7 days a week, 365 days a year, including holidays (PWS paragraphs 3.2 and 4.1).

While the typical schedule will follow Monday, Wednesday, and Friday operations (PWS paragraphs 4 and 4.1), changes may occur. Any schedule adjustments require a minimum of 24 hours' notice prior to departure and mutual agreement between the contractor and the appointed PRSC 611th Traffic Management Ordering Officer.

18 PWS paragraph 3.2 Can aircraft be chartered on days it’s not being utilized? 3/27/2025 Yes. See "Note" under PWS Paragraph 3.2.

19 Is there a cost for military landing permits? 3/27/2025 No.

Are the 1090 hours guaranteed to be paid out if the contract under flies that number? 3/27/2025

The contractor will only be paid for the hours that are flown for missions in accordance with PWS paragraph 3.5.

21 PWS paragraph 3.10.

Will timeline of “no later than 60 days prior to start of contract” match up with October 2025 start date? Do you want flight crew and plane in PANC 60 days prior to start date of contract and should that cost be included in the bid? (3.10) 3/27/2025

Cost for mobilization shall not be included in the price proposal. The contractor shall be in place and ready to perform on 1 October 2025.

22 Confirm no cabin attendant or maintenance personnel are required 3/27/2025 The contractor must provide personnel to insure they are able to provide all services required by the PWS. See PWS paragraph 1.0.

23 Can you define a MX delay? Is de-ice or icing considered a MX delay? 3/27/2025 Maintenance (MX) do not include de-icing. De-icing is a weather related delay.

Confirm the only reimbursement for ferry legs is if we leave the ground enroute to your location and you cancel the trip after we’ve departed? 3/27/2025

Ferry leg is not included in accepted flight hours in positioning and depositioning from JBER in accordance with PWS paragraph

3.5. Cancellations are paid in accordance with PWS paragraph 10.1.b. "Should the government cancel a scheduled flight after the contractor’s aircraft has already departed its home base en route to position or has already positioned for a scheduled flight when notice of cancellation is given, the government shall reimburse the contractor positioning and re- positioning costs at the established flight hour unit price using actual flight hours flown (carrier will provide logbook/automated entry times)."

Will our company be considered on an equal basis with companies who are currently on an approved DOD air carrier listing? 3/27/2025 Carriers must be DoD CARB approved at proposal submission. See 52.212-2(c)(A)(iii) on RFP. See answer to Q&A number 1.

Are the previous client questionnaires due before the packet? Is the questionnaire form applicable to our current individual charter clients since we haven’t done government work? 3/27/2025

Past Performance Questionnaires are due on RFP submission deadline date of 14 April 2025. The questionnaire form can be used for non-governmental work that is relevant to the RFP.

27 Are these flights EXEMPT from Federal Excise Tax FET 3/27/2025 These flights are not exempt from Federal Excise Tax (FET) in accordance with FAR 29.201(a)(1).

Is there any incumbent/recompete or this is a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past. 3/31/2025

Please see Question #2 that was posted to SAM.gov under Amendment 1. This RFP is a re-compete. The current Task Order is

HTC71124FC004.

29 PWS paragraph 12 How many flight hours are guaranteed per month?

IAW PWS 4.0 Flight schedules vary from day to day and there is not a guarantee of flight hours per month. Flight hours could change based on weather.

30 PWS paragraph 5 Is there aircraft hanger space at JBER and EAFS?

There is no aircraft hanger space available at JBER and EAFS. For hanger space, seek alternative locations. See PWS paragraph

2.8.2. for overnight stays. See PWS paragraph 3.10. for hangar space.

Is it possible for personnel at JBER to bus to/from the Anchorage International Airport, for the charter? This will be decision made by the mission partner, e.g., weather issues out of JBER but flights possible out of Anchorage.

32 PWS paragraph 5 What is the make and model of the aircraft tow bars at JBER and EAFS?

This to ensure compatibility at each location for our aircraft.

Tow bars are not available at military installations and must be furnished by the contractor.

See PWS paragraph 2.8.5.